Loading...
HomeMy WebLinkAboutSW7070219_HISTORICAL FILE_20201105STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE�10,� YYYYMMDD WAP-3 ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 5, 2020 The Reserve at Herons Ridge, LLC Attention: Sidney A. Wood 1524 Mt Pleasant Road Chesapeake, VA 23322 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7070219 The Reserve at Herons Ridge Pasquotank County Dear Sidney Wood: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7070219 for a stormwater treatment system consisting of three wet detention ponds serving a proposed Reserve at Herons Ridge Subdivision located off River Road in Elizabeth City, NC expires on February 20, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. If you would like to keep this permit active, please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: https: /Ideq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- niles/stormwater12rogram/post-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit if the project is built. Failure to maintain a permit subjects the owner to assessment of civil penalties. If this project is not built and you do not plan on building it in the future, you can request that the permit be rescinded. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger.thorpe aOncdenr.gov. Sincerely, �-ar�"`� a✓� Roger K. Thorpe , Environmental Engineer n^tea North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources REGEWEO 007 The Reserve at Herons Ridge DWQ-WAR® Pasquotank County — Elizabeth City - North Carolina The Reserve at Herons Ridge is a proposed 106 lot residential subdivision located off of River Road (SR 1169). The tract to be subdivided contains 47.13 acres, but only 46.87 acres are included in the subdivision. A residual parcel located across the canal, fronting on River Road contains 0.26 acres and is not included in this permit. The land is currently vacant and zoned R-10 (Residential 10,000 sf lots) and R-15 (Residential 15,000 sf lots). Development of this subdivision will include construction of approximately 6,988 If curb and guttered streets with sidewalks, water main, gravity sewer main, sewer force main and three detention ponds. The streets will contribute 5.08 acres of impervious surface and the sidewalks will be another 1.17 acres. Coverage on each lot will be limited to 5,500 sf for the R-10 lots and 7,500 sf for the R-15 lots. The maximum coverage for the development is 20.55 acres or 43.85%. According to the Pasquotank County Soils Maps as prepared by USDA, Soil Conservation Service, the soils on this site are predominately Arapahoe with small areas of Dragston, Tomotley, and Roanoke. The Roanoke soils are limited to the perimeter of the property that is adjacent to the large existing ditches. Three soil borings were performed in the detention pond areas by Sean C. Robey, PE and Kimberly Hamby on February 12, 2007. All soil borings were conducted with an AMS 2-3/4" diameter, 6' long, hand mud auger. Boring No. 1 was located in the area for Pond A. The elevation at the boring location is approximately 6.50'. The first 10" inches were sandy loam topsoil. From 10- 36" was a sandy clay loam, from 36-42" was a fine sandy loam, and at 42" it changed to sand. At 66" the sand was wet and we were unable to remove any additional soil with the auger we were using. We estimate the seasonal high water table to be approximately 66" below the surface, or elevation 1.0'. The permanent pool for Pond A has been set at 1.0'. Boring No. 2 was located in the area for Pond C. The elevation at this location is approximately 8.00'. The first 8" were sandy loam topsoil. From 8-42" was a sandy clay loam. Below 42" was sand. Based on a change in coloration at 60" and visible soil wetness at 66", we estimate the seasonal high water table at 60" or elevation 3.0'. The permanent pool elevation for Pond C has been set at elevation 3.0'. Boring No. 3 was made in the area of proposed Pond B. The elevation at this location is approximately 6.50'. The first 8" inches were sandy loam topsoil. From 8- 42" was a sandy clay loam, and at 42" it changed to sand. At 66" the sand was wet and we were unable to remove any additional soil with the auger we were using. We estimate the seasonal high water table to be approximately 66" below the surface, or elevation 1.0'. The permanent pool for Pond B has been set at 1.0'. Each of the three borings supported the soils map classification of Arapahoe. While the Arapahoe soils have permeability rates that could support infiltration, Drainage Areas 1 & 3 are too large to utilize infiltration. With the utilization of underground piping, we find that the depth of the piping and the elevation of the water table prohibits the use of infiltration in Drainage Area 2. Therefore, we have determined that wet detention basins are the most appropriate method of storm water treatment for this development. All of the detention ponds are designed for 90% TSS removal and they drain to a tributary of the Pasquotank River that drains under River Road before entering the river. In addition to meeting state requirements for stormwater treatment, this site will comply with the City of Elizabeth City's Stormwater Ordinance. This ordinance requires that post development runoff not exceed pre development runoff during a 10 year storm event. Rational method was utilized to estimate pre and post development runoff for each drainage area. Our "chainsaw routing" method detention pond spreadsheets calculate the peak discharge out of each pond. Based on these methods we have determined the following: Drainage Area Pre-dev. Discharge Post-dev runoff Det. Pond Discharge 1 52.9 cfs 75.61 cfs 15.29 cfs 2 5.86 cfs 8.37 cfs 0.98 cfs 3 20.41 cfs 29.15 cfs 10.28 cfs Drainage Area 1 contains 26.03 acres that are designed to drain to Detention Pond A. This drainage area includes 126,882 sf (2.91 ac) of roads and 31,337 sf (0.72 ac) of sidewalks. It includes all of lots 6-89. The maximum impervious area allowed per lot is 5,500 sf or a total of 462,000 sf (10.61 ac) for this drainage area. The resulting maximum impervious area for this drainage area is 14.24 acres or 54.71%. All of the roadway drainage will be collected in curb and gutter and an underground piping system. Runoff from lots 74-89 will sheet flow across grassed yards into rear lot line ditches with 3:1 side slopes and into Detention Pond A while the rear of lots 56- 73 will sheet flow across grass yards directly into the pond. Lots 6-19 will sheet flow across grassed yards and over the curb into the curb and gutter system and into a rear lot swale that will direct runoff into the underground drainage system. Lots 20-55 are adjacent to a canal and an existing ditch that is to remain protected. These lots will have to be graded to force all runoff from impervious surfaces to the front of the lots and into the roadway drainage system. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. Drainage Area 2 contains 2.91 acres that are designed to drain to Detention Pond B. This drainage area includes 25,996 sf (0.6 ac) of roads and 3,021 sf (0.07 ac) of sidewalks. This area includes lots 1-5 and the pump station lot. The maximum impervious area allowed per lot is 5,500 sf or a total of 33,000 sf (0.76 ac) for this drainage area. The resulting maximum impervious area for this drainage area is 1.43 acres or 49.14%. All of the roadway drainage will be collected in curb and gutter and an underground piping system. Runoff from the lots will sheet flow across grassed yards into the curb and gutter and into rear lot line swales with 3:1 side slopes. The rear lot line swales are routed into the piped drainage system that drains to Detention Pond B. Detention Pond B has been designed for 90% TSS removal. Drainage Area 3 contains 10.14 acres that are designed to drain to Detention Pond C. This drainage area includes 68,443 sf (1.57 ac) of roads and 16,652 sf (.38 ac) of sidewalks. This area includes lots 91-106. The maximum impervious area allowed per lot is 7,500 sf or a total of 127,500 sf (2.93 ac) for this drainage area. The resulting maximum impervious area for this drainage area is 4.88 acres or 48.13%. All of the roadway drainage will be collected in curb and gutter and an underground piping system. Runoff from lots 90-105 will sheet flow across grassed yards and into rear swales or over the curb into the curb and gutter system. The rear lot line swales are routed into the piped drainage system that drains to Detention Pond C. Lot 106 shall be graded to such that all runoff from impervious surfaces will drain across the yard and into the curb and gutter. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. The total disturbed area for development will not exceed 40.77 acres. This includes the entire tract except for the area within the 30' AEC, the area within the top of bank of the protected ditch, and the residual parcel that fronts River Road. Limits of disturbance have been shown on the plans. / ^i OFFICE USE ONLY Date Ra:clverl —�� Pce Pail - � Put mi( Nun,bel� l` 1 S-/-v70'70;?