Loading...
HomeMy WebLinkAboutNCC215806_ESC Approval Submitted_20211019ROY COOPER Governor MICHAEL S. VEGAN Secretary BRIAN WRENN Actfrig 9imrtor NORTH CARO.LINA Enyinanmenta!"Quality June 4, 2020 LETTER OF APPROVAL WITH MODIFICATIONS NITS CLT, LLC Attention: Joe F. Polite Jr., VP 2857 Westport Road Charlotte, North Carolina 28208 RE: Project Name: Brookdale Village Townhomes Acres Approved: 4.75 Project ID: CABAR-2020-075 County: Cabarrus City: Harrisburg Address: Plaza Street Ext. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: MTS CLT, LLC Date Received by LQS: May 12, 2020 Plan Type: New Dear Mr. Polite, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approvaI, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.ne.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas cC�7r ncdellr. ov or Paul Clark at Patil.clai-k@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. QNorth.�. Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources D- E�/]� Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 Letter of Approval with Modifications MTS CLT, LLC June 4, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Brookdale Village Townhomes Project ID: CABAR-2020-075 County: Cabarrus I. Erosion and sediment control measures are shown outside the proposed disturbed limits. All area required for stockpiling of topsoil, contractor staging, temporary access, haul roads, erosion control measures or other land -disturbing activities associated with this project must be included within the disturbed limits. [Relocate stone outlet noted on sheets 4.01, 4.02, 4.03 inside limits of disturbance.]