Loading...
HomeMy WebLinkAboutSW6110505_HISTORICAL FILE_20110613STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWT/��50� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M D D PARAMOUNTE E N G I N E E R I N G. 1 N C. 5 9 1 1 O L E A.N D E R D R I V E, SUITE 2 0 1 W I L M ING TO N, N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) L F. T T F. R O F TRANSMITTAL To: NCDENR-DWQ Date fil (p 1p 11 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Alpha Charter Academy School (Revised) State Stormwater Submittal Attn: Brian Lowther Project No. I 11128.PE e are sending: ❑ Originals ® Prints ❑ Shop Drawings ® Calculations ❑ Correspondence ® Plans ❑ Specifications ❑ Other as listed below he followin items: Quantity Date Dwg. No. Description 2 6/10/11 24" x 36" Design Documents (Revised sheetC-2.1) 0 101 - WATEP QUAL Issue Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ I -or Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ Sec Remarks coon Taken: ❑ No 8xccptions Taken ❑ Makc Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Remarks: Cc: Signed: b / 21 11r-- "retche6 Merix )ARAMOUNT . E N 'G '.I N E E F2 I N G, I N C. 5 9 1 1 OLEANDER D R I V E, SUITE 2 0 1 W I L M I N G T O N, N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) L F. T T F. R 0 F T R A N S M I T T A I. To: NCDENR-DWQ Date 06/06/11 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Alpha Charter Academy School (Revised) State Stormwater Submittal Attn: Brian Lowther Project No. I 11128.PE eare.sciidiii-: ❑ Originals ® Prints ❑ Shop Drawings ® Calculations ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below rf he following items: .. Quantity - . ;; Date_ Dwg: No., Description 2 06/06/11 24" x 36" Design Documents (Revised sheets C3.0, C5.0) 2 06/06/11 Revised Stormwater Calculauons 1 06/06/11 Comment and Response Letter Issue.Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Rerm ction Tarkeinil ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubm ❑ Rejected -See Remarks ❑ Approved as Submitted ❑ Other Remarks: IECEIVE, JUN 7 2011 pARAMOUNTE F N G I N F_ F R i N C. I N C. June 6, 2011 Brian Lowther NCDENR — Division of Water Quality 1617 Mail Service Center Raleigh, NC 27604 RE: Response Submittal: Alpha Charter Academy Project ID: SW611505 Mr. Lowther, On behalf of Alpha Charter Academy, we are submitting a response to your comments dated May 26, 2011. Please find your comments below with our response provided in bold. The volume in excess of the treatment volume must be evenly distributed across a minimum 30 foot long vegetated filter. For sites that have difficulty meeting this requirement, options are available for waiving of the offline bypass and vegetated filter strip by permitting the system under alternative design criteria in NCAC 21-1.1006(h). For these options, please see Section 16.3.9 in Chapter 16 Infiltration Devices in the BMP Manual. Please revise the plans to include a vegetated filter or to meet the alternative design. Please find revised calculations attached to this submittal that are in accordance with Section 16.3.9, number 4, of the BMP Manual for waiving the offline bypass and the vegetated filter requirement. The attached calculations show that the entire 10 yr. 24-hour storm is stored and infiltrated in the proposed basin with 1/2 the infiltration rate (14.2 in/hr/2 = 7.1 in/hr). The peak elevation of the 10 yr 24-hour storm event is 219.26 and the proposed outlet structure weir is set at elevation 219.30. The emergency spillway is set at elevation 219.60 while the top of basin still remains at elevation 221. 2. The overflow volume looks to flow to a collection system. Part of the system is shown on the plans but no detail is given. Please provide more detail about the system in either narrative or on the plans. • A 24-inch RCP storm sewer was stubbed into lot 6 for future development of lots 5 and 6. The off -site storm sewer collection system ties into the NCDOT drainage system as shown on sheet C-2.0. The existing access road and utilities where designed and permitted by George M. Rose, PE and have been installed and certified. 3. Plan Sheet C-2.0 indicates two phases for the project. Please note the infiltration basin must be complete and certified before any building is occupied. The notes on the plan sheets indicate the sediment basin will be converted once the entire drainage basin in fully stabilized. Please provide more detail about the construction sequence. Will Phase I be complete and occupied before Phase II is complete? • The Owner has indicated that the project will proceed as one project and that there will be no phasing. If this should change, a modification to the erosion control permit will be requested. 5 9 I I O L E A N D E R D R I V E, 6 T E. 20 1. W I L M 1 N G T G N, N C 2 0 4 O 3 P H: 1 9 1 0 1 7 9 1- 6 7 D 7 F A X: 1 9 I❑ 1 7 9 1- 6 9 6 D pARAMOUNTE 6 N G I N E. E R I N G. I N C. If you have any questions or concerns with this re -submittal package please feel free to contact me directly by phone or email. Thank you for your time and attention to this matter. Sincerely, Paramounte Engineering, Inc. Robert P. Balland, P.E. rballandna paramounte-eno.com (910) 791-6707 5 9 1 1 O L E A N D E R D R I V E, S T E. 20 1. W I L M I N G T O N, N C 2 B 4 D 3 P H. (9 1 D ) 7 9 1- 6 7 0 7 FAX: 1 9 1 D 1 9 9 1- 5 9 6 D NCDENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Mr. Robert Balland, PE Paramounte Engineering, Inc. 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 Dear Mr. Balland: Division of Water Quality Coleen H. Sullins Director May 26, 2011 Natural Resources Subject: Request for Additional Information Stormwater Project No. SW6110505 Alpha Charter Academy Cumberland County Dee Freeman Secretary The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on May 17, 2011. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The volume in excess of the treatment volume must be evenly distributed across a minimum 30 foot long vegetated filter. For sites that have difficulty meeting this requirement, options are available for waiving of the offline bypass and vegetated filter strip by permitting the system under the alternative design criteria in NCAC 2H .1008(h). For these options please see section 16.3.9 in Chapter 16 Infiltration Devices in the BMP Manual. Please revise the plans to include a vegetated filter or to meet the alternative design. 2. The overflow volume looks to flow to a collection system. Part of the system is shown on the plans but no detail is given. Please provide more detail about the system in either narrative or on the plans. 3. Plan sheet C-2.0 indicates two phases for the project. Please note the infiltration basin must be complete and certified before any building is occupied. The notes on the plan sheets indicate the sediment basin will be converted once the entire drainage basin is fully stabilized. Please provide more detail about the construction sequence. Will Phase I be complete and occupied before Phase II is complete? Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 13, 2011, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolira 27604 Phone: 919-807-6300 \ FAX: 919-807-6494 \ Customer Service: 1-877-623-6748 Internet: wwwmwaternuality.org An Equal Opportunity \ Affirmative Action Employer One NorthCarolina Naturally SW6110505 — Alpha Charter Acadcmy May 26, 2011 Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (919) 807-6368. Sincerely, Brian Lowther Environmental Engineer cc: Fayetteville Regional Office SW6110501 File -PG_wl�1t? rr 1 '�` `I /.l. ]✓ l o o k., 0 ✓ire State of North Carolina r. 194 9 Q 3 2 Department of the SefretarN of State SOSID: 556889 ARTICLES OF INCORPORATION Date Filed: 7/12/2000 4:30 PM Elaine F. Marshall NONPROFIT CORPORATION North Carolina Secretary of State pursuanl to �55A-2-02 of the General SlaIUICS of North Carolina. the undersigned corporation does lmcbs submit Ihcsc Arucles of Incorporation Rx the purpose of forming a nonprof-itcoiporalion. I. The name of the corporation is: �/ %/J/'�C'��/r 1i✓G (Check only if applicable.) The corporation is a charitable or religious corporation as defined in NCGS $ii A-1-40(J ). _ . The street address and county of the initial registered office of the corporation is'. Number and Street / %00 FR % 7— fits. State. Zip Code ,9ys7/f�',//f_../t�C�._. .3dj _ Counp ck. 2e�.Ivlcl 4. The mailing address if diJJcretn tom the.ureet eiddrecs of the initial registered off ice is: ?K3'3 _. The name of the initial registered agent is: 6. l-he name and address of each incorporator is as follows: c/A�1w� ,✓ r z �sZ o 7. (Check either a or Is below.) o. x I -he corporation will have members. h. rooThe corporation will not have members. 9. Attached are provisions regarding the disc ibmion of the cot poralion s avet> upon its dl.seolmion. 9. Am other provisions which the corporation elects to include are attached. 10. The street address and county of the principal office of the corporation is: /j -l5o0 _f ,1ia,s_i?