-1q State of Norllt Carolina Departutenl of Environmen( and Natural Resources P// Division of Wa(er Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORMRECE-WED This rotn may be photocopied for use as an original 1. GENERAL INFORMATION FEB 2 0 2007 OWO-WARO Applicants name (specify lbc not ofthe corporalion, individual, etc. who owns the project): The Reserve at —Herons —Rid 2. Print Owner/Signing Official's name and tille (person legally responsible for facilityand compliance): _S_te�hen L1 e,Ppler ..Managing -_Mem 3. Mailing Acldress for pcison lisiecl in item 2 above: 113 South Colonial Road Suite 123 City: Virginia Beach State: Va. 7ip: 23451 TclephoncNumbcr: ( 757 )_853-1111 4. Project Name (subdivisioTi, facility, or estai)IlSbillent newe - should be COI]SiStCnt With project name on l'ilons, specifications, letters, operation and maintenance agreements. etc.): The Reserve at Herons Ridge 5. Location of Project (street aciclress): Northwest corner of River Road (SR 1169) and Asbury Road (SR_1316) City: Elizabeth C.it_y Cou, [Y:_P_as.q.u.o_tank __ G. Dircclions to project (from twonst niojor intersection): H ads t e�_&4 ta.l_�v�.r_d—t.o_ R.i v e�13_Q a-d_._2rQj e.ct__is_o.n_t.h_e_N.o_r_t corner of River Road and Asbury Road. 7. Latitude: 36 ° 17 ' Lougiwde: 76 ° 12' 8. Contact person who can answer questions about the projecC of project Nan,c:-K.i,Mb_e-r-1-yC._3amb_y TolcphoneNumibcr: (25_2) 335-1888 if. PERMIT INFORMATION: 1. Specify whetlier project is (check one): X New Renewal 1\40dification Form SWU-101 Version 3.99, Pagc l Of"I 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit _Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major X Sedimentation/Erosion Control _404/401 Permit XNPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . Tn all drainage areas roadway drainage will ha rnllerted into a underground piping system. Runoff from the lots ylill sheet fl _y_ into rear lot line swales or into the cub�nd cutter system-. 2. Stormwater runoff from this project drains to the 3. Total Project Area: 46.87 acres 1 5. How many drainage areas does the project Pasauotank River basin. 4. Project Built Upon Area: 43.85 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 1 Drainage Area 2 Receiving Stream Name pas uotank River Pas uotank River Receiving Stream Class SC SC Drainage Area 6 Existing Impervious* Area 0 0 Proposedlmpervious"Area 13.85 AC 1.42 AC % Impervious* Area (total) 53.21% 48.80% Impervious; Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 0 0 On -site Streets On -site Parking 0 0 On -site Sidewalks �, Other on -site 5 5 0 0 s f 1 t 462 OOOsF 10.61 A 33,000 sf .76 AC Off -site 01 0 Total: 13.85 AC I Total: 1.42 AC Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 Attachment to Stormwater Management Permit Application Form Information for Third Drainage Area for The Reserve at Herons Ridge Subdivision Basin Information Drainage Area 3 Receiving stream name Pas uotank River Receiving stream class SC Drainage area 441,719 sf (10.14 AC) Existing impervious area Proposed impervious area 212,095 sf (4.87 AC) % impervious area (total) 48.13% . Impervious surface area Drainage Area 3 On -site buildings On -site streets 68,443 sf (1.57 AC) On -site parking On -site sidewalks 16,652 sf (.38 AC) Other on -site Off -site (7,500 sf per lot) 127,OOO1 (2.93 AC) Total: 4.88 AC 7. How was the off -site impervious area listed above derived? IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. Z. No more than * square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or, similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stornnvater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. * lots 1-89 5,500 sf and lots 90-106,7,500 sf By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITI'ALREQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Wafer Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. L Please indicate (]lot you have provided the following required inforrualion by initialing In [lie space provided next to each Item. - Initials • Original and one copy of the SlormwaLer Management Permit Application Form . ; P • One copy of the applicable SupplemmIL Foh'nh(5) for each BMP • Permit application processing fee of $420 (payable to NCDENR) t� • 1)etallccl narrative description of sIorrnwater Ircaoncnt/nhaIlagcn'hent • Two copies of plans and specifications, including: 9 - Develophnent/Project name - Engineer and firm - Legend - North arrow - Scale - Revision mmIIbef & elate _ - Muau high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numhers - OF contours, proposed contours, spot elevations, finished floor elevations - Details of loads, drainage fUaIWICs, collection systems, and sLorniwater conn'ol measures - W00,E1nds delineated, or a note on plans that none exist - Existing drainage (including o17-si1e), (Irainage easements, pipe sizes, runoff Calcnla Lions - Drainage areas duliucated - Vegetated bullers (where required) VII. AGENTAUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your hehalf, please complete this section. Designated agent (individual or firm):_Hym.arl—&—AQb--y—PC Mailing Adch'css: PO Box 339 City: Camden Phone: l—Z5.2 L33-5-18.8-8-- VIll. APPLICANT'S CERTIFICATION State: NC _ Zip: 27921 Fax: ( 25.2 )_3.38 555-2 _ 1,(pint ortype name ofpcisonlisted ill General lnfontutGon,Real 2) Stephen L. Peppler certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will he constructed in conformance wilh [lie approved plans, that the required cleed resb-ictions and protective cover will b recorded, and that the proposed project complies with the requlrenhents of 15A NCAC 21-1 .1000. Signature: _ Date: —C2 //j_0 Porten SWU-101 Version 3.99 Page 4 of4 Pcruiil. No. (to be provided by DIVQ) State of Norlh Carolina Departnienl of Environtuent and Natural ReSOUPCCS Division of Water Quality STORM WATER iVIANACEME.N'I' PERMIT APPI-,ICA'f10N FORM WET DETENTION BASIN SUPPLEMENT This form may be phofocopied for use as au original DWO StormwaterManagernent Plan Review: A complete stormwater management plan submittal includes an application foru'i, a wet detention basic supptement for cacti basin, design calculations, and plans and specifications showing all basin and outlet structure details. i. PROJECT INFORM.A'FION Project Name: The Reserve at Herons Ridge Cont.ktPerson:_Stephen L. Peppler PhoncNumbcr: (757)853-1111 For projects with nndtiple basins, specify which basin this woiksheet applies to: Detentioll!Pond�A- elevations Basin Bottom Elevation-4 .0 ft. (floor of the basin) Permanent Pool Elevation 1.0 ft. (elevation of the orifice) Temporary Pool Elevation 1 .()6 ft. (elevation of the discharge structure, ovq-flow) areas Permanent Pool Surface Area 61 , 361 sq. ft. Drainage Area Impervious Area volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Olher parameters SA/DAi Diameter of Orifice Design Rainfall Design TSS ]removal Z FormSWU-102 Rev3.99 26.03 ac. 13.85 ac. (ivcrter siuface area at the orifice elevation) (ore -.cite and (�f-site drainage to the basin) (on -site and off ,rile drainage to the b(Uin) 13 408 cu. R. (coiubined volume gfmain basin andforebay) 60,854 _ Co. It. (volume detained above die permanent pool) 40,387 cu.ft.(opproxiniolely20%ofTotalvolunie) 3. 9% (surface area to drainage area ratio fan DIVQ table) 4 n. (2 to 5 day temporary pool draw -down requirecn 5.75 in. (10 year storm) 90 % (mininnan 85% required) Page I of 4 Footnotes: t When using (lie Division SA/DA tables, the correct SAMA ratio for penuaucut pool sizing should be computed based upon the actual impervious % and pennanent pool depth. Linear interpolation should be employed to determine the correct value for uou- standard table entries. 2 In the 20 coastal counties, the requirement fur a vegetative filter may be waived if the %vcl detention basic is designcal to provide 90% TSS removal. The NCDL•NR 13MP manual provides design tables for both 35%TSS removal mud 90%TSS removal. If. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Managcurent Practices Manual (N.C. Department of Environment, health and Natural Resomrccs, 'February 1999) and Administrative Code Section: 15 A NCAC 21-1 .1008. Initial in lire space provided to indicate the following design requirements have been mcl and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Porte, the agent rimy initial below. I1' a requirement has not been met, aUnch justification. Applicants initials 132W It. (O�iM b. C. d. C. