Loading...
HomeMy WebLinkAboutSW3161001_CURRENT PERMIT_20161024STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ,�110��BBl DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD PAT MCCRORY C., en,. DONALD R. VAN DER VAART Energy, Mineral and Land Resources ENVIRONMENTAL OUALITV 11 f ,1 019 101����'a October 24, 2016 Pastor Richard Wilson Threshold Church 3127 Weddington Road Matthews, North Carolina 28105 Subject: Stormwater Permit No. SW31601001 Threshold Church, Union County Dear Pastor: Secrernm TRACY DAVIS "ecF OCT /��® �s ova M° e `aP 1, S�<� 19 °a/ t1017 co The Division of Energy, Mineral, and Land Resources (DELMR), received a complete Stormwater Management Permit Application for the subject project on October 21, 2016. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A Section NCAC 2H.1000. We are forwarding Permit No. SW3161001, dated October 24, 2016, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance until October 23, 2024, or until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Mike Randall at (919) 807-6374; or mike.randall@ncdenr.gov. Sincerely, for Tracy E. Davis, PE, CPM, Director cc: SW3161001 File, Mooresville Regional Office ec: James P. Magennis, Construction Materials Engineering & Consulting PC State ol-North Carolina I Environmental Quality I Energy, Mineral and land Resources 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 919-807-6375 ) State Stormwater Permit Permit No. SW3161001 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT QUALITY STATE STORMWATER MANAGEMENT PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Threshold Church o r' 00 Weddington, Union CountyCr � o FOR THE construction, operation and maintenance of the Dry Detention Basin in c&npliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the State and considered a part of this permit. This permit shall be effective from the date of issuance until October 23, 2024, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The Dry Detention Basin is approved for the management of stormwater runoff as described in the application documents and as shown on the approved plans. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the Dry Detention Basin. 5. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 4 State Stormwater Permit Permit No. SW3161001 It. SCHEDULE OF COMPLIANCE During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all time provide the operation and maintenance necessary to assure the Dry Detention Basin functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the cell and outlet structure must be available at all times. 3. Records of maintenance activities must be kept for the Dry Detention Basin. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 4. The permittee shall submit an annual summary report of the maintenance and inspection records for each of the Dry Detention Basin. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. The Dry Detention Basin shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the Dry Detention Basin certifying that it has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an erosion control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. Page 2 of 4 State Stormwater Permit Permit No. SW3161001 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of eight years from the date of the completion of construction. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form sighed by both parties, to the State, accompanied by the supporting documentation. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the State, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 3 of 4 State Stormwater Permit Permit No. SW3161001 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 24'h day of October, 2016. EM Director Division of Energy, Mineral, and Land Resources Page 4 of 4 State Stormwater Permit Permit No. SW3161001 Threshold Church Weddington, Union County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL cc: NCDEQ-DEMLR Regional Office Page 1 of 1 DEMLR USE ONLY Date Received Fee P Permit tuber i Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: 1.6 State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Psi o- F2 �• STORMWATER MANAGEMENT PERMIT APPLICATION F�bF� �0�� 10 77tis form may be photocopied for use as an original Lyp_ <o I. GENERAL INFORMATION �"�/� 1. Project Name (subdivision, facility, or establishment name -should be consistent with4lCdje` t h ron plans, specifications, letters, operation and maintenance agreements, etc.): _ dl;Atn .. o 2. Location of City: (street address): County: UNION Zip: Z0104 3. Directions to project (from nearest major intersection): 201 10 50Q;Y0a M71pp06RC4, M. -Go 4UTN�pOti —RI 70 5L7�mN L�r. 4. Latitude: 3Jt' 0 02 'S!. /" N Longitude: �U ° 165 f L " W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New Modification ❑ Renewal w/ Modificationt tRenewals with me ifications also requires SWU-102 — Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing 5W3 permit numberi5e2o3 , its issue date (if known) —/5 and the status of construction: ❑Not Started ❑Partially Completed* Completed* *provide a designer's certification 2. Specify the type of pr ject (check one): ❑Low Density r-ligh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requestin a state stormwater management permit application, list the stormwater project number, if assigned, — and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Se ice Center at 1-877-623-6748): ❑CAMA Major dimentation/Erosion Control: 5.7 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been issue date and the type of each permit:_ please provide the Project Name, Project/Permit Number, 5. Is the project located within 5 miles of a public airport? No If yes, see S.L. 2012-200, Part Vl: http:/(portal.ncdenr.org/web/I /rule a Form SWU-101 Version Oct. 31, 2013 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Signing Official & Title: A(dmo W ywi 0kgz 17yr.