Loading...
HomeMy WebLinkAboutSW7090906_CURRENT PERMIT_20091015STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT. NO. SW C��(����i DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Rp N O;L-Rd North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Russell H. Malone, III, Member Malone, LLC 10220 West Broad Street Glen Allen, VA 23060 Dear Mr. Malone: Division of Water Quality colleen H. Sullins Director October 15. 2009 Subject: Stormwater Permit No. SW7090906 Dollar General High Density Commercial Wet Pond Project Beaufort County Dee Freeman Secretary The Washington Regional Office received a complete Stormwater Management Permit Application for Dollar General in Washington, NC on October 15, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comp)yy with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7090906 dated October 15, 2009, for the construction of the subject project. This permit shall be effective from the date of issuance until October 15, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. inclelrely, A�`ll -lodge Regional Supervisor Surface Water Protection Section AH/ sv: S:\WQS\STORMWATER\PERMIT\SW7090906 cc: Steve Janowski, PE Beaufort County Building Inspections Washington Regional Office Central Files North Carolina Division of Water Quality Internet: w rumaterqualiry.org One 943 Washington Square Mall Phone: 252-946-6481 1 FAX: 252-946-9218 North Carol I rl it Washington, NC 27669 FAX: 252-946-9215 An Equal Opportunity unily 1 Affirmative Action Employer Naturally State Stormwater Management Systems Permit No. SV 7090906 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Malone, LLC Dollar General On 5th Street/USHwy 264 in the City of Washington, Beaufort County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 15, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 28,864 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. Page 2 of 7 State Stormwater Management Systems Permit No. SW7090906 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ft2: b. Total Impervious Surfaces, ftz: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMS�: g. Permanent Pool Surface Areq, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMSL: j. Predevelopment 1 year 24 hour: k. Post development 1 year 24 hour: I. Controlling Orifice: M. Permitted Forebay Volume, W: n. Fountain Horsepower, HP o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE FA 0 38,768 28,864 1.50 3.50 avg. 90 % 8.00 3,371 3,489 at temporary pool el 8.83 1.96 cfs 1.89 cfs 1.00"0 pipe 1,417 0, fountain not allowed Cherry Run / Tar - Pamlico 28-103-17 "C; Sw, NSW" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance -of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Access to the stormwater facilities shall be maintained via appropriate easements at all times. Decorative spray fountains will not be allowed in the stormwater treatment system. Page 3 of 7 State Stormwater Management Systems Permit No. SV 7090906 8. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 14. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 4 of 7 State Stormwater Management Systems Permit No. SV 7090906 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project.are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until October 15, 2019. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 15th day of October, 2009. N RTH 70,LINA ENVIRONMENTAL MANAGEMENT COMMISSION — for oleen ul irector Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7090906 Page 5 of 7 State Stormwater Management Systems Permit No. SV 7090906 Dollar General Stormwater Permit No. SV 7090906 Beaufort County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SV 7090906 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Beaufort County Building Inspections Page 7 of 7 r DWQ USE ONLY .. ' D6te Received Pee Paid C.ie# 5`)fl Permit Number 3soa 5W D9 0 Ct 0Applicab stal SW -1995 Coastal SW - 2008 I -Post Construction(select all that apply) on-CoastalSW-HQW ORW Waters ❑ Unrmwater Management Plan ther WQ M mt Plan: NC DENR State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION L'J C' 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 2. Location of Project (street address): City: Washington County: Beaufort Zip: 27889 3. Directions to project (from nearest major intersection): From the intersection of US HWY 264 (5th Street) & West 15th Street go north on US HWY 264 approximately one sixth of a mile and project site is on the eastern side of the right-of-way of US HWY 264 4. Latitude:350 34' 0" N Longitude:77° 4' 36" W of the main entrance to the project. It. PERMIT INFORMATION: 1. a.Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue elate (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑1-ow Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 1.333 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07July2009 Page I of III. I CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Malone. LLC Signing Official & Title: Russell H. Malone III, Member b.Contact information for person listed in item I above: Street Address: 10220 West Broad Street City: Glen Allen State: Virginia Zip: 23060 Mailing Address (if applicable): 10220 West Broad Street City: Glen Allen State: Virginia Zip: 23060 Phone: (1-804 ) 747-3391 Fax: (1-804 ) 747-3822 Email: RUSS.MALONEQLANDSOUTHLLC.COM c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Anna W. Lilley & Dalton G. Lilley Signing Official & Title: Dalton G. Lilley, Owner b. Contact information for person listed in item 2a above Street Address: 214 Whisperine Pines Road City: Washington State: NC Zip: 27889 Mailing Address (if applicable): 214 Whispering Pines Road City: Washington State: NC Zip: 27889 Phone: ( 252 ) 946-4751 Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Baldwin & Janowski. PA Signing Official & Title: 1. Stephen Janowski, PE b.Contact information for person listed in item 3a above: Mailing Address: 1015 Conference Drive City: Greenville State: NC Zip: 27858 Phone: ( 252 ) 756-1390 Fax: (252 ) 321-1412 Email:jsjanowskiOObaldwinandassociatesnccom mcaf/h<^i 4. Local jurisdiction for building permits: Point of Contact: Phone #: Form S W U-101 Version 07July2009 Page 2 of 6 IV. . PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from this development will be captured by roof drains and conveyed by curb and gutter, sheet Flow, a concrete Flume, and a Swale to a proposed wet detention pond designed to remove 90% TSS before finally discharged to an outlet swale and then into the existing off -site drainage system. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ® Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Tar -Pamlico River basin. 4. Total Property Area: 1.181 acres 5. Total Coastal Wetlands Area: 0.00 acres 6. Total Surface Water Area: 0.00 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 1.181 acres Total project area shall be calculated to exclude the followingR the normal ool of impounded structures, the area bctWeen the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MFIW) line, and coastal wetlands landward from the NHW (or MHW) line. 77ue resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of tlue NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 62.54 % 9. How many drainage areas does the project have? 2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina e'Area 1 Draina e Area 2 Draina e Area Draina e Area _ Receiving Stream Name Cherry Run Cherry Run Stream Class * C; Sw, NSW C; Sw, NSW Stream Index Number * 28-103-17 28-103-17 Total Drainage Area (so 38,768 12,676 On -site Drainage Area (so 38,768 12,676 Off -site Drainage Area (so 0 0 Proposed Impervious Area** (so 1 28,864 0 % Impervious Area** total 74.45% 26.12% Impervious— Surface Area Draina e Area ' Draina e Area' Draina e Area Draina e Area _ On -site Buildings/Lots (so 9,014 0 On -site Streets (so 0 0 On -site Parking (so 18,168 0 On -site Sidewalks (so 1,682 0 Other on -site (so 0 0 Future (so 0 0 Off -site (so 0 0 Ex' ting BUA*** (so 0 Total (so: 28,864 3,311 * Stream Class and Index Number can be determined at: http.11l12o.enr.state.nc.nslbims/reportslreportsWB html " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, Sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version 07July2009 Page 3 of 6 11. Flow was ,the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Offtce staffto check ifthe project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornwater requirements Its per NC.4C 026.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. s 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) / 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to � http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express progra and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Version 07July2009 Page 4 of 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs Include an 8 5"x11" co of the NRCS County Soils ma with the 10. 11. Py P project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT pric to submittal, (910) 796-7378.) A copy of the most current property deed. Deed book: 939 Page No: 323 For corporations and limited liability corporations (LLC): Provide documentation from the N Secretary of State or other official documentation, which supports the titles and positions helc by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). TI corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Cori2orations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. V III. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: 1. Stephen Janowski, PE Consulting Firm: Baldwin & ianowski, PA Mailing Address:1015 Conference Drive City: Greenville State: NC Zip: 27858 Phone: (252 ) 756-1390 Email: isianowski@baldwinandassociatesnc.com Fax: ( 252 ) 321-1412 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or hjpe name of person listed in Contact Information, item 2a) Dalton G. Lilley , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) Russell H. Malone, Ill with (print or type name of organization listed in Contact Information, item Ib) Malone, LLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07July2009 Page 5 of As (he,legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a Stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $2 ,000 pe day, pursuant to NCGS 143-215.6. ( 1 SignMature: Date: 1n, A K��� .