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forcbay volume is approximately equal to 20% of the basin volume. The temporary pool controls runofffrom the design storm event. The temporary pool draws clown in 2 to 5 days. If required, a 30-foot vegetative tiller is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is grader than 3: 1. g. The basin side slopes above the pennaucnt pool are no steeper than 3:1. It. A submerged and vegetated perimeter shclfwith a slope of 6:1 or Less (show detail). i. Vegetative cover above the permanent pool elevation is specified. �v-i j. A trash rack or similar device is provided for both the overflow and orifice. — — — — — — — — k. A recorded drainage casement is provided for each basin including access to nearest right- of-way. _ I. If the basin is used for sediment and erosion control during conshuclioa, clean out of file basin is specified prior to use as a wet dctcntiou basin. in. A mechanism is specified which will drain the basin for maintenance or an emergency. (iqu^p I11. WET DETENTION BASIN OPERATION AND MAINTENANCE AG12EI$MEN1' The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and (hc vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does 0 does not incorporate pretreatment other than a forcbay. Pone SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monUily: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition.' b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. Repair eroded areas immediately, is -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper Functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling neat' a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool deptli rcads 3 . 75 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feel in the forebay, the sediment shall be removed. 13ASIN DIAGRAM Ul/ in the bhnnks) Permanent fool Elevation 1 . 0 Sediment Rcu oval GL =1 -25 175'% ---- - Sediment Removal Elevation 2 . 75 75% Bollmn Glcalion —2. 0----------------------------- -------------- ---- Bottom Elevation —4 . 0 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the Maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Printname: Stephen L. 'Peppler Title: Managing Partner Address: 114 Smith Colonial Roa c1 Sni tr 10 3 Note: 7'he legally responsible party should not be a homeowners association unless more than 50% of the lots have bccn sold and a resident of the subdivision has been named the president. 1_C'a� _CXe — , a Notary Public for the State ofecl� C a-fo\ dr o County of as!i. o�c �� �� o hereby certify that f>� P.Q � Dl C C' personally appeared before me this V-3`c ^ day of a�—t , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, MARIANNE J. COOPER NOTARY PUBUC PASOUOTANN COUNTK NC SEAL My commission expires b - I F - S1a Form S WU-102 Rev 3.99 Page 4 of 4 Attachment to WET DETENTION BASIN SUPPLEMENT For The Reserve at Herons Ridge Detention Pond A — Drainaee Area 1 e. Pond has been designed for 90% TSS removal. k. The pond will be located on property owned by the Homeowners Association which has frontage on a public street. I'GI'Inll No (to be provider! by UIVQ) Slate of Nor IIi Cni-olina Dupartiucnl of Gnvirunnic it and NetW'al Rosonrccs Division of Water Quality SfOIRMWATeIZ Iv1ANACC':Ad13N'1 PLR(rll`f APP1•ICrA'PION PORIA WLT D1:TLN'TION BASIN SUPPLEJOENT This moll may be 116olocopicd ral use as nil of igiuel DWQ Slonnwater Ilan Review: A complete stormwatci nuulagenicnL plan sublidirW iucludcs an application form, a wct cictcntion basin supplement for each basin, design calculations, and plans and specilicatioris sbo%ving all basin and outlet structure details. 1. PROJEC'J' INFORNINFION ProjectNanw: The Reserve at Herons Ridge Contact Person: Stephen L. Peppler _ Phoac NLmIbCi: (757 8) 53-1111. Por projects Willi nndtiPlc basins, spccily which basin this worlcslicct applies Mycent ion Pond R elevations Basin Bottoin Elcvalion __� 0 ft. Permanent Pool Glcvatio❑ 1 i 0 R Temporary Pool hlevation wva.r Pcrnuuicul Pool Surface Arcn,0193 _ sj I Dramagc Arai Impervious Area Pcruiancal fool Volume Temporary Pool V011llne porebay Volliiile Other poronletc)-s SA/DA I Diameter of Orifice Dcsigu Rainfall Design TSS Rciuoval 2 2 .91 _ ac. 1.42 ac. (floor of the basin) (clevation of the orifice) (elevation ofthe di.vchat;ve slrnclure ov,iJlom) (inner Sla:iace orcu at the or7ficc elevullon) ((m-.vile and qIf -vile (lroinaj;e to the b(isin) (on -silo and off site (h'clincl�,,e to the bruin) 19,613 _ cw I1. (combined volume o% main ba.vin an(ynrchn),) 6,406 _ cu. IL (vohune (lelainsi above the permanent pool) 3,921 cu. 11. (opp) oxilwocly 204, of lutal vohnnc) 3 . 5 % (san Gue area to dl uinogc area ralia fi-oln DWQ /able) 1.5 ill. (2 to 5 cloy tempol-oly pool clrniv-du nor rcgau-ed) 5.75 in. (10 year storm) 90 in (mininlluu 85i; regtrire(1) Dorm SWU-102 Rev 3.99 I'agc 1 or 4 Fouluulcs: When using the Division SA/DA tables, the correct SA/DA ratio fur peruumcnl pool nixing should be co npu(cd bused upon Ihc actual impervious'A and pcnuauma pool depth. Liucar inlerpolaliou Ahould be employed to detcraiuc d, correct value for lron- standard table entries. 2 In the 20 coastal cmuntim, Ihc. imphcwua Rn a vegetative Gltcr way be waived Wdw wcl dcicution bast❑ is dcsigucd to pWvidc 9U% ISS removal. The NCDGNR BMP manual provides dcsigu tables Ibr both U'Xb TSS rcwoval and 901A FSS rcwoval. H. REQUIRED ITEi IS CHECKLIST The following checklist outlines design requirements per the Stoniawater BestManagcmcnt Practices Main,] ] (N.C. Depaitntent of Isnviiountent, llcallh and Nalural RCSOUICGS, I'VaLiary 1999) and Administrative Code Section: 15 A NCAC 211 .1008. Initial in the space provided to indicate the following elcsign requirements have been act and supporting docunicntation is attached. 11 Ihc applicant has dcsignaled an agent in the Storinwutcr Managcmcut Pcsmit Application Form, the agent ncly initial hclow. If a requircuteut has not been owl, attach jusHlica(iou. Applicants Initials ILJII{ hla. The pwmancntpool depth is between 3 and G feet (requited minimum of 3 feet). I� h b The fotcbay volutuc is appnoxiinately equal to 20% of the basin volatile. G. 1fhc twnpoiary pool conbols runoff front the dcsigu stotrn event. 1CF t� d. The lennporary pool draws clown in 2 to 5 days. — — — — — — c. If required, a 304bot vegctalive Filler is provided at So outlet (include tlon-crusNe now calculations) �&h f. The basin length to widlh ratio is greater than 3:1. g. The basin side slopes above the penutuientpool are no steeper than 3:1. — I � It. A submerged and vegetated perimeter shcll-with a slope of 6: t or less (show detail). i. Vegetative cover above the pennanent pool elevation is specified. J. A bush rack or similar device is provided for both Me overflow and orifice. k. A recorded drainage casement is provided for each basin including access to nearest i ight- of-way. 1. If the basin is used for sediment and erosion control during construction, clam out of the �q�� basin is specified prior to use as a %VJ dctention basin. in. A niechankin is specilied which will drain the basin for ntairuciiance or all culcal ca cy. cfUNnP Ill. WETDETENTION13ASIN OPERATION AND NIAINTEINANCE AGIZEE1IENT The wet detention basin system is defined as the wet detention basin, pretrcatmcut including lbrcbays and the vegetated filter if one is provided. This system (check one) 0 does lI does not incorporale it vegdatcd litter at the oullet. This system (check otre) 0 dues 19 does not incorporate pretreatment older Uian a torebay. Form SWU-102 Rcv 3.99 Page 2 of 4 Maintenance activities shall be perlbrIII cd as follows: 1. Alter ever), niticant,ruuoflpIoctic ing riinfaII event anI a lead: numlhly: a. Inspect the wet detention basin system for sediment, aMlinulatiou, erosion, trash aecuuiulaliou, vegetated covet, and general condition.' b. Check and clear the orifice of any obstructions such that drawdown of the tcnnporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seccl as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height, of six inclics, and remove trash as needed. 3. Inspect and repair the collcclion system (i.e. catch basins, piping, swales, I iprnp, etc.) quarterly to maintain proper functioning. 4. RCI110Ve accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (sec diagram below). Removed sedimenl shall be disposed of in all appropriate mamicr and shall be handled in a manner that will not, adversely impact water quality (i.e. stockpiling scar a wet detention basin or stream, etc.). The measuring device used to dclernine the sccliment elevation shall be such that it will give an accurato depth reading and not readily pcuclratc into accuuiulaled sediments. When the permancul pool depdf rcads 3. 75 feel it, the main pond, the sediment shall be Iciuovccl. When the permanent pool depth rcads 2 . 25 lect in the forcbay, the sccliment shall be reiuoved. 13ASIN DIAGRAM (ill in /lie blanks) Pcnnaocut Pool l.lcvutio❑ 1 . 0 Sediment Rca oval El. —1 . 25 -15, -------- ---- -- Saliwwil Removal Plovatiou —2. 7S llollom 131c °aliuu ------- ___---- ______ -- 13ouom 131cvation=4.0 FOREBAY N'IAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of [lie basin surface. Thesc plains shall be encouraged to grow along the vegetated shelf and forcbay beau. 6. If the basin must be drained for an colergency or to perform maintenance, the flushing of sediment through the emclgency drain shall be minimized to the maximum extent practical POrm SWU-102 Rev 3.99 Page 3 of 7. All components of the wet detention basin system shall he maintained in good %voiking order. 