- P4oup7je b.Contact information for person listed in item la above: Street Address: 312,/wI%lill mbi r2c> n City: Ml�irr►' tw6 State: N6 Zip: ZDlO5 Mailing Address (if applicable): SMO Phone: p7o Z77— 5 Fax: ( ) NONE Email: lelCHA9P, W11,S tS A 491 HVM- care cXleecheck the appropriate box. The applicant listed above is: he property owner (Skip to Contact Information, item 3a) essee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owners name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: f ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can al,,,,,r 0— r ;ter Other Contact Signing Offick b.Contact information for person listed in item 3a above: �� Mailing Address: � �37I /b pleoill t%L�IiE F4A0 �• � ^ City: VV g; �r T/v r'��^ State: %� L Zip: 4 1 %� Phone: Q O ZC/ Fax: Email: ik-iln AQ a YyyiGti♦P.>f'lm, li✓ A►'d Hpl 60M 4. Local jurisdiction for building permits: W imdlNyinl�9�— 1-1P2 AqA* Point of Contact: 'fr Y [alel (--Pl N Phone #: ( 7011 ) UNION &ulv7Y- W1W1Jv1Y PV):?,N1V Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. a)� Ex -ray 21MMnigm FyM b 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the CA'rJ+W rJr'tQQ,� River basin. 4. Total Property Area:_acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Proper Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': acres Total project area shall be calculated to exclude the following the normal pool of imppou�nded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water W) (MHline, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHWp (or MHW) line may be included in the total project area. 1' , d A(//q• p,4/i 1a0 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = "'26. 5 T. 9. How many drainage areas does the project have? f (For high density, count 1 for each proposed engineered stornwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area / Drainage Area Drainage Area Drainage Area _ Receiving Stream Name ALE '= wig2f GC Stream Class * Stream Index Number Total Drainage Area (sf) On -site Drainage Area (sf) / Off -site Drainage Area (so Proposed Impervious Area** so G % Impervious Area** total Impervious' Surface Area Drainage Area / Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/ Lots (so Z7—LW0 On -site Streets (so On -site Parking (so ©Q On -site Sidewalks (so / Other on -site (so Future (so Off -site (so �— Existing BUA*** (sf) %rQ� Total (sf): * Stream Class and Index Number can be determined at: http://portal.ncdenr.or hay ebAoq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httv://Portal.ncdeiir.ori!/web/wo/ws/su/bmD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://Rortal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map athttp://portal.ncdennorg web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots. 1. Original and one copy of the Stormwater Management Permit Application Form. - 2. Original and one copy of the signed and notarized Deed Restrictions &Protective Covenants , Form. (if required as per Part VII below) Q/tfT7 ar7 //y4t-UJ7LW 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestoRexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. It. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). J4< Ja Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). A/ 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify J elevations in addition to depths) as well as a map of the boring locations with the existing �/ elevations and boring logs. Include an 8.5"x1l" copy of the NRCS County Soils map with the W/T,` /l ` project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. AWAI to submittal, (910) 796-7378.) (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to venfij the SHWI prior � 10. A copy of the most current property deed. Deed book: 60M� Page No: / vJ%z j�'4 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H,1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hft:lZwww.secretLr_y.state.nc.us/Corp—orations/CSearch,aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http./, 2ortal.ncdenr.org/webZlrlstate-storMwatpr-forms dots. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information)). Consulting Engineer: Jmor7 P /ylAOA5"V/s Consulting Firm: IV67L�{/GTIO/U M/i japL E //�//yI2J/i�� v le �cli/ 77A(� r%(j Mailing Address:�Cj 1-kP7'bA) R n City: State: Zip:-.. 0,6 21 Phone: Fax: ( 1 Ns/ligr Fin ail- IYY17/1G Nil IL /1 n.n IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or We mmne of Person listed in Contact Information, item 2a) certify that own the property identified in this permit application, and thus give permission to (pr nt or hjpe name of person listed in Contact Information, item la) with (print or hjpe narne of organization listed in Contact Information, iten la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Versi9n Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permft!Teverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I a Notary Public for the State of lCounty of do hereby certify that before me this _ day of and acknowledge the due execution of the a stormwater permit. Witness my hand and official seal, SEAL My commission appeared plication for K APPLICANT'S CERTIFICATION V�2')4'H 19 lt-'9100) I, (print or type nante of person listed in Contact Inforntation, item 1a) PAW X INCEW~ ✓r 0 certify that the information included on this permit application form is, to the best of my knowledge', correct ani that the project will be constructed in conformance with the approved plans, that the required deed 'restrictions and protective covenants will be recorded, and that the propo ed project complies with the requirements of the applicable stormwater E _ ndeE,15A 15;As 2H .1000,any Ay other applicable state stormwater reguiremenl I, Rol 0( -' to n 1 CL S (a4" a Notary Public for the State of _N � C ! County of f do hereb certify that . i� ko-f J 1 '�, o r\ personally appeared before me this -L day of C 26and acknowledge the due execution of the application for a stormwater permit Witness my hand and official seal, Hama Nodah NOTARY PUBLIC Medlenburg Cou111g NO My Commission Expires December 16, 2018 SEAL My commission Form S WU-101 Version Oct. 31, 2013 Page 6 of 6 4Paj �MWMZN'c Permit Number: (to be provided by DWQ) Drainage Area Number: 7 Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system eck one): o ❑ does [ooes not incorporate a vegetated filter at the outlet. ? 