Loading...
HomeMy WebLinkAbout20130943 Ver 1_Site Plan_20130903f"'CHEDULE OF DRAWINGS -g - --------- SED —001 ..... COVER SHEET G ON LINE RA ATER TRANSMISSI 1� ;0 EXISTING Rm G-002 ..... NOTES AND LEGENDS HIGHLANDS WATER TREATMENT PLANT 4 k4 N —57-015) (P WS I D NO. 01 Iffi X �ggg' NW. Z""'OW C —101 ..... RAW WATER INTAKE SITE PLAN T g ISTING ,W WATER INTAKE -0,0M D TRANSMISSION LINE —102 ..... RAW WATER PUMP STATION BUILDING PLAN C J C —103 ..... RAW WATER INTAKE PROFILE & BUILDING DETAILS % ev .. . .. .. a % 4"il C-1 04 ..... RAW WATER LINE PLAN — PROFILE 7�, �ow F. A ,PROPOSED RAW WATER INTAKE AN U -INN � "A "I PUMP STATION SITE C-1 05 .... RAW WATER LINE PLAN PROFILE —501 ..... MISCELLANEOUS DETAILS C 1.4 w C-502 ... MISCELLANEOUS DETAILS: z MUM 0 I 1i S Mq '0_ aw co C-503 ..... MISCELLANEOUS DETAILS cr mv, J w", "N CD C-504..... MISCELLANEOUS DETAILS 600 0 300 600 12GO 0) VICINITY MAP GRAPHIC SCALE I INCH:= 600 FEET C-505 ... MISCELLANEOUS DETAILS 0 m 04 C-506..... MISCELLANEOUS DETAILS c\l C) 9 9 \0 C) WO s CD SEAL 024487 Ile 2 A r—F-1 FINAL DESIGN GIW_ AL IL A S S NOT RELEASED FOR /till a) 9 ENGINEERING -PLANNING -FIN AN CE CONSTRUCTION 55 BROAD STREET ASHEVILLE, NC 28801 PH. (828) 252-0575 FIRM LICENSE # C-0459 C:) 13 6 J UN" E 20 d GENERAL: ALL EROSION CONTROL TROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL. WORK. 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND QUALITY, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE AVAILABLE ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 2. - INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. 3. - NO WORK SHALL BE PERFORMED IN STREAM FROM OCTOBER 15 TO APRIL 15 (TO ACCOMMODATE COE AND DWQ RECOMMENDATIONS CONCERNING WORK IN TROUT WATERS). 4. - CONTRACTOR IS TO PLACE PERMANENT STAKES MARKING CLEARLY THE 25' BUFFER FOR STREAMS WHERE SHOWN ON THE PLANS AND THE MARKERS ARE TO BE VISIBLE AT ALL TIMES DURING CONSTRUCTION. 5. - OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. 6. - CONSTRUCTION SHALL BE LIMITED TO 2000' OF CONTIGUOUS ROAD CORRIDOR UNTIL ALL CUTS, FILLS, AND DITCHES ARE STABILIZED FOR THAT 2000' SECTION. UPON STABILIZATION OF THAT SECTION ANOTHER 2000' SECTION CAN BE CONSTRUCTED AND STABILIZED. 7. - ALL STREAM CROSSINGS AND PERENNIAL STREAMS WILL BE ALIGNED WITH THE NATURAL STREAM PATTERNS ABOVE AND BELOW THE PROPOSED ROAD. ARCH CULVERTS WILL BE USED AND FOOTERS WILL BE CONSTRUCTED IN UNDISTURBED BANKS AWAY FROM THE STREAM FLOW. 8. - PROCEED WITH GRADING, CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. 9. - SEED AND PLACE EROSION CONTROL MATTING ON. ALL CUT AND FILL SLOPES THAT ARE NOT ROCK IMMEDIATELY UPON COMPLETION OF SLOPE STABILIZATION. 10. - ALL TEMPORARY STREAM AND CREEK CROSSINGS FOR EQUIPMENT DURING CONSTRUCTION SHALL BE MADE USING TEMPORARY BRIDGES. NO STREAM BANK OR STREAM BED DISTURBANCE SHALL BE ALLOWED FOR EQUIPMENT CROSSINGS. 11. - SEED AND MULCH DENUDED AREA WITHIN 15 DAYS AFTER FINISHED GRADE ARE ESTABLISHED. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. LIME 4,000 LBS FERTILIZER (10- 10 -10) 1,000 LBS KY -31 FESCUE 100 LBS. STRAW MULCH 60 -80 BALES FOR SUMMER SEEDING ADD TO THE ABOVE: GERMAN MILLET 40 LBS SMALL - STEMMED SUDAN GRASS 50 LBS FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN 120 LBS IF HYDROSEEDING, WOOD CELLULOSE MAY .BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: PURE LIVE SEED SWITCHGRASS 4 LBS BROWNTOP MILLET 8 LBS GRAIN SORGHUM 2 LBS ALL SLOPES 2 :1 OR STEEPER SHALL BE COVERED BY EROSION CONTROL MIATTING. NATIVE SEEDING: THE CORRECT SEEDBED pH IS 5.5 TO 6.5. APPLY ZERO NITROGEN AT PLANTING. INCORPORATE SOIL AMENDMENTS INTO TOPSOIL /ROOT ZONE BEFORE SEEDING. FIRM SEEDBED BEFORE SEEDING (TRAVEL WITH DOZER CLEATS). SEEDING DEPTH FOR ALL NATIVE SSP. (EXCEPT E.GAMAGRASS) NEED TO BE 1/4" - 1/2 ". GREATER DEPTHS CAUSE HIGH SEED MORTALITY. SPECIALIZED SEEDING IMPLEMENTS ARE REQUIRED. SEED MIXES AND RATES TO MATCH SEEDER USED. A NO -TILL, DROP SEEDER OR BROADCASTER WITH PRECISION METERING TO CONTROL SMALL SEED FLOW AND PICKER WHEEL AGITATORS TO HANDLE FLUFFY SEED ARE BEST SUITED FOR NATIVE SEED. NATIVE PLANT SEEDING MIX FOR STREAM OR RIVERBANK STABILIZATION SEEDING FOR STREAM OR RIVERBANK STABILIZATION SHALL BE A MIXTURE OF NATIVE GRASSES, PLANTS AND TREES. NATIVE PLANT MIX SHALL INCLUDE THE FOLLOWING: GRASSES - BIG BLUESTEM, INDIAN GRASS, LITTLE BLUESTEM, SWITCHGRASS 5 LBS /ACRE EACH AUGUST THRU MAY - GREENRYE 25 LBS /ACRE EACH MAY 1 THRU AUGUST - MILLET 25 LBS /ACRE EACH TREES - SILKY DOGWOOD (CORNUS AMONUM), SILKY WILLOW (SALIX SERICEA), HAZEL ALDER (ALMUS SERRULATA) AND ELDERBERRY (SAMBUEUS CANADENSIS) NATIVE PLANT MIX VARIATIONS SHALL BE APPROVED BY ENGINEER. NOTE: NO FERTILIZER SHALL BE USED WITHIN 10' OF TOP OF STREAM OR RIVER BANK. 12. - MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 13. - REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 14. - REQUEST FINAL APPROVAL BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION. m CL GENERAL C T ZION NOTE REVISION DATE -JUNE 16, 20:9 1. FINISH GRADE TOLERANCES SHALL BE AS NOTED IN THE SPECIFICA T�ONS. THE ENGINEER MAY MAKE GRADE A PRICE FOR UNCLASSIFIED EXCAVATION. CHANGES AS REQUIRED IN THE FIELD WITHOUT EFFECTING THE UNIT BID S CAV ION 2. UNLESS OTHERWISE STATED, ALL FILL AREAS SHALL BE CONSTRUCTED IN LAYERS OF 8" MAXIMUM THICKNESS, WITH WATER ADDED OR SOIL CONDITIONED TO THE OPTIMUM MOISTURE CONTENT AS DETERMINED ! BY THE ENGINEER AND COMPACTED WITH A SHEEP'S FOOT ROLLER TO A COMPACTION EQUAL TO OR GREATER THAN 95% (100% IN THE TOP 2' OF THE SUB GRADE BELOW ROADWAYS AND PARKING LOTS) OF THE DENSITY OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH THE STANDARD PROCTOR METHOD OF MOISTURE- DENSITY RELATIONSHIP TEST, ASTM D698 OR AASHTO -99 UNLESS SPECIFIED IN OTHER SPECIFICATIONS. 3. ENTIRE AREA TO BE GRADED SHALL BE CLEARED AND GRUBBED. NO FILL SHALL BE PLACED ON ANY AREA NOT CLEARED AND GRUBBED. 4. ALL SOIL EROSION CONTROL MEASURES REQUIRED BY THE GRADING PLAN SHALL BE PERFORMED PRIOR TO GRADING, CLEARING OR GRUBBING. ALL EROSION CONTROL DEVICES SUCH AS SILT FENCES, ETC., SHALL BE MAINTAINED IN WORKABLE CONDITION FOR THE LIFE OF THE PROJECT AND SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT ONLY ON THE ENGINEER'S APPROVAL. PAYMENT SHALL BE CONSIDERED INCIDENTAL TO CLEARING AND GRUBBING. IF DURING THE LIFE OF THE PROJECT, A STORM CAUSES SOIL EROSION WHICH CHANGES FINISH GRADES OR CREATES "GULLIES" A,'40 "WASHED AREAS ", THESE SHALL BE REPAIRED AT NO EXTRA COST, AND ALL SILT WASHED OFF OF THE PROJECT SITE ONTO ADJACENT PROPERTY SHALL BE REMOVED AS DIRECTED BY THE ENGINEER AT NO EXTRA COST. THE CONTRACTOR SHALL ADHERE TO ANY APPROVED EROSION CONTROL PLANS WHETHER INDICATED ITN THE CONSTRUCTION PLANS OR UNDER SEPARATE COVER. 