�(� fly._// C 2J-3=.jj_._Count\ lam �,4 44-11cl I I. The mailing address if dij/erent/rom the street udd rrecc of the principal office is: Revised January 2000 form N-01 CORPORATIONS DIVISION P. O. BOX 29622 RAU.16 i. NC _2762G-0022 I'_. I hr,r ailicics %+ill be el wke upon lilies. u111cSS;1 lelcr tints and nr dalc i>>pccilkd I his is the_// das of �q �� .20 O(' . i _ .5 ,, a� �nCUI'pnl"at �N j ryz Tipe -In int Incurpnrumr A mere and ti,te. it am NOTES: I_ Filin_ lee is S60. This document and one enact or conformed copy of these articles must be liled with the Secretan olSlaw. Rey iscd Januar, 2000 Form N-oI CORPORATIONS DIVISION P. 0. 13OX 29622 RALEIGH. NC27620-0022 1)qm mam ,I Ili: Sri rcl:u') ol'Sl:u, lilt[):. v ���%%>pa'CIJn .>wlc nc.kl; Loll Jim ;it one ruvp�nl hlni Purpose of Corporation This corporation is or_anized for the following purposes) (che(k as upplicuhlel: religious. charitable. �x educational. _testing for public safety. scientific. __literary. lostering national or international anuueur sports competition. and/or _prevention of'C'uclty to children or animals. including, for such ptu'poscs. the making ofdisu'ibutions to organizations that qualify as eceript organizations under Sections 501(c)(3) and 170(c)(2) ofthe Internal Revenue Code of 1986 (herein the "Code") (or the corresponding provisions of any future United States Internal Revenue ('ode). Prohibited Activities No part ofthe net earnings ofthe corporation shall more to the benefit ofor be disuibutahlr to. its members. directors. officers. or other private persons except that the corporation shall be authorized and empowered to pay reasonable compensation for services rendered and to make payments and distributions in furtherance of purposes set forth in these articles of incorporation. No substantial part of the activities of the corporation shall be the carrying on of propaganda or otherwise attempting to influence legislation. and the corporation shall no( participate in or intervene in (including the publishing or distribution of statements) any political campaign on behalf of or in opposition to ally candidate for public office Notwithstanding any o(he' provisions of these articles. the corporation shall not earn on am oche activities not permitted to he carried on (a) by ❑corporation eNentpt Front I'C&Ml income tall undo Section 501(c)(3) of the Code or (b) by a corporation. corn ihutions to are deductible under Section I70(c)(?) ofthe Code. Distributions Upon Dissolution Upon the dissolution of the corporation. the Board of Directors shall. after pit vingr omaking provision for the payment (-)['all of the liabilities of the corporation, dispose of all 01,111C assets of the corporation „I J 7-11''1010l.riI I - \I klIDipninl �i�llc �ccrclnr� ul SI',II�� 11111) Vh�N\%SueI cmll slur. I I c u..<o rpnra It) lb otp`III hlnl exclusively for the purposes of the coil t atlon in such manrim or to such organvanon of ulgantr:uiolls organized and operated exclusively for religious. charuable. educational. s6cnulic or lactate pwposcs as shall at the time qualify as an exempt organization oroNanizations under Suction AOINH A of IN Code Lis the Board of Directors shall determine. or to federal. state. or local governments to be used exclusively for public purposes. Any such assets not so disposed orshall be disposed or by the Superior Court of the county in which the principal office of the corporation is then located. exclusively for such Purposes Otto such organizations. such as the court shall determine. which are organized and operated exclusively for such purposes. or w such governmenu for such purposes. A " 71121111U .I: S I I - %I )A.RA MOUNTE 5 9 1 1 OLEANDER D R I V E, SUITE 2 0 1 W I L M I N G T O N, NC 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( o) 9 1 0- 7 9 1- 6 7 6 0 ( F) L E T T F, R n F T R A N S M I T T A I. To: NCDENR - DWQ Date 05/16/11 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Alpha Charter AcademySchool State Stormwater Submittal '.Att`tS Mike Randall Project.. No I 11128.PE e.areseiidin ® Originals ® Prints ❑ Shop Drawings ® Calculations ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below he following.items: Quantity Date Dwg. No. Description 2 24" s 36" Design Documents 1 Stormwater Narrative (w/ Calculations, Soils Info, etc.) 1 Original and Copy of S\Wl01 1 Original of SWU401 Supplement Form 1 $505.00 check (#075564) 1 Original O&\I agreement 1 Deed 1 NC Secretary of State Information 1 Partial Soils Report (SFRXrf & Infiltration Rate) Issue.Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks crion.Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Remarks: Ro-b Balland, PE EIVE MAY 1 7 2011 BK7490PG 1 16 7490 0116 (N.R SEAL) 004896 P. ' CUMBERURD COUNTY NC 02/01/2007 + 5618.00 n nn ORTNA ^�0, Real Estate POLI 'I�ji Excise Tax RECEIVED 2— 1-2007 AM 10:50:54 J. LEE WARREN JRREGISTERDEED. CUMBERLANDOCo., ---NSC NORTH CAROLINA GENERAL WARRANTY D�E�E/DD'- /'(` �jj Excise Tax: $ 618.00 047! r6 1 Passel Identifier No. 9476-97-7406 Verified by Cowry on the _ day of .20 MailtBox to: McCoy, Weaver, Wiggins, a al, 202 Fairway Dr., Favencville, NC 28305 This instrument was prepared by: McCoy, Weaver, Wiggins, et al, 202 Fairway Dr., Fayetteville, NC 28305 Brief description for the THIS DEED made this 30th day of January . 20_j, by seed between William P. Mitchell, and wi UN itlb a Bartell Land Group, LLC Berry Lee Mitchell; William P. Mitchell Trustee pursuant to Declaration of Trust recorded in Book 2977 Page, 361, Cumberland County Registry The designation Gr ntorand Crsnta u used herein shall innhtde said parties, their heirs, summers. end assigns, and shall include singulu, plum], masculine, Icram ne or neuter as required by context WICNESSETH, that the Grantor, for a valuable consideration paid by the Gramx, the receipt of which is hereby acknowledged, has end by these preseats does gram, bargain, sell and convey unto the Grantee in fee simple, all that certain lot orpateel of land situated in the City of Fayetteville Township, Cumberland County, North Camlioa and nnre particularly described as follows: SEE EXHIBIT "A" ATTACHED HERETO AND HEREBY INCORPORATED BY REFERENCE. Betty U. Mitchell died on August 8, 1999. The property hereinabove described was acquired by Grantor by instnmteat recorded in Book page A map showing the above described property is recorded in Plat Book page NC Bar Association Form No. L-3 ® 1976, Revised 0 1977, 2002 Printed by Agreement with the NC Bar Association — 1981 Soli Corporation, 333 E. Six Forks Rd., Raleigh, NC 27609 OX749OPG 1 17 7490 0117 '1'0 HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurterurnces thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, the Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: Easements, restrictions and rights of way of record. Current year ad valorem taxes. IN WITNESS WHEREOF, the Grantor has duly executed the fmcgoi f the day and year first above written. SEAL) (Entity Name) Wll,am P. Mitchell By: Z /b (/� (SEAL) Title: Bett a itc ell By: (SEAL) Tide: William P. Mitchell, Trustee By: Title: State of /V b —Cowtyof 0_UM beA (0 01 I, the undersigned Notary Public of the County and State aforesaid, certify that William P. Mitchell and Deny Lee Mitchell personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Nq(*,p11Seq)rs{ Stamp th"Oorday of.(anuary, 2#07. 1 My Commission Expires: .. .. , `�w`Ce) pNDq //4/i =m;q 9A- Carolina — County of CumberlaIR 7,"% e`<IC /'ef 1, the undersigned No1azy Public of the C*tQ&jjM*'**said, certify that William P. Mitchell, Trustee personally appeared before me this day and acknowl4j4dMajd02xexecution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial Seal of Stamp this 30th d f/dnuary, 2007. My Commission Expires: � - (/v" Notary Public The foregoing Certificate(s) of is/are Certified to be correct. This instrument and this certificate are duly registered at the date\A}u�A/Book and Page shown on the first page hereof. lO CO bq /2'. Register of Deeds for Cumberland Deputy/Assistant — Register of Be NC Bar Association Form No. L3 6 1976, Revised C 1977. 2002 Primal by Agreement wish the NC Bar Association— 1981 SonPm Corporation, 333 E. 7490 0118 80490PG 1 18 EXHIBIT "A" Cross Creek Township, Cumberland County, North Carolina Beginning at a stake in the northern right of way margin of U. S. Highway 401, said stake being the southwestern corner of the tract of which this is a part (said tract being described in that certain Deed recorded in Book 2168, Page 87), and running thence with the western line of said tract North 3 degrees 53 minutes West 1246.36 feet to a concrete monument; the northwestern corner of said tract; thence with the northern margin of said tract South 52 degrees 37 minutes East 403:16 feet to a stake; thence a new line South 8 degrees 51 minutes West 490.22 feet to a stake; thence North 81 degrees 9 minutes West 179.50 feet to a stake; thence South 3 degrees 53 minutes East 546.36 feet to a stake in the northern right of way of said U. S. Highway 401; thence with said right of way margin North 81 degrees 09 minutes West 20.50 feet the Beginning, and being a portion of that tract of land described in deed recorded in Book 2168, Page 87, Cumberland County Registry, and being the same property described in Release Deed, recorded in Book 2250, Page 1, aforesaid Public Registry. LESS AND EXCEPT that portion of the aforesaid land conveyed. to the Department of Transportation by deed recorded at Deed Book 3587, Page 458, Cumberland