1 acknowledge and agree by my signature below that 1 am responsible for the performance of' the seven nutintcmance procedures listed above. I agree to nobly DWO of;uty problans wilh the system or prior to any changes to the system or responsible party. Print name:_ct Pnhan- i, - •PPnnl ar Title: Managing Partner Address:— 11 SS D„ r h(-33_Lo.niaLRaad S uite_1 2 3 Date: 6 7 Note: The legally responsible party shoUId not be n Ilol➢60vVWI's assoc iati ou unless moic Ilan 50% of the lots Itave been sold ;ind a resident of the subdivision has been named the president. 1, `C� c-,,c c--A��ccp��- t Notary Public lot the Slate of j-" r� Cc. N\ice CounY of�A5e;do h\ t ��.r'~ , ereby certify that} Q,ph..¢,� �, PA,r�n lR r• personally appeared before me this clay of �,-Zbrt., C�1 ,tout acknowledge the clue execution of the forgoing wet detention basin maintenance recluileme� -nts. Witness my hand and official seal, MARIANNE 1. COOPER NOTARY PUBLIC PASQUOTANN COUM NC SEAL My commission expires FoanSWU-102 Rcv3.99 Pagc4of4 Attachment to WET DETENTION BASIN SUPPLEMENT For The Reserve at Herons Ridge Detention Pond B — Drainalle Area 2 e. Pond has been designed for 90% TSS removal. k. The pond will be located on property owned by the Homeowners Association which has frontage on a public street. Pull m l No. (to be provide(!by DIVJ Slide. of Norlll Carolina Depai l nlcnt of Environuu:nl and Natural Resources Division of Wali�r Quality STORM\WATI3R FORM WET IDETENTION BASIN SUPPLEMENT 'Ellis form may be pllolocopied for u.se as an 01 ilgilml D\VQ Stoiniwatei Management Plan Review: A complete stormwatcr management plan submit(al supplement for cacti basin, design calculations, and structure details. PHOJEC't' INFORMA'PION includes an application form, it wct detention basin plans and specilicalions showing all basin and outlet PiojcclNainc: The Reserve at Herons Ridge Coulact Person: Stephen 1. Peppler Phouc NUmbcr: ,(757 ) 853-1111 For projects Willi multiple basics, specily which basin Lbis Worl<sllect apPlics lo:Dgten-L on Pond C elevations Basin 1301-loin Elevation —3.0 Cl. Permaucnt pool Llevalion 3.0 Il. Tcmporv-y Pool Elcva(ioll _ 4.31 areas Perntaucut Pool Surface Arca-L6-, 0-1�5_ sy. Cl. Dreivage Arca Impervious At _ 10.14 _ac. 4.87 _ac. (floor of the basil]) (devotion of r/le wlficc) (elevotion �f dre dia'char�a sh'rrGure ot�ei/lom) (nvter srofiace area al the orifice elevation) (o)i-silo and o[f-.site (hranloge to the basill) (o) 1-sire wlei offsite ch ainuge to the basin) VolUDles Pcnuancnl Pool V01umc 42 , 194 — cu. 11. (combined rohmic o% moor basin olld orcboO Telupot'ary Pool Volmuc 22,683 cu. fl. (volume cdelaine(lohove llle pernluilen[ pool) Foicbay Volume _ 8 , 754 cu. I'( ((ippi oaiinotely 20% of total volunle) Other paramelcrs SAIDAI 2. 7% (surfcice areo to (1rainoge oreo ratio fi oil] DIVQ table) Diameter of Orifice 2.375 in. (2 to .5 doy lewpora,), pool draw-dowl, I g1to-ecl) Design Rainfall 5.75 u. (10 year storm) Design TSS IZCIttOVal 2 90 %, (nlhlilnunl 85% required) Form SWU-102 Rev 3.99 Page 1 01 4 Footuolcs: Whcu ueiug the Divi.sim; SA/DA InLlcs, 11w Cut Imd SAMA ratio for pernuumnl pool sii,inh should Lc cunlIII led burud upon II C actual iugtervious % and penn;uwul pout depth. Linear iIIlerpolmiou should be employed to delcrmiue the correct value for uun- standard table entries. 2 In the 20 co;alal couutics, the wquilclima Gila vcgclolivc Ilticr luay be waived if llic we( detadiou basin is designed to pmvidc 9oss us removal. Ile NCDENK UMP nmmmi provides design tables for bolh 35Z,'I SS removal and 90%'I SS rcwoval. IL REQUIRED ITEMS CHECKLIST The following checklist outliucs design requirements per the SW nlwater Best Management Practices Ivlauuah (N.C. Depaitnnenf of Environment, IIcalth and Natural ICesourccs, February 1999) and Administrative Code Section: 15 A NCAC 211 . I008. Initial in the space provided to indicate the following design requirements have been met and supporting docuulcntatiotl is ❑ttachutd. If the applicant has designated all agent in the Stornnvatcr Management Permit Application Fonn, We agclu nmy initial below. II' a requirement has not been noel, attach jusMicaliou. Applicants Initials a. The permancutpool depth is between 3 and 6 feet (mgAred minimum of 3 feel). b. The forcbay volume is approximately cclual to 20% of the basin volume. C. The temporary pool controls runoff Gone the design slorm event. d. The temporary pool :haws clown in 2 to 5 clays. — — — — — — — — c. if required, a 30400t vegelalke filler is provided at the outlet (include Ion -erosive Iloov calculations) VA� f. "file basin Icnglh to width ratio is Wcalcr Hiatt 3: I. _ 41 g. The basin side slopes above the pelinauc It pool are no steeper than 3:1. II. A subnncrged mud vegelali;el pcdnncwr shelf wifh a slope of'6:1 of less (show detail). i. Vegetative cover above the permanent pool cicvatiou is specilicd. j. A trash rack or shiWar device is provided for bulb the overflow and orifice. k. A recorded drainage easematnl is provided for each basin includinng access to nearest I ight- ofvvay. I. if tine basin is used for sediment and erosion control during construction, clean out of the (���� basic is specified prior to use as a vvet dctcntiou basin. m. A mechanism is specified which will :train the basin for nwintenauce or au eulcrgoltcy. (pN M. AVETI) OVENTION BASIN OPERATION AND [MAINTENANCE AGRE.ENIEMY The wet detention basin system is defined as the wet detemiun basin, pretreatment including f aujnlys and the vegetated tiller if one is provided. This system (check one) 0 does R does not incorporate a vege(ated Eller at (he outlet. 'Phis systcnl (check one) 0 does to does cat incorporate pre( -eminent outer than :t lilreb:ry. Fromm SVW 02 Rev 3.99 Page 2 of 4 Maiatemamce activities shall be per(Lrnled as IoIIows: Aftcr every signillcant rusuff producing rainfall event and al least monlhdy: a. lnspect the wet detention basin system fur scdimcnt acemminlatiOla, crosiou, trash acculnulatiou, vegetated cover, and gcncrnt condition.' Check and clear the wilicc of any obstructions such that drawdown of lac temporary pool occults within 2 to 5 days as designed. 2. Repair eroded areas ilnmcdiatcty, m-seed as necessary to maintain good vcgctativc cover, mow vcgctativc cover to maintain a uwximurn height of six inches, and remove trash as needed. 3. fmspect and repair the collection system (i.c. catch basins, piping, swalcs, riprap, etc.) quarterly In maintain proper fumcliuming. RCmOVe accumulated scdimcnt Prom the wet detention basin system scmli-annually or when dcplh is reduced to 75% of do original design depth (sec dAgrmn below). Removed sediment Will be disposed of' in an appropriate manner and shall be handled in or manner that will not udvcrscly ilupacl wafer qualily (i.e. stockpiling near it %vet detention basin or dream, etc.). The mcesuring device used to dctcnnille the scdimcnt elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sulimculs. Whcn the pcnnancnt pool dcpdf reads A Sa, Poet iu do main pond, the scdimcnt shall be removed. When the permanent pool depth reads _2. P 9 feel in the Porebay, the sediment shall be removed. Salimcm Rml oval W. —1 . 50 ( 75' u t ollom 111c:rtiuu i'%, FOREBAY BASIN DIAGRAM bill in 11w hlnnhs) Pelinaaent Pool Elevatioll 3, 0 _----sediment Removal Elevation . 7 5 I;i llom Elevation _1, 0 MAIN POND 75'A 25% 5. Remove cattails and other indigenous wetd.md plants when they cover 50% of the basin surface. 'These plants shall be encouraged to grow along the vegetated shelf and lbrcbay berm. 6. If the basin must be drained for an cmcrgcncy or to pcliorm maiulcnance, the lhlshimg of scdimcnt through Me cmcrgcncy drain shall be minimized to Uro maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of4 7. All components of the wet detention basin system shall be rnahmained in WnW working order. I acknowledge and agree by my sigmame below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Printnamc: Stephen ,L-_ Reppler Address: 1 1 ' S9.tith_C.ol4niaLRaad_S.uj-Le-12 3 Note: The legally responsible party should not be a homcownsrs association unless more then 50%, of the lots hive been sold and a resident of the subdivision has been mans! the president. rrvltj�tt a Notary Public for the State of��r}Y� GeoL�o�, County of PGS • �,�„� , do hereby certify that'�-i�_ep�,r \ _ �--� p�r personally appafrect bcforc me this L7 t day of cb-a—,, D-)C�Z and acknowledge the due execution of the forgoing weC dctention basin maintenance requirements. Witness my hand and official seal, MARIANNE J. COOPER NOTARY PUBLIC N400YOK UMNR NC SEM My commission expires_ (a - I F — Perm SWU-102 Rev 3.99 Page 4 of 4 Attachment to WET DETENTION BASIN SUPPLEMENT For The Reserve at Herons Ridge Detention Pond C — Drainage Area 3 e. Pond has been designed for 90% TSS removal. n4L����� FEB 2 0 2007 ®WQ-WAR® k. The pond will be located on property owned by the Homeowners Association which has frontage on a public street. AIR EGE6VED 2007 AR® The Reserve at Herons Ridge Pasquotank County — Elizabeth City - North Carolina February 13, 200 The Reserve at Herons Ridge is a proposed 106 lot residential subdivision located off of River Road (SR 1169). The tract to be subdivided contains 47.13 acres, but only 46.87 acres are included in the subdivision. A residual parcel located across