5. DISPOSABLE MATERIAL A. CLEARING AND GRUBBING WASTES SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE, UNLESS SPECIFIED OTHERVASE. B. SOLID WASTES TO BE REMOVED, SUCH AS SIDEWALKS, CURBS, 'PAVEMENT, ETC., MAY BE PLACED IN SPECIFIC DISPOSAL AREAS DELINEATED ON THE PLANS OR REMOVED FROM THE SITE AS REQUIRED BY THE SPECIFICATIONS. THIS MATERIAL SHALL HAVE A MINIMUM COVER OF 2'. THE CONTRACTOR SHALL MAINTAIN SPECIFIED COMPACTION REQUIREMENTS IN THESE AREAS. WHEN DISPOSAL SITES ARE NOT PROVIDED, THE CONTRACTOR SHALL REMOVE THIS WASTE FROP -II THE SITE AND PROPERLY DISPOSE OF IT AT HIS EXPENSE. C. ABANDONED UTILITIES SUCH AS CULVERTS, WATER PIPE, HYDRANTS, CASTINGS, PIPE APPURTENANCES, UTILITY POLES, ETC., SHALL BE THE PROPERTY OF THE SPECIFIC UTILITY AGENCY, OR COMPANY HAVING JURISDICTION. BEFORE THE CONTRACTOR CAN REMOVE, DESTROY, SALVAGE, REUSE, SELL OR STORE FOR HIS OWN USE ANY ABANDONED UTILITY, HE MUST PRESENT TO THE OWNER WRITTEN PERMISSION FROM THE UTILITY INVOLVED. D. ON SITE BURNING IS AN ACCEPTABLE METHOD OF DISPOSING OF FLAMMABLE WASTES. WHEN BURNING IS ANTICIPATED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND MEETING GOVERNING CODES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR HIS REPRESENTATIVE AS TO THE SPECIFIC LOCATION OF BURNING. AFTER BURNING IS COMPLETED, PURE ASH MAY BE DISPOSED OF BY MIXING WITH FILL DIRT.! ALL MATERIAL NOT TOTALLY BURNED SHALL BE DISPOSED OF AS SPECIFIED IN "B" ABOVE. THE CONTRACTOR SHALL NOT HOLD UP WORK PROGRESS FOR THE PURPOSE OF 41VAITING FOR A "BURNING DAY ". 6. IN THE EVENT EXCESSIVE GROUNDWATER OR SPRINGS ARE ENCOUNTERED WITHIN THE LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL INSTALL NECESSARY UNDER DRAINS AND STONE AS DIRECTED BY THE ENGINEER. ALL WORK SHALL BE PAID BASED UPON UNIT BIDS, (UNLESS SPECIFIED OTHERWISE. 7. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER HE PERFORMS THE WORK OR A UTILITY COMPAJNY PERFORMS THE WORK. 8. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR, EMERGENCY VEHICLES. ALL OPEN DITCHES AND HAZARDOUS AREAS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE SPECIFICATIONS. 9. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS. THE FINISHED SURFACE SHALL BE TO GRADE AND SMOOTH, FREE OF ALL ROCKS LARGER THAN 3 ", EQUIPMENT TRACKS, DIRT CLODS, BUMPS, RIDGES AND GOUGES PRIOR TO SEEDING; THE SURFACE SHALL BE LOOSENED TO A DEPTH OF t4 " -6" TO ACCEPT SEED. THE CONTRACTOR SHALL NOT PROCEED WITH SEEDING OPERATIONS WITHOUT FIRST OBTAINING THE ENGINEER'S APPROVAL OF THE GRADED SURFACE. ALL SEEDING SHALL BE PERFORMED BY A MECHANICAL "HYDRO - SEEDER;'.. HAND SEEDING SHALL BE AUTHORIZED ON AN AREA BY AREA APPROVAL BY THE ENGINEER. DISTURBED AREAS SHOULD THEN BE MATTED WITH SHORT -TERM PHOTODEGRADABLE EROSION CONTROL MATTING. 10. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE CORRUGATED METAL. PIPE (CMP) CONFORMING TO AASHTO M -36, WITH REROLLED ENDS TO ACCOMMODATE CORRUGATED COUP,.:6NG BANDS. 18" PIPE SHALL BE 16 GAUGE, 24" AND 30" PIPE SHALL BE 14 GAUGE AND 36" PIPE AND OVER SHALL BE 12 GAUGE AS SPECIFIED ON THE PLANS, PIPE AND COUPLING BANDS SHALL CONFORM TO N CIDOT 1032 -3 FOR PLAIN PIPE OR 1032 -4 (A) FOR BITUMINOUS COATED AND PARTIALLY PAVED PIPE. DIMPLE BANDS SHALL NOT BE USED. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP) CONFORMING TO AASHTO M -170, AS CONTAINED IN NCDOT STANDARD SPECIFICATION 1032 -9 FOR WALL "B" TYPE. WHERE SPECIFIED, ALL STORM DRAIN PIPE SHALL BE HIGH DENSITY POLYETHYLENE (HDPE). SMOOTH WALL INTERIOR, WITH WATER TIGHT JOINTS, BACKFILLED WITH # 57 WASHED STONE UP TO MIN. 6" OVER THE TOP OF THE PIPE. HDPE PIPE USED FOR STORM DRAINAGE DETENTION S�Y'STEMS SHALL BE ADS N12 WT OR APPROVED EQUAL. WHERE SPECIFIED, ALL CORRUGATED METAL STORM DRAIN PIPE (CMIF) SHALL BE ALUMINIZED TYPE 2 CORRUGATED STEEL MANUFACTURED IN ACCORDANCE WITH THE REQUIREMENTS OF AASHTO M -36. THE PIPE SHALL BE MANUFACTURED FROM ALUMINIZED STEEL TYPE 2 MATERA',L CONFORMING TO THE REQUIREMENTS OF AASHTO M -274. ALL PIPE SHALL BE FURNISHED WITH REROLLED ENDS AND SHALL BE JOINED WITH HUGGER BANDS. THE USE OF DIMPLE BANDS WILL NOT BE ALLOWED. PIPE THI TROUGH 24" DIAMETER SHALL BE 16 GAUGE, PIPE THROUGH 42" DIAMETER SHALL BE 14 GAUGE, PIPE THROUGH 54" DIAMETER SHALL BE 12 GAUGE. 11. CONTRACTOR SHALL VERIFY ALL ELEVATIONS BEFORE INSTALLATION OF FACILITIES. 12. CATCH BASINS CAST -IN -PLACE SHALL CONFORM TO THE REQUIREMENTS OF NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (LATEST EDITION) ARTICLES 840 -1 THROUGH 840 -3. CURB INLET CATCH BASIN SHALL CONFORM TO NCDOT STANDARD DETAILS 840.02 THROUGH 840.04. DROP INLETS SHALL CONFORM TO STANDARD DETAIL 840.14. JUNCTION BOXES SHALL CONFORM TO STANDARD DETAIL 840.31. 13. CURB INLET FRAME, GRATE AND HOOD SHALL BE NEENAH R- 32330:,, PRODUCTS BY DEWEY BROS., U.S. FOUNDRY OR EQUAL. DROP INLET FRAME AND GRATE SHALL BE NEIENAH R -3339A OR EQUAL. FIELD INLET COVER SHALL CONFORM TO NCDOT STANDARD DETAIL 840.04, OPENING FACING UPSTREAM. 14. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). COhNiICRETE SHALL BE CLASS A OR B. 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 1000, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS OF SECTION 1040„ CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND /OR 834. 15. TOPS OF PROPOSED FRAMES AND GRATES SHALL BE FLUSH WITH F!E' IISHED GRADE. 16. PRE CAST CONCRETE BOXES ARE ACCEPTABLE ALTERNATIVES FOR PROPOSED CATCH BASINS. GENERAL T NOTES REVISION DATE - NOVEMBER 19, 2010 1. ALL CONSTRUCTION OUTSIDE RIGHTS -OF -WAY SHALL TAKE PLACE WITHIN THE PERMANENT AND TEMPORARY ACCESS EASEMENTS SHOWN. 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE, OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION, CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL 811 BEFORE YOU DIG. 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO THE RULES OF THE STATE OF NORTH CAROLINA. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. WATER LINES SHALL HAVE 3' -0" MINIMUM COVER UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 8. WATER AND SEWER LINES SHALL HAVE A MINIMUM 10' HORIZONTAL SEPARATION OR A MINIMUM 18" VERTICAL SEPARATION WITH THE WATER OVER SEWER, OR BOTH WATER AND SEWER LINES SHALL BE DUCTILE IRON PIPE 10' EITHER SIDE OF THE CROSSING. 9. WATER AND STORM SEWER LINES SHALL HAVE A MINIMUM 12" VERTICAL SEPARATION. 10. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION. 11. LEGAL DESCRIPTIONS FOR PROPOSED EASEMENTS BY OTHERS. 1. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 24 HOURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO LOCAL. NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND COUNTY EMERGENCY AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE 'NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 2. CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER EXISTING BURIED UTILITIES HAVE BEEN LOCATED AND 24 HOURS PRIOR TO CONSTRUCTION. 3. ALL FENCE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED [NITH LIKE MATERIALS IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE: CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 4. CONTRACTOR SHALL FIELD LOCATE ALL BURIED TELEPHONE LINE IN CONFLICT WITH THE PROPOSED WATER LINE. WHERE NECESSARY, EXISTING BURIED TELEPHONE LINE SHALL BE TEMPORARILY MOVED DURING CONSTRUCTION OF THE PROPOSED WATER LINE AND RE -LAID AT NO ADDITIONAL COST TO THE OWNER. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING. CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED ON THE ROAD TO AID IN THE CLEAN UP AFTER CONSTRUCTION. A MINIMUM OF 2" OF SAND SHALL BE PLACED ON THE ROAD PRIOR TO STOCKPILING SPOIL MATERIAL ON THE ROAD SURFACE TO FACILITATE CLEANUP. a � max\ Z_ 1 �NN,t PROPOSED -® \\ WATER LINE \ I.E.: 2244.82' PROPOSED SILT FENCE INSTALLED BET% CONSTRUCTION TRENCH AND DITCH LINE (TYPICAL) PROPOSED U CAN UNDERGROUND CABLE: I'J SIGN D DOT MON D D.O.T. CONTROL POINT... STRAW WATTLE CHECK DAM AT 50' INTERVALS IN DITCH I EXISTING CONDITIONS LEGEND� 0RBF R REPAR FOUND � � P P LINES IN ACTIVE CONSTRUCTION AREA WHERE DITCH LINE J JUG TCS - - _ -F { , A I R RRSPIKE R RAILROAD SPIKE M M®I u IS BETWEEN EDGE OF ROAD AND PROPOSED UTILITY LINE U N TEL °PED TELEPHONE PEDL STAL �UG GAS U CALCULATED POINT 0 PK NL P PK NAIL FOUND SET; ► ►°+ c W ELEC ELECTRIC PEDFSIAL 0IPS 1/2" REPAR SET WITH CAP SPINDLE o SPINDLE U � � a macaw LP L LIGHT POLE C ® 0 HUB & TACK SET SPED CABLE TV PEDESTAL CONCRETE MONUMENT x SIGN SIGN CM -R /W 0 RIGHT -OF -WAY MONUMENT , MCP /NL GPs / CONTROL` POINT NAIL SET � �^ PROPOSED U CAN UNDERGROUND CABLE: I'J SIGN D DOT MON D D.O.T. CONTROL POINT... STRAW WATTLE CHECK DAM AT 50' INTERVALS IN DITCH I IUG FOC U UNDERGROUND FIBEIR OPTIC CABLE SIGN 0 0RBF R REPAR FOUND � � P P LINES IN ACTIVE CONSTRUCTION AREA WHERE DITCH LINE J JUG TCS - - _ -F { , A I R RRSPIKE R RAILROAD SPIKE M M®I IS BETWEEN EDGE OF ROAD AND PROPOSED UTILITY LINE U N TYPICAL � �UG GAS U UNDERGROUND GAS LINE SIGN 0 0 PK NL P PK NAIL FOUND SET; ► ►°+ c cu PROPOSED G G EXEC i _ S SPINDLE o SPINDLE U � � o0 CULVERT INLET PROTECTION ® LP L LIGHT POLE C ® 0 HUB & TACK SET AT UPSTREAM END OF CROSSING x x PIPE (TYPICAL) � � UP U UTILITY POLE M MCP /NL GPs / CONTROL` POINT NAIL SET � �^ F G GUY WIRE ANCHON C CP/NL C CONTROL POINT /NAIL SET CPS E.: 2246.37' � �TSP T TRAFFIC SIGNAL POLE O OCP /TEMP C CONTROL POINT TEMPORARY MARK RXR R RAILROAD CROS :dNb `SIGNAL N NGS METAL ROD N NATIONAL GEODETIC SURVEY METAL ROD a a C CJ PROPOSED ( (D MH M MANHOLE N NGS CM N NATIONAL GEODETIC SURVEY CONCRETE MONUMENT Z Z \ \ AT UPSTREAM END OF DRIVE G SANITARY SEWER MANHOLE w TEMPORARY CONTROL POINT SET w PIPE (TYPICAL) S G) SDMH T STORM DRAIN MANHOLE N NETWORK TRIANGULATION POINT > > Q coMMr� C COMMUNICATION Iv \NHOLL W ®STAKE S W \ \ WM � O O ELMH E ELECTRICAL MANHOLL ® STAKE FOUND JUNCTION BOX R 4o I INTERSTATE HIGHWAY w w \ \ \1 S SPIGOT 6 SPIGOT /YARD HYDRANT F 66 U.S. HIGHWAY W \\ S O C.O. E SEWER CLEAN -OU ; FFE U FINISHED FLOOR ELEVATION W \\ 0 0 E.SS ® ELECTRIC SERVICE ` lUrb- OUT Q ®Mw M MONITORING WELL Rk, Q \ � 0 0 G.SS G GAS SERVICE S I Uk3 -- 0U i P Pz P PIEZOMETER SO CB C CATCH BASIN L LANDFILL GAS MONITORING PROBE 4 4 EROSION cam,' 898 NOTES^ ®CI CURB INLET SURFACE WATER SAMPLING LOCATION � ,f 1. STRAW WATTLE CHECK DAMS SHALL BE PLACED AT 50' INTERVALS OWM WATER METER LANDFILL GAS VENT IN ALL DOWN SLOPE DITCHES DURING ACTIVE CONSTRUCTION. JQ F" FIRE HYDRANT LANDFILL GAS COLLECTION WELLHEAD ��lulrr! 2. ROCK CULVERT INLET PROTECTION SHALL BE USED AT THE Pa WV � POTABLE WATER' WELL WATER VALVE UPSTREAM SIDE OF ALL CROSSING AND DRIVE CULVERTS BLOW OFF VALV. OMB MAILBOX OR PAPER BOX o� ° °° BLOW OFF VALVE O DURING ACTIVE CONSTRUCTION. A G/M °PB POSTAL DROP BOX � °o�P GAS METER Jar 3. SILT FENCE SHALL BE INSTALLED DOWN SLOPE OF TRENCHING d G/v j SAT DISH SATELLITE DISH' = oc w ¢ zo - ACTIVITIES BETWEEN TRENCH AND DITCH LINE IN ACTIVE GAS VALVE °�, N c, YARD ORNAMENT , p Z° STATUE, BIRD BATHS, ETC. CONSTRUCTION AREA. r� PIV IRRIGATION CON 1 i\OL y POST INDICATOR OR ✓ALVE TREES %, °d °° ° G �• 4. ALL DISTURBED AREAS SHALL BE STABILIZED EEO TAILS DAILY. ® E.JUNC o ° o 4\ \\ F�°-R- ELECTRIC JUNCTION BOX OR OUTLET 0 SHRUBS / BUSHES p SIG flllfll��` BOX -3O ., �+"--Y ?�C 5> CHECK DAMS, CULVERT PROTECTION AND SILT FENCE MAY BE TRAFFIC SIGNAL L Jx (H) HORIZONTAL GROUND DISTANCE REMOVED WHEN DISTURBED AREAS ARE STABILIZED OR AN ADEQUATE STAND OF GRASS HAS BEEN ACHIEVED PER DETAILS. (G) NO STATE PLANE GRID DISTANCE EROSION CONTROL MATERIALS REMOVED FROM STABILIZED AREAS = _ _ _ = - _ - _ _ _ _ _ = CULVERT. MAY BE REUSED IN ACTIVE CONSTRUCTION AREAS. x - - x - - x - - -- FEt`CE � - -- CI _ - -{_}- -- - - -- SILK FENCE 6. ALL EROSION CONTROL DEVICES AS SHOWN ON THE PLANS AND - o- a- a- .- o- ._ :, -- - _- -o- -„ -,, o- GUARD DETAILS SHALL BE. CONSIDERED AS INCIDENTAL TO THE PROJECT ARD RAIL AND NO ADDITIONAL PAYMENT SHALL BE MADE. _ _ _ >� _mss APPROXIMATE LOCATION OF PRECAST CONCRETE CONSTRUCTION NOTES REVISION DATE - NOVEMBER 3, 2008 1. ALL PRECAST COMPONENTS SHALL MEET REQUIREMENTS ASTM C -478, LATEST REVISION, AND ASTM C -890. 2. ALL "FORMED IN PLACE" CONCRETE SHALL BE CLASS "B ", 3000 PSI MIN. 3. ALL PRECAST SECTIONS SHALL BE CONSTRUCTED PLUMB. 4. IF MANHOLES OR VAULTS ARE SET IN LOCATION OF HIGH WATER TABLE OR UNDERGROUND WATER IS ENCOUNTERED, THE CONTRACTOR SHALL INSTALL UNDER DRAINS AND STONE AS DIRECTED IN THE FIELD BY THE ENGINEER. 5. THE PRECAST SUPPLIER SHALL BE RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THE STRUCTURE AND, WHEN REQUESTED BY THE ENGINEER, SHALL SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS WHICH HAVE BEEN SIGNED AND SEALED BY A REGISTERED STRUCTURAL ENGINEER. 6. THE PRECAST SUPPLIER SHALL SUBMIT BUOYANCY CALCULATIONS TO VERIFY ANTI- FLOATATION OF WET WELL. CONTRACTOR SHALL MODIFY STRUCTURE AS REQUIRED TO ENSURE ANTI- FLOATATION AT NO ADDITIONAL COST TO OWNER. FINAL DESIGN NOT RELEASED FOR' CONSTRUCTIOIN N fy IPS IRON PIN SET CV � �I � � RBF REEAR FOUND p >- N OTIPF OPEN TOP IRON PIN FOUND o W W >I C FIPF CRI,APED TOP IRON PIN FOUND o m m W `j Of CIviU CONCRETE MASONRY UNIT LU �! w N LL. >- � ,o 0 R %In! RIGI1T OF WAY O Z m Z Z w o o(9 u) Z co 0 CEI,TERLINE In I- c/) 0 U) Z LU n o O¢ w Q w O CURVE (SEE CURVE TABLE) POB POlNT'OF BEGINNING CID CALCULATED POINT PB PLAT BOOK DB DEED BOOK vi L LINE (SEE LINE TABLE) BLDG BUILDING F' CAST IRON PIPE CORRUGATED METAL PIPE "ONC CONCRETE Ctv1U COKCRETE MASONRY UNIT CF)P CORRUGATED PLASTIC PIPE Lu DIP DUCTILE IRON PIPE & T ELECTRIC & TELEPHONE F OC FIBER OPTIC CABLE GIP GALVANIZED IRON PIPE C :'H OVERHEAD RCP REINFORCED CONCRETE PIPE u jG UNDERGROUND vi CID VITRIFIED CLAY PIPE PVC POLYVINYL CHLORIDE PIPE i =E FINISHED FLOOR ELEVATION PG PAGE REF REFERENCE I - 'JT DEPARTMENT OF TRANSPORTATION `1GS NATIONAL GEODETIC SYRVEY NCSP NORTH CAROLINA STATE PLANE R i3:_)X ME`I ER BOX GMU02 NO. DATE BY REVISION DESCRIPTION PRECAST CONCRETE CONSTRUCTION NOTES REVISION DATE - NOVEMBER 3, 2008 1. ALL PRECAST COMPONENTS SHALL MEET REQUIREMENTS ASTM C -478, LATEST REVISION, AND ASTM C -890. 2. ALL "FORMED IN PLACE" CONCRETE SHALL BE CLASS "B ", 3000 PSI MIN. 3. ALL PRECAST SECTIONS SHALL BE CONSTRUCTED PLUMB. 4. IF MANHOLES OR VAULTS ARE SET IN LOCATION OF HIGH WATER TABLE OR UNDERGROUND WATER IS ENCOUNTERED, THE CONTRACTOR SHALL INSTALL UNDER DRAINS AND STONE AS DIRECTED IN THE FIELD BY THE ENGINEER. 