Loading...
HomeMy WebLinkAboutNCC215882_NOI Application_20211025Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/20/2021 2:04:26 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 10/21/2021 7:44:43 AM (Review - Construction NOI 69234) • The task was assigned to Broussard, Brooklyn C by round robin distribution 10/20/2021 2:05 PM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 22, 2021 5:00 PM 10/20/2021 2:05 PM Submit by Selkane, Aziza 10/25/2021 2:40:38 PM (Payment Verification for NCC215882) F Caviness and Cates Building and Development Co • Selkane, Aziza assigned the task to Selkane, Aziza 10/25/2021 2:38 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 2, 2021 5:00 PM 10/21/2021 7:44 AM NORTH CAROLINA Rrf OmFkm&tral Qualrly A. Project Information Part A. Project Location and Waterbody Information Are you submitting No an NOI that was Yes rejected before? la. Project Name* Laurel Ridge subdivision Phase 2 ( Lots # 42-60) 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 42-60 1 c. Parcel ID List all PINs associated with this project. Number(s) (PIN) parent parcel #00026008 2. County* Moore 3. Highway or Street Acorn Knoll Drive and Piney Oak Drive Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Mineral Springs Township 5. State* NC 6. Zip Code* 28327 7. Latitude* Enter the latitude in decimal degrees 35.2520 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -79.4410 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/18/2021 Estimated Construction Project Start Date 10. Date to End* 10/18/2022 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Development 12. Acres to be 9.25 disturbed * (including off -site borrow and waste areas) 13. Total site area 9.25 (acres)* 14. Post -construction 1.71 impervious area (Estimated) (acres) * Project Tracking ID NCC-MOORE-2021-Laurel Ridge subdivision Phase 2 ( Lots # 42- 60) Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Unnamed tributary to Nicks Creek Waterbody * Name of waterbody into which stormwater runoff will discharge 15b. Waterbody Index 18-23-3-(0.5) No. * NC Waterbody Index Number Stormwater No discharges will flow Yes to additional waters* 16a. Is this project Yes subject to the NC No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Permittee Information - Legally Responsible Entity and Individual ........................................................................................................................................................................ Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee* Legally Responsible Entity Caviness & Cates Building and Development Company If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. 2. First Name* Christopher If Corporation, enter Registered Agent First Name 3. Last Name* Cates If Corporation, enter Registered Agent Last Name 3b. Title Vice President / Caviness & Cates 4. Permitee E-mail pam@cavinessandcates.com Address* 5. Permittee 910-778-7902 Telephone No.* 6. Permittee Mailing Street Address Address* 639 Executive Place Suite 400 Address Line 2 City State / Province / Region Fayetteville NC Postal / Zip Code Country 28305 US Check box if the Yes street address the same as mailing address 7. Permittee Street Street Address Address * 639 Executive Place Suite 400 Address Line 2 City State / Province / Region Fayetteville NC Postal / Zip Code Country 28305 us 8. Type of Ownership is only individual if an individual is named in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................. 1. Primary Site Pamela Contact - First Name* 2. Primary Site Geddie Contact - Last Name* 3. Title Starts Coordinator 4. Site Contact E-mail Pam@cavinessandcates.com Address* 5. Site Contact 910-709-9801 Telephone No.* 6. Organization Name Caviness & Cates Building and Development Company 7. Site Contact Street Address Mailing Address* 639 Executive Place Suite 400 Address Line 2 City Fayetteville Postal / Zip Code 28305 8. Consultant Name (Optional) Glenn Tew First and Last name 9. Consultant E-mail JohnnyT@eclsglobalinc.com This person will be copied on all correspondence. 10. Consultant 9108973257 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) pam@cavinessandcates.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 910-778-7902 Default is legally responsible person telephone State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Plan Approval Information 1. Date E&SC Plan 10/18/2021 Approved * 2. E&SC Plan Project MOORE-2022-014 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. State DEQ Office* Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan Laurel ridge Phase 2 - erosion control plan Approval letter or 113.22KB approval.pdf Grading Permit Must be PDF format 6. Signed FRO Financial Responsibility/Ownership Form Laurel Ridge Phase 2 - Signed FRO.pdf 108.02KB Must be PDF format 7. Site Location Map Must be PDF format (limit 20 MB) Laurel Ridge Phase 2 - Vicinity map.pdf 9.7KB Please do not upload entire set of E&SC plans. 8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. Include additional waterbodies if necessary. 9. NOI Certification LR42-60 NOI.pdf 520.86KB Form Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.6113 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person' (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ('%�r�ltC{GDIr'P [ ir'�lPr`Ff Type Name* Christopher E. Cates Title Vice President / Caviness & Cates Organization Legally Responsible Entity Caviness & Cates Building and Development Company Date * 10/20/2021 F. Tracking and COC Info NOI Tracking No. 69234 NC Reference No. NCG01-2021-5882 Uses'count_numb& variable (incremented by SP) Certificate of NCC215882 Coverage (COC) No.* Uses'count_number' variable (incremented by SP) Count Number 5882 Sequential number for submittal that is incremented by Stored Procedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NCC" in COC no.) Initial Invoice No. NCC215882-2021 Invoice Due Date 11/20/2021 Initial Fee $ 100.00 Invoice Status OPEN