Loading...
HomeMy WebLinkAboutSW4210701_Design Calculations (Wet Pond 2)_20211008GUPTON'S ROYAL DESIGN GROUP u;VIz E +Gig EE RMG o s- —I PL4,-4— T_ G 0 S TOWN%VAT D a IcN LANDSCAPED D SIG v � i.�.:�,'O S2 Rt EvING PO BOX 1070, KING, NC 27021 Office Phone (336) 985 — 6519 secondary Phone (336) 70S - 0633 KIN+G'S CROSSSING Moore Road King, N.C. 27021 WET DETENTION BASIN #2 CALCULATIONS 09/20/2021 King's Cross Properties, LLC P.O. BOX 21029 Winston-Salem, N.C. 27120 336.414.3796 KING'S CROSSING Zoned CU-PUD, R-15 MOORE ROAD KING, N.C. 27021 36 deg. 16 min. 33 sec. N -80 deg. 20 min. 31 sec. W King's Crossing is a proposed large multi -use project situated on 149.68 acres located on Moore Road (S.R. 1122) in King, Stokes County, North Carolina. The existing site is mostly a previously timbered tract which subsequently grew up with misc. grassy/weed & brush. It was mowed with a bush chipper in late 2019. The current condition is a regrowth of grass, weeds & small brush. The soil on the site is a majority (40.3%) of Fairview -Poplar Forest, hydrologic group C, Clifford sandy clay loam (33.2%), hydrologic group B, Fairview -Poplar Forest (24.4%), hydrologic group B, and Fairview -Poplar Forest -Urban (2.1 %), hydrologic group B. The proposed developed site will consist of 123 single family lots, 65 townhome units, 23 commercial use units in two detached buildings, and 6 more commercial units attached to a 51,000 square foot commercial use building. There are also eight outparcel areas planned for development. The development is projected to have over 11,590 If of 27' back -back curb and gutter streets, 976 If of 54' wide parking areas, over 4,328 If of paved 8' wide multi -use pathways along with 5 ft. wide sidewalks along the streets. Moore Road will be widened from main entrance eastwardly along the property's frontage for approximately 1,030 If. The entire site is designed to be graded continuously in segments with each segment containing approximately 25 +/- Acres where Cut & Fill areas are approximately balanced and further defined by natural features such as Roads & Streams. The runoff from the buildings will be piped to the storm drainage system as can be constructed with the other areas graded to the parking areas. The parking areas runoff will be collected by inlets and piped to the proposed storm water detention ponds. The detention ponds are designed to retain the "first flush" 1 year 24 hour 1-inch storm and the 2, 10, and 25 year storm events with release rates lower than the pre -construction release rates. Because of these low flow rates the downstream water courses and channels will not receive increased flows from the site and ponds. Also for the same reasons the ponds outlet pipe flows will exit over an energy dissipater and level filter area before entering the receiving water course. A segmented or phased development approach will began with Section 1 (commercial areas North of Kingscote Way) and Section 2 (commercial and townhome areas) South of Kingscote Way. Then Section 3 (amenities area) will be constructed. All 3 Sections will be 80% stabilized prior to beginning any work on the remaining Section 4 (single family lots). Street design has been utilized to minimize stream crossings, provide construction access to various segments and be utilized for connectivity and economy in land use. There is an existing sediment basin/stormwater structure left over from previous development that shall be repaired and reconfigured for use with this planned development delineated by Pilot Environmental, Inc. whose report has been included with submitted documents. Stream CL's, Top Banks and Delineated Wetland areas have been located by Field Survey by GRDG. 401/404 permits will also be obtained by Pilot Environmental, Inc. and will be made available when completed. All stream buffers and wetlands will be visibly marked with orange protection fencing per plan details. Permanent basins that are to be used as storm water ponds have been slightly over sized to help control storm water flows as sites are developed. They have all been design to store and release storm water at pre -developed flows for major storms including the 100 year storm thus reducing any downstream impacts. 2 Table of Contents King's Crossing Project Introduction and Overview ................................... 1-2 Site Conditions and Input Data ..... ....... ....... .......... 3 SCS Curve Number (CN) Computations............ .............. 4 IN Table Computed for King, N.0 .................................. 5 NOAA Point Precipitation Frequency Estimates (inches/hour) .......... 6-8 NOAA Point Precipitation Frequency Estimates (inches) ............... 9-11 Computed Design Data — 1 -Yr Water Quality & 25-Yr Water Quantity. , ......12 Permanent Basin Design — Computed Storage & Water Quality Drawdown ... 13 Site Soils Map and Data . - . . ......... ......................... 