� �e r I as No ary Public for the State of %� C - County of YI A , do�her e�by certify that&' V_Y1 i-�" L 1 � )eu personally appeared before me this L-� day of I M 9 _ , an ack owlecige the e execution of the application for a Mormw6�411h► Witness my hand and official seal, CQ,VNW A___ #01AW pUsoco X. APPLICANF'S CERTIFICATION SEAL My commission expires �� I I, (Inint or type name of person listed in Contact Information, item 2) Russell I1 Malone Pf certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, St, 2006-246 (Ph. It - Post Constructi n) or SL 2008-211. Si -nature: ��' ��G Wl.�f�CI e � T Date �'JI IC ' i 1 I, E MMLI t 911U� to ►�YtGU doherebycertify that be o'tore me this � ay of �J qU a stormwater permit. Witness my hand and official SEAL ry Public for the State of My commissi and ack PUBLIC REG 4 344002 "'COMMISSION EXPIRES II A-- . County of personally appeared )"f the application for I'I0I k Form SVA'U-101 Version 07.Iuly2009 Page 6 of 6 S k Permit No. S7t'/7 C19 0 / QL (to W provided by DWO) ®�A NCDENR EXPRESS SEP 16 2009 NC DENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I.fP,ROJECT.WF-ORMATION„. Project name Dollar General Contact person Phone number Date Drainage area number Janowski, PE IISDESIGNINFORMATION Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak Flow required? 1-yr. 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1011 vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 38,768 ft' 28,864 ft2 74.45 % 1.5 in 3,489 ft' 3,489 g' ft, ry3 tt3 0 ff3 Y (Y or N) 3.2 in Insufficient required volume. OK, volume provided is equal to or in excess of volume required. 0.41 limitless) 0.76 (unitless) 4.59 iNhr OK 1.96 ft3lsec 1.89 ft3lsec -0,07 fl'Isec 8.83 fmsl 8.00 fmsl 8.46 first 8.50 fmsl 7.50 fmsl 2.00 fmsl 1.00 fmsl 1.00 ft N (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.6-21220M Parts I. 8 n. Design Summary, Page 1 or 2 Permit No. (to be provided 6y DW07 Ilk DESIGN INFORMATION.',t `:.; v ... 1 Surface Areas Area, temporary pool 4,767 ft' Area REQUIRED, permanent pool 2,886 ft SAIDA ratio 7.45 (unitless) Area PROVIDED, permanent pool, Ace,,,, cod 3,371 it' OK Area, bottom of 1Oft vegetated shelf, Aw ,ter 1,463 it' Area, sediment cleanout, top elevation (bottom of pond), A,. 157 ft' Volumes Volume, temporary pool 3,489 ft� OK Volume, permanent pool, V._p, 6,690 ft' Volume, forebay (sum of forebays if more than one forebay) 1,417 fts Forebay %of permanent pool volume 21.2% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 7.45 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vp„ _,w ft' Area provided, permanent pool, A.-PW it, Average depth calculated ft Average depth used in SAIDA, d„, (Round to nearest 0.5ft) it Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A, 3,371 ft2 OK _p, Area, bottom of 10ft vegetated shelf, Aw s,, 1,463 ft OK Area, sediment cleanout, lop elevation (bottom of pond), Adoi-pond 157 ft2 OK 'Depth' (distance blw bottom of 1 Oft shelf and top of sediment) 5.50 ft OK Average depth calculated 3.40 it OK Average depth used in SAIDA, d„, (Round to nearest 0.5ft) 3.5 ft OK Drawdown Calculations Drawtlown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Cu) Driving head (Ho) Drawtlown through weir? Weir type Coefficient of discharge (C.„) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of towpath to width ratio Length to width ratio Trash rack for overilow & onfice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Captures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies Form SW401-Wet Detention Basin-Rev.6-2120109 Y (Y or N) 1.00 in in 0.60 (unitless) 0.28 it N (Y or N) (unitless) ft ft 1.96 ft/sec OK 1.89 ft'Isec OK 0.03 ftslsec 2.92 days OK, draws down in 2.5 days. Of, drawdown time is cored. 3 :1 OK 10 :1 OK 10.0 ft OK 5 :1 OK 4.6 :1 OK Y (Y or N) OK 2.1ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump Out Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III:,_REQUIRED ITEMS�CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. M Page/ Plan Sheet No. 2 7- 7- NIX NIA AIM AlM Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), Overflow, device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.6-2/20/09 Part III. Required Items Checklist, Page 1 of 1 EXPRESS Wet SEP 16 2009 Permit Number: S L') 7 0 /y / 9r� (to be provided by DWQ) Drainage Area Number: Detention Basin Operation and Maintenance Agreement NC tA9YctLp a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ® does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin 0&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.00 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 3.00 1 ----------------- FOREBAY BASIN DIAGRAM (fill in the blanks) 'ft Min. Sediment Storage Permanent Pool Elevation 8.00 Pool Sediment Removal Elevation 2.00 Volur ------------- -------------- ----- Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DR'Q) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project BMP drainage area number:! Print name:_ Dater A/ 09 LL G • " 4. Ma lone . Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, /n�j j �f (X/�C� ✓ a Notary Public for the State of n L County of C' J do hereby certify that 665 S�// Ct GG)�P % personally appeared before me this day of BIYI[1 )Z and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, J. , op r 'NOTARY .�F PUBLIC REG 4 344002 MY.COMMISSION ? EXPIRES '�•,, 0_913012012,r Q SEAL My commission expires OJ�� 4Pb Form SW401-Wet Detention Basin D&M-Rev.4 Page { PAGE }of{NUMPAGES}