Loading...
HomeMy WebLinkAboutNC0024571_Inspection_20011107ATA NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor Mr. Todd Powell, City Manager City of Lumberton PO Box 1388 Lumberton, NC 28359 November 7, 2001 SITEJECT: Compliance Evaluation Inspection City of Lumberton Wastewater Treatment Plant NPDES Permit No. NC0024571 Robeson County Dear Mr. Powell: 1111/a, 134/7 William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality Enclosed is a copy of the Compliance Evaluation Inspection conducted October 24, 2001. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations and recommendations are in Part D. Summary of Findings/Comments of this inspection report. The cooperation of Mr. Jon Locklear, Grade IV ORC was greatly appreciated. During the inspection a copy of the NPDES Compliance Reminders were reviewed and left with Mr. Locklear. As a reminder preservation of the Waters of the State can only be acquired through consistent NPDES permit compliance. Please review the attached report. If you or your staff have any questions do not hesitate to contact me at 910-486-1541. Sincerely, Belinda S. Henson Environmental Chemist /bsh Enclosures cc: Mr. Jon Locklear, ORC, City of Lumberton Central Files FRO Files Fayetteville Regional Office 225 Green Street - Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-1541 1 FAX: 910-486-07071 Internet: www.enr.state.nc.us/ENR An Equal Opportunity \ Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper NPDES COMPLIANCE INSPECTION REPORT North Carolina Division of Water Quality Fayetteville Regional Office Section A. National Data System Coding Transaction Code: N NPDES NO. NC0005762 Date: 011024 Inspection Type: C Inspector: S Facility Type: 1 Reserved: Facility Evaluation Rating: 4 BI: N QA: N Reserved: Section B: Facility Data Name and Location of Facility Inspected: City of Lumberton WWTP Entry Time/Date: 9:15am/011024 Permit Effective Date: 010101 Exit Time/Date: 2:30pm/0l 1024 Permit Expiration Date: 040731 Name(s), Title(s) of On -Site Representative(s): Jon Locklear - (Certified Grade IV)-"ORC" Karen Lewis - (Certified Grade III)"Laboratory Supervisor Phone Number(s): (910)671-3859 Name, Title and Address of Responsible Official: Mr. Todd Powell, City Manager PO Box 1388 Lumberton, NC 28359 Contacted: no Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated, N/A = Not Applicable) ....................................... ....................................... ....................................... ....................................... ....................................... Zecords/Rep:or 'k ... Site :a. nitAttizify 'retreatiilealt '':P ....... .lYl.04$0reitteo uen ecelvm amp lane Scl�eetule .............................. elfNlfoii�torin aage:uispasa. ro ra . pgra to c. 0 Vlaiatetiatic S::. ...................................... Mr. Powell Page 3 November 7, 2001 Section D: Summary of Findings/Comments: 1. The facility has two (2) flygt and one (1) screw pumps and one (1) bypass pump which bring influent flow into the plant. Under normal flow conditions one flygt pump is used during the week. The screw and bypass pumps are used on the weekends when flows decrease. All pumps appeared to be operational. The railings and the safety cage to the influent pump area were in need of repair. A recommendation would be to repair these areas in the near future as part of maintaining the wastewater treatment plant as per the NPDES permit. These areas were noted in the last report dated March 2, 2001. 2. The two (2) automatic bar screens appeared to be operational. All screenings are disposed of through the Robeson County Landfill. 3. The influent flow meter is a Milltronics OCM III. The flow meter was calibrated June 26, 2001 by Mr. Harold Lovette, who is the City's Instrumentation Technician. The % error was documented at 1.36. 4. The influent and effluent sampler temperatures were adequate at 3 degrees C. The acceptable temperature range of samples during storage and for stored samples are 1.0 - 4.4 degrees C. 5. The grit chamber appeared to be operational. All grit is disposed of through the Robeson County Landfill. 6. The facility has backup power which will operate key areas in the plant when power outage occurs. 7. Four (4) aeration basins are on site and appeared to be operating adequately. Six (6) aerators and two (2) mixers are located in each basin. At the time of the inspection, three (3) aerators were operating and both mixers in each basin. Aerators are rotated every three (3) hours as per Mr. Locklear. 8. The facility has five (5) clarifiers. The sludge depths are as follows with a tank depth of 12 feet: Clarifier # 1 - 4 feet Clarifier #2 - not in service- noted in last report -has not appeared to cause noncompliance Clarifier #3 - 4 Clarifier #4 - 3 'A feet Clarifier #5 .