14-17 HydraFlow Watershed Model Schematic .............................. 18 Hydrograph Report — Pre -developed 1 -Year ........................... 19 Hydrograph Report — Post -developed 1-Year ....... .................. 20 Hydrograph Report — Routed Pond 1 -Year .......................... . . 21 Hydrograph Report — Pre -developed 2-Year ........................... 22 Hydrograph Report — Post -developed 2-Year .......... .......... 23 Hydrograph Report — Routed Pond 2-Year ......... ........ ......... 24 Hydrograph Report — Pre -developed I 0-Year ............... ...... ... 25 Hydrograph Report — Post -developed 1 0-Year ......................... 26 Hydrograph Report — Routed Pond 1 0-Year . - - . ......... ... 27 Hydrograph Report — Pre -developed 25-Year ........................ . . 28 Hydrograph Report — Post -developed 25-Year ......................... 29 Hydrograph Report — Routed Pond 25-Year ........................... 30 Hydrograph Report — Pre -developed 1 00-Year .................. ... 31 Hydrograph Report — Post -developed 1 00-Year. . ...................... 32 Hydrograph Report — Routed Pond I 00-Year. . , . ................... . .. 33 Pond Report — Stage < Discharge ..... ............................. 34 Pond Report — Stage f Storage ......... ..................... .... . _ 35 Table of Contents - Continued Pond Outlet Structure Schematic — Front View ......................... 36 Pond Outlet Structure Schematic — Section View ... ................... 37 GUPTON'S ROYAL DESIGN GROUP, PA P.O. BOX 1070 KING, N.C. 27021 KING'S CROSSING STORMWATER MANAGEMENT WET DETENTION STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN 92 SITE DATA Total Site Area: 149.68 Acres Total Disturbed Area: 22.02 Acres Total Drainage Area Into Structure: 22.02 Acres Proposed BUA/Impervious Area: 11.85 Acres Drainage Area Proposed BUA/Impervious Area %: 53.8 % Off -Site Drainage Area: 0.00 Acres Off -Site BUA/Impervious Area: 0.00 Acres Total SUA/Impervious Area Into Structure: 11.85 Acres Total BUA/Impervious Area Into Structure %: 63.8 % Design Data Pre -Developed: Overland Flow Runoff Factor Factor Hydraulic Length: 2295.79 Feet Hydraulic Height: 102 Feet Time of Concentration, To (Pre -developed) : 20.06 Min. Post -Developed: Overland Flow Runoff Factor Factor Hydraulic Length: 2661.09 Feet Hydraulic Height: 102 Feet Time of Concentration, To (Post -developed) : 11.90 Min, *Note: Times of concentration are calculated using Kirpich Method. Use minimum 5 minute To. SCS Weighted Curve Number (Pre -developed): 67 CN SCS Weighted Curve Number (Post -developed): 81 CN Precipitation Depth, 1 yr. 24 hr. Storm: **See table 2.92 Inches Precipitation Depth, 2 yr. 6 hr. Storm: **See table 2.44 Inches Precipitation Depth, 10 yr. 6 hr. Storm: **See table 3.57 Inches Precipitation Depth, 25 yr. 6 hr. Storm: **See table 4.26 Inches GUPTON'S ROYAL DESIGN GROUP, PA P.O. BOX 1070 KING, N.C. 27021 KING'S CROSSING STORMWATER MANAGEMENT WET DETENTION STRUCTURE SITE CONDITIONS AND INPUT DATA BASIN 2 Pre -Developed SCS Runoff Curve Number (CN) ori�Group - Description N � CN �x _..� Area (acres) � m . Product of CN. x Area B Woodlands - Fair 66 11.01 726.6730379 B Brush 67 11.01 737,6832354 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 1 0 I ULd15 Weighted SCS Curve Number (CN) = Post -Developed SCS Runoff Curve Number (CN) 1L.UZ 1464.36 66.50 Soil Group Description CN Area (acres) Product of CN x Area B Pavement 98 6.70 657.0257466 B Sidewalks 98 1.28 125.6809954 B Dnvewa s 98 0.66 64.36521212 B Grassed Areas 61 10.17 620.1889185 B Buildings 98 3.21 314.5576823 0 0.00 0 0 0.00 0 0.00 0 i ULdib ZIZ.' 778t.82 Weighted SCS Curve Number (CN) = 80.92 *See table 8.03e *Reference made to "Erosion and Sediment Control Planning and Design Manual' State of N.C. Depth -Duration -Frequency Table King, Stokes County NC Return Period Duration 1-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr in.) in.) (in.) (in.) (in.) (in.) (in.) 5min 0.37 0.44 0.52 0.58 0.64 0.69 0.73 10 min 0.59 0.70 0.83 0.92 1.02 1.10 1.16 15 min 0.74 0.88 1.05 1.16 1.30 1.39 1.47 30 min 1.01 1.22 1.49 1.68 1.92 2.09 2.25 60min 1.26 1.53 1.91 2.19 2.56 2.83 3.10 2 hr 1.50 1.82 2.30 2.66 3.14 3.52 3.91 3 hr 1.62 1.97 2.49 2.88 3.41 3.83 4.26 6 hr 2.00 2.42 3.05 3.55 4.23 4.79 5.36 12 hr 2.43 2.95 3.72 4.35 5.23 5.96 6.73 24 hr 2.90 3.51 4.45 5.22 6.32 7.23 8.21 Intensity -Duration -Frequency Table King, Stokes County NC Return Period Duration 1-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) 5min 4.43 5.27 6.22 6.90 7.70 8.26 8.77 10 min 3.53 4.21 4.98 5.51 6.13 6.58 6.97 15 min 2.94 3.53 4.20 4.65 5.18 5.55 5.88 30min 2.02 2.44 2.98 3.37 3.84 4.18 4.50 60min 1.26 1.53 1.91 2.19 2.56 2.83 3.10 2 hr 0.75 0.91 1.15 1.33 1.57 1.76 1.95 3 hr 0.54 0.66 0.83 0.96 1.14 1.28 1.42 6 hr 0.33 0.40 0.51 0.59 0.71 0.80 0.90 12 hr 0.20 0.25 0.31 0.36 0.43 0.49 0.56 24 hr 0.12 0.15 0.19 0.22 0.26 0.30 0.34 Reference Data Precipitation