the canal, fronting on River Road contains 0.26 acres and is not included in this permit. The land is currently vacant and zoned R-10 (Residential 10,000 sf lots) and R-15 (Residential 15,000 sf lots). PY g S; Jv,sf •aoti y0—/,6 9 7,5o05-1 a-t4 Development of this subdivision will include construction of approximately 6,988 If curb and guttered streets with sidewalks, water main, gravity sewer main, sewer force main and three detention ponds. The streets will contribute 5.08 acres of impervious surface and the sidewalks will be another 1.17 acres. Coverage on each lot will be limited to 5,500 sf for the R-10 lots and 7,500 sf for the R-15 lots. The maximum coverage for the development is 20.55 acres or 43.85%. According to the Pasquotank County Soils Maps as prepared by USDA, Soil Conservation Service, the soils on this site are predominately Arapahoe with small areas of Dragston, Tomotley, and Roanoke. The Roanoke soils are limited to the perimeter of the property that is adjacent to the large existing ditches. Three soil borings were performed in the detention pond areas by Sean C. Robey, PE and Kimberly Hamby on February 12, 2007. All soil borings were conducted with an AMS 2-3/4" diameter, 6' long, hand mud auger. Boring No. 1 was located in the area for Pond A. The elevation at the boring location is approximately 6.50'. The first 10" inches were sandy loam topsoil. From 10- 36" was a sandy clay loam, from 36-42" was a fine sandy loam, and at 42" it changed to sand. At 66" the sand was wet and we were unable to remove any additional soil with the auger we were using. We estimate the seasonal high water table to be approximately 66" below the surface, or elevation 1.0'. The permanent pool for Pond A has been set at 1.0'. Boring No. 2 was located in the area for Pond C. The elevation at this location is approximately 8.00'. The first 8" were sandy loam topsoil. From 8-42" was a sandy clay loam. Below 42" was sand. Based on a change in coloration at 60" and visible soil wetness at 66", we estimate the seasonal high water table at 60" or elevation 3.0'. The permanent pool elevation for Pond C has been set at elevation 3.0'. Boring No. 3 was made in the area of proposed Pond B. The elevation at this location is approximately 6.50'. The first 8" inches were sandy loam topsoil. From 8- n 42" was a sandy clay loam, and at 42" it changed to sand. At 66" the sand was wet and we were unable to remove any additional soil with the auger we were using. We estimate the seasonal high water table to be approximately 66" below the surface, or elevation 1.0'. The permanent pool for Pond B has been set at 1.0'. Each of the three borings supported the soils map classification of Arapahoe. While the Arapahoe soils have permeability rates that could support infiltration, Drainage Areas 1 & 3 are too large to utilize infiltration. With the utilization of underground piping, we find that the depth of the piping and the elevation of the water table prohibits the use of infiltration in Drainage Area 2. Therefore, we have determined that wet detention basins are the most appropriate method of storm water treatment for this development. All of the detention ponds are designed for 90% TSS removal and they drain to a tributary of the Pasquotank River that drains under River Road before entering the river. In addition to meeting state requirements for stormwater treatment, this site will comply with the City of Elizabeth City's Stormwater Ordinance. This ordinance requires that post development runoff not exceed pre development runoff during a 10 year storm event. Rational method was utilized to estimate pre and post development runoff for each drainage area. Our "chainsaw routing" method detention pond spreadsheets calculate the peak discharge out of each pond. Based on these methods we have determined the following: Drainage Area Pre-dev. Discharge Post-dev runoff Det. Pond Discharge 1 52.9 cfs 75.61 cfs 15.29 cfs 2 5.86 cfs 8.37 efs 0.98 cfs 3 20.41 cfs 29.15 cfs 10.28 cfs Drainage Area 1 contains 26.03 acres that are designed to drain to Detention Pond A. This drainage area includes 126,882 sf (2.91 ac) of roads and 31,337 sf (0.72 ac) of sidewalks. It includes all of lots 6-89. The maximum impervious area allowed per lot is 5,500 sf or a total of 462,000 sf (10.61 ac) for this drainage area. The resulting maximum impervious area for this drainage area is 14.24 acres or 54.71%. All of the roadway drainage will be collected in curb and gutter and an underground piping system. Runoff from lots 74-89 will sheet flow across grassed yards into rear lot line ditches with 3:1 side slopes and into Detention Pond A while the rear of lots 56- 73 will sheet flow across grass yards directly into the pond. Lots 6-19 will sheet flow across grassed yards and over the curb into the curb and gutter system and into a rear lot swale that will direct runoff into the underground drainage system. Lots 20-55 are adjacent to a canal and an existing ditch that is to remain protected. These lots will have to be graded to force all runoff from impervious surfaces to the front of the lots and into the roadway drainage system. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. Drainage Area 2 contains 2.91 acres that are designed to drain to Detention Pond B. This drainage area includes 25,996 sf (0.6 ac) of roads and 3,021 sf (0.07 ac) of sidewalks. This area includes lots 1-5 and the pump station lot. The maximum impervious area allowed per lot is 5,500 sf or a total of 33,000 sf (0.76 ac) for this drainage area. The resulting maximum impervious area for this drainage area is 1.43 acres or 49.14%. All of the roadway drainage will be collected in curb and gutter and an underground piping system. Runoff from the lots will sheet flow across grassed yards into the curb and gutter and into rear lot line swales with 3:1 side slopes. The rear lot line swales are routed into the piped drainage system that drains to Detention Pond B. Detention Pond B has been designed for 90% TSS removal. Drainage Area 3 contains 10.14 acres that are designed to drain to Detention Pond C. This drainage area includes 68,443 sf (1.57 ac) of roads and 16,652 sf (.38 ac) of sidewalks. This area includes lots 91-106. The maximum impervious area allowed per lot is 7,500 sf or a total of 127,500 sf (2.93 ac) for this drainage area. The resulting maximum impervious area for this drainage area is 4.88 acres or 48.13%. All of the roadway drainage will be collected in curb and gutter and an underground piping system. Runoff from lots 90-105 will sheet flow across grassed yards and into rear swales or over the curb into the curb and gutter system. The rear lot line swales are routed into the piped drainage system that drains to Detention Pond C. Lot 106 shall be graded to such that all runoff from impervious surfaces will drain across the yard and into the curb and gutter. If necessary, gutters and downspouts shall be utilized to route runoff to the collection system. The total disturbed area for development will not exceed 40.77 acres. This includes the entire tract except for the area within the 30' AEC, the area within the top of bank of the protected ditch, and the residual parcel that fronts River Road. Limits of disturbance have been shown on the plans. &man & Rohev, PC CansullingEngineers and Land Surveyors 1,(252) 335-1838 Office (252) 338-2913 C%fice - (252) 338-5552 Fax I February 15, 2007 Scott Vinson Division of Water Quality -Surface Water Section Washington Regional Office 943 Washington Square Mall RE, GENE® Washington, NC 27889 FEB 2 0 2007 Subject: Stormwater Management Permit pVUQ WAR® The Rcscrve at I lerons Ridge Project # 050016 Dear Mr. Vinson: Enclosed for your review and approval, please find the following items: I. Two (2) copies of sheets C- 3, 7-9 and 11-13 for the above referenced project- .. 2. The original and one copy of the Stormwater Permit Application and required attachments. 3. Two (2) copies of the project description and calculations. 4. Check in the amount $4000.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252) 335-1888. cc: file Stephen Peppier Sincerely, Scan C. Robey, P.E. 10 / Kimberly D. Hamby vv am Project Manager P. O. Box 339, Camden, NC 27921 NC®ENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all information below and CHECK required Permit(s). Fax or email this completed form along with a narrative and vicinity map of the project location to the appropriate One -Stop Coordinator: • Fayetteville or Raleigh Region -David Lee 919-791-4203; dayid.lee(c ncmail.net rl�ECEHV ED • Mooresville & Asheville Region -Patrick Grogan 704-663-3772 or patrick.groganPricmail.net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(@,ncmail.net • Wilmington Region -Cameron Weaver 910-350-2004 or cameron.weavetfa ncmail.net FEB 2 0 2007 Project application received after 12 noon will be stamped in the following work day. ®WQWARO APPLICANT Name Stephen L. Peppier Company The Reserve at Her-ns Ridge, LLC Address 113 South Colonial Rcb: Ste..101�[State Va. Beach, VA Zip23451 Phone(757) 853-1111 Fax Email PROJECT SYSTEM(S) TRIBUTARY TO SURFACE WATER CLASSIFICATION PROJECTName The Reserve at Herons Ridge County PROJECT LOCATION (ADDRESS) Corner of Asbury Road and River Roar? ENGINEER/CONSULTANT Company Hyman .,c Robey, PC Address PO Box 339 City/State Camden, NC Zip_27921 Phone (252)335-1Rftft Fax Email State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required ❑Yes ❑ No © STREAM ORIGIN Determination: of Stream calls; Stream Name ® STORMWATER ❑Low Density ® High Density -Detention Pond ❑ High Density -Other ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off Site WETLANDS MUST BE ADDRESSED BELOW ❑COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® LAND QUALITY ❑ Erosion and Sedimentation Control Plan with 411 acres to be disturbed.