- 3 feet. 9. The chlorine contact tank sludge depth was 1 %2 feet deep. The facility has no way to drain the tank to clean it at this time but construction will begin within the next month to provide this added feature. Chlorine gas (ton cylinders) are utilized for disinfection. 10. Sulfur Dioxide gas is added to the effluent for dechlorination purposes. The dechlorination feed system was devised by facility staff and appears to operate at the present flows. A recommendation is to evaluate the system to ensure compliance with the NPDES permit can be maintained to accomodate higher flows when they occur. Mr. Powell Page 4 November 7, 2001 11. The facility has Tertiary filters which cannot be operated at this time with the flow capacity into the plant. 12. The facility has two (2) aerobic digesters and one (1) holding tank for sludge disposal. The sludge disposal is contracted out to "S & ME" and land applied under permit # WQ0000672. The City has a total of 2102.95 acres in the permit. 13. All maintenance and operational records appeared to be adequate. The ORC log was complete. The facility does not have the most recent "As Built Plans". A recommendation would be to contact your engineering firm to acquire these plans. 14. The facility has a certified laboratory onsite which analyzes the following parameters: pH, Residual Chlorine, Biochemical Oxygen Demand (BOD), Total Suspended Solids (TSS), Dissolved Oxygen, Conductivity and Temperature. All other parameters are analyzed by "Environmental Science Corporation" through a contract with the laboratory "TBL". The Chronic Toxicity is analyzed by "Meritech". 15. Laboratory records were reviewed for the months February and June 2001 and compared to Discharge Monitoring Reports (DMRs) and they appeared to be accurately reported. 16. A compliance evaluation for the period September 2000 through August 2001 did not reveal any monthly violations. A Notice of Violation was sent to the facility for a weekly Fecal Coliform violation for the month of February 2001. Please respond in writing to our office concerning items 1, 10 and 13 by December 10, 2001. Name and Signature of Inspector Agency/Office/Telephone Date Belinda S. Henson ' etc, co Name and Signature of Reviewer Paul E. Rawls ii) Action Taken DENR/Fayetteville/(910)486-1541 Agency/Office/Telephone Date DENR/Fayetteville/(910)486-1541 Regulatory Office Use Only Compliance Status Noncompliance Compliance Date 1 Section D: Summary of Findings/Comments Brief Facility Description: Continue to operate a 20 MGD WWTP consisting of influent pumps, mechanical bar screens (2), grit removal, parshall flume and influent flow measurement, extended aeration basins (4), secondary clarifiers (5), tertiary filters (supplemental treatment), aerobic digesters, sludge holding tanks, lime addition, alum phosphorus removal facilities, chlorine disinfection and dechlorination. FACILITY SITE REVIEW es No N/A 1. Treatment units properly operated and maintained. ( )No N/A 2. Standby power or other equivalent provision provided. eJ No N/A 3. Adequate alarm system for power or equipment failure available. 4. Sludge disposal procedures appropriate: Ye No N/A a. Disposal of sludge according to regulations Yes No N/A b. State approval for sludge disposal received. Yes' No N/A 5. Sufficient sludge disposed of to maintain treatment process equilibrium. es No N/A 6. The ORC and Backup Operator are officially designated with NCDENR/DWQ Training and Certification Unit. es No N/A 7. Adequate spare parts and supplies inventory maintained. Lre) No N/A 8. Plant has general safety structures such as rails around or covers over tanks, pits, or wells. Yes No N/A 9. Plant is generally clean, free from open trash areas. 10. Screening: Yes No ( 2) a. Manual es� No N/A b. Mechanical Yes©% N/A c. Buildup of debris 6tes% No N/A d. Screenings properly disposed of. 11. Grit Removal: Yes Co) N/A a. Excessive organic content in the grit chamber Yes (No) N/A b. Excessive odors No N/A c. Grit properly disposed of. Page 2 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No. No No No No No No No No No No No No No N/A N/A N/A N/A N/A. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Yes ` N/A Yes . N/A Yes No N/A Yes 1 N/A Yes o N/A Yes No Yes No (Nl Yes No Yes No N/A Yes No N/1 Yes No NIA 12. Primary clarifier: a. Excessive gas bubbles b. Black and odorous wastewater . . c. Poor suspended solids removed d. Excessive buildup of solids in center well of circular clarifier e.. Weirs level f Weir blockage g. Evidence of short circuiting h. Lack of adequate scum removal i. Excessive.floating sludge j. Broken sludge scraper. 