Frequency Data Server littps://hdsc.nws.noaa.gov/hdsdpfds/pfds�rintpage.html?lat=36.2759&... NOAA Atlas 14, Volume 2, Version 3 Location name: King, North Carolina, USA* Latitude: 36.2759°, Longitude:-80.34210 ' Elevation: 1096.96 fit** ` source: ESRI Maps a� ,• source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M Bonin, D. Martin, B. Lin, T. Parzybok, MYekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular } PF graphical I Maps & aerials PF tahtilar PDS-based Duration point precipitation frequency estimates with 90% confidence intervals (in inches)1 IAverage recurrence interval (years) 5-min 10-min 15-min 30-min 60-min ( + 0.369 {0.341-0.401) 0.590 ) (0.5450.640 0.737 (0.681-0.800) 4.01 (0.934-1.10)� 1.26 {1.16-1.37) )2 , 0.44D (0.406-0.479) ( 0.703 0-650-0.767 0.884 (0.817-0.964) 1.22 (1.13-1.33) 1.63 (1.42-167) 5 0.520 (0.479-0.566}� } { 0.832 0.7670.906)i 1,05 (0.971-1.15) 1.60 j1.381.63) 1.92 (1.77-2.09) 10 0.676 (0.530-0.626) 0.921 (0-8481. 0) 1.16 i (1.07-1.27) 1.69 (1.55-1.83) 2.20 (Z02-2.39) 25 0.643 (0.588.0.699} 1.02 (0.937-1.11) 1.30 11 (1.19-1.41) 1.92 (1.76-2A9) 2.56 (2.34-2.79) 150 j 0.689 (0.626-0.750) 1.10 (0-998-1.20) 1.39 (1.26-1.51) j 2.09 11 {i.90-2.28) 2.84 (2,58-3.09) 100 0.732 (0.661-0-799) 1.16 (1.05-127) 1.47 (L33-1.60) 2.25 (2.03-246) 3.10 (2.80-3.38) 200 0.772 (0.692-0Z45) 1.22 {1.10-1.34) 1.54 (1.38-1.69) 2.40 (2,15-2.63) 3.37 (3.02-3-69) 500 0.819 [0.724-0.900 1.30 (1,15-1.42) 1.63 (1:44-1.79) 2.69 (2.29-2.85) 3.72 (3.29-4.09) I 1000 0.852 (0.746�0.942) 1.34 (1.181.48} 1.69 (1.48-1.86) 2.73 {2.393.01) 3.98 (3.49 4.40) 2-hr 3 hr 6-hr 1.60 1.83 (1.38-1.64) (1.68 2.00) 1.62 1.98 (1.82-2-17) j1.49-1.7$ C�� 2.01 2.44 (1.85-2.19) (2.24 2.67) 2.31 2.67 3.15 (2.12-2.53) , (2.44-Z92) (2.86-3-45) 2.60 2.89 3.43 (2.30-2.73 (2.65 3.16) (3.11-3.74) 3.07 3.57 4.26 (2-82-3.36) (3.26 3.90) (3.86-C65) 3.54 3.92 4 31 (3.19-3.87) (3.50-4.30) (3.82-434} 3.84 4.27 4.70 ) (4.16-5.16} (3.46-4.20) (3.82-4.67 �LA 4.81 6.39 5.99 (4.33-5.25) (4.805.86) j5.27-6.54) 4.84 (4.23 5.35) 1 6.30 (4.62-5.83 6.83 (5.91-Z49) 6.26 � (4.54-5.83} 6.76 (4.96 6.37) 7.51 (15AD-8.27) 12-hr 24-hr 2 day 3 day 2.44 2.97 (2.25-2.67) (2.73-3.24) 2.92 3.63 (2.70 3.16} j [3.26-3.83) 3.44 4.16 (3.20-3.71) (3.86 4.48) 3.64 4.39 (3.39-3.92) (4.09-433) 3,85 4.64 (3.59-4.13) I (4.33-4.98) 3.75 4.38 6.27 (3.44.4.09) . {4.00 4.76) (4.77-5.71) 4.48 5.24 fi.35 (4.13 4.85} (4.83 5.67) (5.81.6,86) 5.22 6.08 7.28 (4.85-5.63) (5.63 6.54) (6.71-7-83) 5.62 6.41 7.68 (5.135.93) (5.95-6.89) (7.09-8.24) 6.81 6.75 8.07 (5.42 6.23) ' (6.28-7.23} (7.48 $.64) 6.00 6.78 -7.60 i {5.3 66.49) (6.03-733) (6.67-8.23) 7.27 8.26 9.31 (6.61-7.85} a 46-8.90) (8.35-10.1 8.26 9.30 10.4 {7.58.8.89) (8.48-10.0) (9A3-11.2) ; 8.71 9.79 10.9 (8.01-9.35) (8.96-10.5) (9.94-11.8} 9.15 10.3 11.5 {$.43 9.81} (9.43-11.0) (10.5 12.4) 8.80 (T57-9.55) 10.8 (9.62-11.7) 12.0 (10.712_9) 12.6 (11.3-13-6) 9.77 (8.27-10.6) 12.1 13.3 13.9 13.2 (11.9-14.3) 1 14.6 (13.1-15.8} 7-day 10-day 20 day 30-day 45-day 60-day 4.38 5.26 (4.10 4.68} (4.92-5.62} 5.00 5.97 (4.69-5.33) (5BI6.37) 6.74 8.01 {6.36a.i5; {7.56-8.49} 8.35 9.86 (T93-8.78) (9.37-10A) Y 10.6 12,4 (10A-11.1) (11.8-13.0) 12.6 14.7 (12.0-13.1) (14.1-15.4} 6.47 7.46 8.82 (6_Q5-6.92) (6.96 7.96) (8.20-9.42) 11 7.28 8 32 9.75 (6.83-7.76) (738-8.86) t9:09-10.4) 9.58 1 q,8 12.5 (9.03 10 2) (10.2-11.5) [11.7-13.21 11.5 12.8 14.6 (11.0-12 1) (12.2-13.5) ' (13 7-152) 14.3 1b.8 17.6 (13-6-15.0) (15.0-16.5) (16.7-18.5) 1 16.8 18.4 20.3 (16.1-1T5) (17.5192) (19.4-21.3) • 9.94 11.1 12.3 (9.19-10.6) (10.2-11.9) (11.3-13.2) 10.9 12.1 13.3 (10.1-11.6} (11.2-12.9) i (12.2-14.2) 13.8 15.1 16.5 (12 9-14.6) (14.1-16.1) (15.3-17.5) 16.8 17.0 182 (14.9-16.5) (16.0-1T9) (17.1-19.2) 19.0 20.4 21.7 (18.0-%9) (19.3-21.4) (20.4-22-8) 21.8 23.2 24.6 (20.8-22.8) (22.0-24.3) &2 :25.8) 14.1 ; (12.7-15.1) 16.0 (13.7-16,1) 18.3 (16 8-19.5) . 19.8 (18.5-20.9) ! 23.4 (21.9-2431 26.3 (24.8-27.6) 15.5 (13.9-16.7) 164 (14.9-17-7) 19.7 (18 2-21.1) 21.0 (19.6-22 3) 24.6 (23.026.1} 27.5 (25.9-29.Q) Precipitation Numbers in (for a given duration are not checked Please refer frequency (PF) estimates in parenthesis are PF estimates and average recurrence against probable maximum to NOAA Atlas 14 document this table are based on frequency analysis at lower and upper bounds of the 90% confidence interval) will be greater than the upper bound precipitation (PMP) estimates and may be for more information. of partial duration series (PDS). interval. The probability that precipitation (or less than the lower bound) is 5%. Estimates higher than currently valid PMP values. frequency at upper estimates bounds Back to Too PF graphical of 3 7/17/2019, 11:19 AM IPrecipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat--36.2759& .A-1 25 C e - 20 9x I PDS-based depth -duration -frequency (DDF) curves Latitude: 36.27590, Longitude: -80.34210 E -IF XF ry rn k6 N -0 'D 'a -0 -0, -'0' -0, VM a �q LM 14 0 rn 0 w HDuration ro tw A 4 r4, 6 6 6 A� =7t- 5 10 79 qf) i nn ")nn inn inr Average recurrence interval (years) r) NOAA Atlas 14, Volume 2, Version 3 Created (GMTY Wed Jul 17 15:18:03 2019 Back to Top Maps & aerials Small scale terrain 3 m k 2m! Rural H all." x Average recurrence nenai (years) 10 25 so IGO — 200 — Soo — 1000 Duration 5-min — 2-day 104nin — 3-day 15-min — 4-day 30-satin — 7-day 60-min — 10-day 2--hr — 20-day 3-hr — 30-clay "r 45-day 12-tw 60-d" 24-hr 2 of 3 7/17/2019, 11:19 AM Precipitation Frequency Data Server https://hdsc.uws.nOaa.gov/hdsc/pfds/pfds—pzintpage.hbnl?iat=36.2759&... Large scale terrain Eke k i. rj kC.wok.F 1 Ef �.