5. THE PRECAST SUPPLIER SHALL BE RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THE STRUCTURE AND, WHEN REQUESTED BY THE ENGINEER, SHALL SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS WHICH HAVE BEEN SIGNED AND SEALED BY A REGISTERED STRUCTURAL ENGINEER. 6. THE PRECAST SUPPLIER SHALL SUBMIT BUOYANCY CALCULATIONS TO VERIFY ANTI- FLOATATION OF WET WELL. CONTRACTOR SHALL MODIFY STRUCTURE AS REQUIRED TO ENSURE ANTI- FLOATATION AT NO ADDITIONAL COST TO OWNER. FINAL DESIGN NOT RELEASED FOR' CONSTRUCTIOIN N fy IPS IRON PIN SET CV � �I � � RBF REEAR FOUND p >- N OTIPF OPEN TOP IRON PIN FOUND o W W >I C FIPF CRI,APED TOP IRON PIN FOUND o m m W `j Of CIviU CONCRETE MASONRY UNIT LU �! w N LL. >- � ,o 0 R %In! RIGI1T OF WAY O Z m Z Z w o o(9 u) Z co 0 CEI,TERLINE In I- c/) 0 U) Z LU n o O¢ w Q w O CURVE (SEE CURVE TABLE) POB POlNT'OF BEGINNING CID CALCULATED POINT PB PLAT BOOK DB DEED BOOK vi L LINE (SEE LINE TABLE) BLDG BUILDING F' CAST IRON PIPE CORRUGATED METAL PIPE "ONC CONCRETE Ctv1U COKCRETE MASONRY UNIT CF)P CORRUGATED PLASTIC PIPE Lu DIP DUCTILE IRON PIPE & T ELECTRIC & TELEPHONE F OC FIBER OPTIC CABLE GIP GALVANIZED IRON PIPE C :'H OVERHEAD RCP REINFORCED CONCRETE PIPE u jG UNDERGROUND vi CID VITRIFIED CLAY PIPE PVC POLYVINYL CHLORIDE PIPE i =E FINISHED FLOOR ELEVATION PG PAGE REF REFERENCE I - 'JT DEPARTMENT OF TRANSPORTATION `1GS NATIONAL GEODETIC SYRVEY NCSP NORTH CAROLINA STATE PLANE R i3:_)X ME`I ER BOX GMU02 NO. DATE BY REVISION DESCRIPTION z 0 N SLUDGE HOLDING ca CL HOLDING cy) C) q C) U) 0) rn ca C) O C) O O wj BUILDING PROPOSED FLANGED INTAKE SCREEN WITH AIR BURST CLEAINING SYSTEM PER DETAIL. ROCK A =-�z� _ - - I ( ° \ —�`"� �I�T- a.7 - - - - \ \ \\ \ \ ° \ \\ \ \ ° \ � \� 41 It 13. J 60 \GRA IT '2 W4 < ZW & PROPOSED ----------- SIL1\ 1 8' WARNING SIGN PER DETAIL, \. '36'00 V") ROCK 'tPS —GPS Rl�'I�l ED OF +sIL N: 506422.17 --4LT- 2-.1 - — — — — — — R TK 2 1 WA 8' E: 736 ij,2 99 p a — — — — — — — — — — EL: 3604. ]E)366 5 ROCK U z Q U 0 Y A H\ AMW A S + SILT 1. 6� z I AN + PROPOSED 12" DI RAW WATER TRANSMISSION L A ILT 2.2' LINE (SEE OTHER SHEETS) PROPOSED z ID I-StLT 2. HIGHLANDS WWTP OUTFALL -- WARNING BUOY '\ 12" DIP I.E.3578.00' + SILT 1. 7' z 07 PER DETAIL j I fx, 4 -jS moo- CONCRETE DAM J1 \q, - r SILT Ir Z, z Stf- T-, PROPOSED I r�-� F- W s4k \- 0 ;Y4" WATER SERVICE CONNECTION AND J595 WATER METER PER DETAIL. EXTEND 0 8�- NNxl N N Ml, SERVICE TO CONTROL BUILDING. ET +7L 3' —3600- -_ �--z -,\ oo oho, o -------- - - - - -- 0 00 \ - -- ----- - - - - -- - PROPOSED Qom .1.01 LUL I) "t -3605' TEMPORARY COFFER DAM (14 o FS 1-1/2" BARI 50629581 o Cv 736150.*64 - - - - - - - - - - — — — o. 3613.77 (BY OTHERS) o..... -SIPHON - - - - - - - - - - TOww6F HIGHLANDS/ SANITARY SEWER MANHOLE TOP EL: 3619.94' 12' DIP I.E.:361193' 12" DIP I.E.: 3613.67' If PROPOSED MAGNETIC FLOW METER IN 4'x4' M—rc! SILT 2.8j PIN No.7530 -06-3347 + DB F13/PG 210 1 zl' OP K . . \ gnUT� 'W ,:t, YV CP NL SET N SfLT 2.0' N 506264.92 E: 73616 �50 L: 16 4 E: '00 Z 4— CONCRETE VAULT kZ)r-C. Vlnr-r\ --� s i F ii E DIV, 0 C qN6LG8PS STATIC ug, N 0 2o 16 ,s 'p PROPOSED S-jfp AERATI ON 12' WIDE ASPHALT ACCESS ROAD PER DETAIL. SLOPE ROAD AT 2.0% TO DRAIN. TO PERMANENT DITCH #1. f I y ACCESS ROAD M,11-lQ gffi -0, PROPOSED op m PERMANENT DITCH #1 om �� / en FF --- I DOUBLE Sffi'iG; C ASPHALT '7- Duo I off E: 736084.28 EL: 3632.58 PROPOSED VxV PRECAST CONCRETE CATCH BASIN PER DETAIL.—/ 'y TOP EL.: 3635.50' I.E.: 3632.50'± PROPOSED 12" DOUBLE WALLED HDPE STORM CULVERT. INFLUENT I.E.: 3632.50' DISCHARGE I.E.: 3632.00' BUILDING PROPOSED 4 of Hx8 90 W ASPHALT CURB LOCATED AT EDGE OF EXISTING PAVEMENT. 70 LF ASSUMED — ACTUAL LENGTH TO BE VERIFIED IN THE FIELD BY THE X ENGINEER DURING CONSTRUCTION. TOWN OF HIGHLANDS WASTEWATER k TREATMENT PLANT Z Z 'PERMANENT DITCH #2 uj \ \i \ \\ \ \ j \1 { > \ \ \\ \ \ \\ \\ \ \ \ \\ \ \\ \ \i \ \, \ \ \ \ i / / I \ U, > If B-2 PROPOSED r /SILT /2.5' L) 0 D '14" DI RAW WATER INTAKE LINE (SEE OTHER SHEETS) Lu do- 0 rx mmmm I / / y MiL TOWN OF, HIGHLAN\DS / it / I / Lu < PIN \No.75�0-56-4\145, U) 56 8/PG 105 LL 0 uj Z / TOWN OF HIGHLANDS z PIN 'No,7530-56-4145 /+ DB 18 PG 105 Si 1.7'/ 22.5* DI MJ FITTING WITH JOINT RESTRAINT j/ANU THRUST BLOCK PER DETAIL (TYP OF 2) 'Now- It —/SIIL'T 23' PROPOSED PROPOSED /RAW WATER PUMP STATION 4'Wx8'Lxl.5'D If ae RIP RAP APRON BUILDING (SEE OTHER SHEETS) PROPOSED C) PROPOSED SILT FENCE PER DETAIL (TYPNI GARNETTH TAYLOR PIN No.7530-65-1901 DB H-27/PG 1140 GRADING CONTOURS (TYP) -1 NO. DATE BY REVISION DESCRIPTION C) co > < O W W 0-) w- M co 0 co > w > w 04 1 0 W LL UJ z On z F-: > < w z I�j (-5 o 3 (j) z cm) L- fn rl rn 2! Lu e-, NO. DATE BY REVISION DESCRIPTION 25' -0" Q LO O c+3 O N 3 0 O N' W N 2 CL C (0 a WALL MOUNTED 1500 W, 240 V ELECTRICAL HEATER THERMOSTATICALLY CONTROLLED (TYP. OF 2) a d ... d .a `3 /$' .PVC PIPING --" i I „ 'a SEAL WATER PIPING 1 NORMALLY CLOSED ° TO SAMPLE POINT SOLENOID VALVE < I I (TYP. OF 2) a d: e a d s' a 4'- 0 "x4' -0" AUTOMATIC AIR LOUVER MOUNTED a a d: ° . a e° , VERTICAL TURBINE PUMP e 2' -0" A.F.F. d ° —I— J— ON MOUNTING PAD PER ° e .n ° ° < .'.° .d _ .,t l =, DETAIL (TYP -. OF 2) g' °. ' ° Q ° a 10" MJ 90° BEND WITH JOINT RESTRAINT. PROVIDE THRUST BLOCK PER DETAIL. ° < e 4.1. ,e ASPHALT T 0 zo¢ o a 2 �w z� Li! U :E z Co v G'! Y W 0 °' ° °d i 14 GATE VALVE COPPER SEAL WATER DRAIN,. °• °' d ° a _Q. n .a ; � 1 29 OCT 12 JCW (TYP. OF 2) SIZED BY MANUFACTURER °; DATE (0 °' e ° 10 » FLxFL 90° BEND (TYP. OF 2) z a a° d a° a ° EMMA,. 10 AIR CUSHIONED — — — — w o 9' ° SWING CHECK VALVE ° _ v o W 4 „ THICK CONCRETE (TYP. OF 2) s — \ \ °, a ' SIDEWALK PER DETAIL <X//, LIL .a' .• .d .. .a a 4 - 10 "x10" TEE 0 D \\ ° (TYP. OF 2) PUMP ° a 6” THICK REINFORCED CONCRETE SLAB WITH I 14 DIP (CL350) INTAKE LINE Ill W/ FLANGED SLUICE GATE f N0.1 \ a ° ` ° a da a. °a °' 6x6 -10x10 WWF & 6" CABC BASE. SLOPE a : --� d ° n. ° Q' —a ° °' a II II AWAY FROM BUILDING. BROOM FINISH. a .a I 1 °' �__L _ ° ° d d a° d I I LINE ROUTED TO INTAKE SCREEN - _ a ° PRESSURE GAUGE PER o Q` -- - - - -__ ° ' ° d . a (3' -0" MIN. COVER) o w_ w ci I DETAIL (TYP. OF 2) 0 w-W > > w w diO> II ud z 6j �z/C(�1 m � trz�n L: Q o , II II p'd w Q O w Boa`. iI tt A II i I F77 II 2" SCH. 40 WELDED STEEL AIR LINE z t n. d G° ° u e ..° . q BELOW GRADE AND SECURED -- — = I TO PUMP I w ° Q c i N0.2 FINAL DESIGN o ° ° ° .'° 4 ° 1,600 CFM EXHAUST FAN 0 RELEASED I CONSTRUCTION . .