Loading...
HomeMy WebLinkAboutNCC190168_NOT Closeout Documents_20211007ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality September 16, 2021 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Piedmont Natural Gas, Inc. Attn: Mr. Aaron Weldon, Project Manager 4720 Piedmont Row Drive Charlotte, NC 28210 RE: PNG Line 439 — Winterville, NC (Pitt-2019-017) Dear Sir, Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, � Al J. Randall Jones, Jr., PE Environmental Engineer (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality f Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 wo;r� oix;nn--u + P Wert d 1 en w Q.; /`� 252.946.6481 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Pitt Project: PNG Line 439-Winterville, NC River basin: Neuse Person financially responsible: Piedmont Natural Gas - Herb Jeans, Project #: PITT-2019-017 Director -Design, Construction, Pipeline Address: 4720 Piedmont Row Drive, Charlotte, NC 28223 1. Project Location: Nash Joyner Road, Winterville Pictures: No 2. Weather and soil conditions: Sunny, warm, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P C.A. and rules? Yes if no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: September 16, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.no.gov/Forms/NCGO I -Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Randall Jones Date of inspection: September 15, 2021 cc: Others present: Time arriving on site: 4:30 PM Time leaving site: 5:00 PM