�1lPi7 iltl Greensboro • I NOR H a ,fie R 'off' L I N ,fie i 100km 60mi �,} adott€ E ett�vili � Large scale map Lgr� oP�ixu'c� Elan ki.[�ur ,Roanoke Johnson Citj AAAAr � Aria ti llY Sto17- :Sl n7 Greensboro .. ,.. Durham j igh t is ,ld, r :Irr,iin,:, — 100km hrYtttte 60mi ?Yettevi lEe Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service t"Ota WataC antar 1325 East West Htghway Silver Spring, MD 20910 Questions?: HDSC.QuestionsOnoaa.aov . Disclaimer 3 of 3 7/17/2019, 11:19 AM Precipitation Frequency Data Server https:/thdsc.nws.noaa.gov/hdscipfds/pfds_printpage.html?lat=36.2759&... NOAA Atlas 14, Volume 2, Version 3 Location name: King, North Carolina, USA* Latitude: 36.27690, Longitude:-80.34210 Elevation: 1096.96 ft**� ' source: ESRI Maps • source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M Bonin, D. Martin, 8, Lin, T. Parzybok, MYekta, and D. Riley NOAA, National Weather Service, Silver Spring, Nbryland RE tabula I ,PF graphical I Map§ & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inc hes/ho_u_r}7 Burafion��� Average recurrence interval (years) 5 min 10-mm f_ ! _J 4.43 (4A9-4.81) 3.54 (3.27-3.84) .2 � 6.28 (4.87-5 75) 4.22 (3.90-4.60) 1 i 6.24 i((5.75-6.79) 4.99 ' (4.60-5.44) 10 6.91 (6.36 7 51) 5.53 {5.09 6.01) 25 7.72 (7.06 8.39) 6.114 (5.62-6.68} {___ 50 8.27 (7.51-9.00) 6.59 (5.99-7.17) 100 4 8.78 j (7.93 9.59} { 6.98 P (6.30-7.61) 200 9.26 {8.30-10.1} 7.34 (6.58-8A3) 500 9.83 (8.69-70.8) 7.77 {6.87 8.54j 1400 10.2 ? (8.95-11.3) 8.05 15-mm 30 min 60 mtn 2-hr 3-hr 6-fir 12-hi 2.95 {272-3.20) -02 (1.87-2.19) 1.26 0.16-1.37) 0.752 (0.690-0.822) 0.640 (0.497-0.592), 0.336 j (0 308-0.366) 0.203 (0A87.0.221j 3.54 4.21 4.66 1 (3.27-3.86j (3,88.4.58) (429-5.06} 2.44 2.99 3.37 { (2.26-2.66) (2.76-326) (3.11 3.67) 1.53 1.92 2.20 (1.42-1.67) (1.77-2.09) { {2.02-2.39} 0416 1.15 1 1.33 (0.841-1.00) (1.06-1.26) (1.22-1.46) 0.660 0.832 0.963 (0.607-0123) {0.764 D.909) (0.882-1.05) OA07 D.512F-0--59-6-1 {0.375-0.446) (0.471-0.562j (0.545-0.651) 0.246 0.311 0.363 (0227-0269 (0.286-0-339j (0.332-0.395) 5.19 {4.75-5.65) 3.85 (3.52-4.18) 2.56 (2.34-219) 1.5$ (1.43-1.72) 1.14 (1.03-1.25) 0.710 (0:644-0.776) 0.437 E 5.56 5.88 6.18 (5.05-6.05} f (5.31-6.42) {5.54-6.76) 4.19 4.51 4.81 (3.81 4.56} (4.07-4.91) _ (4.31-5.26) 2.84 3.10 3.37 (2.58-3.09) (2.803.38) {3.023.69) 1.77 1.96 2.16 (1.59 i_93} (1-75 2 15) (1.91-2.37) i.28 1.42 1.57 (1.15 1.40} (1.27-1.56) i (1.39-1.72) 0.803 0.900 1.04 (0.723-0.877 (0.802-0.981j (0.880-1.09) 0.498 0.663 0.631 6.52 {5.76-7.17j 5.19 (4.59-5.70) 3.72 (3.29-4.09) 2.42 (2.11-2.57) 1.77 1 0.54-1.94) 1. 44 (0.987-125) 0.730 6.74 (5.90-7.44) 5." (4.78-6.03) (11 3.98 3.49-4.40) 2.63 (227-2.9� 1.92 1 1.25 0,811 24-hr 2-day 0121 (0.112-0132) 0.072 (0.067-0.077) 0.147 0.187 0.219 (0.136-0.160} (0.172A.202) (0.201-0236) 0.086 0.109 0.127 (0.080-0.493j (0-101-0117)� (0.117-0.136) {0.396-0.474) 0.265 (0.242-0286j 0.162 I0.172 (0.447-0.538) (0.500-0.609) (0.553-U83) 0.303 0.344 0.388 (0.276-0.327 (0.311-0.371) (0.348-0.419 0.194 0.217 {0.628-0.792) 0.452 EA01-0.488)' 4.249 {0.686-0.882) 0.505 {0.444 0.546} 0.276 3-day 4-day 7-day (0.� 00054) 0.040F (0.037-0.043) 0.026 1 {0.024-0.028}i 1 {005-0.066j {0.0761 0.0610 77 082) (0.083-0.096; 0.048 0.061 0.070 (0-045 OA52j (0.05&-0.065) (0.065-0.075 0.431 0.039 4.044 {0.029-0.033) (0.036-0.041) (0.140-0.163j (0.098-0 114) 4.4$4 (0A78-0.090j 0.053 (0.158-0.185 (0.177 0.209) (0.196-0.234)i (0. 11-0.130) (0.124-O,1 46) (0.138-0.11 0.095 0.107 O.t2D (0.088-0.102 (0-098-0A15j (0.109-0.129) D.059 0.066 0.D73 (0224-0.269) (0.157-0.AA189) 0.1 38 {0.124-0.148) 0.084 (0.246-0.299 (0.173 0.210j 0.152 {0.136-0.165 0.092 10-day 0.021 (0 02Q 0.022)� {0.041-0.047)i 0.025 0.03.0 0.035 t0A23 0.027) (0.028-0.032) (0.032-0.037) (D.049-0.056j1(0.055-0.063 0.041 (0.038-0.043) (OA61-0.071) (0.067-0.079 0.045 0.060 0.056 (0.042-0.048 (0.047 0.054) (0.051-0.059) (0.076-0-090) 0.063 (0,057-0.067) (0.083-0.099 0.068 (0.062-0.074 20-da 0•d14 1 y (0.013-0.015) iI 30-day 0.012 y (0.011-0.012). 