° ° °. e .4 a a ° A 30 "x30" ALUMINUM 4 FLANGED COUPLING / = — — -j ADAPTER (TYP. OF 2) �� a - 4 12 WIDE ROLL —UP DOOR 136.10' `.. � $ 4 3619.0' TI. / a A- ° ° - - " -- 1" AIR /VACUUM VALVE ° ' •° a ° ° Q (TYP. OF 2) .. a 4 ATE VALVE ° d ° °° GRATED TRENCH DRAIN PER - - a DETAIL. SLOPE BUILDING FLOOR 10 "x8" 90° REDUCING BEND e.. 4.4 a. .. a° TO DRAIN AT Y8 ":1' MINIMUM. ° a I I " A CONCRETE PIPE SUPPORT 8 ANGLE SURGE RELIEF PER DETAlil (TYP) VALVE DRAINED TO WETWELL ° °d 6" BOLLARD PER DETAIL (TYP OF 2) i I L a ei a ea a a °. a pd. ° ° ° d a a 4 ° ° °. I I a , 2" BUTTERFLY VALVE ACCESS HATCH 6' -0 PRECAST CONCRETE WETWELL WITH MANHOLE STEPS PER DETAIL. i AIR COMPRESSOR, TANK AND CONTROL I I UNIT FOR SCREEN AIRBURST SYSTEM ° I I ° I I (BY SCREEN SUPPLIER) ON 6" THICK 4 ° ) . . . . I I HEATER CONCRETE PAD 6" SCH. 80 PVC PIPE WITH TRAP I I AND FLAPPER VALVE AT OUTLET. DRAIN TO DAYLIGHT AT 1.0% SLOPE. I I I I 30' -0" 32 "x48" ALUMINUM FRAME DOUBLE HUNG SHATTERPROOF GLASS WINDOW AT 4' -0" A.F.F. (TYP.. OF 3) MANHOLE STEPS (ROTATED FOR CLARITY) 10" MAGNETIC FLOW METER ADJUSTABLE PIPE SUPPORT PER DETAIL (TYP. OF 2) 6" MIN. #67 STONE -J 14'-S-C'H 80 PVC PIPE WITH TRAP AND FLAPPER VALVE. DRAIN TO DAYLIGHT AT 1.0% SLOPE. ' W dwwmm -J 1 29 OCT 12 JCW REVISED INTAKE LINE QUANTITY PER PWSS RECOMMENDATION NO. DATE BY REVISION DESCRIPTION EMMA,. Yxx i` EL <X//, LIL F- SLUICE GATE MANUAL OPERATOR, GEARED CRANK TYPE. 0 D -- - - - - -- -� 14 DIP (CL350) INTAKE LINE Ill W/ FLANGED SLUICE GATE --- - - - - -� PER DETAIL II II a it 2" SCH. 40 WELDED STEEL AIR N o I I LINE ROUTED TO INTAKE SCREEN I IN SAME TRENCH AS INTAKE LINE. o Q` U (3' -0" MIN. COVER) o w_ w ci II i I - m w 0 w-W > > w w diO> II ud z 6j �z/C(�1 m � trz�n L: Q o , II II p'd w Q O w Boa`. iI iI II II i I II 2" SCH. 40 WELDED STEEL AIR LINE ROUTED THROUGH WALL WITH HIGH TEMP LINK SEAL. TURNED DOWN TO BELOW GRADE AND SECURED -- — = I TO OUTSIDE WALL WITH S.S. STRAP. FINAL DESIGN 1,600 CFM EXHAUST FAN - -�-- -� (4'- 0 "x4' -0") MOUNTED RELEASED 6'-0" A.F.F. CONSTRUCTION FLOOR PLAN SCALE: Y2" _ 1' 1 29 OCT 12 JCW REVISED INTAKE LINE QUANTITY PER PWSS RECOMMENDATION NO. DATE BY REVISION DESCRIPTION z a m c. 0 N O 3 N U 0) NI W' a' I w 2 a` 06 a s� c m 0 UI N O r U 0 T M O O O r O C t6 L C m t/f N O r M O O O O O IN J C - 7.4 ° A A. 4 6" CONCRETE PAD 48 "X48" INTAKE AIR LOUVER MOUNTED 2' A.F.F. CONTROL BUILDING (SEE OTHER SHEET BOLLARD PER DETA CONCRETE SL/ 6" SCH. 80 PVC I: 10" DI RAW WATE 8" DI SURGE 14" I CONTINUOUS RIDGE VENT a' 4- :- _ e A 4 . A FRONT ELEVATION NOT TO SCALE PLYWOOD SHEATHING WITH METAL SIDING AND FINISH TO MATCH ROOF LIGHTING FIXTURE 2' ROLL -UP DOOR —� �— 6" BOLLARD (TYP-) SPLIT FACE CMU vcDTiI-Ai TIIPPIKIf= PIIKAP ALUMINUM GUTTER SPLASH BLOCK (TYP.) SLOPE AWAY FROM BUILDING (TYP) ♦ II�TA 1 M A AICI mAAC 12'- It —V X / —U 1-1VLLVYY IVIL 1l11_ TVA l ln"' • 1. � 1, � . z \', / I > LITE SAFETY GLASS & PANIC BAR - _ _PROVIDE POSTIVE DRAINAGE 61. III 1 I III -1111 I AWAY FROM BUILDING (TYP) O _ - IIhITI- III ®ILI I III -f I l -I I,I.- I EI 1 1--_ 11 I I M I I_I I I -111 I I I I I I SIDE ELEVATION Il li III -III III =III_ f ll -III I I -I II I (I - i k NOT TO SCALE r4'1'L I I I_III °IIi � I I 1 -111 (III I2 "8 #67 STONE WITH 6 I I I I I -11 -- M VAPOR BARRIER I I ,) i I! -1 I M 1 I I f I I I =1 I I -ITT= I I I -1 I I -III I i 1 -1 I I_I 11 -f I ui I III -I 11 -1 I i I I -I 11 -1 I I -I 11= 111- 111 =1.11 <� II I II -1 I 1= 111 -1( �` COMPACTED FILL NOTES: 1. ROOF FOR BUILDING SHALL BE A CONCEALED FASTENER, LAP -SEAM METAL ROOF. SEE PROJECT SPECS FOR DETAILS. 0 +00 0 +20 U +4U UTOV w PROFILE VIEI W \ USFS 1 -1/2" BAR EDEN GLEN LTD �/ ' V wu N: 506474.41 \ E: 736499.47 PIN No.7530 -66 -6559 i PLAN PROPOSED 2-12" 450 FITTINGS \ EL: 3616.47 DB Y24 /PG 1558 � I rl \ NP50 L 62 56 / I 50 0 25 50 100 150 W E. 736500.40 I U_ PROPOSED FULL WIDTH EL 3613.34 NS50637811 BAR E :736611.75 PROPOSED CULVERT INLET GRAVEL DRIVE REPAIR \ EL: 3614.70 18 "CMP PROTECTION PER DETAIL GRAPHIC SCALE I INCH = 50 FEET w - - --------- I.E. :3608.74' a� TBM NL IN POLE EL: 3611.20 PLASTIC YARD INLET '" \ \ � HARDWOOD 36" SANITARY SEWER MANHOLE ��=i / - - - \�� NC SET H N _ 5 S 14 �\ i I N: 06325.28 f, i 00 TOP EL: 3615.15'1 -lCr/ / >� / _ �0p ` }� E� 3614 93 0 'J oNO FORCE MAIN WITH VALVE % ° i ' \ \ Zap a-° °" 4`w` - +ag PROPOSED FULL LANE WIDTH O MILLING AND OVERLAY PER I per„ USFS 1 -112" BAR s �' '� tti O cif �eM,, ,,• i ��-% =r� - �\ eo °O, \ .: \ X EPAIR DETAIL ,-- _ !/ CUARDR T PAVEIYIENT R l S� \ \ NCD If 1 N. 506568.66 , - % � / ,� �s _ / `� --. - � \\ � 1 E: 736165.92 °i f��%° �% % �3X '/OE OF %AT ° \ ` °2 ^�O (� a EL 3624.64 506422.17 00, / ° _ ° " \ \ _ ty IGNS EL736641,7 "\ 00°.S �./ s / - -- \ ! \ \ _ _ ' , PROPOSED 12" GATE \ \ \ X (APPROXIMATE - - - CUARdRAIL / / ✓// / /�i - _ _ - ° _ / \ \ ^ LOCATION W TOWN OF HIGHLANDS =VALVE AND BOX / ' ° ° ° - _ PIN No.7530 -06 -3327 / (_ J I DB F13 1PG 210 `LAKE - - �i / \ _ \\ \ 1 1 \\ EXISTING 6" /� // // / \ 4,,p mss\ WATERLINE I PROPOSED CULVERT INLET RTK _ / \ / " \ PROTECTION PER DETAIL W _ SEQUOYAH - - y95 / / // �/n \� \ 4 <J \ ° W GPS N. 506490.88 E: 736186.65 CO a/ f/ EL: 3605.16 \ ,/ % i� �✓ 3� // / \� \� \ \ \ °\ 1 ✓ //� / \ \ z \ \\ L \ i Xl6p� l \ //i i� / -� \` \�� \ \\ �s9-- a /. / r _ ✓/\ \ \ \ \ \/ 1: \� ° \\ Q UP 3 41 W 0) ROCK WALL Z. 24 "CMP L \ _J I I ° \ \ \� ` \ ° \ \ \ i \ \ \ \ // `� ` \ E.:3593.20° \ ° \ i�/ -\ ` ° \ 1:4 \ - - ` -- \ \ . TEL ROCK WALL k`rr) ' --ll E ROCK \ _ / �r _ (DIVER -)- c Vv 04 EQ \ \ (/,�` \ \� rl \�`\\ �, \ 1 \L =/ ! _ / % // / ✓ , jj 7 X -_ _ \ \ \ \ \ \�° �s 9s 9 \\ \ \\ \\ \ \ `\ \ � \ 1 \ ( � \��\ / , i I �I iIIrI I l '� 72 \ \ \ RAW PROPOSED TEMPORARY N/59.A ( 29 0 „9 WM LE.:360570'- " D 30 "CMP ° FINAL m R¢ I V PROPOSED E 36170 00 i o COFFER DAM (BY OTHERS) N `�-' -- - WATER TRANSMISSION LINE, \ x,� _ �o PLACE IN CENTER OF WEST \ ? CP /NL SET ``� \ xe `w ey.,' �. - - o uj ' Go _j ° ° \ \� \� \ \\ \\ \ -`p � ^^.,,,...�- .Z:=z` \ O •c o t_/J N: 506012.35 �\ �`.� `DL oW (!) N �o h E: 736840.77 ;: HIGHLANDS WWTP \ (\ \ \ EL 3615.96 0 -� t \ \' /,/, s e -5, BOUND ll\ °�` \`� PROPOSED RAW WATER INTAKE BOUND TRAVEL LANE �.�, _ \ k x _ CONSTRUCTION ° 72" DIP OUTFACE h I.E.: 3578.00' / ✓ / ° // ' \°FR \ \ \ \� / ° o °�`` \` \ \ \\\\� \�� LINES (SEE OTHER SHEETS EXISTING 12" DIP l I I \ \ ` , } �� �� SEWER FORCE MAIN RAIL ° o \kp p �\ \\I \\ \\ , \, ,_ Iultti I i I i l ` \ \ \ \, TOWN( : OF HIGHLANDS Lu usFS 1 -t /�" BAR PROPOSED FLOW METER VAULT PIN h o.7530 -56 -4145 958 _ .... _ ... ° °e E: 736150.64 EL: 3613.77 1AND 10 GATE VALVE ANDS 18/PC 105 \.. \ ° SANITARY SEWER MANHOLE BOX (SEE OTHER SHEETS) ° cn TOP EL: 3619.94' LAKE SEQUOYAH 12" DIP I.E.:3613.93' 12" DIP 1,E.:3613.67 ° CP1NL SET ° N: b06264.92 ° E: 736162.50 ° ! EL; 3616.44 \ \ \\ PROPOSED RAW WATER \� \ \\ NOTES: OCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE ° ` , `, \� \ INTAKE PUMP STATION FIELD BY THE !CONTRACTOR. ° / ,�ti //Q ,�a c� �,�� �.., 1 1 � 2. CONTRACTOR SHALL REMOVE AND REPLACE ROADWAY SIGNS AND MAILBOXES AS NECESSARY TO INSTALL PROPOSED. ts� -r ` ` \ (SEE OTHER SHEETS) UTILITY LINE. CONTRACTOR SHALL COORDINATE SIGN REMOVAL AND REPLACEMENT WITH THE NCDOT.- ° _ / - -� \ - - - - - - - - - 3. CONTRACTOR SHALL COORDINATE WORK IN THE PROXIMITY OF UTILITY POLES WITH APPROPRIATE UTILITY COMPANIES. , / 4. CONTRACTOR SHALL PLACE A 2" LAYER OF SAND ON ALL ASPHALT OR CONCRETE SURFACES PRIOR TO PLACING / EXCAVATED MATERIAL. CP /NL CPS STATIC �\ \ \ \ \/ PROPOSED 5. CONTRACTOR SHALL CONTACT ALL UTILITY PROVIDERS CONCERNING EXACT LOCATION OF EXISTING LINES PRIOR TO ° N: 506208.16 \ \ \ \ \ CONSTRUCTION. IF EXISTING UTILITY CABLES ARE ENCOUNTERED IN CONFLICT WITH PROPOSED UTILITY LINE, CONTRACTOR TOWN OF HIGHLANDS E \ SILT FENCE PER DETAIL SHALL STRIP OUT EXISTING CABLES, : 736111.83 \ \ \ \ \� INSTALL PROPOSED UTILITY LINE & RE- INSTALL EXIS EL TING UTILITY CABLES. 