HomeMy WebLinkAboutNCC191727_Annual Fee NOD Letter_20211018RCY COOPER
Gownx
ELIZABETH S. 81SER
SP , f-Y
BRIAN WRENN
vrnKmr
10/18/2021
Pine Gate Renewables, LLC
Attn: Patty Wright
130 Roberts Street
Asheville, NC 28801
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC191727-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 9/1/2021 and was due on 10/112021. The annual fee applies to the following construction site:
Spring Hope 3 Solar
Frazier Road, Spring Hope, NC
Nash County
Certificate of Coverage No. NCC191727
NC Reference No. NCG01-2019-1727
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
North Camlhi Department of EnAmnmental Qgallly I Dlvlskm or Energy. Mln l and Land Rrsarrces
S12NonhSallsburyStree 1 1612 Mall Servke Cenrer 1 Ralelgh,NathCamlkna2709-1612
ter. rw�rr�rq
919 707.9200