0 010 45-day (0.009-0.010)� 64 day 0.009 11 {0A08-0.009) 0.017 0 020 (0.016-0.014[(0.019-0.021} 0.014 OA16 (4A13-0.014) (0.015-0A17) 0011 0.013 (oA11-0.012} (0-013 0.014j (1.010 0.012 i {0.010 0.011} (O.Oii-0.012)� 0.023 (0.021-0.024) 0.018 (0.017-0.019} 0.015 (0.014R0015j 0.013 (0.012-0.013} 0 226 (0.024-0 028) 0.0 00 (OA19p00 021) 0.016 {0.015-0.017} 0.014 (0:013 0.015} 0 029 (0.027 0 030) a.o2z (0.021-0.023} 4.018 (0.017^0.018 0.015 {O.Oi4 0.016)# 0.032 (0_029-U33) o.024 (DA22 oA25)` 0.019 (0 018-0.020)j 0.016 (0.015-0.017j 0.034 (0.032-0,037 0.025 (0.024 0.027) 0.020 (0.019 0.021) 0.017 (0.016A.018) 0.038 (0.035 0.041) 0.028 (0.026-0.029j 0.022 (0.020-O.tl23j 0.018 (0.017-0.019) 0.041 (0.038-0.Q44 0.429 (OA27-fl.031j 0.023 t0.021-0.024 0.019 (0.018-0.020j 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5°In. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. C Please refer to N©AA Atlas 14 document for more infomiation. Bads to Top PF graphical of 3 7/17/2019, 11:21 AM IPrecipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdselpfds/pfds—printpage.html?lat--36.2759& 100,0 10-000 1.000 0-100 43 V 2 LL 0.010 PDS-based intensity -duration -frequency (IDF) curves Latitude: 36.2759*, Longitude: -80,34211 .......... -------- ............. ------------------ 0.001 ! I -, S r_ E C E - " - "= �" �" :" ' ;" �:' ' M 6 E -9 M '9 '9 'Y 1� rL 2 R 0 0 Duration rn UD 100.000 10.000 --------- ---------- -------- ...... ----------------- .............. 1.000 0 0.100 -------- 13 7- ----------- ------ --------- 0.001 L. 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Wed Jul 17 15:20:25 2019 Back to Top Maps & aerials Small scale terrain .King 3km Rut -at Hafl-�,, 2mi 1. Average recurrence interal (years) 5 25 50 100 — 200 — Soo — 1000 Duration 2-day 10-4nin — 3-day 15-inin — 4-day 30-min — 7-day 604n#n — I D-day 2-hr — 20-day 3-hr — 30-day "r — 46-day 124W — "-day 244w 2 of 3 7/17/2019, 11:21 AM :Precipitation Frequency Data Server Mips://hdsc.nws_noaa.gov/hdsctpfdstpfds__pfintpage.htmi?lat=36.2759&... Large scale terrain Lynchburg Blacksburg Roanoke BrF tr s Now MWA Wit) Stoll -Sal' 3 * Durham Greensboro • r.0 r.rn. t,�u N: R T H A R O L I N A s t 100km --" a harhotte eomi Fayetteville Large scale map Lynchburg Blacksburg ftF ane,k Nth rt f3 r { 1 J{Ain �n lrl4d winstcrr14lenr .Greensboro Durham. lgh Ashe•,rlle 100km Etariotte 6 mi Fayetteville Back to Top US department of Commerce National Organic and Atmospheric Administration National Weather Service Nntj�t Wator COM- 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(noaa.gov Disclaimer 3 of 3 7/17/2019, 11:21 AM KING'S CROSSING STORMWATER MANAGEMENT ED STRUCTURE COMPUTED DESIGN DATA BASIN #2 COMPUTED 1-YR. WATER QUALITY DATA Volumetric Runoff Coefficient, Rv: 0.634 Water Quality Volume (1-inch Storm), WQv: 42,710.651 Cu.Ft. Water Quality Runoff Volume, Qa: 0.53 Inches Water Quality CN (using Qa): 96 CN Intial Abstraction, la: = 0.116 la/P(1") = 0.116 Qu (TR-55)= 920.00 csm/in Time of Concentration, Tc 20.06 Min. Intensity for 1 yr. Storm, 1 2.96 In./hr. Peak Rate of Runoff, Tp : 33.42 Min. Water Quality Peak Discharge, Qp: 16.9 cfs Runoff Depth, Q* : 1.25 Inches Water Quality Drawdown Elevation: 1016.00 Water Quality Volume Provided: (Volume between Permanent Pool and Riser Ori1�87,038.15 Cu.Ft. Permanent Pool Elevation: 1016.00 Riser Orifice Elevation: 1019.00 COMPUTED 26•YR. WATER QUANTITY DATA Pre -developed Runoff Volume: Post -developed Runoff Volume: 101,495 Cu.Ft. 191,641 Cu.Ft. Runoff Volume to be Detained (Post - Pre): 1 90,146 j Cu.Ft. Water Quantity Volume Provided: (Volume between Permanent Pool and 25-yr Ell 100,198 Cu.Ft, Surplus Volume Provided: 10,052 Cu.Ft. Permanent Pool Elevation: 1016.00 25-YR Elevation: 1019.41 Discharge Rate @ 48 hrs: 0.268 cfs Approx. Time to Complete Discharge: (max. 120 hrs.) 96 hr. PRE/POST DEVELOPED PEAK DISCHARGES Pre -Developed Post -Developed Routed Pond Peak Discharge Peak Discharge Peak Discharge Design Storm (cfs) (cfs) (cfs) 1 yr_ - 24 hr 10.450 39.250 0.399 2 yr. - 6 hr. 3.1."_38 16.540 0.360 10 yr. - 6 hr. 12.520 34.000 6.207 25 yr. - 6 hr. 19.890 45.300 10.800 50 yr. - 6 hr. 0.000 0.000 0.000 100 yr. - 6 hr. 34.180 65.250 17.570 KING'S CROSSING STORMWATER MANAGEMENT ED STRUCTURE PERMANENT BASIN DESIGN BASIN #2 BASIN CONFIGURATION (RISER & ORIFICE Width Approx. Basin Dimension: 110 X Basin Side Slopes: 3 : 1 Minimum Length/Width Ratio: Proposed Length/Width Ratio: Main Pool Surface Area and Volume (SA/DA): Permanent Pool Average Depth: Percent impervious Cover: Required SA/DA Ratio for TSS Removal: Required Permanent Pool Area for TSS Removal: Permanent Pool Area Provided: Permanent Pool Average Depth Calculation: *Shelf is not submerged: VPP Davg = APP Water Quality Drawdown Orifice: Maximum Head: Minimum Head: Design Head (h max/3), h: Maximum Release Rate: Minimum Release Rate: Maximum Hole Size: Minimum Hole Size: Conduit Size Used: Orifice Size Used: Orifice Size Release Rates: Required Temporary Pool Depth: Permanent Pool Depth: Minimum Crest Height of Riser: Crest Height of Riser: Length Surface Area 210 23,100.00 S.F. Volume of Permanent Pool Area of Permanent Pool Davg = 0.069 S.F. 0.028 S.F. 0.049 S Y 0.1810 CFS 3.00 