40 Z N This system ( eck one): z ❑ does Ydoes not incorporate pretreatment other than a forebayy Q fi Important maintenance procedures: — The drainage area will be managed to reduce the sediment load to the dry extended detention basin. — Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. — I will maintain the vegetation in and around the basin at a height of approximately six inches. — Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one-time fertilizer application. Form SW401-Dry Detention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 'r'''= Sediment has accumulated Search for the source of the �A and reduced the depth to 7 % of the original design de sediment and remedy the pro m if possible. Remove the sedi nt and (see diagram below). dispose of it in a location here it will not cause impacts streams or the BMP. Erosion has occu ed or Provide additional rosion riprap is displ ed. protection such reinforced turf matting or rip p if needed to reventfu erosion problems. Weeds az present. Remove weeds, preferably by hand. I pesticides are used, wipe them n the plants rather than s r in . The main treatment area Sediment has accumulated Se ch for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Revegetate disturbed areas immediately with sod (preferred) or seed protected with securely staked erosion mat. Water is standing more than Check outlet structure for clogging. 5 days after a storm event. If it is a design issue, consult an appropriate rofessional. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). Form SW401-Dry Detention O&D1-Rev.3 Page 2 of 4 BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. Grass cover is unhealthy or Restore the health of the grass cover eroding. - consult a professional if necessary. Signs of seepage on the Consult a professional. downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads I feet in the main pond, the sediment shall be removed. When the basin depth reads I feet in the forebay, the sediment shall be removed. Sediment Removal Bottom N/A BASIN DIAGRAM (fill in the blanks) Sediment Storage Temporary Pool Elevation Awe Pool em orar �J P Sediment Removal Elevation _/ Volumi Bottom Elevation VOW 4, 25% MAIN POND Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4 Permit Number: . (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: / ` t C f/A / i L S- /J Title: L Xg c u ,—) v(; PASTo, t Z)C.l C<(yitCt4 lC� O)Atr,�-onJ NC eZ.7/0q -2 0cf-�27-)-3/5_-) Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. _ a Notary Public for the State of K6 (AAA CA.CO` i nt , County of Met GC (" do hereby certify that ter, personally appeared before me this 5+ day of Or �o b er DAot (o , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, We Nasrallah NOTARY PUBLIC Medde tq Cowty, NC - My Commission E)ires December 16, 2018 SEAL My commission expires l� C_< ��t Form SW401-Dry Detention O&M-Rev.3 Page 4 of 4 r !sCA c^:fl 0' r A YPATCi Permit No. (to be provided by DWq) ®�� Gov wATf-, c STORMWATER MANAGEMENT PERMIT APPLICATION FORM o WDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Threshold Church Site Plan Phase 2 Contact person Phone number Date Drainage area number Jim Magennis 704-323-7334 II. DESIGN INFORMATION She Characteristics Drainage area 265,946.00 (t' Impervious area 115,DD0.00 ft % Impervious 0.43 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak control Storage Volume: Non -SA Waters Minimum required volume Provided volume Sediment storage volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Provided volume Sediment storage volume provided Basin Design Parameters Drawdown time SHWT elevation Basin bottom elevation Storage elevation Basin side slopes Top elevation Freeboard provided Basin Bottom Dimensions Basin length Basin width Length to width ratio 2.93 in 0.40 (unitless) 0.60 (unidess) 0.12 inmr 0.29 ft'/sec 0.44 ft'/sec 0.15 ft3/sec 13,927.00 ft' 69.426.00 ft' OK 17,357.00 ft' OK ft3 ft3 ft3 ft3 ft3 ft3 3.00 days OK fast 666.00 fmsl OK 667.56 fmsl 3.0 :1 OK 672.00 fmsl OK 1.00 It OK 140.00 ft 70,00 It 2.D0 :1 OK Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. 411. Design Summary, Page 1 of 2 Permit No. (to be provded by DWQ) Additional Information Total runoff volume captured by basin 6.22 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build -out? Y (Y or N) OK Is a sediment depth indicator included? Y (Y or N) OK Does the basin include a drain? Y (Y or N) OK Forth SW401-Dry Extended Detention Basin-Ray.3 Parts I. a 11. Design Summary. Page 2 of 2 Permit III. REQUIRED ITEMS CHECKLIST (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the bioretenfion cell showing: - Basin dimensions - Pretreatment system, - Maintenance access, - Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. 3. Section view of the basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment unfil the entire drainage area is stabilized. 7. The supporting calculations. / ✓ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. V/ 9. A copy of the deed restrictions (if required). fw:7, atol 111a tv j � 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Aftr- AN iNtiar4nav Pftffil Form SW401-Dry Extended Detention Basin-Rev.3 Part III. Required Items Checklist, Page 1 of 1