County Registry. l4 8349 FILED 0582 CUMBERLAND COUNTY NC J. LEE WARREN, JR. gK 0 8 3 4 9 PG 0 5 8 2 REGISTER OF DEEDS FILED Mar 04,2010 AT 03:26:00 pm BOOK 08349 START PAGE 0582 END PAGE 0583 INSTRUMENT# 06368 RECORDING $22.00 EXCISE TAX $900.00 KSJ NORTH CAROLINA GENERAL WARRANTY DEED TITLE NOT CERTIFIED Excise Tax $900.00 M8 P File If 1081-3 Parcel Identifier No.: Part of 9486-07-0152 Prepared by/Return to: Rebecca F. Person, 1308 Fort Bragg Rd.. Ste 101, Fayetteville, NC 28305 Brief Description for the Index: Lot 6, consisting of 2.81 acres more or less, Subdivision Map- Property of SIX PACK INVESTMENTS, LLC THIS DEED made this March 4, 2010 by and between: GRANTOR SIX PACK INVESTMENTS, LLC, a North Carolina limited liability company Mailing Address: 2510 Raeford Rd. Fayetteville, NC 28305 parry: name, GRANTEE STUDENT ENHANCEMENT SERVICES, a North Carolina non-profit corporation d/b/a ALPHA ACADEMY Mailing Address: 1906 Morganton Road Fayetteville, NC 28305 e.g., or partnership The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in or near the City of Fayetteville, Seventy -First Township, Cumberland County, North Carolina and more particularly described as follows: BEING all of Lot 6, consisting of 2.81 acres more or less, as shown on a plat entitled "Subdivision Map -Property of SIX PACK INVESTMENTS, LLC" prepared by George M. Rose, P.E., and duly recorded in Plat Book 126, Page 43, Cumberland County, North Carolina Registry. The property hereinabove described was acquired by instrument recorded in Book 7222, Page 198, Cumberland County, North Carolina, Registry. 8349 0583 BKO8349 PG0583 A map showing the above described property is recorded in Plat Book 126, Page 43, Cumberland County, North Carolina, Registry. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: restrictive covenants and easements, permits, and rights of way as the same may appear of record IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal effective the day and year first above written. SIX PACK INVESTMENTS, LLC, a North Carolina limited liability company By.A (SEAL) Name: Toff nwton Title: Mn,,. STATE OF NORTH CAROLINA COUNTYOF 'I. "Mberlaad I certify that the following person(s) personally appeared before me this day and I have personal knowledge of the identity of the principal(s) or have seen satisfactory evidence of the principal's identity, by a current state or federal identification with the principal's photograph in the form of a driver's license or a credible witness has sworn to the identity of the principal(s): each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: Name of Principal: fo{, paws rye M� Date: 3 ) 4 t J rSignature of Np7'�7�ry Public Wccc T,r'S�n Printed Name of Notary Public My Commission Expires: �CCA F p pi C pVBLIG 2 '`,9ND COVr:`� (N.P. SEAL) First Submittal ❑ Re-su Development/Project Name: Receiving stream name R Application Completeness Review _�5' 19 q ate Received: 5 i r% Date Reviewed: 5 1 B f By Bill Diuguid� i C_h,eft A-Admy classitication: For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-IVUS-II, WS-III, Ws -IV, HOW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Manaqement Strategy. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): N1A Latitude and Longitude: 35 0 2 03 W — 7 9 Ord 03 t,,/ Jurisd ction &y ndfe ye )/. /e. ^ G eelA, f Project Address: go u. S. HwN �tio Engineer name and firm: i%A(lA.,e{@pacarnea.fe—tars.c•rw''" ?/Oetter 6-70,. ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outletsMan ensity ❑ Other ❑ 401/404 impacts to surface waters, wetlands, and buffers (add language to coverr a dinfo letter)' <��Check for $505.00 included E/Original signature (not photocopy) on application ; Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed striction statement p/Sealed, signed & dated calculations Wa' Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Rooftop Runoff Management ❑ Dry Detention Basin ❑ Sand Filter ❑ Filter Strip ❑ Stormwater Wetland ❑ morass Swale ❑ Wet Detention Basin V Infiltration Basin ❑ Low Density ❑ Infiltration Trench ❑ Curb Outlet ❑ Level Spreader ❑ Off -Site ❑ Permeable Pavement ❑ NCDOT Linear Road ❑ Restored Riparian Buffer V­Two sets of sealed, signed & dated layout & finish grading plans with appropriate details Narrative Description of stormwater management provided d Soils report provided Wetlands delineated or a note on the plans that none exist on site and/or adjacent property ;/ Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; e/ Dimensions & slopes provided el Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density spection and maintenance agreements provided Application complete ❑ Application,lncomplete Returned: (Date) F7 February 9, 2009 Revision Ali SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density projects ❑ No more than two dwelling units per acre or 24% built -upon area; ❑ Vegetated conveyances to the maximum extent practicable;','. ❑ Built -upon areas at least 30 feet landward of perernial 2itd,intermittent surface waters; a Deed restrictions, protective covenants, and/or other restrictive language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve 85% average annual removal of total suspended solids. ❑ For BMPs that require a separation from the seasonal high-water table (SHWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(6)1 ! ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffer Requirements ❑ Undisturbed riparian buffers within 200 feet of water bodies within the 100-Year Floodplain and within 100 feet of water bodies that are not within the 100-Year Floodplain.,Exceptions to the undisturbed buffer requirements are set forth in 15A NCAC 02B .0607 Stormwater Controls as required by 15A NCAC 02B .0602 ❑ Control and treat the difference between the pre -development and post -development conditions for the one- year, 24-hour storm with structural controls. ❑ Development and redevelopment shall implement stormwater management measures that promote infiltration of flows and ground water recharge for the purpose of maintaining stream base flow. ❑ 85% average annual removal of total suspended solids. U Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. ❑ Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one- year, 24-hour storm. ❑ Meet design or stormwater management measures set forth in 15A NCAC 2H .1008. High Density Projects that require a 401/404 within an NSW ❑ 85% TSS ❑ 30% TIN ❑ 30% TP February 9, 2009 Revision TFRRoTECH F N G I N E E 4 5- I N C C,eot"hnlcat C nylneeriny Enmronnental Consulting Con56udlon Ajatenals Testing Report of Subsurface Investigation and Geotechnical Engineering Evaluation Alpha Charter Academy Fayetteville, North Carolina prepared for Lisle Architecture & Design, Inc. N.C. Engineering Corporation C-1356 TerraTcch Engineers, Inc. 4905 Professional Court Raleigh, North Carolina 27609 Phone:919-876-9799 Fax:919-876-8291 4905 Professional Coup • Raleigh. Nonh Carolina 27609 • (919) 876-9799 • Pax: (919) 876-8291 n TRRRaTECH E N G I N E E A S- I N C C,eotechnicA 6nyineeriny CnHronmenkal CorouLllny Cons[mckion Ma}erials Testing August 2,2010 Lisle Architecture & Design, Inc. 614 Market Street Wilmington, North Carolina 28401 ATTENTION: Ms. Ashley Hague, Assoc. AIA _ Report of Subsurface Investigation and Geotechnical Engineering Evaluation Alpha Charter Academy Fayetteville, North Carolina Our Project Number 121-10-62530 Ladies and Gentlemen: TerraTech Engineers, Inc. has completed the authorized subsurface investigation and engineering evaluation for the above referenced site. The enclosed report describes our investigative procedures, _ presents the results of our testing and evaluation, as well as our design and construction recommendations for this project. We appreciate the opportunity to work with you on this subsurface investigation and engineering evaluation, and are prepared to follow up with the recommended construction materials testing services. If you have any questions concerning this report, please contact us. Sincerely, T T ch Engineers, Inc. -1356) •.