Ft. 53.8 % 1.90 18,267.28 S.F. 20,207.28 S.F. 1016.0 Elevation 71,750.18 Cu.Ft. 20,207.28 S.F. 3.66 Ft. 19.8 In. 0.0 in. 6.6 In. 2 Days 5 Days 3.56 In. Dia. 2.25 In. Dia. 4.0 In. Dia. 3.00 In. Dia. 2.7 Days 1.65 Ft. 3.00 Ft. 4.65 Ft. 7.00 Ft. Basin Volume as Configured at Top of Riser: 161,296.00 C.F. M.ST,OZ vM _N c 2 M.ZZ,TZ .09 Z (n Z 7 O i0 ♦-1 Cat%06 0=0b 0066VO, CO9VLOv 00M7 0096E06 ONOUI& rnwtrw rmvrinr, rvrar,rro, m:,,.. M „SI,OZ QOB CO 0 iC3 i3} 2 c N (D t6 N (n d N Wo c t� LQ W t Q pp V � t g N _g 0 C C z 2 U M.ZZ.TZ .02 OOE9EOh 0009E06 C064406 tJOF3h14b OOLDV04 W96406 004 WP OD4W6 00E & CaQ W6 OO1t+lOb z o v m �o tB c O U 0 0 z O Q 0 Z d L Z W W J a a N "o w m U O w c U a U O o) U cII E co m 0. to= ca tl a N O U c E c N E m W Mn tT m p O c In N 'Q i6 t6 Q p a Ca m w+ O p O 16 a >omvU) n mo @ h w E t� " 0-0 C O c° aci°en E a) E m c C a)a C N 'E rn N u m c m 's w c S o Y N cc m (D mas a > 2�Uo is T mac c Cn co -p U) p N 0 C E Y co O O cc E a) M Q y �cr U •O O N m rA V) (D (D C >-0 N Z L Na UoN � a)ccOa. a m O Co m Cl)O NO Ch a Qo Z C `msm ¢o om i° v opmcaa to p y s O O Oy 7:3 EA ca Cno�Um—E "oa)Q=o aa) S6nou,' aY O "� $ Wl} m 3 a Q O Z E Q¢ c a)O- cu mEn N�vc m m"' O N O 'c Nm m n Uvi Ecoa T o m3 ; Lcci s 3-0 6 Q a Qm� a) E wcn m c m m E c m co U U o > m m c `o � s c N E aca m: O 'Q co 2.2 m (D m (� C` N a 0)Q Q A C1 0 B c5) N Q a A O C CA mON O COU EN tU L4 ovU yW ON a) 6 o 0a E s m m m U m . n m `o a o y 2 w a O m0 O C N E CY 0 m vJ as i 0 O CS Qi C3 CJ Q Z 3 in oo L v y C ® ® u O O` w yy .� T Y w m m a N C cu 0 N CO O O N C O Q o R c .0+ C m p S¢ a Co m _ 0 U; tq W gDil co z Hydrologic Soil Group —Stokes County, North Carolina King's Crossing Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Clifford sandy clay loam, B 49.7 33.2°% 2 to 8 percent slopes, moderately eroded FpC2 Fairview -Poplar Forest C 62.1 41.5% complex, 8 to 15 percent slopes, moderately eroded FpD2 Fairview -Poplar Forest B 34.6 23.1% complex, 15 to 25 percent slopes, moderately eroded FrB Fairview -Poplar Forest- B 0.0 0.0°% Urban land complex, 2 to 8 percent slopes W Water 3.3 2.2% Totals for Area of Interest 149.7 100.0% USDA Natural Resources Web Soil Survey 5/6/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group --Stokes County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Solis are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, BID, and CID). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a ciaypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (AID, BID, or CID), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher King's Crossing QNatural Resources Web Soil Survey 5/6/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCADGi Civil 3D® 2009 by Autodesk, Inc. v6A68 310 Legend Hyd. Origin Description 1 SCS Runoff Pond #2 Pre -Development 2 SCS Runoff Pond #2 Post -Development 3 Reservoir Pond #2 Routed Project: HYDROGRAPH - POND 2#.gpw Thursday, Oct 7, 2021 Hydrograph Report Hydraflow Hydrographs Extension forAutoCADO Civil 3D®2009 byAutodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 1 Pond #2 Pre -Developed 24 Hr Hydrograph type = SCS Runoff Peak discharge = 10.45 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 42,054 cult Drainage area = 22.020 ac Curve number = 66.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 20.10 min Total precip. = 2.92 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Pond #2 Pre -Developed 24 Hr Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 .:- Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DQ 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Pond #2 Post -Development 24 Hr Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 22.020 ae Basin Slope = 0.0 % Tc method = USER Total precip. = 2.92 in Storm duration = 24 hrs Thursday, Oct 7, 2021 Peak discharge = 39.25 cfs Time to peak = 722 min Hyd. volume = 102,710 cuft Curve number = 80.9 Hydraulic length = 0 ft Time of cone. (Tc) = 11.90 min Distribution = Type 11 Shape factor = 484 Pond #2 Post -Development 24 Hr Q (cfs) Hyd. No. 2 -- 1 Year 40.00 30.00 20.00 10.00 Q (cfs) 40.00 1 if 20.00 a.aa 1 I 1 1 I I I 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 4 Pond #2 Routed 24 Hr Hydrograph type = Reservoir Peak discharge = 0.399 cfs Storm frequency = 1 yrs Time to peak = 1446 min Time interval = 2 min Hyd. volume = 88,874 cult Inflow hyd. No. = 2 - Pond #2 Post -Development 24 Hr Max. Elevation = 1018.97 ft Reservoir name = POND 2# Max. Storage = 168,788 cult Storage Indication method used. Wet pond routing start elevation = 1016.00 ft Q (cfs) 40.00 10.00 M Pond #2 Routed 24 Hr Hyd. No. 4 -- 1 Year 0 10 20 30 40 — Hyd No. 4 — Hyd No. 2 50 60 70 80 90 Total storage used = 168,788 cult Q (cfs) 40.00 20.00 we] -1 0.00 100 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADQ Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 6 Pond #2 Pre -Development Hydrograph type = SCS Runoff Peak discharge = 3.138 cfs Storm frequency = 2 yrs Time to peak = 162 min Time interval = 2 min Hyd. volume = 25,338 cult Drainage area = 22.020 ac Curve number = 66.