3625.57 1 PIN No.7530 -56 -4145 \ \ \ 6. ALL RIGHT OF WAY INFORMATION PROVIDED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. s DB 18 /PG 105 \\ \ \� \� \ GARNETTH TAYLOR 7. CONTRACTOR SHALL RESTRAIN PIPING JOINTS WITHIN 2 PIPE LENGTHS OF NORMAL WATER LEVEL. APPROVED \ \ \ \ GARNETTH TAYLOR \ PIN No.753O -66 -3031 RESTRAINING DEVICES INCLUDE RETAINING GLANDS (MEGALUGS), FIELDLOCK GASKETS AND RESTRAINT SYSTEMS \ \ u APPROVED PIPE MANUFACTURERS. ... � PROVIDED BY APP OVE • a PIN No.7530 -65 -1901 V DB H-27/PG 1140 g, TREE REMOVAL SHALL OCCUR BETWEEN AUGUST 15 AND JANUARY 31, PREFERABLY IN FALL OR WINTER TO AVOID r • D8 H -27 /PG 1140 POSSIBLE IMPACTS TO RAFINESQUE S BIG EARED BAT AND INDIANA BAT. ANY -TREE REMOVAL OUTSIDE OF THIS PERIOD 1 29 OCT 12 JCVV REVISED SITE LAYOUT PER PWSS COMMENT LLI r / M6L1 SHALL BE COORDINATED WITH THE U.S. FISH AND WILDLIFE SERVICE. LILM \ NO. DATE BY REVISION DESCRIPTION j-° y ry / \ PROFILE 11' - -- - SCALE: HORIZ. 1 "= 50' VERT. EXISTING GROUND 1 "= 5' 3620 3620 - US HWY 64 LF-12!�-� USH -ON JOINT PIPE TO BE US ---D FOR 3615 ALL PPE INST AL ED WITHIN 2 PIPE J INT LNGT S 3fa15 OF NORMAL W TER LEVEL WHERE PRACTICABLE -mom 12 „DIP F/M 3610 N ( aT 3: Q o N > N 361 30 "CMP LL o 8 „CMP PROPO ED 12" DIP RAW - - - -- - -- - = - -- - �- m m > a � NI It -- WATER TRANSMISSION LINE-. u w ° w w (3' -0" MIN. COV R) 3605 °z LL z o z � z � �I 3605 LAKE SEQUOYAH NORMAL WATER LEVEL z W CD O <t w <C Lu O r a 12' MIN. -- CLEARANCE 12" MIN. CLEARANCE 3600 3600 2> S H. 40 WELDED 12" MI Q 1 STEEL. AIR LINE FCLEARAN CE 14 "DI RAW WATER Lu p INTAKE _INE 3595 Q 3595 .�. LL 4 PROPOSE 12" GATE VALVE AND BOX r m C) - " NOTE: 3590 3 3590 FOR LAKE CROSSING, 3' COVER REQUIRED BELOW NATURAL GRADE. ACCUMUILATED SILT ABOVE' NATURAL a � GRADE SHALL BE EXCAVATED AND RETURNED TO N TRENCH OR DISPOSED OF AT SUITABLE LOCATION ®o ' OUTSIDE THE LAKE BOUNDARIES. �I 3585 �' ui m C14 J o ZW X rZ -- w -I m Z 3580 3580 W m Z ®W - -` UJI ®--� (n Q CL Q -- - - -1 -- - - - -- Ld Cc CL 0- -� - 3575 SHEET 3575 O w Q LO > w w - o + W t-- + co- ci .. Q O Q Q " o to u_ '� V) ® �-- !1 -- `� Slj 10 +00 11 +00 12 +00 13 +00 1 +00 15 +00 16 +00 17 +00 18 +00 19 + ®0 20 +00 21 +00 22 +00 i c Q m n M M d' ch O N 3 a N U 0 N w co 0 u> U 0 U 0 m 0 0 0 0 a� io c m .N a� 0 'o M O 0 d 0 0 A APPROVED WARNING TAPE o A CONCRETE THRUST 24" ABOVE PIPE (PVC ONLY) —_ BLOCK BACKFILL MATERIAL BACKFILL MATERIAL, w COMPACTED IN 6" LIFTS \ / / / / / // / // // / COMPACTED IN 6 LIFTS w A/2 A/2 UNDISTURBED \ \ / \ \ / \ \ / \ \/ / \ \ / \ \ / \ \ / \ \i :EARTH DUCTILE IRON PIP 12" M ,_..� 4. \ \ / ;BACKFILL MATERIAL / \ \� LINK—SEAL "° .° a / ° / " /. BACKFILL MATERIAL SEAL MODEL C OR ° CONCRETE / / d / a I " 6 MIN /\ ' COMPACTED N 3 LIFTS. COMPACTED IN 3 LIFTS �P° THRUST BLOCK \ o \ CQ L, OR 'APPROVED EQUAL C`? as d.- d .) °°. a B 4 Q / \� / No.12 COATED COPPER TRACING WIRE (PVC ONLY) Q ° UNDISTURBED \\ \\ \ UNDISTURBED 6 ° e EARTH EARTH D BELL LHOLES NOT SHOWN o STANDARD EXCAVATION OVERGUT EXCAVATION MM N UNDISTURBED CORE` DRILLED HOLE z BEND BEND EARTH NOTE: ^ a TYPICAL THRUST BLOCKS 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND / HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S r� REVISION DATE NOVEMBER 3, 2008 RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES cn AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. PIPE SIZE CORE SIZE LINK— SEAL MODEL NO. w `C W CONCRETE 24" MIN.% THRUST BLOCK /\ \ \ \ \\ \ \� / \// TYPICAL T I DETAILS 499 899 Ls— 400 TRENCH WIDTH \��� \\ \\ / \ \ \� / \ \/ Q \, �/ \ \ /i \, \- / /�� / / \�,\ LINES 6,, Io,, LS =goo o f \\ \ / \ \\ \\ \\ 12 MIN. / // /// / `// `// THREADED ROD (GALVANIZED REVISION DATE - NOVEMBER 3, 2008 - \�� \ \ / \/ / \ \ /\ \ / \/ OR BITUMINOUS COATED) >: ,9 ,,; / \/\ 8 12 LS --400 ' W 12 16 LS— 425 n2 MIN \\ 4— A ° -�— y' ,r W 16 20 LS— 425 0 �P daa o / \ Ir. Qc 9, ,y oUl (n N Uo° J m \ \ \\ 12 MIN. \� ;� 1 B 24 LS -525 _ a p Z 4J q4 4 3Q °° \/\ \ /j� /� � / / \ //\ / / APPROVED WARNING TAPE 24" NOTES: ABOVE PIPE (PVC ONLY THREADED ROD {GALVANIZED / /// / /� / /� / /� / /� / // 4 PIPE DIAMETERS 1. DO NOT GROUT LINK -SEAL IN PLACE OR BITUMINOUS COATED} UNDISTURBED EARTH / \ \ \j \ \ \ / / \ \� \ \� \ 2. LINK —SEAL SIZE FOR WALL SLEEVES WILL VARY FROM TABLE /' 3. OTHER PIPE SIZES, MATERIALS AND APPLICATIONS ` SHALL BE PER TYPICAL THRUST BL F MANUFACTURERS SPECIFICATIONS. REVISION DATE - NOVEMBER 3, 2008 BACKFILL BACKFILL LINK—SEAL DETAIL - CO T HOLES MATERIAL MATERIAL COMPACTED COMPACTED REVISION DATE - NOVEMBER 3, 2008 w IN 6" LIFTS IN 6" LIFTS CONCRETE / \ \X\ \/\24 \MIN \ / \ \ / \i 12 MAX / \/ THRUST BLOC. //. / / / " \\ 12" MAX ^� OFRPIPE LINE �` \P' " \/ OF PIPE LINE A 6. MIN TRENCH. WIDTH 6 MIN �\ o� \ / \� \ \ \/ \ 12 \MIN.' THREADED ROD (GALVANIZED No.12 COATED / /\ No.12 COATED �/ /// ° / / \ //\ a //� OR BITUMINOUS COATEQ) COPPER TRACING \\ COPPER TRACING WIRE (PVC ONLY) 6" MIN \\ WIRE (PVC ONLY) ° 6" \\ \�. a a ° 1MIN. ° Ii a PLUG /\ \\ �. WASHED STONE /x /� \ \� \ /\ /\ / \\ WASHED STONE -'< \ �° a 12 MIN.) ' `L - = == / \ \ / \\, " . ° EMBEDMENT // ���� \ �\ ai. 112 MIN //\ `� / / EMBEDMENT _ \\ \\ - e ' a' \ \ _ UNDISTURBED EARTH ADDITIONAL WASHED ..'WATER .LINE _ a Al ° = STONE FOR UNDERCUT \ \ \ / \\ a Q - w ° e EXCAVATION ONLY AS c- /\//\ - �', / / \� - - - -- DIRECTED BY ENGINEER - L ° \ 18" -a - -- - \ .. Q \ a e I�, STANDARD EXCAVATION \ \ %� \ /� \` \� \` \ \r \ \`f \ \` \� ° \ 12 MIN. :., e \ �/\ // / / Lu 4 = - - UNDISTURBED EARTH /\ \ SEWER LINE °° _ 0/>/\00y IN WET CONDITIONS 0 ° . ° \ \ \ \� 3/4" TAP W/ CORPORATION Lu / /\\ STOP FOR AIR PRESSURE RELIEF �I UNDERCUT EXCAVATION IN UNSTABLE SOILS TYPES THREADED ROD (GALVANIZED STORM PIPE OR BITUMINOUS COATED) UNDISTURBED EARTH /� /� / / \ / / \ / /\ // 11.E NOTE: OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL TYPICAL THRUST BLOCK SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS REVISION DATE NOVEMBER 3, 2008 THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS CROSSING STORM PIPE AND FOLLOW THEM ACCORDINGLY. SEWER 2. PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL REVISION DATE - JANUARY 2, 2007 QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. A 3. PAYMENT FOR WASHED STONE UNDERCUT SHALL BE FOR THE LENGTH OF THE TRENCH REQUIRING UNDERCUT X 6" DEPTH INCREMENTS TO THE DEPTH REQUIRED. A/2 A/2 UNDISTURBED EARTH cr- TY IC TRENCHING T I PIPE as . e . n a CONCRETE u? CONCRETE Q F Q THRUST BLOCK WITH I H WASHED STONE EMBEDMENT T THRUST BLOCK. Az 4 \ \ \ \ \\ \\ \\ REVISION DATE - NOVEMBER 3, 2008 ° w_ w M � � U .4 4 w wU 04 0 I- - °.. ° \ O d u1 Q w `o =!'o 0 p° O - m tw- cn o in z w c, 0 O ° 3 C14 E. ° d ° \ ° Q e °' - ° . ava® cu TEE TEE UNDISTURBED EARTH STAINLESS STEEL BOLT STEEL ENCASEMENT MASONRY SEAL AT END OF PIPE