Loading...
HomeMy WebLinkAbout19980260 Ver 7_U-2579AA wetland tree removal_Final area measure_20211019 Wanucha, Dave From:Euliss, Amy Sent:Tuesday, October 19, 2021 10:03 AM To:Wanucha, Dave; Williams, Andrew E CIV USARMY CESAW (USA); Matthews, Monte K CIV USARMY CESAW (USA) Cc:Chambers, Kelby D; Trantham, Randall D; Barrett, William A Subject:RE: \[External\] RE: U-2579AA wetland tree removal_Final area measure An estimate measured from the plans is @0.04 acres. If you need something more exact, I can get it measured in the field. From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Monday, October 18, 2021 4:34 PM To: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Euliss, Amy <aeuliss@ncdot.gov>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Cc: Chambers, Kelby D <Kelby.Chambers@terracon.com>; Trantham, Randall D <rdtrantham@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: RE: \[External\] RE: U-2579AA wetland tree removal Amy, And, please provide an estimate of the wetland area impacted/reseeded. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NCDOT Divisions 9 and 11 NC Department of Environmental Quality 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 From: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil> Sent: Thursday, October 14, 2021 10:53 AM To: Euliss, Amy <aeuliss@ncdot.gov>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Chambers, Kelby D <Kelby.Chambers@terracon.com>; Trantham, Randall D <rdtrantham@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: RE: \[External\] RE: U-2579AA wetland tree removal_Corps CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. 1 Amy, Thanks for taking care of this. Andrew Williams Regulatory Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Office Tel: (919) 554-4884, x26 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at https://regulatory.ops.usace.army.mil/customer-service-survey/ to complete the survey online. From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Thursday, October 14, 2021 10:44 AM To: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Chambers, Kelby D <Kelby.Chambers@terracon.com>; Trantham, Randall D <rdtrantham@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: \[Non-DoD Source\] RE: \[External\] RE: U-2579AA wetland tree removal I wanted to let you know that everything is cleaned up and we now have the fencing installed instead of the staking. Amy From: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Sent: Wednesday, October 6, 2021 11:52 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Euliss, Amy <aeuliss@ncdot.gov> Cc: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Chambers, Kelby D <Kelby.Chambers@terracon.com>; Trantham, Randall D <rdtrantham@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: \[External\] RE: U-2579AA wetland tree removal CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy, I understand the line relocation is to be completed without a 404 impact, therefore a modification for Section AA is not needed before it occurs. With that in mind, I believe we can concur with Dave’s email below. Thanks, Monte 2 From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Wednesday, October 6, 2021 11:06 AM To: Euliss, Amy <aeuliss@ncdot.gov>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Cc: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Chambers, Kelby D <Kelby.Chambers@terracon.com>; Trantham, Randall D <rdtrantham@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: \[Non-DoD Source\] RE: U-2579AA wetland tree removal Amy, What you have reported is sufficient to document the occurrence. I cannot think of anything additional we would need other than an estimated area impacted and a follow-up email once the work you requested is completed. It’s commendable that NCDOT tracks occurrences of these types and makes notification. Of course, if the Corps requires or needs anything further other than what we have requested, please forward that information along. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NCDOT Divisions 9 and 11 NC Department of Environmental Quality 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Wednesday, October 6, 2021 9:17 AM To: Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Chambers, Kelby D <Kelby.Chambers@terracon.com>; Trantham, Randall D <rdtrantham@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: U-2579AA wetland tree removal Monte and Dave, Monte, I’m emailing you since Andy is on vacation. We currently have Duke clearing trees and relocating lines on U- 2579AA and AB in preparation for the upcoming projects. We have a final design permit mod issued for AB. We do not have a final design permit mod applied for or issued for AA. Duke (or their contractor) cleared approximately 10 trees that were deemed ‘danger trees’ in the wetland at the location circled on the attached plan sheet (permit site 5). Wood chips were placed in the wetland. These trees were either dead or damaged, and they were concerned that they would fall onto the line that is being relocated. I have attached a couple pictures and marked the photo point on the plan sheet. In the photo, our inspector is standing at the 3 edge of the wetland and looking towards it. The existing road slope is to the right of the photos for reference. The wetland was staked and flagged. Clearing this area was not discussed with DOT beforehand. We have DOT inspectors on site which is how we found the clearing after it was done. We have requested that the flagging be more visible or that they utilize the orange fencing. We have also directed them to remove the wood chips and seed the area with native riparian seed mix. We had a previous incident on the same project a few months ago. We reported that incident to Dave and Andy. After that incident, our inspectors have ensured that the wetlands were flagged ahead of clearing, and we had discussions regarding proper wetland protocols with the Duke and their clearing contractor. Should we add hand clearing to this area on our permit drawings to account for the additional clearing? Is there anything else you would like us to do? Our apologies for the second occurrence. Amy Euliss Division 9 PDEA Engineer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4