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Te method = USER Time of cone. (Tc) = 20.10 min Total precip. = 2.44 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 4.00 kme Mi 1.00 0.0 1.0 ­ �— Hyd No. 6 Pond #2 Pre -Development Hyd. No. 6 -- 2 Year 2.0 3.0 4.0 5.0 6.0 Q (cfs) 4.00 3.00 1.00 —1 0.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. NO. 7 Pond #2 Post -Development Hydrograph type = SCS Runoff Peak discharge = 16.54 cfs Storm frequency = 2 yrs Time to peak = 150 min Time interval = 2 min Hyd. volume = 73,738 cult Drainage area = 22.020 ac Curve number = 80.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 11.90 min Total precip. = 2.44 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 9.00 - 6.00 - 3.00 - MM Pond #2 Post -Development Hyd. No. 7 -- 2 Year Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Tuesday, Oct 5, 2021 Hyd. No. 3 Pond #2 Routed Hydrograph type = Reservoir Peak discharge = 0.360 cfs Storm frequency = 2 yrs Time to peak = 374 min Time interval = 2 min Hyd. volume = 69,912 cuff Inflow hyd. No. = 2 - Pond #2 Post -Development Max. Elevation = 1018.45 ft Reservoir name = POND 2# Max. Storage = 152,291 cult Storage Indication method used. Wet pond routing start elevation = 1016.00 ft. Pond #2 Routed Q (cfs) Hyd. No. 3 -- 2 Year 18.00 15.00 12.00 • ei AM 3.00 1 10 20 30 40 . No. 3 Hyd No. Q (cfs) 18.00 15.00 12.00 • ii . ii 3.00 v. vv 50 60 70 80 90 100 Time (hrs) Total storage used = 152,291 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil Me 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd, No. 6 Pond #2 Pre -Development Hydrograph type = SCS Runoff Peak discharge = 12.52 cfs Storm frequency = 10 yrs Time to peak = 158 min Time interval = 2 min Hyd. volume = 69,050 cult Drainage area = 22.020 ac Curve number = 66.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 20.10 min Total precip. = 3.57 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 Pond #2 Pre -Development Hyd. No. 6 — 10 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd Na. 6 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 7 Pond #2 Post -Development Hydrograph type = SCS Runoff Peak discharge = 34.00 cfs Storm frequency = 10 yrs Time to peak = 150 min Time interval = 2 min Hyd. volume = 144,910 cult Drainage area = 22.020 ac Curve number = 80.9 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of cone. (Tc) = 11.90 min Total precip. = 3.57 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 - 5.00 - . - Hyd No. 2.0 Pond #2 Post -Development Hyd. No. 7 — 10 Year 3.0 4.0 5.0 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO civil 3DO 2009 by Autodesk, Inc. v6.066 Tuesday, Oct 5, 2021 Hyd. No. 3 Pond #2 Routed Hydrograph type = Reservoir Peak discharge = 6.207 cfs Storm frequency = 10 yrs Time to peak = 264 min Time interval = 2 min Hyd. volume = 137,910 cult Inflow hyd. No. = 2 - Pond #2 Post -Development Max. Elevation = 1019.27 ft Reservoir name = POND 2# Max. Storage = 178,968 cuft Storage Indication method used. Wet pond routing start elevation = 1016.00 ft. Q (cfs) Or- rlr% 30.00 25.00 � tt 15.00 10.00 5.00 ma Pond #2 Routed Hyd. No. 3 -- 10 Year 0 10 20 30 40 --- Hyd No. 3 ---` Hyd No. 2 50 60 70 80 90 Total storage used=178,968 cuff Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 �z 100 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 6 Pond #2 Pre -Development Hydrograph type = SCS Runoff Peak discharge = 19.89 cfs Storm frequency = 25 yrs Time to peak = 156 min Time interval = 2 min Hyd. volume = 101,495 cult Drainage area = 22.020 ac Curve number = 66.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 20.10 min Total precip. = 4.25 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 Pond #2 Pre -Development Hyd. No. 6 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 D.00 3.00 3.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd No. 6 Time (hrs) I- Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No, 7 Pond #2 Post -Development Hydrograph type = SCS Runoff Peak discharge = 45.30 cfs Storm frequency = 25 yrs Time to peak = 150 min Time interval = 2 min Hyd. volume = 191,641 euft Drainage area = 22.020 ac Curve number = 80.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 11.90 min Total precip. = 4.25 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 50.00 01111rl 10.00 1 ii Pond #2 Post -Development Hyd. No. 7 -- 25 Year Q (cfs) 50.00 40.00 20.00 10.00 FsMa� 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 _ ­­1 Hyd No. 7 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAM Civil 3Q0 2009 byAutodesk, Inc. v6.066 Tuesday, Oct 5, 2021 Hyd. No. 3 Pond #2 Routed Hydrograph type = Reservoir Peak discharge = 10.80 cfs Storm frequency = 25 yrs Time to peak = 208 min Time interval = 2 min Hyd. volume = 184,618 cuft Inflow hyd. No. = 2 - Pond #2 Post -Development Max. Elevation = 1019.41 ft Reservoir name = POND 2# Max. Storage = 183,438 cuff Storage Indication method used. Wet pond routing start elevation = 1016.00 ft Pond #2 Routed Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 6 Pond #2 Pre -Development Hydrograph type = SCS Runoff Peak discharge = 34.18 cfs Storm frequency = 100 yrs Time to peak = 154 min Time interval = 2 min Hyd. volume = 162,971 cult Drainage area = 22.020 ac Curve number = 66.