Loading...
HomeMy WebLinkAboutGW1-2021-03780_Well Construction - GW1_20210823 1 Ill ll l VII WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well� Contractor Information: ' Ji//"9./ 14.WATER ZONES Well Contractor Name FROM TO DESCRTIONO ft. 'rJ ft. ��� .S 44 A5 � (t. ft. NC Well Contractor Certification Number 15.OUTERCA ING for multi-cased wells OR LINER if a licabler ,n, /�� ('f� 2Cm62 k FROM DIAMETER FTHICKNESS MATERIAL Company Name 16.INNER CASING OR TUBING(peother al closed-loop) 2.Well Construction Permit#• FROM TO DLNiETER I THICKNESS I MATERIAL List all applicable well construction permits(i.e.111C,Count)-,State. Variance,etc.) ft. ft. in. 3.Well Use(check well use): H. ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS I MATERIAL Agricultural Municipal/Public v ft. rj ft. Z in. v 4 Geothermal(Heating/Cooling Supply) Residential Water Supply(single) ft' ✓ ft. in. 7 Industrial/Commercial DResidential Water Supply(shared) 18.GROUT rNon-Water FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT upply Well: D ft. P Recovery ft.11:harge Groundwater Remediation19.SAND/GRAVEL PACK if a licableage and Recovery DSalinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test OStormwater Drainage lr' tt. ft. / ... ✓11, Experimental Technology OSubsidence Control Geothermal(Closed Loop) OTracer 20.DRILLING LOG attach additional sheets if necessary) Geothermal(Heating/Cooling Return) FlOther(explain under#21 Remarks) FROM TO DESCRIPTION color bardn soit/mck tyve,gnin sbe,etc) 4.Date Well(s)Completed: V Well ID# ft. rt• C 5a.W 1v ►V1ell Locationn /]:�� L p fir. v ft. et f' 4l Lim iv- Facility/OwnerNamc Facility 1D# ifapplicable)A fit. fir. 't:Y ft. fit. �"•�"`' Physical Address,City,and Zip ft. 21.REMARKS County Parcel Identification No.(PIN) NWH ...,,*K ,,IC' 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one ladlong is sufficient) 22.Certification: N W �..� (cc <6 6.Is(are)the well(s)fflPermanent or UTemporary Signature ofOnfificd Well Contractor Date By signing this form,I hereby cerrrfi,that the Kell(s) was(were)corutrucred in accordance 7.Is this a repair to nn existing well: Oyes or O rvilh 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a lfthis is a repair,fill out known well construction information and erplain the nature ofthe cop)gfthis record has been provided to the well owner. repair tinder#21 remarks section or on the back o(this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft-) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdii ferent(example-3@200'and 2@1109 construction to the following: 10.Static water level below top of casing: V (ft.) Division of Water Resources,Information Processing Unit, lfwater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: (in.j n 24b.For Injection Wells: In addition to sending the form to the address in 24a n /`_ G,r.) above,also submit one copy of this form within 30 days of completion of well 12.Well construction method: vJ w (i.e.auger,rotary,cable,direct push,etc.) construction[o the following: Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: '0'JAT.J 24c.For Water Supply&Infection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: C Amount: completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016