•``•�H CAR �''•., �v Glen A. Malpass, P.E. = Q a E •7 " � Erwin T. Williams 111, P.E. Senior Geotechnical Eng' a r�Principal Geotechnical Engineer GAM/sk tiF FNctrtE�P P��,.r� ��nnnw•a` 4905 Professional Cowl • Raleigh, North Carolina 27609 • (919) 876-9799 • Fax: (919) 876-8291 TRRR 4TECH E N G I N E E R 5- I N C C�eolechnicaL C ngineeH" LmiranmenbL Consulting Page 1 Construction �akerials Testing SCOPE OF SERVICES The scope of this subsurface investigation was outlined in our revised proposal 4636-N dated July 20, 2010. The primary objectives of this investigation were to evaluate the subsurface conditions within the area of proposed construction and to make recommendations regarding foundation design. More specifically, this investigation included the following objectives: (1) To evaluate the existing subsurface soil and ground water conditions within the area of proposed development. (2) To perform infiltration testing and assess the expected seasonal high ground water table elevation. (3) To recommend foundation types which can safely and economically support the proposed construction. (4) To evaluate the allowable bearing pressure of the foundation subsoils encountered within the proposed building area for support of shallow foundations. (5) To make recommendations concerning site preparation and site grading. (6) To make design recommendations forconcrete slabs -on -grade. (7) To make recommendations concerning control of ground water during construction and on a permanent basis, if necessary. (8) To make recommendations for material types and thicknesses for the planned pavement systems in the driveways and parking areas. (9) To make recommendations for achieving high density structural fill capable of satisfactorily supporting the proposed construction. (10) To make pertinent recommendations concerning quality control measures during construction. Page 2 INVESTIGATIVE PROCEDURES Field Investigation TRRP4TECH E N G I N E E R S- I N C GeotechnicaL Engineering EnaironmentaL CansuLbng Con>6uctlon L.tate,iAL Testing The subsurface investigation consisted of fifteen soibtesvbdrings performed at the site. Seven of these borings were performed in the planned building areas,'dn&2est.boring was performed in the location of the planned storm water pond, and the remaining seven soil test borings were performed in the planned driveway and parking areas. The borings performed in the planned building areas were performed to depths ranging from 15 to 40 feet below the existing ground surface elevation. The test boring in the location of the planned storm water pond was performed to a depth of 10 feet, while the driveway and parking area borings were performed to a depth of 5 feet. The approximate test boring locations are shown on Figure 1 in the Appendix. The test borings were located in the field by representatives of TerraTech Engineers, Inc. by measuring distances and angles from existing site reference points. In general, the locations of the test borings should be considered approximate. Ground surface elevations were not known at the time of this report. Dynamic Cone or Standard penetration testing as provided for in ASTM STP-399 and ASTM D-1586, respectively, was performed at selected intervals in the soil test borings. The penetration resistance, in conjunction with soil classifications, provides some indication of a soil's engineering characteristics. Detailed descriptions of the soils encountered in the test borings are provided in the Test Boring Records included in the Appendix. Ground water conditions, penetration resistances, and other pertinent information are also included. Please note that the stratification lines on the Test Boring Records are approximate boundaries between soil types. The in -situ transitions are likely to be more gradual. _ In addition to the test borings, water infiltration tilting and!our evaluation of the seasonal high ground water elevation were performed in the approximate 166ation of test boring B-8. The water infiltration test was performed using a double ring infiltrometer in general accordance with ASTM D 3385-03. Our evaluation of the seasonal high water table elevation is based on our observations during our hand auger boring as well as our review of soil survey maps. Laboratory Investigation The laboratory investigation consisted of a physical examination and classification of all samples obtained from the drilling operation. Classification of the soil samples was performed in general _ accordance with ASTM D-2488 (Visual -Manual Procedure for Description of Soils). Soil classifications include the use of the Unified Soil Classification System described in ASTM D-2487 (Classification of Soils for Engineering Purposes). - TRRPATECH ENGINEERS- INC CTeatechnicaL Engineering Environmental Caneuthmg Page 3 Construction lvjateriaLs Testing GENERAL SITE AND SUBSURFACE CONDfrIONS Site Location and Description The subject site consists of two adjacent parcels located at 8024 Raeford Road in Fayetteville, North Carolina. At the time of our investigation, there was a home and several small out buildings located on the western side of the site. The eastern portion of the site is currently undeveloped. At the time of our investigation, the majority of the site was clear of trees and the ground surface was generally covered with grass and underbrush. The ground surface generally slopes downward to the south, with maximum relief of approximately 8 to 10 feet. Reeional Geology The site is located in the Coastal Plain Geologic Province. The soils in this area generally consist of marine sediments deposited during successive periods of Fluctuating shoreline. The formations tend to dip slightly seaward, and several are exposed at the surface in bands paralleling the coast. Many beds exist only as fragmented, erosional remnants with more continuous strata located above and below. The soils typically classify as sands, silts, and clays, with irregular deposits of shells. Some of the existing, formations contain predominantly plastic clays interbedded with strata of sands and poorly consolidated limestones. Others contain predominantly sands with localized deposits of highly plastic clays. Stream valleys in this area often contain alluvial(water deposited) soils, depending on ground surface topography, stream flow characteristics, and other factors. By nature, alluvial.soils can be highly variable depending upon the energy regime at the time of deposition. Coarse materials such as sand or gravel are deposited in higher energy environments, while fine grained materials such as silt and clay are deposited in low energy environments. Alluvial soils may also contain significant amounts of _ organic materials, and are frequently in a loose, saturated condition. In many cases, fine grained alluvial soils will be highly compressible and have relatively low shear strength. General Subsurface Conditions From the ground surface, topsoil was encountered aLeach of the test boring locations. The thickness of the topsoil ranged from 4 to 12 inches. The thickness of topsoil can be quite variable and could be significantly different at other locations on the site. The reported thickness of the cultivated soils should not, therefore, be used for detailed quantity estimates. _ Beneath the topsoil, soils typical of the Coastal Plain were encountered in each of the test borings. These soils generally classified as sandy clays and fine to medium sands with varying amounts of clay. Standard Penetration resistances ranged from 7 to 43 blows per foot and dynamic cone penetration resistances ranged from 3 to 25 blows per increment. The mechanically drilled boring were performed using mud -rotary drilling techniques. Therefore, ground water levels could not be determined at the time of the drilling operations. Ground water was _ not encountered in our shallow hand auger -borings to the boring termination depths. However, the moisture condition of our sample fronq a.lh pili;of'ppproximately 10 feet below the existing ground surface in the hand auger boring performed in the location of our infiltration test (B-8) indicated that we were near the ground water elevation. , Based on the moisture condition of the samples obtained from cei , TFRP4TECH F N G I N F l R 5 N C ` C,eatechnical Cngineeriny GviranmentaL CoreuLting Page 4 Construction MateriaLs Testing the mechanically drilled borings, we anticipate that the ground water level at the site is generally between 9 and 12 feet below the current ground surface. The test borings were backfilled upon completion to avoid hazard to pedestrian traffic. Therefore, 24 hour ground water readings were not available. It should be noted that ground water levels will fluctuate depending on seasonal variations of precipitation and other factors, and may occur at higher elevations at some time in the future. For more detailed descriptions of subsurface soil and ground water conditions, please refer to the Test Boring Records included in the Appendix. Page 5 PROPOSED CONSTRUCTION TRRR oTECH E N G I N E E R 5- I F C C,eatechnlcal 6ngineeriny GnWonmenlal CansuLflny Construction Materials Testing Our understanding of the proposed construction is based on e-mail correspondence from Ms. Ashley Hague with Lisle Architecture & Design. Building construction will reportedly include two-story buildings with modular pre -cast concrete walls, a steel frame, a concrete slab -on -grade Floor, and asphalt and concrete pavements around the buildings. Structural loading conditions are currently unknown. However, based on our experience 'with :'similar construction we have assumed maximum column loads of 100 kips and maximum walVl6aij9`ofY kips per lineal foot. If actual column and wall loadings are less, please contact us so that we'can review the recommendations provided below. Site grading plans were not known at the time of this report. However, based on our review of site topographic plans available from the Cumberland County GIS office and our observations at the site, we expect site grading plans to include cut and fills on the order of approximately 4 to 6 feet. Traffic volumes for the planned parking and driveway areas are not currently known. However, based on our experience with similar facilities, we have estimated that traffic volumes will include a maximum of 2,000 cars per day and 5 delivery or trash trucks per week. If actual traffic volumes are later determined to be greater, please notify