HomeMy WebLinkAbout20131045 Ver 1_More Info Received_20131008
Homewood, Sue
From:BLuckey <BLuckey@ecslimited.com>
Sent:Tuesday, October 08, 2013 8:59 AM
To:Euliss, Amy; Homewood, Sue
Cc:Williams, Andrew E SAW
Subject:AICDZ Road Updated Drawings
Attachments:13097 Roadway Impacts Sheet 3 Rev-10-7-13.pdf; 13097 Roadway Impacts Sheet 1
Rev-10-7-13.pdf; 13097 Roadway Impacts Cover Rev-10-7-13.pdf
Thanks Amy.
Updated Road drawings that include the below listed table. The attached impact exhibits are the two that had wetland
impacts located within the buffers.
Sincerely,
Bradley Luckey
Environmental Project Manager
ECS Carolinas, LLP 4811 Koger Boulevard, Greensboro, NC 27407 T: 336-856-7150 D: 336-478-1620 C: 336-404-1229 F: 336-856-
7160 www.ecslimited.com
CELEBRATING 25 YEARS
Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient
From: Euliss, Amy [mailto:amy.euliss@ncdenr.gov]
Sent: Tuesday, October 08, 2013 8:19 AM
To: BLuckey; Homewood, Sue
Subject: RE: AICDZ
Regarding the <0.01 acres, the email and impact chart will suffice.
From: BLuckey [mailto:BLuckey@ecslimited.com]
Sent: Monday, October 07, 2013 1:49 PM
To: Homewood, Sue
Cc: Euliss, Amy
Subject: RE: AICDZ
Per the NCDOT, the <0.01 acres was listed on the application vs. the actual impact acreage. The impact number is
0.0021 acres and can be found on the impact chart on first page of drawings. Do you need the PCN revised or can you
use the information from the impact chart?
We are working to put together the below listed table.
Sincerely,
Bradley Luckey
Environmental Project Manager
ECS Carolinas, LLP 4811 Koger Boulevard, Greensboro, NC 27407 T: 336-856-7150 D: 336-478-1620 C: 336-404-1229 F: 336-856-
7160 www.ecslimited.com
CELEBRATING 25 YEARS
Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient
1
From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov]
Sent: Monday, October 07, 2013 1:30 PM
To: BLuckey
Cc: Euliss, Amy
Subject: FW: AICDZ
Brad,
For the road project, it is unclear to us if the wetlands have been subtracted from the buffer impact areas or
not on the plan sheets and the total impacts tables. Can you please provide a table like this:
Zone 1 minus = Zone 1 Zone 1 Buffer Zone 2 minus = Zone 2 Zone 2
Site
Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers (not Buffer
(sq ft) in Zone wetlands) (sq Required (using (sq ft) in Zone 2 wetlands) (sq Mitigation
1 (sq ft) 3:1 ratio) (sq ft) ft) Required
ft) (using
1.5:1
ratio)
_
_
_
_
Totals
For the <0.01 acres, we need it presented to the next decimal point, so we can determine if we
should round up or down for mitigation. If its < or equal to 0.005, they’ll need to offer another 0.01
acres of mitigation. This is how we’ve been handling this for DOT for a few years now.
2