TYPICAL THRUST L C TEES STEEL ENCASEMENT REVISION DATE - NOVEMBER 3, 2008 FINAL 9 NOT RELEASED 1FI NOTES:- JOINTS SHALL NOT BE POURED IN CONCRETE OR HAVE CONCRETE SPILLED ON THE BOLTS OR NUTS. THE FITTING SHALL BE WRAPPED IN A LAYER OF POLYETHYLENE PLASTIC PRIOR TO POURING THE THRUST BLOCK. CONSTRUCTION 2. ROD AND EYE BOLT DIAMETER SHALL BE A MINIMUM OF 3/4" AND SHALL MATCH THE SIZE OF THE BOLT PROVIDED WITH THE FITTING. BOLT -0� TYPE SKID 3. CONTRACTOR SHALL REPLACE FITTING BOLTS WITH THREADED ROD FOR 1/2 OF THE BOLTS SUPPLIED WITH EACH FITTING. RODS SHALL W/ BITUTAASTIC PAINT ESS STEEL BE EQUALLY SPACED. OR STAU "�:�!L TYPE SIZE 11-1/4' BEND 22-1/2* BEND 45° BEND 2 -6 8 12 12 12 12 14 16 18 20 24 30 36 40 46 12 12 14 18 20 22 26 28 34 42 50 58 66 12 16 20 24 28 32 36 40 46 58 70 80 90 16 22 28 32 38 42 48 52 64 78 94 108 124 16 22 28 32 38 42 48 52 64 78 94 108 124 14 18 22 28 32 36 40 44 54 66 80 92 104 10 12 14 16 18 20 24 30 36 42 48 CARRIER PIPE TWEEP HOLES BOLT -ON TYPE SKID AT BOTTOM (MIN. 2 PER JOINT, CARRIER PIPE SPACED EVENLY) NOTE: FOR PRESSURE CARRIER PIPES, IF SUITABLE UNDISTURBED EARTH IS NOT AVAILABLE FOR THRUST BLOCKS DUE TO EXCAVATION, CONTRACTOR SHALL ATTACH THREADED RODS AS SPECIFIED IN THRUST BLOCK DETAILS TO THE ENCASEMENT AND ROD FITTINGS DIRECTLY TO'THE ENCASEMENT PIPE. ATTACHMENT OF THE RODS SHALL BE BY WELDING DIRECTLY TO THE ENCASEMENT PIPE OR BY WELDING EYE BOLTS TO THE ENCASEMENT FOR ATTACHMENT OF oriE E, T THREADED RODS WITH NUTS. MINIMUM OF THREE RODS REQUIRED PER FITTING. -- — - -' -- — -- - Aok mm Aft A a J w O a c4 0 N O_ 3 0 0 N w C. U 0 U 0 co 0 0 0 0 m 0 0 M O 0 0 'o O E \- UNDISTURBED EARTH ivU I ta: 1. EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. GROOMED CLEAN OF DUST BEFORE TACK COATIS APPLIED. 2. EDGES TO BE TACKED WITH CRS -1 OR CRS -11- 3. THICKNESS OF CABC STONE, 1 -19.OB BINDER AND SF 9.5A SURFACE COURSE SHALL MATCH EXISTING CONDITIONS IF GREATER THAN SHOWN ON DETAILS. 4. CONTRACTOR RESPONSIBLE FOR REPLACEMENT OF ANY PAVEUENT MARKINGS DISTURBED OR COVERED BY OVERLAY. 5. CONTRACTOR SHALL PROVIDE CABC, EQUIPMENT AND LABOR AS NECESSARY TO DRESS UP ROAD SHOULDERS TO ACCOMMODATE NEW ASPHALT OVERLAY. 3� L F�S S"fD: "PROCTOR DR UNDIST RBED jj // EARTH 2" MIN. 6" MIN. \-- TACK EXISTING PAVEMENT EDGE WITH CRS -1 OR CRS -11. PATCH TO MATCH EXISTING PAVEMENT ---6" LIFTS OF SUITABLE SOIL OR CABC AT OPTIMUM MOISTURE COMPACTED 95% STANDARD PROCTOR NOTE: 1. EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. BROOMED CLEAN OF DUST BEFORE TACK COAT IS APPLIED. 2. EDGES TO BE TACKED WITH EMULSIFIED ASPHALT TACK CRS -1 OR CRS -11. ASPHALT DRIVE REPAIR NOT TO SCALE REVISION DATE - NOVEMBER 3, 2008 ( 1' -0' SEE TRENCH DETAIL 1' -0 FOR WIDTH TO MATCH EXISTING GRAVEL SURFACE ® EXISTING BASE COURSE EXISTING BASE COURSE TYPICAL PAVEMENT REPAIRS"' NOT TO SCALE 8" MIN.. CABC COMPACTED TO 100% 8„ R OR / \ \ / \ \ / \ \ / \ \ / \ \� \ \�� \�� ' CONTRACTOR'S NOTES: PAVEMENT REPAIR SHALL BE PERFORMED ACCORDING TO THE FOLLOWING PROCEDURE, PLUS ALL OTHER MILLING AND OVERLAY SHALL EXTEND FROM EDGE OF REQUIREMENTS OF THIS DETAIL AND THE SPECIFICATIONS: PAVEMENT TO WITHIN 6" OF EXISTING CENTERLINE DRY/ \\ STRIPE. THE INTENT IS TO AVOID DISTURBING UNDISTURBED 1. BACKFILL TRENCH WITH SUITABLE EARTH AND COMPACT TO TRENCH SHELF AS SHOWN ON THE DETAIL. EXISTING CENTER LINE STRIPING AND REFLECTORS. EARTH � 6" LIFTS OF SUITABLE SOIL 2. PLACE CABC IN 2 COMPACTED LIFTS TO WITHIN 13" OF THE EXISTING PAVEMENT SURFACE. OR CABC AT OPTIMUM 3. PLACE 13" OF TYPE B 25.00 BASE COURSE IN 2 COMPACTED LIFTS, UP TO EXISTING PAVEMENT SURFACE. MOISTURE COMPACTED 95% 4. ALLOW SEVERAL DAYS FOR VEHICLE TRAFFIC TO FURTHER COMPACT THE REPAIR. STANDARD PROCTOR 5. MILL TOP 2- INCHES PER DETAIL. 6. PLACE 2" OF TYPE S 9.5C SURFACE COURSE AND COMPACT. 2" TYPE S 9.5C COMPACTED BITUMINOUS SURFACE COURSE 7. NOTE: UPPER 2 FEET OF BACKFILL UNDER ROADS TO BE COMPACTED TO 100%. ( PIPE 11" TYPE B25.00 BITUMINOUS BASE COURSE IN TWO COMPACTED LIFTS C.A.B.C. IN TWO COMPACTED LIFTS TO WITHIN 13" OF SURFACE I COMPACTED TO 100% COMPACTION - STANDARD SAWCUT EXISTING PAVEMENT ROAD GRAVEL DRIVE A MILL EXISTING ASPHALT 2" DEPTH AND TO E.O.P. OVERLAY 2" TYPE S 9.5C COMPACTED NOT TO SCALE VARIES BITUMINOUS SURFACE COURSE REVISION DATE - NOVEMBER 3, 2008 MILL EXISTING ASPHALT 2" DEPTH AND OVERLAY 2" TYPE S 9.5C COMPACTED ( EXISTING EXISTING I BITUMINOUS SURFACE COURSE /\1,/\1,/ \x,/17777,/\ LLj ' • /�� /jam /j� /j / \ \ / / \ \ / / \ \ /��`/ e BITUMINOUS TACK COAT \� \\/ /jam //i 2' -0" PIPE 2' -0" 1' -0" x� \// O.D. \ COMPACTED EARTH 3' 12' 3 3 BACKFILL \ S�OpE -11" FT -1/4-/FT 1 4" FT - 1 %FT 21 \ /x /" A /� �. /i, /ice, UNDISTURBED EARTH 2" TYPE S 9.5C COMPACTED 6" CABC COMPACTED SUBGRADE BITUMINOUS SURFACE COURSE NOTE EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. BROOMED CLEAN OF DUST BEFORE TACK COATIS APPLIED. 2. TYPE S 9.58 SURFACE COURSE IS AN ACCEPTABLE ALTERNATIVE TO TYPE S 9.5C. 3. EDGES TO BE TACKED WITH CRS -1 OR CRS -11- TYPICAL R - T I "LAD CRu' 4. THICKNESS OF CABC STONE, B 25.00 BASE COURSE AND 5 9.5C (OR S 9.5B) SURFACE COURSE SHALL MATCH EXISTING CONDITIONS IF GREATER THAN SHOWN ON DETAILS. NOT TO SCALE 5. CONTRACTOR RESPONSIBLE FOR REPLACEMENT OF ANY PAVEMENT MARKINGS DISTURBED OR COVERED BY OVERLAY. REVISION DATE - NOVEMBER 3, 2008 TYPICAL PAVEMENT REPAIRS W/ II - NOT TO SCALE MODIFIED FOR THIS PROJECT NOTE: 1. ALL STRIPING IS THERMO PLASTIC, PER N.C.D.O.T. STANDARD 1087(C). 2. PAVEMENT MARKINGS SHALL CONFORM TO N.C.D.O.T. DIVISION OF HIGHWAYS STANDARD DRAWINGS: - 1205.01, SHEET 1 OF 2 - 1205.04, SHEET 1 OF 2 - 1205.05, SHEET 1 OF 1 1205.06, SHEET 2 OF 2 - 1205.07, SHEET 1 OF 1 - 1205.08, SHEET 1 OF 7 GENERAL NOTE ( TIP'I REVISION DATE - NOVEMBER 3, 2008 • PAVEMENT PATCHING AND RESURFACING - COMPLETION OF TRENCHING PATCH WITHIN 2 DAYS SMALL ;PAVEMENT OR CABC PATC . HING IS COMPLETE, IF APPROVED BY THE ENGINEER. B ® I L 1/2 ". EXPANSION JOINT -� r-007-1 /7" EXPANSION r4 T'+ w to A 2" ASPHALT SURFACE COURSE (TYPE SF 9.5A) 6" TYPE 119.OB BITUMINOUS BINDER COURSE IN TWO 3" COMPACTED LIFTS MATCH EXISTING PAVEMENT 6" C.A.B.C. IN TWO 3" COMPACTED LIFTS COMPACTED TO 100% COMPACTION - STANDARD 1 EXISTING EXISTING o v BITUMINOUS TACK COAT \�� \/ i' -0" 1' -0" PIPE 1' -0" MAX. O.D. MAX. �\ COMPACTED EARTH BACKFILL NOTE: UPPER TWO FEET OF ROADS TO j� BACKFILL UNDER BE COMPACTED TO 100 % \- UNDISTURBED EARTH ivU I ta: 1. EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. GROOMED CLEAN OF DUST BEFORE TACK COATIS APPLIED. 2. EDGES TO BE TACKED WITH CRS -1 OR CRS -11- 3. THICKNESS OF CABC STONE, 1 -19.OB BINDER AND SF 9.5A SURFACE COURSE SHALL MATCH EXISTING CONDITIONS IF GREATER THAN SHOWN ON DETAILS. 4. CONTRACTOR RESPONSIBLE FOR REPLACEMENT OF ANY PAVEUENT MARKINGS DISTURBED OR COVERED BY OVERLAY. 5. CONTRACTOR SHALL PROVIDE CABC, EQUIPMENT AND LABOR AS NECESSARY TO DRESS UP ROAD SHOULDERS TO ACCOMMODATE NEW ASPHALT OVERLAY. 