us and we will review our recommendations for applicability to the higher traffic volumes. — :r Page 6 i F,VALUATIONS AND RECOMMENDATIONS TFRRaTECH E N G I N E E 4 5- I N C C:eotedinicaL Engineering C-nviranmentA Consdting Construction Materials Testing The following recommendations are based on the information available on the proposed structures, the data obtained from our soil test borings, and our experience with soils and subsurface conditions similar to those encountered at this site. Because the test borings represent a very small statistical sampling of subsurface conditions, it is possible that conditions may be encountered during construction that are substantially different from those indicated by the,test,borings:; ;In these instances, adjustments to the design and construction may be necessary depending on,1*qual conditions. ac, it _ General Site Development Considerations Based on the results of our test borings, loose sands were encountered near the ground surface in several of our test boring locations. Remedial measures during building and pavement construction should be expected. Based on the results of our analysis, the planned construction can be supported on shallow foundations designed using an allowable bearing pressure of 2,000 pounds per square foot. Based on the reported loading conditions, the estimated post -construction foundation settlement is expected to be less than 1 inch, if the recommended foundation bearing pressure is used. In areas of the site where placement of fill soils is performed, settlement related to the weight of the fill could also occur. Since loose sands were encountered in some of the test borings performed in the planned building area, _ remedial measures will most likely be needed in the footing excavations to attain the recommended bearing capacity. r'r: General Site Preparation All vegetation, topsoil, roots, and other deleterious materials should be removed from the proposed construction areas. Site clearing, grubbing, and stripping should be performed only during dry weather conditions. Operation of heavy equipment on the site during wet conditions could result in excessive mixing of topsoil and organic debris with clean underlying soils. _ All demolition of existing structures; excavation: and removal of existing foundations; removal of demolition debris; and removal or relocation of!existirig;underground utilities should be completed before site grading begins. The ends of abandoned underground utilities should be permanently sealed to prevent the inadvertent introduction of Fluids into the construction area. Any septic tanks and drain fields within proposed building and pavement areas and 20 feet outside should be excavated and removed. If water wells are found to be present on the property, we recommend that all wells be filled in with concrete and closed in accordance with the Cumberland County Health Department requirements. Concrete should be pumped or tremied into the well to an elevation approximately 5 feet below the finished subgrade. Then, excavate and remove the well casing to a depth 5 feet below finished subgrade and backfill with well compacted ABC stone meeting the NCDOT Standard Specifications for gradation. The crushed stone should be placed in 6 inch loose lifts and compacted with "wacker- packers" or other suitable equipment to at least 05 percent of the standard Proctor (ASTM D-698) maximum dry density. The excavation should be backfilled tdYe'turn to the planned finished subgrade. Based on our experience with similar soil conditions, some softening of the near surface and exposed soils should be expected during times of wet weather. The depth of soft soils caused by wet weather can URP4TECH EN G I N E E A S• INC C7eotechnical =.ngineering Environmental Consulting Page 7 Constmdion MaleriaLs Testing _ be highly variable, and can be dependent on the slope of the ground surface, the presence of on -site or off -site sources of surface water, and other factors. Therefore, we recommend that site preparation operations be performed during times of'dry weather: While wet weather can occur at any time during the year, the summer and early fall are times when drier weather is generally prevalent. Scheduling site grading during this time frame would reduce the probability of softening of the near surface soils from inclement weather conditions. Several of our test borings encountered loose sands near the ground surface. After removal of all vegetation, roots and any organic laden soils, we recommend that the exposed soils be compacted to a minimum of 95% of their standard Proctor maximum dry density. Adequate density tests should be _ performed to verify that the recommended level of compaction is achieved. Routine adjustments in soil moisture content should be expected in order to achieve proper compaction. We recommend that areas to receive structural fill be proofrolled prior to placement of structural fill. Areas of proposed excavation should be proofrolled after rough finished subgrade is achieved. Proofrolling should be performed using,a loaded`'durnp truck weighing at least 15 tons. Proofrolling should be accomplished by performing at least 3 passes in each of two perpendicular directions within entire construction areas, and 10 feet beyond. Any unsuitable materials that may be present should be removed and replaced with well compacted fill material placed in accordance with the Structural Fill section of this report. Proofrolling should be observed by our representative to determine if remedial measures are necessary. If soft or loose soils are present that cannot be adequately compacted, recommendations for remedial measures should be provided by our project engineer. Proofrolling should facilitate the identification of.soft or loose surficial soils, but should not be expected to reveal soft conditions more than 2 feelibelow.the ground surface at the time of proofrolling. Footing examinations will be required to evaluate'the presence of deeper soft soils, which could adversely affect foundation support. Footing examinations will be discussed later in this report. The placement of significant quantities of fill will likely result in settlement of the finished ground surface due solely to the weight of the fill soils. If site preparation can be performed early in the development of the property, then the sandy nature of the existing soils present near the ground surface at the site will likely allow this settlement to occur prior to building construction. Based on our experience on similar sites, there may be buried foundations, burn pits or trash pits located on the property. On sites located near developed areas this is not an unusual occurrence. All too frequently such buried material occurs in isolated areas which are not detected by the soil test borings. Any buried waste, construction debris or trash which is found during the construction operation should be thoroughly excavated, and the waste materialishould bexemoved from the site prior to placement of fill soils. Seasonal High Ground Water Table and Infiltration'restine The estimated depth to the seasonal high ground water table was evaluated and water infiltration testing was performed in the approximate location of test boring B-8. The estimated depth to the seasonal high ground water table is based on our visual observations of the soil samples retrieved during our drilling operations and our review of soil survey maps. Based on our evaluation, we estimate the elevation of the seasonal high ground water table to be approximately 6 feet below the existing ground surface elevation in the test location. L ;; Rage 8 TFRRoTECH E N G I N E E A S 1 N C C,eatecLlnicaL 6 nyineenng C nvironmental ConsuLting Construction MateHab Testing The highest ground water observations generally occur in the late winter and early spring and can vary with Fluctuations in precipitation, evaporation, surface water runoff, and other factors. If long term ground water levels are crucial for the planned construction, we recommend that water levels be monitored over an extended period of time using wells or piezometers. Our representative also performed water infiltration tests in the approximate location of test boring B-8 as shown in Figure I. The water infiltration rate was measured using a double ring infiltrometer in general accordance with ASTM D 3385-03. Based on the results of our testing, the maximum measured infiltration rate of the near surface soils in the test location was 16.5 inches per hour. The average _ infiltration rate over the test period was 14.2 inches per hour, and the minimum recorded infiltration rate was 11.9 inches per hour. It should be noted that soil type and relative density have a significant effect on the surface water infiltration rate. We recommend -that tlidihifiltration rate of the soils in the location of the planned storm water pond be verified after the'pdnd's b6Ftom elevation is established. Ground Water Control Based on our soil test boring results, the expected seasonal high ground water level is approximately 6 feet below the existing ground surface. If only minimal excavation is expected during construction, the control of ground water may not be required. However, ground