(CK #3503 (for DENR use)) ❑ WETLANDS (401): Check all that apply Isolated wetland on Property ❑ Yes ❑ No Wetlands on Site ❑ Yes ❑ No / Buffer Impacts: ❑ No ❑ YES: acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Minor Variance : ❑ No ❑ YES Major General Variance ❑ No ❑ YES US ACOE Approval of Delineation completed: ❑ Yes ❑ No 401 Application required: ❑Yes ❑ No If YES, ❑ Regular 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Perennial, Blue line stream, etc on site ❑ yes ❑ No The legislation allows additional fees, not to exceed 50% of the original Express Review permit application fee, to be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only Fee Split for multiple permits: (Check #J� �) Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA Variance ❑ Maj; ❑ Min SW ❑ HD; ❑ LID) 401: LQS Stream Deter,_ Page I PERMANENT POOL DETENTION PONDS DESIGN OF POND The Reserve = Detention Pond A 10 Yr, 24 Hr Storm DETENTION POND - Pond A (Front Pond) Hyman & Robey, PC 150-A Hwy 158 East Camden, NC 27921 (252)-335-1888 02/13/07 SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 WATERSHED AREA: 26.03 ACRES WATERSHED % IMPERVIOUS: 54.71 PERMANENT POOL ELEVATION: I FT DESIGN PERMANENT POOL DEPTH: 5 FT SA/DA PERCENTAGE FACTOR: 3.9 clo POND SURFACE AREA REQ-D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH= 121.41 LF LENGTH = 364.229 LF 44221 SF 13266 SF 6.5 FT 0.3 1.0 1.3 1.8 2.3 2.9 3.4 4.0 4.6 5.1 FEB 2 0 2007 DWQ-WAR® 7.0 FT 0.2 0.9 1.4 1.9 2.4 2.9 3.4 3.9 4.3 (FROM ABOVETABLE -TAKEN FROM DESIGN OF STORM WATER CONrROL FACILITIES WORKSHOP MANUAL - PENC 198M (BASED UPON MINIMUM SURFACE AREA) Use these dimensions: WIDTH 142.70 LF LENGTH 430 LF VOLUME OF 1" RAINFALL Normal Pool Elevation AREA OF ROOFS: 5.30 AC AREA OF PARKING/CONCRETE: 8.94 AC AREA OF GREEN AREAS: 11.79 AC VOLUME OF RUNOFF 58628.1 CF VOL(CF)=[(ROOF*1.0)+(PARKING*.95 STORAGE DEPTH FOR MINIMUM AREA = 0.96 FT ELEVATION OF I" RAINFALL = 1.96 i e SEAL 18550 Vol I I tos'k. I \\\\\\ 12 Page 2 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.33928 CFS Q(5 DAYS) = 0.13571 CFS 1" RUNOFF STAGE 0.96 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 3.61721 INCH DIA HOLE A=[Q/(Cd*SQRT(2gh)))* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. DIAMETER OF HOLE TO USE: 4 INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.33647 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 76 cfs Tc = Time of Concentration = 20 min Calculation of Tp (Time to Peak) From SCS NEE 4, page 15-7 Eqn. 15.4 Lag Time (L) _ (IA0.8*(S+I)A0.7)/(1900*YA0.5) for L in Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in S = (1000/CN)-10 = 1.49425 L= 0.40606 hrs From SCS NEE 4, page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.04433 hrs Tp = 0.42823 hrs = 25.6938 min Volume under Hydrograph = 1.39 * Qp * Tp = 162858 Cubic Feet 1185 1.49425 87 0.5 17 SEAL 18550 _ • '••fteINee. ' CI t RO\\\N "81/1 Page 3 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.04 2 351 0.20 0.10 0.09 8 1172 0.30 0.19 0.13 14 2226 0.40 0.31 0.17 24 3632 0.50 0.47 0.21 36 5507 0.60 0.66 0.26 50 7733 0.70 0.82 0.30 62 9607 0.80 0.93 0.34 71 10896 0.90 0.99 0.39 75 11599 1.00 1.00 0.43 76 11716 1.10 0.99 0.47 75 H 599 1.20 0.93 0.51 71 10896 1.30 0.86 0.56 65 10076 1.40 0.78 0.60 59 9139 1.50 0.68 0.64 52 7967 1.60 0.56 0.69 43 6561 1.70 0.46 0.73 35 5390 1.80 0.39 0.77 30 4569 1.90 0.33 0.81 25 3866 2.00 0.28 0.86 21 3281 2.20 0.21 0.94 16 4851 2.40 0.15 1.03 11 3445 2.60 0.11 1.11 8 2507 2.80 0.08 1.20 6 1804 3.00 0.06 1.28 4 1289 9 , 3.20 0.04 1.37 3 937 jfSEAL 3.40 0.03 1.46 2 680 3.60 0.02 1.54 2 492 18550 = 3.80 0.02 1.63 1 351 i P .... :' '. GiNEE 4.00 0.01 1.71 1 258 /�iP�� , \NN\c 1Ci11tRO 4.50 0.01 1.93 0 293 5.00 0.00 2.14 0 0 Volume under hydrograph = 154691 cf Based upon runoff volume = 162858 cf Depth req'd for minimum area = 2.65409 Page 4 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 61361 0 0 0 Surface area at normal pool 1 63088 31112 31112 0.5 10.35 -0.69 0.59 1.5 64833 31980 63093 1 11.05 0.00 1.09 2 66596 32857 95950 1.5 11.47 0.41 1.57 2.5 68378 33743 129694 2 11.77 0.69 2.04 3 70177 34639 164332 2.5 12.01 0.92 2.50 3.5 71994 35543 199875 3 12.21 1.10 2.96 4 73829 36456 236330 3.5 12.37 1.25 3.43 4.5 75682 37378 273708 4 12.52 1.39 3.89 5 77553 38309 312017 4.5 12.65 1.50 4.36 5.5 79442 39249 351266 5 12.77 1.61 4.83 6 Regression Output Constant 9.34346 Ks = S/Z^b = 57179.01 Sul Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes Hld = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 9.50 Elev Invert Barrel (ft) Cdb = 0.60 Barrel orifice coeff 3.65 'a.'SEAL 10550 - ••'•.�VOINEEP'•• �� sFgN C. R���P`�• Barrell Adjustment Factor 3 Page 5 EMERGENCY WEIR Elevation Cw = 3 Weir coeff Ecr = 1.96 Elev weir coeff (ft) Lw = 5 Weir Length (ft) Riser Riser Riser Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.09 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.17 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.27 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.41 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.58 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.9 2.28 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.7 2.43 0.0 0.0 0.0 0.0 0.0 0.0 0.00 4.8 2.56 0.0 0.0 0.0 0.0 0.0 0.0 0.00 7.0 2.68 0.0 0.0 0.0 0.0 0.0 0.0 0.00 9.1 2.77 0.0 0.0 0.0 0.0 0.0 0.0 0.00 10.9 2.84 0.0 0.0 0.0 0.0 0.0 0.0 0.00 12.3 2.89 0.0 0.0 0.0 0.0 0.0 0.0 0.00 13.3 2.92 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.1 2.94 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.6 2.97 0.0 0.0 0.0 0.0 0.0 0.0 0.00 15.2 2.97 0.0 0.0 0.0 0.0 0.0 0.0 0.00 15.3 2.96 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.9 2.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.3 2.89 0.0 0.0 0.0 0.0 0.0 0.0 0.00 13.5 2.85 0.0 0.0 0.0 0.0 0.0 0.0 0.00 12.6 2.81 0.0 0.0 0.0 0.0 0.0 0.0 0.00 11.8 2.77 0.0 0.0 0.0 0.0 0.0 0.0 0.00 10.9 2.73 0.0 0.0 0.0 0.0 0.0 0.0 0.00 10.1 2.69 0.0 0.0 0.0 0.0 0.0 0.0 0.00 9.4 2.60 0.0 0.0 0.0 0.0 0.0 0.0 0.00 7.6 2.52 0.0 0.0 0.0 0.0 0.0 0.0 0.00 6.3 / 18550 Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.043 2 0 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.086 8 351.492 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.128 14 1523.13 1.04 0.00 0.00 0.00 0.00 0.00 0.00 0.171 24 3749.24 1.09 0.00 0.00 0.00 0.00 0.00 0.00 0.214 36 7381.33 1.17 0.00 0.00 0.00 0.00 0.00 0.00 0.257 50 12888 1.27 0.00 0.00 0.00 0.00 0.00 0.00 0.300 62 20620.8 1.41 0.00 0.00 0.00 0.00 0.00 0.00 0.343 71 30228.3 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0.385 75 41124.5 1.75 0.00 0.00 0.00 0.00 0.00 0.00 0.428 76 52723.8 1.93 0.00 0.00 0.00 0.00 0.00 0.00 0.471 75 64440.1 2.11 0.87 0.00 0.00 0.00 0.00 0.87 0.514 71 75905.9 2.28 2.70 0.00 0.00 0.00 0.00 2.70 0.557 65 86386 2.43 4.84 0.00 0.00 0.00 0.00 4.84 0.600 59 95715.4 2.56 7.04 0.00 0.00 0.00 0.00 7.04 0.642 52 103769 2.68 9.12 0.00 0.00 0.00 0.00 9.12 0.685 43 110331 2.77 10.92 0.00 0.00 0.00 0.00 10.92 0.728 35 115209 2.84 12.32 0.00 0.00 0.00 0.00 12.32 0.771 30 118700 2.89 13.35 0.00 0.00 0.00 0.00 13.35 0.814 25 121212 2.92 14.10 0.00 0.00 0.00 0.00 14.10 0.856 21 122904 2.94 14.62 0.00 0.00 0.00 0.00 14.62 0.942 16 124959 2.97 15.25 0.00 0.00 0.00 0.00 15.25 1.028 11 125108 2.97 15.30 0.00 0.00 0.00 0.00 15.30 1.113 8 123837 2.96 14.90 0.00 0.00 0.00 0.00 14.90 1.199 6 121749 2.93 14.26 0.00 0.00 0.00 0.00 14.26 1.285 4 119156 2.89 13.48 0.00 0.00 0.00 0.00 13.48 1.370 3 116288 2.85 12.63 0.00 0.00 0.00 0.00 12.63 1.456 2 113330 2.81 11.77 0.00 0.00 0.00 0.00 11.77 1.542 2 110380 2.77 10.93 0.00 0.00 0.00 0.00 10.93 1.627 1 107502 2.73 10.13 0.00 0.00 0.00 0.00 10.13 1.713 1 104730 2.69 9.37 0.00 0.00 0.00 0.00 9.37 1.927 0 98149.3 2.60 7.65 0.00 0.00 0.00 0.00 7.65 2.141 0 92545.6 2.52 6.27 0.00 0.00 0.00 0.00 6.27 2.97307 = maximum stage elevation 15.2951 = maximum discharge Page 7 The Reserve - Pond A Pasquotank County - Elizabeth City 10 yr STORM -.