Loading...
HomeMy WebLinkAboutGW1-2021-02459_Well Construction - GW1_20211014 w ®, NORTH CAROLINA ilk WELL CONSTRUCTION RECORD (GW-1 ) EnvfronmertmfQua(Iry Form GW-1 Well Construction Electronic Form North Carolina Department of Environmental Quality Division of Water Resources April 1,2021 Submission ID# G W 1-2021-02459 Are you submitting a printed form?* Yes No CONTACT INFORMATION ....................................................................................................................... Contact Name* Email Address* Gary Justice justicewelldrilling@yahoo.com Is this a revision to the form you have previously submitted?* Yes No WELL CONSTRUCTION INFORMATION 1.Who is installing these wells?* Owner Well Contractor 1. Well Contractor Information: Well Contractor Name NC Well Contractor Certification# Company Name 2.Well Construction Permit#: SW21-0253 List all applicable well construction permits(i.e.Monitoring Wells,UIC,County,CCPCUA,etc.) What type of well is this?* Injection Well Non-Water Supply Well Water Supply Well (includes irrigation wells) 3.Water Supply Well* Geothermal (Heating/Cooling Supply) Industrial/Commercial Irrigation Municipal/Public/Community Residential Water Supply(single) Residential Water Supply(shared) Wells> 100,000 GPD 4.Date well was completed and ID# Date Well Completed* Well ID# Well Yield 10/14/2021 1 (gallons per minute)" 5.Well Location Facility/Owner Name* JODY&MANDY CRISP Facility ID# (Required) (If applicable) County* Parcel Identification No.(PIN) McDowell 1713003568112 Physical Address* Street Address 300 Lakeview Drive Address Line 2 City State/Province/Region Marion NC Postal/Zip Code Country 28752 us Latitude* 35.4407350000 Longitude*81.5921220000 Decimal degrees Decimal degrees ............................................................................................................................ 6.Is(are)the well(s):* Permanent Temporary 7.Is this a repair to an existing well:* Yes o No If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed. 8a. Indicate TOTAL NUMBER of wells drilled: 1 9.Total well depth below land surface: (ft.) 9a.What is the depth of the casing from ground 605 surface? For multiple wells list all depths if different 116 (example-3@200'and 2@100') in feet 10.Static water level below top of casing: (ft.) 11.Borehole diameter: 60 6 1/8 If water level is above casing,use"+" in inches 12.Well construction method: Auger Air Rotary Cable Tool Direct Push Mud Rotary Rotosonic Other 13. FOR WATER SUPPLY WELLS ONLY: 13a.Yield(gpm) 1 13a. Method of test: If applicable 13b.Disinfection type:* 13b.Amount: Chlorine 73% ................................... 14.WATER BEARING/FRACTURE ZONES From To Description 400 480 1/2 gpm in feet in feet 520 540 1/2 gpm in feet in feet 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) From To Diameter Thickness Material in feet in feet in inches 17.SCREEN .................................. From To Diameter Thickness Material in feet in feet in inches 18.GROUT ............................................................................................... From To Material Emplacment Method&Amount 0.00 1.00 Hole Plug 1 Bag Poured in feet in feet 1.00 21.00 Easy Seal 1 Bag Pumped in feet in feet 114.00 116.00 Hole Plug 1 Bag Poured in feet in feet 19. SAND/GRAVEL PACK(if applicable) From To Material Emplacment Method in feet in feet 20. DRILLING LOG From To Description(color, hardness,soil/rock type,grain size,etc.) 1.00 80.00 Red Clay in feet in feet 80.00 110.00 Soft Rock&Dirt in feet in feet 110.00 605.00 Granite Quartz in feet in feet 21. Remarks 22.Site diagram or additional well details: You may upload additional well construction information here. pdf only CERTIFICATION INFORMATION * By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23.Certification* rn� Signature of Certified Well Contractor Submittal Date 10/14/2021