water control may be required during the installation of underground utilities. In general, we expect that control of ground water in utility trench excavations can be performed by, "pumping, directly from the trench excavation. If pumping from trench excavations proves to be ineffective; hen the use of well points or other methods may be required. Pumping from dewatering trenchesshodld be done with care to prevent loss of soil fines, boils, or instability of slopes. In certain cases, gravity Flow in a trench may be sufficient for effective dewatering. We must emphasize that dewatering requirements will be dictated by ground water conditions at the time of construction. The contractor should use a technique or combination of techniques which achieves the desired result under actual field conditions. Foundation Design After the above described site preparation and site grading are complete, it is our opinion that the proposed structures may be supported on conventional shallow, foundations. Based on the test boring results, and our past experience, we recommend that the shallow foundations be designed using an _ allowable soil bearing pressure of 2,000 pounds per square foot (pso. Based on our assumed loading conditions, the estimated post -construction foundation settlement is expected to be less than I inch, if the recommended foundation bearing pressure is used. We recommend a minimum width of 18 inches for continuous wall footings and 24 inches for isolated column footings to prevent localized shear failure. Footings should bear at a minimum depth of 18 inches below the prevailing exterior ground surface elevation to provide the recommended bearing capacity. Detailed footing examinations should be performed 'in 'each' footing excavation prior to placement of reinforcing steel. These inspections should be perforine`d by our representative to confirm that the Page 9 TRRPATECH F N C, I N E E N S- I N C 4eoiechwaL E n6ineerin5 Fnvlranmental Con>uttlnq Ca..tm6an Materlate Testing _ design allowable soil bearing pressure is available. The footing examinations should be performed using a combination of visual observation, hand rod probing, and dynamic cone penetrometer testing. Dynamic cone penetrometer testing, as described in ASTM STP-399, should be performed in each column footing location and at no greater than 15 foot intervals in continuous wall footings. Loose sands were encountered near the ground surface in several of our test borings. Depending on the final design bearing elevations of the foundations, remedial measures may be required to achieve the design foundation bearing pressure. Tlie most feasible remedial measure in most cases is stone replacement, where any encountered soft,'Those or wet soils are excavated from the footing excavations and replaced with washed #57 stone. The washed 457 stone should be placed in maximum lifts of 12 to _ 18 inches, and each lift should be consolidated with a vibratory plate tamp or similar equipment. If soft or loose soils are encountered, our representative can suggest the most suitable remedial measures depending on the actual subgrade conditions encountered at the time of construction. Structural (ill materials may be placed on portions of the site. We must emphasize the importance of quality control during the placement of structural fill. Performance of building foundations which are supported by structural fill material will depend largely on achieving the recommended level of compaction on fill materials. Compacted soil densities less than the recommended percentage of the standard Proctor maximum dry density could result in excessive foundation settlement. _ Exposure to the environment may weaken- the''soils..at the foundation bearing surface, if they are exposed for extended periods of time.l'"If IFie3ouridation bearing surface becomes softened due to exposure, the soft soils should be removed prior to placement of concrete. Seismic Site Classification We have reviewed our test boring results and pertinent geological maps to determine a seismic site classification in accordance with the 2006 International Building Code (IBC). The 2006 IBC provides a method to estimate a site's seismic classification based on the average standard penetration resistances of the upper 100 feet of a soil profile. While ourmaximum test boring depth was 40 feet, we have used the results of test borings performed on.other;Cumberland County sites as well as our experience with similar conditions to estimate the seismic'' classification for the subject site. Based on our review and experience, the site should be classified as type D in accordance with table 1615.1.1 of the 2006 International Building Code. Concrete Slabs -On -Grade _ Based on our test boring results, and the anticipated site grading operations, we recommend that a design modulus of subgrade reaction (k) value of 100 pounds per cubic inch (pci) be used for concrete slabs -on -grade. This recommended value assumes that the subgrade soils and fill soils will be clayey sands that are compacted to a minimum of 98 percent of their standard Proctor (ASTM D-698) maximum dry density in the upper 12 inches. Construction activities and exposure to the environment often cause deterioration of the prepared slab - on -grade subgrade. Therefore, we recommend,•iliaf tfie subgrade soils be evaluated by our representative immediately prior to floor slab construction. This evaluation may include a combination of visual observations, proofrolling observations, and field density tests to verify that the subgrade has been properly prepared. If soft areas are encountered, we will provide recommendations for remedial Page 10 measures. TFRR oTECH E N G I N C E R S I N C C,eotechnicaL G nyineering Lwwonm ,bt Consulting Constmdion Matelots Teeting In order to provide a stable base for construction activity, and to reduce the potential for capillary rise of ground water affecting the slab -on -grade, we recommend that all slab -on -grade construction be underlain by a minimum 4 inch thickness of washed #57 stone. Flexible Pavement Design., Based on the results of the soil test borings, we expect the subgrade soils within the proposed pavement areas to consist primarily of clayey fine to medium sands. The California Bearing Ratio (CBR) for _ these soils may reasonably range from approximately 5 to 15, if the subgrade soils are uniformly compacted to a minimum of 100% of the standard Proctor maximum dry density ill the top 8 inches. Placement of fill soils could alter the type of pavement subgrade soils. Further evaluation of the subgrade CBR value should be performed at the time of construction. For purposes of pavement design, we have used,a California Bearing Ratio of 5 for the pavement subgrade soils, and a loading condition equivalent to QOydaily 18 kip axle loads. These loading conditions are based on the traffic volumes previously!discussed in this report. Based on the AASHTO design method, a 20 year design life, and our pas[ experience, we present the following suggested pavement section: Parking Areas: 2 inches Asphaltic Concrete Surface Course 6 inches Aggregate Base Course Driveways: 3 inches of Asphalt Concrete Surface Course 8 Inches of Aggregate Base Course Stone The asphaltic concrete surface course should be a type S9.513 bituminous concrete mixture in accordance with Section 645 of the NCDOT Standard Specifications (2006). Aggregate base course stone should be in accordance with Section 520.of the NCDOT Standard Specifications. Proper subgrade compaction, adherence to the NCDOT specifications, and compliance with project plans and specifications are critical to the performance of the constructed pavement. Based on our past experience, we recommend that a Portland cement concrete pavement be used in dumpster areas, and in other areas where heavy trucks are turning while traveling at slow speeds. We suggest the use of a 6 inch thick section of Portland cement concrete having a 28 day design compressive strength of 4,500 psi above a 4 inch thick section of compacted ABC stone. The concrete pavement should be designed with appropriately spaced joints, and should utilize reinforcing steel and dowels, as needed, for adequate load transfer. Construction joints and other design details should be in accordance with guidelines provided by the Portland; Cement, Association, the American Concrete Institute, and NCDOT. Suitability of Excavated Material for Reuse as Structural Fill Based on the results of our soil test borings, the sandy and clayey soils at the project site generally appear to be suitable for re -use as structural fill material. Routine adjustment of moisture content will be necessary to allow compaction in accordance with project specifications. Page l l Structural Fill TCRRaTECH E N G I N E E R$• INC C,eatechnicat 6"gineenng Environmental C'r'Uting Constmction Nlateriats Testing In order to achieve high density structural fill, the, following recommendations are offered: (1) Materials selected for use as structural' fill'` should be free of vegetable matter, waste construction debris, and other deleterious materials. The material should not contain rocks having a diameter over 3 inches. It is our opinion that the following soils