HomeMy WebLinkAboutNCC215682_Site Plan or Location Map_20211028EROSION CONTROL
PHASES 6, 91 10 AMENDMENT
TOWN OF FUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA
EROSION CONTROL NUMBER: EC-2021,,-05
SITE DATA
PROJECT:
ENGINEER:
DEVELOPER:
PROPERTY LOCATION:
PINS:
ZONING:
TOWNSHIP:
PROPOSED USE:
TOTAL TRACT AREA (PH 1-5):
DISTURBED AREA (PH 6,9,10)
PURFOY SOUTH SUBDIVISION PHASES 6,9,10
TIMMONS GROUP
5410 TRINITY ROAD; SUITE 102
RALEIGH, NC 27607
PHONE: 919-866-4507
FAX: 919-859-5663
MIKE ZACCARDO PE
EMAIL: MARK.ZACCARDO@TIMMONS.COM
PULTE HOME COMPANY, LLC
1225 CRESCENT DRIVE, SUITE 250
CARY, NC 27518
PHONE: 919-816-1146
RANDY KING
RANDY.KING@PULTEGROUP.COM
PURFOY ROAD
0665-59-7186, 0665-89-9420
RMD - CZD
i
MIDDLE CREEK
RESIDENTIAL
224.77 ACRES (EXISTING)
221.57 ACRES (AFTER RIGHT-OF-WAY DEDICATION)
37.50 ACRES
THESE IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
FOLLOWING PLANS, AND THE STANDARD SPECIFICATIONS OF THE TOWN OF
FUQUAY-VARINA. THE ENGINEER WHOSE SEAL AND SIGNATURE APPEAR BELOW
CERTIFIES THAT THE STANDARD SPECIFICATIONS OF THE TOWN OF FUQUAY-VARINA
HAVE BEEN THOROUGHLY CHECKED AND ARE APPLICABLE TO THIS PROJECT. ANY
EXCEPTIONS TO THE STANDARD SPECIFICATIONS APPLICABLE ARE SHOWN ON THIS
SHEET. VICINITY MAP
EROSION CONTROL CONSTRUCTION SEQUENCE
1. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH THE TOWN OF
FUQUAY-VARINA. OBTAIN A LAND -DISTURBING PERMIT.
2. INSTALL MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS
NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERSIONS, BERMS
AND BASINS IMMEDIATELY AFTER CONSTRUCTION.
3. CALL ENGINEERING CONSTRUCTION INSPECTOR FOR A COMPLIANCE INSPECTION.
4. MAINTAIN DEVICES AS NEEDED FOR ALL PHASES OF PROJECT. REMOVE EROSION
CONTROL DEVICES WITH ENGINEERING CONSTRUCTION INSPECTOR APPROVAL
ONLY.
5. MAINTAIN RAIN GAUGE AND SELF -INSPECTION RECORDS PER NPDES
REQUIREMENTS.
6. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION,
PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS PER GROUND
STABILIZATION TIME FRAMES ON APPROVED PLAN.
7. WHEN CONSTRUCTION IS COMPLETED, AND ALL AREAS ARE STABILIZED, CALL
ENGINEERING CONSTRUCTION INSPECTOR FOR INSPECTION.
8. IF SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT
BASINS, ETC., AND SEED OUT OR STABILIZE ANY RESULTING BARE AREAS. ALL
REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY
DISSIPATORS, SHOULD NOW BE INSTALLED.
9. WHEN VEGETATION HAS BECOME PERMANENTLY ESTABLISHED, CALL FOR A FINAL
SITE INSPECTION BY THE ENGINEERING CONSTRUCTION INSPECTOR.
PLEASE ADD SITE SPECIFIC DETAILS EX: STORMWATER CONSTRUCTION AND
CONVERSION, PHASED SEEDING, STREAM CROSSING SEQUENCING, ETC.
REFER TO CONSTRUCTION DRAWINGS
FOR INFRASTRUCTURE PLANS.
Sheet List Table
Sheet
Number
Sheet Title
C16.0
'EROSION CONTROL COVER SHEET - PHASES 6, 9, 10
C16.1
STAGE 1 EROSION & SEDIMENT CONTROL PLAN PHASE 6, 9, 10
C16.2
STAGE 1 EROSION & SEDIMENT CONTROL PLAN PHASE 6, 9, 10
C16.3
STAGE 1 EROSION & SEDIMENT CONTROL PLAN PHASE 6, 9, 10
C16.4
STAGE 2 EROSION & SEDIMENT CONTROL PLAN PHASE 6, 9, 10
C16.5
STAGE 2 EROSION & SEDIMENT CONTROL PLAN PHASE 6, 9, 10
C16.6
STAGE 2 EROSION & SEDIMENT CONTROL PLAN PHASE 6, 9, 10
C16.7
EROSION & SEDIMENT CONTROL NOTES AND DETAILS
C16,8
EROSION & SEDIMENT CONTROL NOTES AND DETAILS
C16.9
EROSION & SEDIMENT CONTROL NOTES AND DETAILS
C16.10
EROSION & SEDIMENT CONTROL NOTES AND DETAILS
/•� ,
FUQUAY-\/A— R!NA
ENGINEERING D► T APPRO�VgAL
Signature Date 5 - V-2-1
_F�-e�l
EROSION AND SEDIMENT CONTROL
APPROVED PLAN
DATE:
PERMIT NO:
SIGNATURE
E
0
Y
CD �;
o �
0
E
N
v
w
�
z
uj U0�
r'4
� U.
z
Q_
co
t9
v a�
CL
U
X
u
coo
o
0
�Lr)
z
o/�
._ Nt
LL
C°
o
� Q
w
in ON
J
Li
o'
n
0
s
c�
0
Lu
0
w w
u o
Q
z
0
tj DATE
0212312021
0
DRAWN BY
331
DESIGNED BY
331
CHECKED BY
M. ZACCARDO
SCALE
NTS
0
ri
0 cr
kD
66 V)
(V W
z�
<
U
z0 W'
i U7 o u W
Z
Z � 1 =
I.0 = z W
o t�
�C W W
z =Q>
O
o Qu
c� z —
}F_
�,.. = z
o OLLO
z W
oC z
O
DCL� l
O
tL
W
JOB NO.
40697
SHEET NO.
C16.0
0
�CL
0
aof
co
n 0
02
-_
CL0
c
zN
0 m
2x
�4)
0
a�
2 .§
�N
2
5
�8
F 2
m
Ea
co
U co
0 gg
i5
U
O 0
w
�°
a 2
�N
m �
� o
� U
@ O
Q Y
� N
t
F—
L