13.. Trickling Filter: a. Trickling filter ponding(indicating clogged media) b. Leak at center column of trickling filter's distribution arms c. - Uneven distribution of flow on trickling filtersurface d. Uneven or discolored growth e. Excessive sloughing of growth f Odor g. .Clogging of trickling filter's distribution arm orifices h. Filter flies; worms, or snails. 14. Activated Sludge Basins/Oxidation Ditches: a: Dead spots b. Failure of surface aerators c. Air rising in clumps d. Dark foam or bad color e. Thick billows of white, , sudsy foam f. Air rising unevenly g. Excessive air leaks in compressed air piping. 15. Stabilization Ponds/Lagoons: a. Excessive weeds including duckweed in stabilization ponds b. Dead fish or aquatic organisms c. Buildup of solids around influent pipe d. Excessive scum on surface. Page 3 Yes (No) N/A N/A Yes -)N/A Yesy7 NIA Yes &9 N/A Yes N/A des% No N/A Yes N/A Yes (W; N/A Yes N/A Yes Yes Yes Yes Yes Yes No No N/A No N/A No NIA No N/A No N/A Yes a N/A Yes ' N/A Yes (Nb N/A Ea No N/A Yes No N/A Yes No _ E' Le No N/A No N/A • Yes No UT ) No N/A •CYes No N/A Cfes1 No N/A Yes (% N/A Yes 03 N/A • Yes N/A Yes N/A 16. Secondary Clarifier: Excessive gas bubbles on surface Level overflow weirs Weir blockage Evidence of short circuiting Excessive buildup of solids in center well of circular clarifier Pin floc in overflow Effective scum rake Floating sludge on surface Excessive high sludge blanket Clogged sludge withdrawal ports on secondary clarifier. a. b. cd. e. f. g• h. .1. 17. Filtration: a. Filter surface clogging b. Short filter run c. Gravel displacement of filter media d. Loss of filter media during backwashing e. Recycled filter backwash water in excess of 5 percent f. Formation of mudballs in filter media. 18. Chlorination Unit: a. Sludge buildup in contact chamber b. Gas bubbles c. Floating scum and/or solids d. Adequate ventilation of chlorine feeding room and storage area e. NIOSFI-approved 30 minute air'pack f All standing chlorine cylinders chained in place e g. All personnel trained in the use of chlorine h. Proper chlorine feed, storage, and reserve supply. 19. Ultraviolet radiation disinfection present and in use. L YI 20. Dechlorination: a. Proper storage of sulfur dioxide cylinders b. Adequate ventilation of sulfur dioxide feeding room c. Automatic sulfur dioxide feed or feedback control operating properly. 21. Aerobic Digester: a. Excessive foaming in tank b. Noxious odor c. Mechanical aeration failure d. Clogging of diffusers. ra�{�e S Page 4 22. Yes No N I Yes No N/A Yes No Yes No glA Yes No ga) Yes No /A) Yes No Yes No j7 ) No _ N/A Anaerobic Digester: a. Floating cover tilting b. Gas burner operative Sludge Drying and/or disposal: a. Poor sludge distribution on drying beds b. Vegetation in drying beds c. Dry sludge remaining in drying beds d. Dry sludge stored on site e. Filtrate from sludge drying beds returned to front of plant f. Sludge disposal through county landfill. g. Sludge land applied. 24. Filter Press: Yes No a. High level of solids in filtrate from filter presses or vacuum filters Yes No N/A b. Thin filter cake caused by poor dewatering Yes No N/A c. Sludge buildup on belts and/or rollers of filter press Yes No N/A d. Excessive moisture in belt filter press sludge cake. Yes N Yes No N/A Yes No N/A 25. Polishing Ponds or Tanks: a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface b. Solids or scum accumulations in tank or at side of pond c. Evidence of bypassed polishing ponds or tanks because of low capacity. 26. Plant Effluent: Yes NO N/A a. Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present Yes N/A b. Potential toxicity (dead fish, dead plant at discharge) No N/A c. Outfall discharge line easily accessible. 27. Flow Measurement: es, No N/A a. Proper placement of flow measurement device Ye No N/A b. Flow meter calibrated Yes (KO) N/A c. Buildup of solids in flume or weir Yeses N/A d. Broken or cracked flume or weir Yes Noe. Clogged or broken stilling wells Yes N/A f. Weir plate edge corroded or damaged Yes No N/A g. Flow measurement error less than 10%. Page 5 28. Sampling: - Ye No . N/A a. Sampling and analysis completed on parameters specified by permit YesNo N/A b. Composite sample temperatures maintained at 4 degrees Celsius or less (but above freezing) during sampling Yes No N/A c. 'Contract laboratory used for sample analysis Yes No N/A d. Effluent composite samples obtained are flow proportional. I ' RECORD:KEEPING AND REPORTING Yew No N/A 1. Records and reports maintained as required by permit. No N/A 2. All required information available, complete, and current. es No N/A 3. Records maintained for 3 years and all sludge records maintained for 5 years. Ye No N/A 4. Analytical results consistent with data reported on DMRs. Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Sampling and 'analyses data adequate and include: a. Dates, times, and location of sampling b. Name of individual performing sampling c. Results of analyses and d calibration d. Dates of analyses e. Name of person performing analyses. b. Monitoring records adequate and include: a. Monitoring charts kept for 3 years b. Flowmeter calibration records kept for 3 years. Yes) No N/A 7. The pH meter is calibrated daily with two buffers and checked with a third buffer and properly documented. (-,..)Le,No N/A 8. •Expiration dates of pH buffers adequate. Yes 110 N/A 9. All thermometers used in NPDES permit reporting is calibrated annually with an MIST certified thermometer or a traceable thermometer annually and documented. Yet No N/A 10. The following NPDES permit required parameters are analyzed on site: pH, Temperature, Dissolved Oxygen and Chlorine Residual. Page 6 Yes No N/A 11. The NPDES permit required parameter Total Chlorine Residual is analyzed by approved method. 1 No N/A 12. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for every day of operation. No N/A 13. Fecal coliform incubator maintained at 44.5 +/- 0.2 Degree Celsius and the temperature maintained in a log for every day of operation. 14. Plant records adequate and include: p.Q No N/A a. 0 & M Manual Yes No N/A b. "As -built" engineering drawings fo tO+o cl f o'i Yes No N/A c. Schedules and dates of equipment maintenance repairs Yes No N/A d. Equipment data cards. Yes No 15. Permittee is meeting compliance schedule. Yes) No N/A 16. DMRs complete and include all NPDES permit required parameters. Yes No N/A 17. The facility has a permitted flow greater than 5 MOD and is required to operate seven days per week 24 hours a day. es No N/A 18. ORC visitation logs available and current. E . No N/A 19. ORC certified at a level equal to or greater than the classification of the wastewater facility. CYes No N/A 20. Backup Operator certified at one level less than the classification of the wastewater facility or greater. Yes No N/A 21. Current copy of the complete NPDES permit on site. No N/A 22. Facility description verified as contained in NPDES permit. es) No N/A 23. Facility analyzes process control parameters for example: MESS, MCRT, Settleable Solids and others that are applicable. So e, Yes No N/A 24. Industrial Waste Surveys (IWS) sent to all possible Significant Industrial Users (SIUs) within the last five years (especially new industries). Revised 7/16/01 by Belinda Henson INSPECTION REPORT UPDATE OPTION: TRX: 5IF KEY: NC0024571INSCEI 011024 SYSMSG: *** DATA ADDED SUCCESSFULLY *** PERMIT--- NC0024571 REG/COUNTY-- 06 ROBESON FACILITY-- LUMBERTON, CITY / WWTP LOC-- LUMBERTON INS TYPE CEI NEXT PLANNED INSPECTION INSPECTED BY: DATE: 011024 HSB REPORT INSPECTION DMR RESPONSE RECEIVED DATE STATUS STATUS DUE DATE DATE 011101 C C 011130 COMMENTS: dUg Of December 6, 2001 J'umL toz (Watez 5PL'ant rsu/2ezviaoz Environmental Utility Services Department Division of Water Quality Belinda Henson, Environmental Chemist 225 Green Street, Suite 714 Fayetteville, North Carolina 28301 Re: Compliance Audit Evaluation Inspection Response NPDSE Permit No. NC0024571 Dear Ms. Henson: IDEC JI2001 I am writing your office concerning line items number (1), (10), and (13) pertaining to your inspection conducted on October 24, 2001. Reference line item number (1) the railing and safety cage to the influent was in need of repair. I made a recommendation to Kenny Taylor, Executive Safety Director to come out to the plant to look at the ladder and determine the repair by O.S.H.A. standards. Upon the inspection by Kenny Taylor, Executive Safety Director he recommended to replace the cage. The purpose of the cage is to prevent falls or fall arrest. I discussed the findings with Howard Revels, Director and he indicated he would further discuss this issue with Mr. Taylor before removing or repairing the ladder. Reference line item numbers (10) the dechlorination feed system has been evaluated by the JS Dismuke Company, Inc. James Kiles, JS Dismike Company Representative, evaluated the dechlorination system on December 4, 2001. Mr. Kiles will beestimating the cost to design system. Also, during construction or renovation of the chlorine contact would be an opportunity to install this system. Reference line item number (13) I discussed with Howard Revels, Director the recommendation for as built plans for the Lumberton Wastewater Treatment Plant. Howard Revels, Director will contact our engineering firm to inquire about these plans. Box 1388, _CuirstEtton, d/ortfi eazotina 28359 • 910-671-3857 • 910-671-3889 • Jax 910-671-381.4 r' Please review the letter of response. If you have any questions, please call me at (910) 671-3859. Sincerely, Jon Locklear, Wastewater Treatment Chief Operator /scar Cc: Howard Revels, Director Jim Walters, Deputy Director File