represented by their USCS group symbols will typically be suitable for use as structural fill: (ML), (CL), (SM), (SC), (SP-SM), (SP-SC), (SP) and (SW). The following soil types are considered unsuitable: (MH), (CH), (OL), (OH), and (2) Laboratory Proctor compaction tests and classification tests should be performed on representative samples obtained from the proposed borrow material to provide data necessary to determine acceptability and for quality:; control. The moisture content of suitable borrow soils should generally not be more tha"n'4 percentage points above or more than 4 percentage points below optimum at the time of compaction. Tighter moisture limits may be necessary with certain soils. (3) Suitable fill material should be placed in thin lifts (lift thickness depends on type of compaction _ equipment, but in general, lifts of 8 inches loose measurement are recommended). The soil should be compacted by mechanical means such as steel drum rollers or sheepsfcot rollers. Proofrolling with rubber tired, heavily loaded vehicles may be desirable at approximately every third lift to bind the lifts together and to seal the surface of the compacted area thus reducing potential for absorption of surface water following a rain. This sealing operation is particularly important at the end of the work day and at the end of the week. Within small excavations such as -behind ..,retaining walls or in footing excavations, we recommend the use of "wacker packersla " diesel sled tamps to achieve the specified compaction. Loose lift thicknesses of 4 to 6 inches are recommended in small area fills. (4) We recommend that structural fill be compacted to a minimum of 95% of the standard Proctor maximum dry density (ASTM Specification D-698). The upper 12 inches in building pad areas should be compacted to at least 98 percent of the same standard. Additionally, the in -place maximum dry density of structural fill should be no less than 90 pcf. Pavement area fill should be placed in accordance with the NCDOT Standard Specifications. (5) An experienced soil engineering technician should take adequate density tests throughout the fill placement operation to verify that tlic specified compaction is achieved. It is particularly important that this be accomplished during the initial stages of the compaction operation to enable adjustments to the compaction operation, if necessary. Page 12 TFRROIECH E N G 1 N E E R 5- I N C (�cotechnlcat E nyineering hnv.ranmenlal Consulting Construction Matelots Te5tln9 ADDITIONAL SERVICES RECOMMENDED Additional foundation engineering, testing, and consulting services recommended for this project are summarized below: (1) Proofrolline. Observation: Proofrolling should be observed by a representative of the Geotechnical Engineer to determine if remedial measures are necessary in certain instances. _ (2) Quality Control of Fill Placement and Compaction: We recommend that an experienced engineering technician witness all required'fillirigoperations and take sufficient in -place density tests to verify that the specified degree of'odrnjp'ction has been achieved. Soil engineering judgments will be involved and should be made by our project geotccbnical engineer with information provided by our engineering technician. (3) Footina and Slab Evaluations: Footing and slab areas for this project should be evaluated by our — representative. The purpose of these evaluations will be to verify that the design soil bearing pressure is available and that subgrade areas are properly prepared. _ (4) Pavement Components Testing and Inspection: Pavement components should be tested and inspected during and following construction to verify compliance .with project plans and specifications. The attached Appendix completes this report. Sincerely, T Tech Engineers, Inc (C-1356) 16 " -tostiff �9r �y% `�—/// /✓" v`C� ;,•`�O. q 110,9 len A. Malpass, P. 4 Erwin T. Williams III, P.E. — Senior Geotechnical ngi cer S L"r 30988 ` 'principal Geotechnical Engineer .; e ran GAM/sk �sF-..GIN 'Z'.��•r Iy''' hoiuiA��rr TERRATECH E N G I N E E R 5- I N C TERRVKH E N G I N E E R 5 - I N C . k1 IYVP NEter. �l ...... ... ... NN 51 A. d. tqti Ur B-7. -,j U II 7 ;r V J10 2., -B 9 Figure 1. Boring Location Plan Not to Scale TerraTech Engineers, Inc. (C-1356) f)jcc Alpha Charter AcaAcademy- 4905 Professional Court • Fayclieville, North Carolina Raleigh, NC 27609 Out, Project Number 121-10-02530 919-876-9799 TERR KH E N G I N E E P S- I N C Symbols and Nomenclature 1 Undisturbed Sample (UD) Standard penetration resistance (ASTM D-1586) 100/2- Number of blows (100) 'to drive the spoon a number of inches (2) w-o-fl, a Weight of Hammer, Weight of Rods Ax, Bx, Nx Core barrel sizes for rock cores 65% Percentage of rock core recovered RQD Rock quality designation - % of core 4 or more inches long Z Water table at least 24 hours after drilling Z Water table one hour or less after drilling Loss of drilling water A Atterberg Limits test performed-i-s.� c Consolidation test performed'.'' ;. Gs Grain size test performed T Triaxial shear test performed P Proctor compaction test performed 18 Natural moisture content (percent) Penetration Resistance Result's Sands Number of Blows, N Relative Density — 0-4 very loose 5-10 loose II-20 firm — 21-30 very firm 31-50 dense over 50 very dense Silts and Number of Blows, N Approx. Consistency Clays 0-1 very soft 2-4 .,soft 5-8 :firm.. 9-15 - Ar� . stiff 16-30 very stiff 31-50 hard over 50 very hard Drilling Procedures Soil sampling and standard penetration testing performed in accordance with ASTM D-1586. The standard penetration resistance is the nwnbcr of blows of a 140 pound hammer falling 30 inches to drive a 2 inch O.D.. 1.4 inch I.D. split spoon"shmpkr one foot. Core drilling performed in accordance with ASTM D-2113. Undisturbed sampling peFformed in accordance with ASTM D-1587. TEST BORING RECORD TERR4TECHE Water " Blow Standard Penetration Test Depth Descri [ion P Elev. Level Counts blows/it 20 40 60 80 J_ . ......t_.. _:-...i ..._t. Topsoil (Approximately 12 inches ••`1'"'' I i 1 Loose tan slightly clayey fine to medium sand 2 (SP-SC) -3 3-3-4 • 3 478 5 6 7 7-8-9 r 8 9 10 Firm tan clayey fine to medium sand (SC) 9-9-10 --41i ll 12 13 i 14 f! 15 12-8-8 • 16 -17 l7 18 19 Dense tan clayey fine to medium sand (SC) 20 18-20-23 �• 21 22 23 24 25 3-3-4 • 26 27 Firm tan and gray fine sandy clay (CH) 28 29 30 3-4-4 • 31 32 -32 33 34 35 Firm tan and dark gray clayey fine to medium 5-6-8 36 sand (SC) with gravel 37 38 39 40 -40 2-6-8 .. 41 BORING TERMINATED 42 43 44 45 .,�:;..,. Welerl-eve124 he.: Iloring Rack tilled Upon Completion TerraTeeh Engineers, Inc. Doting Number: BA Water Level 1 hr.: 4905 Professional Court Project Number: 12140-625J0 Raleigh, NC 27609 Rate Drilled: 71271I0 Sheet: I of I TEST BORING RECORD TERRATKH5 {?' Water Standard Penetration Test Depth Description � Elev,Blow Level Counts blows/ft " 20 40 6080 i Topsoil (Approximately 12 inches) -1 1 i Loose tan and gray slightly clayey fine to - - 2 medium sand (SP-SC)I 3 3 4 Firm tan slightly clayey fine to medium sand (SP-SC) - 5-8-12 9 5 5.5 6 7 7-9-10 8 9, 10 Firm to very firm tan clayey fine to medium 10-10-12,• sand (SC), 11- 12 13- 14- .. 15 -15 9-12-10 �• BORING TERMINATED 16 17 I8 19 .. 20 . • .. water Level 24 hr.: Iloring Ilackflled Upon Completion TerraTech Engineers, Inc. Iloriag Number: 13.2 Water Level I hr.: 4905 Professional Court" Project Number: 121-10.62530 Raleigh, NC 27609 Date Drilled: 7/27/10 Sheet: I of 1 TEST BORING RECORD TERR4TECH Water Blow Standard Penetration Tcst Depth Description Et04' Level Counts blows/ft 20 40 60 80 Topsoil (Appro)dmately 8 inches) -0.7 I Loose tan slightly clayey fine to medium sand 2 (SP-SC) r_ _ 3-3-4 • I -3 3 4 — 7-9-10 I • 5 6 .. I 7 i Firm to very firm tan and gray clayey fine to '�+: ,•I' 10-9-9 •: medium sand (SC) 8 i 9 10 11 12 i 12 i 13 Very stiff tan fine to medium sandy clay (CL) > 7r 14 i .. 15 - I5 7-8-8 • . BORING TERMINATED 16 17 j t� 18 �I 19 I 20 Water Level 24 hr.: Boring Backftllcd Upon Completion TerraTeeh Engineers, Inc. 4905 Professional Court W„Ier Level I hc: Raleigh, NC 27609 Boring Number: 11-3 Projeci Number: 121-1"2530 Date Drilled: 727/10 Sheet: I of I TEST BORING RECORD TERRATECH E N G I N E E R S- I N C Blow Standard Penetration Test Depth Description Elev.Water Level Counts blows/ft 20 40 60 80 Topsoil (Approximately 12 inches) l j l 1 I 2 Very firm gray clayey fine to medium sand (SC) I -1 10-14-12 • -3 3 Stiff orange fine to medium sandy clay'(CL) I 5 5-5-6 • -5.5 6- 7- 4-6-8 • 8 9 10 Firm to very firm tan clayey fine to medium 5-7-9 • sand (SC) 11 12 13 14 _ ': "•. IS 9-12-14 BORING TERMINATED l6 17 18 19 i Water Level 24 hr.: Boring Bocktilled tllxin Completion 'TerraTech Engineers, Inc. Hoeing Number: B-4 Water Level 1 hr.: 4905 Professional Court I'rojecl Number: 121-10-62530 Raleigh, NC 27609 Date Drilled: 727/10 Sheet: I of 1 TEST BORING RECORD TERRATECH E N G I N E E R S• I N C Water Blow Standard Penetration Test Depth Description Elev. Level Counts blows/ft 20 40 60 80 Topsoil (Approximately 12 inches) II -1 1 :...: j. gltl Very firm tan and gray slightly clayey fine to ,. •. .. .. ..._ 2 medium sand (SP-SC) 12-12-9 'I -3 3- 4- III 5- 4-5-5 0� Loose to firm orange and tan clayey fine to 1 medium sand (SC) 6- 7- I 5-8-7 • 8 8 9 Very firm orange clayey fine to medium sand 10 (SC) 12-14-16 ! .0. . Il or -12" 5 12 13 Dense tan clayey fine to medium sand (SC) 14 I IS -IS 14.19-22 BORING TERMINATED 16 .. p: 17 18 19 20 WYter Level 24 hr.: Boring Backfillcd Upon Completion TerraTeeh Engineers, Inc. lluri.L Number: 13-5 4905 Professional Court ' pro ert Number: 121-10.62530 Water Level 1 hr.: Raleigh, NC 27,609 1 Date Drilled: 7/27l10 Sheri: 1 of I TEST BORING RECORD TERRATECH L N G I N E E e 5- I N C Water Blow Standard Penetration Test Depth Description Elev. Level Counts blows/ft .20 40 60 80 Topsoil (Approximately 8 inches) 0 7 Loose tan slightly clayey fine to medium sand .