Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7130704_COMPLIANCE_20130715
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7l:J,27 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD ?i�")� Land Quality Section: 943 Washington Square Mall, Washington, NC 27889, (252) 946-6481 �bl�-0o111 1 ,. 1 County: �� Project: �Sk GPI-�'- - River basin: fir- qvv� 1� S r�✓^'l Person financially responsible: 6Ltd Project #: t; x —( -204 -00) Address: Case # 1. Project location: 17 Pictures: No: 0 Yes: ❑ Video: ❑ Digital: ❑ 2. Weather and soil conditions: 4Wd7 t'0 weA First inspection: Yes: ❑ No: ❑ Wor{ aWe ' .'J - Y� 3. Is site currently under notice of violation? Yes: ❑ No:© 4. Is the site in compliance with S.P.C.A. and rules? Yes: ❑ No: UV if no, check violations below: ❑ a. No approved plan, G.S. 113A-57 (4) and 15A N.C.A.0 4B.0107(c) ❑g. Inadequate buffer zone, G.S. 113A-57(1) ab. Failure to follow approved plan, G.S. 113A-57(5) ❑ It. Graded slopes and fills too steep, ❑ c. Failure to submit revised plan, G.S. 1 I3A-54.1(b) and G.S. 113A-57(2) or 15A N.C.A.C. 413.0124(d) 5e15A N.C.A.C. 4B.0118(a) Eli. Unprotected exposed slopes, G.S. 113A-57(2) N(� Failure to provide adequate groundcover, G.S. 113A-57(3) and [j. Failure to maintain measures, 15A N.C.A.C. 4B.0113 15A N.C.A.C. 4B.0107(b) or 15A N.C.A.C. 4B.0124(e) ❑ k. Failure to self -inspect G.S. 113A-54.1(e) and [s� e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) 15A N.C.A.C. 413.0131 fj/k f. Failure to take all reasonable measures, 15A N.C.A.C. 4B.0105 ❑I. Other (describe) 5. Is the site in compliance with NPDES Permit NCG 010000? Yes: ❑ No: ❑ Not applicable: ❑ If no, check violations below: 2 .�❑ m. Failure to manage construction site pollutants, WaA te`� NCG 010000 Sec. 11, B. ❑ n. Failure to proviTe grground stabilization, NCG 010000 Sec. 11, B.2 ❑ o. Failure to maintain rain gauge or record daily rainfall -NCG 010000 Sec. 11, B.I(a,b) ❑ p. Failure to meet self -inspection and reporting requirements, NCG 010000 Sec. B, B.I(c-i) ❑ q. Failure to dewater sediment basin from surface, ❑ r. Failure to have approved plan and NPDES permit on site, NCG 010000 Sec. 111, 3(d) s. Failure to instal tain BMP's, NCG 010 0 Sec. III, 4 —� ❑ I. Failure to oper mai control_ Cq measures, NCG 0100 0 Sec. IV, I ❑ u. Bypass of stormwater c t nies, NCG 010000, Sec. IV, 3 NCG 010000 Sec. 11,. BA ❑ v. Other (describe) _-- 6. Has sedimentation damage occurred since last inspection or at 1" inspection? Yes: ED'If yes, where? (check all that apply) No: ❑ Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: Description: m nOr -Ak, cQan+._ar '�- 4�-- �- 4 Stormwater Discharge Outfall with sediment loss: _ Degree of damage: slight: V moderate : ❑ severe : ❑ 7. Contact made with (name): Title: Insneclion report eiven:n or sent: n to person financially responsible. Date aiven/sent ❑ Permanent mound coversufficient to restrain erosion has been established. No additional self-monitorine or self -inspections are required Proiect is released and coverage under NPDES General Stotmwater Permit for Construction Activities is terminated. ❑ See page 2 for Corrective Actions Report by: Date of inspection: cc: Others present: Time arriving on site: Time leaving site: 1 of Rovision Date 08012013 County: Land Quality Section: 943 Washington Square Mall, Washington, NC 27889, (252) 946-6481 Project 9. Corrective actions needed for: S.P.C.A. and rules: ❑ Submit an approvable sedimentation and erosion control plan, including appropriate review fee, covering all areas disturbed or to be disturbed. ❑ Install all sedimentation and erosion control measures as shown on the approved plan. ❑ Submit a revised sedimentation and erosion control plan. ❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved plan. ❑ Install erosion and sediment control devices sufficient to retain sediment on the tract. ❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan. ❑ Install adequate drop inlet protection as shown on the approved plan. ❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25% of the buffer nearer the land disturbance using natural or artificial means. ❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established. ❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days. ❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage. NPDES Permit NCG 010000: ❑ Properly handle concrete to avoid contact with surface waters, wetlands or buffers and prevent discharge from site. ❑ Relocate soil stockpiles at least 50 feet away from storm drain inlets or surface waters. ❑ Provide adequate temporary or permanent ground cover on areas where land -disturbing activity has ceased in 7 or 14 days according to NCG 01000 permit conditions. ❑ Provide sediment basins with a drainage area of one acre or greater with a skimmer or flashboard riser. ❑ Inspect all erosion and sedimentation control measures and storm discharge curtails at least weekly and.within 24 hours of a rainfall event of/: inch or greater and complete self -monitoring reports. ❑ Maintain a rain gauge in good working order and record daily rainfall amounts. 10. Additional Corrective Actions Report by: Date of inspection: Page _ of Revision Date 08012013