3� L F�S S"fD: "PROCTOR DR UNDIST RBED jj // EARTH 2" MIN. 6" MIN. \-- TACK EXISTING PAVEMENT EDGE WITH CRS -1 OR CRS -11. PATCH TO MATCH EXISTING PAVEMENT ---6" LIFTS OF SUITABLE SOIL OR CABC AT OPTIMUM MOISTURE COMPACTED 95% STANDARD PROCTOR NOTE: 1. EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. BROOMED CLEAN OF DUST BEFORE TACK COAT IS APPLIED. 2. EDGES TO BE TACKED WITH EMULSIFIED ASPHALT TACK CRS -1 OR CRS -11. ASPHALT DRIVE REPAIR NOT TO SCALE REVISION DATE - NOVEMBER 3, 2008 ( 1' -0' SEE TRENCH DETAIL 1' -0 FOR WIDTH TO MATCH EXISTING GRAVEL SURFACE ® EXISTING BASE COURSE EXISTING BASE COURSE TYPICAL PAVEMENT REPAIRS"' NOT TO SCALE 8" MIN.. CABC COMPACTED TO 100% 8„ R OR / \ \ / \ \ / \ \ / \ \ / \ \� \ \�� \�� ' CONTRACTOR'S NOTES: PAVEMENT REPAIR SHALL BE PERFORMED ACCORDING TO THE FOLLOWING PROCEDURE, PLUS ALL OTHER MILLING AND OVERLAY SHALL EXTEND FROM EDGE OF REQUIREMENTS OF THIS DETAIL AND THE SPECIFICATIONS: PAVEMENT TO WITHIN 6" OF EXISTING CENTERLINE DRY/ \\ STRIPE. THE INTENT IS TO AVOID DISTURBING UNDISTURBED 1. BACKFILL TRENCH WITH SUITABLE EARTH AND COMPACT TO TRENCH SHELF AS SHOWN ON THE DETAIL. EXISTING CENTER LINE STRIPING AND REFLECTORS. EARTH � 6" LIFTS OF SUITABLE SOIL 2. PLACE CABC IN 2 COMPACTED LIFTS TO WITHIN 13" OF THE EXISTING PAVEMENT SURFACE. OR CABC AT OPTIMUM 3. PLACE 13" OF TYPE B 25.00 BASE COURSE IN 2 COMPACTED LIFTS, UP TO EXISTING PAVEMENT SURFACE. MOISTURE COMPACTED 95% 4. ALLOW SEVERAL DAYS FOR VEHICLE TRAFFIC TO FURTHER COMPACT THE REPAIR. STANDARD PROCTOR 5. MILL TOP 2- INCHES PER DETAIL. 6. PLACE 2" OF TYPE S 9.5C SURFACE COURSE AND COMPACT. 2" TYPE S 9.5C COMPACTED BITUMINOUS SURFACE COURSE 7. NOTE: UPPER 2 FEET OF BACKFILL UNDER ROADS TO BE COMPACTED TO 100%. ( PIPE 11" TYPE B25.00 BITUMINOUS BASE COURSE IN TWO COMPACTED LIFTS C.A.B.C. IN TWO COMPACTED LIFTS TO WITHIN 13" OF SURFACE I COMPACTED TO 100% COMPACTION - STANDARD SAWCUT EXISTING PAVEMENT ROAD GRAVEL DRIVE A MILL EXISTING ASPHALT 2" DEPTH AND TO E.O.P. OVERLAY 2" TYPE S 9.5C COMPACTED NOT TO SCALE VARIES BITUMINOUS SURFACE COURSE REVISION DATE - NOVEMBER 3, 2008 MILL EXISTING ASPHALT 2" DEPTH AND OVERLAY 2" TYPE S 9.5C COMPACTED ( EXISTING EXISTING I BITUMINOUS SURFACE COURSE /\1,/\1,/ \x,/17777,/\ LLj ' • /�� /jam /j� /j / \ \ / / \ \ / / \ \ /��`/ e BITUMINOUS TACK COAT \� \\/ /jam //i 2' -0" PIPE 2' -0" 1' -0" x� \// O.D. \ COMPACTED EARTH 3' 12' 3 3 BACKFILL \ S�OpE -11" FT -1/4-/FT 1 4" FT - 1 %FT 21 \ /x /" A /� �. /i, /ice, UNDISTURBED EARTH 2" TYPE S 9.5C COMPACTED 6" CABC COMPACTED SUBGRADE BITUMINOUS SURFACE COURSE NOTE EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. BROOMED CLEAN OF DUST BEFORE TACK COATIS APPLIED. 2. TYPE S 9.58 SURFACE COURSE IS AN ACCEPTABLE ALTERNATIVE TO TYPE S 9.5C. 3. EDGES TO BE TACKED WITH CRS -1 OR CRS -11- TYPICAL R - T I "LAD CRu' 4. THICKNESS OF CABC STONE, B 25.00 BASE COURSE AND 5 9.5C (OR S 9.5B) SURFACE COURSE SHALL MATCH EXISTING CONDITIONS IF GREATER THAN SHOWN ON DETAILS. NOT TO SCALE 5. CONTRACTOR RESPONSIBLE FOR REPLACEMENT OF ANY PAVEMENT MARKINGS DISTURBED OR COVERED BY OVERLAY. REVISION DATE - NOVEMBER 3, 2008 TYPICAL PAVEMENT REPAIRS W/ II - NOT TO SCALE MODIFIED FOR THIS PROJECT NOTE: 1. ALL STRIPING IS THERMO PLASTIC, PER N.C.D.O.T. STANDARD 1087(C). 2. PAVEMENT MARKINGS SHALL CONFORM TO N.C.D.O.T. DIVISION OF HIGHWAYS STANDARD DRAWINGS: - 1205.01, SHEET 1 OF 2 - 1205.04, SHEET 1 OF 2 - 1205.05, SHEET 1 OF 1 1205.06, SHEET 2 OF 2 - 1205.07, SHEET 1 OF 1 - 1205.08, SHEET 1 OF 7 GENERAL NOTE ( TIP'I REVISION DATE - NOVEMBER 3, 2008 • PAVEMENT PATCHING AND RESURFACING - COMPLETION OF TRENCHING PATCH WITHIN 2 DAYS SMALL ;PAVEMENT OR CABC PATC . HING IS COMPLETE, IF APPROVED BY THE ENGINEER. B ® I L 1/2 ". EXPANSION JOINT -� r-007-1 /7" EXPANSION r4 T'+ w to A z Q rx m a r� m M C) O N to N r U O O N W to °n U 0 u� M 0 0 0 tm . c ro g 35 c a 'o co O 0 0 'o 0 A NOTE: MIN. 3000 PSI CONCRETE REQUIRED THROUGHOUT. 6" CONCRETE TOP WITH GRATE AND FRAME CAST IN UNLESS NOTED OTHERWISE GRATE AND FRAME FOR THIS TOP TO BE 24 "x24" ( "NEENAH R3339A') OR ( "U.S." FOUNDRY 4190 - 62599) OR APPROVED EQUAL; VERIFY TRAFFIC LOAD REQUIREMENTS ON ALL GRATE AND FRAME ASSEMBLIES I I K CONCRETE CATCH BASIN �EXENSION RISER; LENGTH AND WIDTH TO MATCH BASIN, HEIGHT VARIES WITH PROPOSED GRADE (SEE CATCH BASIN SCHEDULE) PRE —CAST CONCRETE CATCH BASIN; LENGTH, WIDTH AND HEIGHT VARIES BY MANUFACTURER AND APPLICATION; SEE CATCH BASIN SCHEDULE AND VERIFY WITH SUPPLIER 5 " -8" WALL THICKNESS WITH KNOCKOUT PANEL \—NO PORTION OF STRUCTURE SHALL BE REMOVED, DAMAGED OR OTHERWISE ALTERED EXCEPT THOSE AREAS DESIGNATED AS KNOCKOUT PANELS WAR!"NHINU SWIMMING, BOATING AND OTHER RECREATIONAL ACTIVITIES PROHIBITED WITHIN 150 FEET OF DAM STRUCTURE AND WATER INTAKE BUOY IN ACCORDANCE WITH HIGHLANDS TOWN ORDINANCE. VIOLATION MAY RESULT IN LOSS OF LIFE OR DAMAGE TO PERSONAL PROPERTY. 18 "x12" ALUMINUM SIGN I( POWDER 2 GAUGES EEL POST GRADE OZ lu IL J �_ 12 " -O x 36" DEEP CONCRETE ENCASEMENT GENERAL NOES: 1, MINIMUM ALUMINUM THICKNESS IS 0.063" 2. LETTERING SHALL BE BLACK. SIGN BACKGROUND SHALL BE WHITE. 3. SIGN PAINTING AND FINISH SHALL BE SUITABLE FOR OUTDOOR USE WARNING SIGN NOT TO SCALE INLET (3) No. 4 REBAR 6" VARIES 6" KNOCKOUT PANEL q �. 6" (TYP. EACH SIDE) "��*__ == _= _�_'-�_ == k == =O �, 1I M I� W bf B -- l o B INLET - -�— , — — — •,� °® VARIES n V -- ti CONCRETE INVERT INSTALLED Mi, AT A CONSTANT SLOPE. 6" FROM INLET TO OUTLET I � I OUTLET SECTION A (PLAN) CATCH BASIN TOP JI 1 't BASIN RISER HEIGHT VARIES 4 M I a (2) No. 4 REBAR KNOCKOUT PANEL '0<_ (TYP. EACH SIDE) �i 41 A A CATCH BASIN HEIGHT +i APPROVED STE-''S REQUIRED VARIES BY PIPE SIZE PIPE TO BE FLUSH WITH Ii FOR STRUCTURE'S OVER AND MANUFACTURER INSIDE WALL OF BASIN INLET ; I �{ 3' -6" IN DEPTH', 12" Q.C. AND GROUTED SMOOTH 7r No. 4 REBAR @ 6" O.C. lt.. EACH DIRECTION? PROPOSED PIPE INVERT = BOTTOM OF 300 PSI CONCRETE TO FORM INVERT, PIPE AT FLOW LINE PROVIDE CONSTANT SLOPE FROM ALL INLETS TO OUTLET, 12" OF #57 STONE SECTION B MAY BE REQUIRED FOR POOR SOIL AND /OR WET CONDITIONS; CONTRACTOR MUST VERIFY WITH ENGINEER BEFORE PLACING BOX 1 2" BAND WIDTH . RESTRICTED AREA SYMBOL 36" EXPOSURE WITH 5 LBS. ANCHOR TACKLE. 61" 1 1 " -3" SILVER REFLECTIVE BAND 3" INTERNATIONAL ORANGE REFLECTIVE BAND 3" BLACK LETTERS (2 SIDES) INTERNATIONAL ORANGE RESTRICTED AREA SYMBOL (2 SIDES) 3" INTERNATIONAL ORANGE REFLECTIVE BAND 1RETHANE FOAM CONCRETE BALLAST J Y2" -0 GALVANIZED ROD WITH 1" I.D. :STEEL MOORING EYE GENERAL NOES: 1. BUOYS SHALL BE WHITE AND A MINIMUM OF 12" DIAME a E_R. 2. BUOYS SHALL BE MADE OF IONOMER FOAM (OR EQUIVALENT), FILLED WITH POLYURETHANE FOAM (OR EQUIVALENT) AND SHALL HAVE SUFFICIENT BALLAST TO MAINTAIN PROPER STABILITY AND EXPOSURE ABOVE THE SURFACE OF THE WATER. 3. CONTRACTOR SHALL PROVIDE MARINE GRADE ROPE OF ADEQUATE LENGTH. 4. CONTRACTOR SHALL PROVIDE REMOVABLE CONCRETE ANCHORAGE OF SUFFICIENT WEIGHT. M• NOT TO SCALE 22" 8" FELT EXPANSION JOINT (TYP) ►� rT DITCH SLOPE( %) b d X PROPOSED DITCH LINING "z o T O Q w w z0 J Q 0 o o o u- , N 1 24.0 2 1 1 D50 = 6 (CLASS A RIP RAP) r 2 12.5 2 1 1 D50 _ 6 (CLASS A RIP RAP)