HomeMy WebLinkAbout20130576 Ver 1_Staff Comments_20131007Strickland, Bev
From:
Lucas, Annette
Sent:
Monday October 07.20131:50PM
To:
Smith, ChorriL
Cc:
Dovano, Boyd- Gtriokland, Bev- Lucas, Annette
Subject:
13'0570Klausnor Lumber Two Project — Take 2
Attachments:
13-0576 Klausner Lumber Two Project — Take 2.docx
[herh,
You definitely deserve a vacation — hope you are doing something fun!
They still have a few more technical issues to deal with on the stormvvater plan, but they've made a lot of progress. |
like how they configured the wet ponds. Please feel free to provide my contact info in the letter so they can call me if
they have questions.
From: Smith, CherhL
Sent: Monday, October O7,2O1] 10:44 AM
To: Lucas, Annette
Cc: Oevane,Boyd
Subject: RE: 13-0576 Halifax County Sawmill
I wasi . ust checking BIMS and see where additional information was received for the Halifax Sawmill project on
September 3. 1 just wanted to let you know that after this week, I'll be on vacation for two weeks and won't be back in
the office until October 28. So if the application is still incomplete, I'll need to get another letter out before the end of
this week. Just wanted to let you know and thanks.
[herh
From: Lucas, Annette
Sent: Friday, October O4, 2013 2:23 PM
To: Smith, CheniL
Cc: Oevane,Boyd
Subject: 13-0576 Halifax County Sawmill
Cherri,
| have this one inmy queue and | will review before the end of next week.
Thanks,
Annette
Annette M. Lucas, PE
Environmental Engineer
lVCI}ElVR I I}EINLR I BtormwaterPrngracu
I8I2 Mail Service Center, Raleigh, lVC 27699 -1612 (D�ail)
512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels)
Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email:
Website: http: / /portal.ncdenr.org /web /lr /stormwater
Before printing this email, please consider your budget and the environment.
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
13 -0576 Klausner Lumber Two Project - Take 2
AML comments
October 7, 2013
1. Please report the drainage area and impervious area in square feet, not acres.
2. Please provide drawdown calculations.
3. Please provide a more detailed planting plan that shows the locations, sizes and spacing
for aquatic shelf plants.
4. The average depth of the ponds must be a minimum of three feet. Please correct the
design and resubmit.