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 20.10 min Total precip. = 5.39 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Pond #2 Pre -Development Q (cfs) Hyd. No. 6 -- 100 Year 35.Oo 30-00 P491Z1l 20.00 15.00 10.00 5.00 2.0 3.0 4.0 5.0 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 7.0 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Hyd. No. 7 Pond #2 Post -Development Hydrograph type = SCS Runoff Peak discharge = 65.25 cfs Storm frequency = 100 yrs Time to peak 148 min Time interval = 2 min Hyd. volume = 273,889 cult Drainage area = 22.020 ac Curve number = 80.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 11.90 min Total precip. = 5.39 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Pond #2 Post -Development Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.04 20.00 10.00 10.00 0.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd No. 7 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD@ Civil 3D9 2009 by Autodesk, Inc. v6.066 Tuesday, Oct 5, 2021 Hyd. No, 3 Pond #2 Routed Hydrograph type = Reservoir Peak discharge = 17.57 cfs Storm frequency = 100 yrs Time to peak = 188 min Time interval = 2 min Hyd. volume = 266,839 cuff Inflow hyd. No. = 2 - Pond #2 Post -Development Max. Elevation = 1020.11 ft Reservoir name = POND 2# Max. Storage = 207,298 cuft Storage Indication method used. Wet pond routing start elevation = 1016.00 ft. Pond #2 Routed Pond Report Hydraflow Hydrographs Extension forAutOCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Pond No. 1 - POND 2# Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 1012.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 1012.00 17,558 0 0 1.00 1013.00 19,079 18,311 18,311 2.00 1014.00 20,703 19,883 38,195 3.00 1015.00 22,279 21,484 59,679 4.00 1016.00 23,914 23,090 82,768 5.00 1017.00 28,373 26,109 108,878 6.00 1018.00 30,433 29,394 138,272 7.00 1019.00 32,550 31,483 169,754 8.00 1020.00 34,724 33,628 203,382 9.00 1021.00 36,954 35,830 239,212 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 3.00 Inactive Inactive Crest Len (ft) = 12.00 12.00 Inactive Inactive Span (in) = 15.00 3.00 0.00 0.00 Crest El. (ft) = 1019.00 1020.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 1012.00 1016.00 0.00 0.00 Weir Type = Riser Ciplti --- --- Length (ft) = 70.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.14 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 EAL(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 6.00 4.00 2.00 0.00 1 0.00 6.00 Total 0 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 1022.00 1020.00 1018.00 1016.00 1014.00 - 12.00 18.00 24.00 30.00 36.00 42.00 48.00 54.00 60.00 1012.00 Discharge (cfs) Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DR) 2009 by Autodesk, Inc. v6.066 Thursday, Oct 7, 2021 Pond No. 1 - POND 2# Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 1012.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) incr. Storage (cult) Total storage (cuft) 0.00 1012.00 17,558 0 0 1.00 1013.00 19,079 18,311 18,311 2.00 1014.00 20,703 19,883 38,195 3.00 1015.00 22,279 21,484 59,679 4.00 1016.00 23,914 23,090 82,768 5.00 1017.00 28,373 26,109 108,878 6,00 1018.00 30,433 29,394 138,272 7.00 1019.00 32,550 31,483 169,754 8.00 1020.00 34,724 33,628 203,382 9.00 1021.00 36,954 35,830 239,212 Culvert / Orifice Structures Weir Structures [A] [g] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 3.00 inactive Inactive Crest Len (ft) = 12.00 12.00 Inactive Inactive Span (in) = 15.00 3.00 0.00 0.00 Crest El. (ft) = 1019.00 1020.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3,33 3.33 3.33 3.33 Invert El. (ft) = 1012.00 1016.00 0.00 0,00 Weir Type = Riser Cipiti Length (ft) = 70.00 0.50 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.14 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inthr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 10.00 8.00 6.00 4.00 2.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage / Storage Elev (ft) 1022.00 i I . _#'� 1 _ I 0.00 - i I 0 50,000 100,000 150,000 - Storage 1020.00 1018.00 1016.00 1014.00 1012.00 200,000 250,000 Storage (cult) c 0 n 0 a 9 0 0 0 v a Q o 0 0 t0 V N O tIS 0 ti Y L N � o A (D iO C) A E Q N N O0. o }N O O Q r oCL N NN N -Q o / a rc6 LL o `S o c9 O /` fU 0 r o o U U uj o om o o r�; c O N Jfff O 'fO CO LU O O di WZ O N � Z Q O O C F2 W i 1 1 1 O ! O o I LL W O Q O m I 1 [� t Z t � 0 1 d fzO 1 o m� 1 CL uL ! I Q o CD r © o 0 o v op N CDU O nL 0-