-- INFLOW (cfs) OUTFLOW 80 — *— Cf)] 70 s 360 50 m 40 30 a 0 20 a 10 a R 0.000 1.000 2.000 3.000 Time (hrs) EAL a 18550 0 FAN C. pog�i POND A CALCULATIONS AREA POND CALCULATIONS FOR POND A-B CALCULATIONS.XIS PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA (A) FOREBAY SURFACE AREA (B) FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM (A) AREA AT EDGE OF FOREBAY SHELF (B) AREA AT EDGE OF FOREBAY SHELF (A) AREA OF FOREBAY BOTTOM (B) AREA OF FOREBAY BOTTOM SURFACE AREA AT 1' STORAGE ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1"STORAGE VOLUME CALCULATIONS MINIMUM MAIN BASIN VOLUME (A) FOREBAY VOLUME (B) FOREBAY VOLUME PERMANENT POOL VOLUME FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME TEMP. STORAGE VOLUME (1- RUNOFF) F2 44221 61.361.12 42,737.18 11,094.94 7,529.00 31,866.62 20,821.75 7,520.75 4,743.35 6,096.39 3,588.34 66,020.86 F 1.00 -0.67 0.67 -2.00 1.96 F3 150,020.31 24,599.50 15,787.99 190,407.79 21.21 % 60,854.23 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 2.87 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION -2.75 PP DEPTH READS ... SEDIMENT SHALL BE REMOVED I�//ij/ 3.75 FOREBAY `\\ ....I SEDIMENT REMOVAL ELEVATION ' ,i3 ��t'; % -1.25 PP DEPTH READS ... SEDIMENT SHALL BE REMOV — SEAL = 2.25 18550 p'V FILE LOCATION -5\Hyman8 Ro6ey05\056016Herons PUNExcal\POND AB CALCULATIONS IS /// s••'•O"IN'`-'�P•� \\\ TAB - POND CALC a\6r20m7�A :a6 an /// OmRog�OP.,1 of 2 POND CALCULATIONS FOR POND A-B CALCULATIONS.xIs TOTAL FOREBAY VOLUME 40,387.49 TOTAL PP VOLUME 190,407.79 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 21.21% — O EAL = 18550 i• •'•.•�%l•'OINE.•'• FILE LOCATION 5\Hyman& Pelee, 05\050016 Heron'e PIM,Excel\POND A B CALCULATIONS.XIe TAB POND CA-C A WlW20071146 W Pape 2 of 2 Page I PERMANENT POOL DETENTION PONDS DESIGN OF POND The Reserve �Detention-Pond-pi 10 Yr, 24 Hr Storm DETENTION POND Hyman & Robey, PC 150-A Hwy 158 East Camden, NC 27921REGO U EV (252)-335-1888 02/13/07 FEB 2 0 2007 ®WQ-IIVARO SAIDA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPR V 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10%D 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: WATERSHED % IMPERVIOUS: PERMANENT POOL ELEVATION: DESIGN PERMANENT POOL DEPTH: SAIDA PERCENTAGE FACTOR: POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH= 38.456 LF LENGTH = 115.368 LF 2.91 ACRES 49.14 % I FT 5 FT 3.5 % (FROM ABOVE TABLE TAKENFROMDESIGN OFSTORM WATER CONTROL FACILUIES WORKSHOP MANUAL - PENC 1988) 4437 SF 1331 SF (BASED UPON MINIMUM SURFACE AREA) Use these dimensions: WIDTH 43.77 LF LENGTH 210 LF VOLUME OF 1" RAINFALL Normal Pool Elevation AREA OF ROOFS: 0.38 AC AREA OF PARKING/CONCRETE: 1.05 AC AREA OF GREEN AREAS: 1.48 AC �_ VOLUME OF RUNOFF 6074.81 CF VOL(CF)=I(ROOF*I.0)+(VAttRtN;;, STORAGE DEPTH FOR MINIMUM AREA = 0.66 FTSs ELEVATION OF I" RAINFALL = 1.66 SEAL 18550 i J''•�./l'OINEEP'•• �rC i iRpB �\\\�� Page 2 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.03516 CFS Q(5 DAYS) = 0.01406 CFS I " RUNOFF STAGE 0.66 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFF OUTLET DEVICE: 1,27675 INCH DIA HOLE DIAMETER OF HOLE TO USE: 1.5 INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.06996 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 9 cfs Tc = Time of Concentration = Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 A=[Q/(Cd*SQRT(2gh))I* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. 15 min Lag Time (L) = (IA0.8*(S+I)A0.7)/(1900*YA0.5) for Lin Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in S = (1000/CN)-10 = 1.49425 L= 0.22264 hrs From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn, 16.12 D = 0.133 tc where: Tc=Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.03325 hrs Tp = 0.23927 hrs = 14.3561 min Volume under Hydrograph = 1.39 * Qp * Tp = 10775.7 Cubic Feet 750 1.49425 87 0.8 1 1 a550 sFgN C. I,///nnun1110N Page 3 inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.02 0 23 0.20 0.10 0.05 1 78 0.30 0.19 0.07 2 147 0.40 0.31 0.10 3 240 0.50 0.47 0.12 4 364 0.60 0.66 0.14 6 512 0.70 0.82 0.17 7 636 0.80 0.93 0.19 8 721 0.90 0.99 0.22 9 767 1.00 1.00 0.24 9 775 1.10 0.99 0.26 9 767 1.20 0.93 0.29 8 721 1.30 0.86 0.31 8 667 1.40 0.78 0.33 7 605 1.50 0.68 0.36 6 527 1.60 0.56 0.38 5 434 1.70 0.46 0.41 4 357 1.80 0.39 0.43 4 302 1.90 0.33 0.45 3 256 2.00 0.28 0.48 3 217 2.20 0.21 0.53 2 321 2.40 0.15 0.57 1 228 2.60 0.11 0.62 1 166 IIII 11 2.80 0.08 0.67 1 119 3.00 0.06 0.72 0 85 Iv'•: _ Q 1�N1 3.20 0.04 0.77 0 62 _ l�' SEAL - 18550 3.40 0.03 0.81 0 45 3.60 0.02 0.86 0 33 i ,'VG!NSFIp 3.80 0.02 0.91 0 23 iz 4A(IC 4.00 0.01 0.96 0 17 4.50 0.01 1.08 0 19 5.00 0.00 1.20 0 0 Volume under hydrograph = 10235 cf Based upon runoff volume = 10775.7 cf Depth req'd for minimum area = 1.17233 STAGE STORAGE FUNCTION OF POND Page 4 (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 9192 0 0 0 Surface area at normal pool 1 9962 4788 4788 0.5 8.47 -0.69 0.54 1.5 10750 5178 9967 1 9.21 0.00 1.02 2 11557 5577 15543 1.5 9.65 0.41 1.50 2.5 12381 5984 21528 2 9.98 0.69 1.99 3 13223 6401 27929 2.5 10.24 0.92 2.50 3.5 14084 6827 34755 3 10.46 1.10 3.02 4 14962 7261 42017 3.5 10.65 1.25 3.56 4.5 15858 7705 49722 4 10.81 1.39 4.12 5 16772 8158 57879 4.5 10.97 1.50 4.71 5.5 17705 8619 66499 5 11.10 1.61 5.31 6 Regression Output: Constant 9.34346 Ks = S/ZAb = 9717.724 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISERIBARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff H I n = 5 Number of Holes HId = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 9.50 Elev Invert Barrel (ft) Cdb = 0.60 Barrel orifice coeff 2.17 Barrell Adjustment Factor Q EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 1.66 Elev weir coeff (ft) Lw = 2 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.07 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.18 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.25 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.33 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.41 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.49 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.56 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.63 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.70 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 1.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 1.84 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.5 1.87 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.6 1.89 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 1.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 1.94 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.9 1.95 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.9 1.96 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.0 1.96 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.0 1.95 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.0 1.95 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.9 1.94 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.9 1.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.8 1.92 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.8 1.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 1.88 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.6 1.86 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.5 SEAL 18550 = .' FNGI�JE..... sFgN /���NIIIN11110w\ Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) efs cfs cfs cfs cfs 0.000 0 0 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.024 0 0 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.048 1 23.2568 1.01 0.00 0.00 0.00 0.00 0.00 0.00 0.072 2 100.78 1.02 0.00 0.00 0.00 0.00 0.00 0.00 0.096 3 248.073 1.04 0.00 0.00 0.00 0.00 0.00 0.00 0.120 4 488.394 1.07 0.00 0.00 0.00 0.00 0.00 0.00 0.144 6 852.751 1.12 0.00 0.00 0.00 0.00 0.00 0.00 0.167 7 1364.4 1.18 0.00 0.00 0.00 0.00 0.00 0.00 0.191 8 2000.09 1.25 0.00 0.00 0.00 0.00 0.00 0.00 0.215 9 2721.05 1.33 0.00 0.00 0.00 0.00 0.00 0.00 0.239 9 3488.53 1.41 0.00 0.00 0.00 0.00 0.00 0.00 0.263 9 4263.75 1.49 0.00 0.00 0.00 0.00 0.00 0.00 0.287 8 5031.23 1.56 0.00 0.00 0.00 0.00 0.00 0.00 0.311 8 5752.19 1.63 0.00 0.00 0.00 0.00 0.00 0.00 0.335 7 6418.89 1.70 0.04 0.00 0.00 0.00 0.00 0.04 0.359 6 7019.78 1.75 0.17 0.00 0.00 0.00 0.00 0.17 0.383 5 7532.02 1.80 0.32 0.00 0.00 0.00 0.00 0.32 0.407 4 7938.61 1.84 0.45 0.00 0.00 0.00 0.00 0.45 0.431 4 8256.07 1.87 0.57 0.00 0.00 0.00 0.00 0.57 0.455 3 8509.35 1.89 0.67 0.00 0.00 0.00 0.00 0.67 0.479 3 8707.74 1.91 0.75 0.00 0.00 0.00 0.00 0.75 0.526 2 9013.33 1.94 0.87 0.00 0.00 0.00 0.00 0.87 0.574 1 9183.76 1.95 0.95 0.00 0.00 0.00 0.00 0.95 0.622 1 9248.47 1.96 0.98 0.00 0.00 0.00 0.00 0.98 0.670 1 9246.26 1.96 0.97 0.00 0.00 0.00 0.00 0.97 0.718 0 9197.71 1.95 0.95 0.00 0.00 0.00 0.00 0.95 0.766 0 9118.72 1.95 0.92 0.00 0.00 0.00 0.00 0.92 0.814 0 9022.42 1.94 0.88 0.00 0.00 0.00 0.00 0.88 0.861 0 8916.2 1.93 0.83 0.00 0.00 0.00 0.00 0.83 0.909 0 8805.35 1.92 0.79 0.00 0.00 0.00 0.00 0.79 0.957 0 8693.16 1.91 0.74 0.00 0.00 0.00 0.00 0.74 1.077 0 8416.99 1.88 0.63 0.00 0.00 0.00 0.00 0.63 1.196 0 8164.72 1.86 0.54 0.00 0.00 0.00 0.00 0.54 1.95795 = maximum stage elevation 0.97582 = maximum discharge 9�1 1 9r'. 1SEAL $ 18550 sFAN:::.:•••e� C. R� Page 7 10 9 8 6 5 m N 4 0 3 2 1 0 The Reserve - Pond B Pasquotank County - Elizabeth City 10 yr STORM I � ' a u t I ut 0.000 0.500 1.000 1.500 Time (hrs) —a—INFLOW (cfs) -- • - OUTFLOW (cfs) 18550 sF9N ........ POND B CALCULATIONS AREA POND CALCULATIONS FOR POND A-B CALCULATIONS.xIs PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE MINIMUM F2 4437 9,192.51 6,273.39 2,919.12 3,437.33 1,116.78 854.88 303.31 10,193.79 ELEVATIONS F PP ELEVATION 1.00 ELEVATION AT EDGE OF MAIN BASIN SHELF -0.67 ELEVATION OF MAIN BASIN BOTTOM -4.00 ELEVATION AT EDGE OF FOREBAY SHELF -0.67 ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE 1.66 VOLUME CALCULATIONS F3 MAIN BASIN VOLUME 15,691.04 FOREBAY VOLUME 3,921.49 PERMANENT POOL VOLUME 19,612.53 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 19.99% TEMP. STORAGE VOLUME (1- RUNOFF) 6,406.21 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 1.98 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDIMENT SHALL BE REMOVED FOREBAY SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDIMENT SHALL BE REMOVED FILE LOCATION - S Wymen & ROCey'W05C016 - Hewn Pu ExcehPOND A-B CALCULATIONS x,s TAD POND OALOD V13/100711,51 AM 18550 sFAN c.: Qs� , -2.75 3.75 1.25 2.25 Ps001 011 Page 1 PERMANENT POOL DETENTION PONDS DESIGN OF POND The Reserve , Detention Pond C 10 Yr, 24 Hr Storm DETENTION POND - Pond A (Front Pond) Hyman & Robey, PC 150-A Hwy 158 East Camden, NC 27921 (252)-335-1888 02/13/07 SAIDA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 WATERSHED AREA: 10.14 ACRES WATERSHED % IMPERVIOUS: 48.13 % PERMANENT POOL ELEVATION: 3 FT DESIGN PERMANENT POOL DEPTH: 6 FT SAIDA PERCENTAGE FACTOR: 2.7 % POND SURFACE AREA REQD: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = 63.0499 LF LENGTH = 189.15 LF 11926 SF 3578 SF 6.5 FT 0.3 1.0 1.3 1.8 2.3 2.9 3.4 4.0 4.6 5.1 FEB 2 012001 7.0 FT 0.2 0.9 1.4 1.9 2.4 2.9 3.4 3.9 4.3 (FROM ABOVE TABLE TAKEN FROM DESIGN OF S FORM W ATER CONTROL FACILmES WORKSHOP MANUAL -PENC 1988) (BASED UPON MINIMUM SURFACE AREA) Use these dimensions: WIDTH 71.50 LF LENGTH 224 LF VOLUME OF 1" RAINFALL Normal Pool Elevation AREA OF ROOFS: 1.47 AC AREA OF PARKING/CONCRETE: 3.41 AC AREA OF GREEN AREAS: 5.26 AC VOLUME OF RUNOFF 20914.2 CF VOL (CF)=[(ROOF*1.0)+(PARKING'.95. STORAGE DEPTH FOR MINIMUM AREA = 1.31 FT ELEVATION OFI"RAINFALL = 4.31 ,I SEAL 18550 sFgN C»•%0'.' 3 Page 2 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.12103 CFS Q(5 DAYS) = 0.04841 CFS I" RUNOFF STAGE 1.31 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFF OUTLET DEVICE: 1.99813 INCH DIA HOLE A=[Q/(Cd*SQRT(2gh))]* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. DIAMETER OF HOLE TO USE: 2.375 INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.02232 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 30 cfs Tc = Time of Concentration = 15 min Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 Lag Time (L) = (I^0.8*(S+I)^0.7)/(1900*Y^0.5) for Lin Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (1000/CN)-10 = 1.49425 L= 0.41017 hrs From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.03325 hrs Tp = 0.4268 hrs = 25.6077 min Volume under Hydrograph = 1.39 * Qp * Tp = 64070.6 Cubic Feet �6EAL 18550 4 C. to 1200 1.49425 87 0.5 Page 3 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf ------ ----- ----------------------------------- ---------------------------------------------- 0.00 0.00 0.00 0 0.10 0.03 0.04 1 138 0.20 0.10 0.09 3 461 0.30 0.19 0.13 6 876 0.40 0.31 0.17 9 1429 0.50 0.47 0.21 14 2166 0.60 0.66 0.26 20 3042 0.70 0.82 0.30 25 3780 0.80 0.93 0.34 28 4287 0.90 0.99 0.38 30 4563 1.00 1.00 0.43 30 4609 1.10 0.99 0.47 30 4563 1.20 0.93 0.51 28 4287 1.30 0.86 0.55 26 3964 1.40 0.78 0.60 23 3595 1.50 0.68 0.64 20 3134 1.60 0.56 0.68 17 2581 1.70 0.46 0.73 14 2120 1.80 0.39 0.77 12 1798 1.90 0.33 0.81 10 1521 2.00 0.28 0.85 8 1291 2.20 0.21 0.94 6 1908 2.40 0.15 1.02 4 1355 2.60 0.11 1.11 3 986 2.80 0.08 1.20 2 710 3.00 0.06 1.28 2 507 3.20 0.04 1.37 1 369 _\ 3.40 0.03 1.45 1 267 -_ 3.60 0.02 1.54 1 194 3.80 0.02 1.62 0 138 4.00 0.01 1.71 0 101 4.50 0.01 1.92 0 115 5.00 0.00 2.13 0 0 Volume under hydrograph = 60858 cf Based upon runoff volume = 64070.6 cf Depth req'd for minimum area = rAl MEAL 18550 sFp gN C ••og. Page 4 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 16016 0 0 0 Surface area at normal pool 3 16912 8232 8232 0.5 9.02 -0.69 0.56 3.5 17825 8684 16916 1 9.74 0.00 1.05 4 18757 9145 26061 1.5 10.17 0.41 1.53 4.5 19706 9616 35677 2 10.48 0.69 2.01 5 20674 10095 45772 2.5 10.73 0.92 2.50 5.5 21659 10583 56355 3 10.94 1.10 2.99 6 22663 11080 67435 3.5 11.12 1.25 3.50 6.5 23684 11587 79022 4 11.28 1.39 4.02 7 24724 12102 91124 4.5 11.42 1.50 4.54 7.5 25781 12626 103750 5 11.55 1.61 5.09 8 Regression Output: Constant 9.34346 Ks = S/Z^b = 15926.22 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes H I d = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 9.50 Elev Invert Barrel (ft) Cdb = 0.60 Barrel orifice coeff Y q^`l ' a SEAL 18550 Barrel] Adjustment Factor 3 EMERGENCY WEIR Page 5 Elevation Cw = 3 Weir coeff Ecr = 4.31 Elev weir coeff (ft) Lw = 3 Weir Length (ft) Riser Riser Riser Hole Hole Hole Riser Riser Barrel (1) (2) (3) (weir) (orifice) 3.00 0.0 0.0 0.0 0.0 0.0 0.0 3.00 0.0 0.0 0.0 0.0 0.0 0.0 3.02 0.0 0.0 0.0 0.0 0.0 0.0 3.06 0.0 0.0 0.0 0.0 0.0 0.0 3.13 0.0 0.0 0.0 0.0 0.0 0.0 3.23 0.0 0.0 0.0 0.0 0.0 0.0 3.37 0.0 0.0 0.0 0.0 0.0 0.0 3.56 0.0 0.0 0.0 0.0 0.0 0.0 3.78 0.0 0.0 0.0 0.0 0.0 0.0 4.01 0.0 0.0 0.0 0.0 0.0 0.0 4.26 0.0 0.0 0.0 0.0 0.0 0.0 4.50 0.0 0.0 0.0 0.0 0.0 0.0 4.72 0.0 0.0 0.0 0.0 0.0 0.0 4.92 0.0 0.0 0.0 0.0 0.0 0.0 5.08 0.0 0.0 0.0 0.0 0.0 0.0 5.21 0.0 0.0 0.0 0.0 0.0 0.0 5.30 0.0 0.0 0.0 0.0 0.0 0.0 5.36 0.0 0.0 0.0 0.0 0.0 0.0 5.39 0.0 0.0 0.0 0.0 0.0 0.0 5.40 0.0 0.0 0.0 0.0 0.0 0.0 5.40 0.0 0.0 0.0 0.0 0.0 0.0 5.37 0.0 0.0 0.0 0.0 0.0 0.0 5.32 0.0 0.0 0.0 0.0 0.0 0.0 5.25 0.0 0.0 0.0 0.0 0.0 0.0 5.18 0.0 0.0 0.0 0.0 0.0 0.0 5.10 0.0 0.0 0.0 0.0 0.0 0.0 5.03 0.0 0.0 0.0 0.0 0.0 0.0 4.97 0.0 0.0 0.0 0.0 0.0 0.0 4.91 0.0 0.0 0.0 0.0 0.0 0.0 4.85 0.0 0.0 0.0 0.0 0.0 0.0 4.81 0.0 0.0 0.0 0.0 0.0 0.0 4.70 0.0 0.0 0.0 0.0 0.0 0.0 4.62 0.0 0.0 0.0 0.0 0.0 0.0 Principal Emergcy Spillway Weir 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.0 0.00 0.7 0.00 2.4 0.00 4.3 0.00 6.1 0.00 7.7 0.00 8.9 0.00 9.7 0.00 10.1 0.00 10.3 0.00 10.2 0.00 9.9 0.00 9.1 0.00 8.2 0.00 7.2 0.00 6.3 0.00 5.5 0.00 4.8 0.00 4.2 0.00 3.6 0.00 0.00 3.1 2.2 0.00 1.5 lrrp ran.. a•I SEAL 18550 • '•.�VpM... C sFAN ���//IIII I pI1P11�� Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.043 1 0 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.085 3 138.282 3.02 0.00 0.00 0.00 0.00 0.00 0.00 0.128 6 599.221 3.06 0.00 0.00 0.00 0.00 0.00 0.00 0.171 9 1475.01 3.13 0.00 0.00 0.00 0.00 0.00 0.00 0.213 14 2903.92 3.23 0.00 0.00 0.00 0.00 0.00 0.00 0.256 20 5070.33 3.37 0.00 0.00 0.00 0.00 0.00 0.00 0.299 25 8112.53 3.56 0.00 0.00 0.00 0.00 0.00 0.00 0.341 28 11892.2 3.78 0.00 0.00 0.00 0.00 0.00 0.00 0.384 30 16179 4.01 0.00 0.00 0.00 0.00 0.00 0.00 0.427 30 20742.3 4.26 0.00 0.00 0.00 0.00 0.00 0.00 0.469 30 25351.7 4.50 0.73 0.00 0.00 0.00 0.00 0.73 0.512 28 29803.1 4.72 2.39 0.00 0.00 0.00 0.00 2.39 0.555 26 33723.2 4.92 4.26 0.00 0.00 0.00 0.00 4.26 0.598 23 37032.2 5.08 6.08 0.00 0.00 0.00 0.00 6.08 0.640 20 39693.1 5.21 7.67 0.00 0.00 0.00 0.00 7.67 0.683 17 41648.4 5.30 8.91 0.00 0.00 0.00 0.00 8.91 0.726 14 42860.7 5.36 9.70 0.00 0.00 0.00 0.00 9.70 0.768 12 43490.2 5.39 10.12 0.00 0.00 0.00 0.00 10.12 0.811 10 43732.7 5.40 10.28 0.00 0.00 0.00 0.00 10.28 0.854 8 43673.6 5.40 10.25 0.00 0.00 0.00 0.00 10.25 0.939 6 43106.6 5.37 9.87 0.00 0.00 0.00 0.00 9.87 1.024 4 41983.2 5.32 9.13 0.00 0.00 0.00 0.00 9.13 1.110 3 40533.7 5.25 8.20 0.00 0.00 0.00 0.00 8.20 1.195 2 39000.7 5.18 7.25 0.00 0.00 0.00 0.00 7.25 1.280 2 37483 5.10 6.34 0.00 0.00 0.00 0.00 6.34 1.366 1 36040.7 5.03 5.52 0.00 0.00 0.00 0.00 5.52 1.451 1 34714.1 4.97 4.79 0.00 0.00 0.00 0.00 4.79 1.536 1 33510.1 4.91 4.15 0.00 0.00 0.00 0.00 4.15 1.622 0 32427.3 4.85 3.61 0.00 0.00 0.00 0.00 3.61 1.707 0 31457.1 4.81 3.14 0.00 0.00 0.00 0.00 3.14 1.921 0 29299.9 4.70 2.17 0.00 0.00 0.00 0.00 2.17 2.134 0 27747.8 4.62 1.55 0.00 0.00 0.00 0.00 1.55 5.40304 = maximum stage elevation 10.2848 = maximum disc Page 7 The Reserve - Pond C Pasquotank County - Elizabeth City 80 10 yr STORM man 70 60 �r N I \ 50 'Ir �, i i �',"•' ' c!� i� rl ', IJun ^i r . 0 —e INFLOW (CIS) 40 .....-.OUTFLOW (CIS) m 30 20 r � ■- �a4•rnr�♦ or..� a . r . wid�L�YYdN •'w i i 1 0 0.5 1 1.5 2 2.5 Time (hrs) Z SEAL 18550 g l'I0 \\� POND CALCULATIONS FOR POND C CALCULATIONS.xIs POND C CALCULATIONS PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE VOLUME CALCULATIONS MINIMUM Fz 11926 16,015.16 11,282.92 4,732.24 6,719.35 1,783.14 2,477.02 1,634.43 18,726.33 F 3.00 1.33 -3.00 1.33 0.00 4.31 F3 MAIN BASIN VOLUME 33,439.79 FOREBAY VOLUME 8,753.85 PERMANENT POOL VOLUME 42,193.63 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 20.75% TEMP. STORAGE VOLUME (1" RUNOFF) 22,683.32 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 3.92 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION -1.50 PP DEPTH READS ... SEDIMENT SHALL BE REMOVED 4.50 FOREBAY SEDIMENT REMOVAL ELEVATION 0.75 PP DEPTH READS ... SEDIMENT SHALL BE REMOVED --,--%�2.25 iesso FILETAB LOCATION $VyWey'650500 macBR16-He,ons PUTEvcBNPONDCCALNLATION$vIs /// sI1�Q � Q p,.1 of 1