� I 2 (SP-SC) ... 5-4.5 • .I -3 3 4 3-5-6 • '. 5 ..• Firm to very firm tan clayey fine to medium •, sand (SC) 6 7 5-9-13 -8 9 i 10 Dense orange clayey fine to medium sand (SC) 13-14-17 i -12 •! 12 .......i. .. 13 Firm gray clayey fine to medium sand (SC) i 14 IS - -IS 8-7-8 • BORING TERMINATED�•�• l6 i 17 19 � I I Water Level 24 hr.: Boring 8acklilled Upon Completion ;TerraTeeh Engineers, Inc. Boring Number: B-6 N'atrr Level I hr.:4905 Professional Court project Number: 121-m-62530 e Raleigh, NC 27609 Dale Drilled: 7R7/10 Sheet: I of 1 TEST BORING RECORD TERRATECH Water Blow Standard Penetration Test Depth Description Elev. Level Counts blows/It 20 40 60 80 Topsoil (Approximately 12 inches) ._ Firm tan slightly clayey fine to medium sand 2 (sp-SC) ! 10.9-7 • j 3 3 4 Loose orange and tan clayey fine to medium I. sand (SC) 5- 5.5 6- 7- Dense orange clayey fine to medium sand (SC) 9 10 18-21-23 • 12 12 13 Firm orange and gray clayey fine to medium sand (SCI 14 l5 -15 .: I2-9-9 •: BORING TERMINATED 16 17 18 19 20 i Water Level 2/ hr.: Moing Duck Ili led Up,., Colnplelion Te[raTech Engineers, Inc. Ilorine Number: 13.7 Water Ln el 1 hr.: 4905 Professional Court Project Number: 121. 10-62530 Raleigh, NC 27609 Date Drilled: 7/27/10 Sheet: 1 or 1 TEST BORING RECORD TERR.ATECH E N G I N E E R S- I N C Water Blow DCP Test (ASTM STP-399) Depth Description Elev. Level Count blows/increment . 5 10 15 20 25 � I � '1-opsoil (Approximately 6 inches) 0 5 I 'fan slightly clayey fine to medium sand (SP-SC)';.`_' -2 Il.• 2- 25 3— 13 • 4 i ._: Orange clayey fine to medium sand (SC)s_ ..: �, 5 10 • 6 12 • 7 / 18 • 8 25 • Tan slightly clayey fine to medium sand (SP-SC) 9 1. 25 10 -10 25 -� BORING TERMINATED 11 12 r 13 14 IS Wale, Level 24 hr.: Boring Ilucklillcd Upon Completion TenaTech Engineers, Inc. Buring Number: B-8 H'pnr Level 1 hr.: Not lincounmred ' 4905, Professional Court PecE Numnher: 121-10-b25ID Raleigh, 1NC 27609 ro I ., . INfe Drilled: 7/28110 5hee1: I ur I TEST BORING RECORD TERR4TECH Water Blow DCP Test (ASTM STP-399) Depth p Description Glev. bevel Count hlows/increment S 10 15 20 25 Topsoil (Approximately 4 inches) .0 3 25 I I ' • l Tan slightly clayey fine to medium sand (SP-SC) -2 20 �....: I ,Ic 3 11 I • Tan and orange clayey fine to medium sand (SC) I 4 9 .. li .. i 5 5 .,. 13 11 BORING TERMINATED 1 6 .. I i 7 ti.•, I 8 i 9 I0 Wale, I.cvel 24 hr.: Boring Backfilled Upon Completion Terra Tech Engineers, Inc. Boring Number: 11.9 Water Lod I hr.: Not Encoumcred 4905 Professional Court Project Number. 121-10-62530 Raleigh, NC 27609 Date Drilled: 7129/10 sheet: I of I TEST BORING RECORD TERRATECHE Water Blow DCP Test (ASTM STP 399) Depth Description Elev. Level Count blows/increment 5 10 15 20 25 A_... I_. .-- ' I Topsoil (Approximately 8 inches) i I i -0.7, I L5 • i Tan slightly clayey fine to medium sand (SP-SC) I '`h.. (-2 12 • 2 i , 3 8 i Orange clayey fine to medium sand (SC) 4 8 5 5 9 i •I BORING TERMINATED 6 .i. 8 9 10 R'aler Levd 24 hr.: Boring Back tilled Illam Completion TerraTeeh Engineers, Inc. Hering Nmnher: H-III Water Level 1 hr.: Not Encountered 4905 Professional Court Project Number, 121-10-62530 Raleigh, NC 27609 Hate Will,& 7/28110 Sheri: I of I i TEST BORING RECORD TERRATKH E N G I N f E R 5- I N C ,Water I Blow DCP Test (ASTM STP-399) Depth Description Elev. Level Count blows/increment 5 10 15 20 25 Topsoil (Approximately 4 inches)' -0.3 I it I 1 4 I •, I Tan slightly clayey fine to medium sand (SP-SC) 2 -I • -3 25 I 3 i q Tan and orange clayey fine to medium sand (SC) 18 i • 5 -5 22 • BORING TERMINATED 6- 7- 8— Water Level 24 hr.: Boring Bocklillcd Upon Completion TerraTech Engineer's, Inc. Boring Number: B-I I Water Level 1 hr.: Not Encountered 4905 Professional Court Project Number: 121-I0-62530 Raleigh, NC 27609 Date Drilled: 7/29/10 Sheet: I of I TEST BORING RECORD TERRATECH Water Blow DCP Test (ASTM SI'P-399) Depth Description Elev. level Count blows/increment 5 10 IS 20 25 Topsoil (Approximately 4 inches) -0 3 I 9 I Tan slightly clayey line to medium sand (SP-SC) � 2 -2 14 I I 3 25 • Orange clayey fine to medium sand (SC) 4 25 • 5 -5 25 • BORING TERMINATED 6- 7- 8- 9 i 10 1 Water I.rrd 24 hc: Boring Ilackti Iled Upon caeplclion TerraTech Engineers, Inc. Boring Number: 13-12 Water Leed I hr.: Not Iincountercd 4905 Professional Court Propel Number. 121. 10.62530 Raleigh, NC 27609 Bair Drilled: 7/29/10 Sheet: 1 at I TEST BORING RECORD TERRATECH Water Blow DCP Test (ASTM STP-399) Depth Description Elea. Level Count blows/increment 5 10 15 20 25 Topsoil (Approximately 8 inches) o v: I 19 Tan slightly clayey fine to medium sand (SP-SC) 1, 2 25 I -..• i 3 3 22 • q Orange clayey fine to medium sand (SC) 25 i • 5 -5 25 • BORING TERMINATED t � 1r 6- 7- 8- 9- to- Wait, Level 24 hr.: Iloring llucklilled Orate Completion TerratTech Englneersr Inc. [luring Numher. I1.13 4905 Professional Court Water Level I hr.: Not Encountered Raleigh; . 27609 I -reject Numher: 121-Ill-62530 Hate [billed: 729110 Sheet: I or I J TEST BORING RECORD TERRATECH E N G I N E E R 5' I N C Water Blow DCP Test (ASTM STP-399) Depth Description Elev. Level Count blows/increment 5 10 15 20 25 Topsoil (Approximately 6 inches) I 3 • Tan slightly clayey fine to medium sand (SP-SC) 2 -2 7 �. I Orange clayey fine to medium sand (SC) 4 25 • 5 .... .. 5 2.5 i • BORING TERMINATED r , 6- 7- to- Watt, Level 24 hr.: Boring Backllllcd llpun Completion TerraTech Engineers, Inc. Boring Numhcr: 11-14 Water Level I hr.: Not 1:ncounwred 4905 Professional Court Projecl Number. 12 1 -I0412530 Raleigh, NC 27609 flute Drilled; 7129/10 Sheer: I of I TEST BORING RECORD TERRATECH E Water Blow DCPTest (ASTM STP-399) Depth Description Elev. Level "Count crement /' increment 5 10 15 20 25 Topsoil (Approximately 6 inches( .�,n� •' -0.5 13 • I Tan slightly clayey fine to medium sand (SP-SC( -2 25 • 2 3 25 • Orange clayey fine to medium sand (SC( y 25 • BORING TERMINATED 6 7 8 10 i.. i r Waler I.eve124 hr.: Boring Backtilled Ulxm Completion TerraTech Engineers, Inc. Boring Numher: 8-15 Waler Lrvel I hr.: Not lincounlered 4905 Professional Court Project Number: 121-10-62530 Raleigh, NC 27609 Date Drilled: 7/29/10 sheen: 1 of 1 c Report of Subsurface Investigation and Geotechnical Engineering Evaluation Alpha Charter Academy Fayetteville, North Carolina prepared for Lisle Architecture & Design, Inc. N.C. Engineering Corporation C-1356 TerraTech Engineers, Inc. 4905 Professional Court Raleigh, North Carolina 27609 Phone: 919-876-9799 Fax: 919-876-8291 TRRRaTECH F N ( 1 N l F A 5 N C C�caicchN<al C.nyln<ering Gnabonmmtrl Cansul:ioy Consfrucklon 6(akeriaLs Tes:iny 4905 Professional Court • RaIeieh. North Carolina 27609 • (919) 876-9799 • Fax: (919) 876-S291 X TFRP4TECH E N G I N E E R S- I N C Gmtechnical E.nyineedny Page ,% Environmental Consulting Constwction Materials Testing _ be highly variable, and can be dependent on the slope of the ground surface, the presence of on -site or off -site sources of surface water, and other factors. Therefore, we recommend that site preparation operations be performed during times of dry weather. While wet weather can occur at any time during the year, the summer and early fall are times when drier weather is generally prevalent. Scheduling site grading during this time frame would reduce the probability of softening of the near surface soils from inclement weather conditions. Several of our test borings encountered loose sands near the ground surface. After removal of all vegetation, roots and any organic laden soils, we recommend that the exposed soils be compacted to a . minimum of 95% of their standard Proctor maximum dry density. Adequate density tests should be _ performed to verify that the recommended level of compaction is achieved. Routine adjustments in soil moisture content should be expected in order to achieve proper compaction. We recommend that areas to receive structural fill be proofrolled prior to placement of structural fill. Areas of proposed excavation should be proofrolled after rough finished subgrade is achieved. Proofrolling should be performed using a loaded dump truck weighing at least 15 tons. Proofrolling should be accomplished by performing at least 3 passes in each of two perpendicular directions within entire construction areas, and 10 feet beyond. Any unsuitable materials that may be present should be removed and replaced with well compacted fill material placed in accordance with the Structural Fill section of this report. Proofrolling should be observed by our representative to determine if remedial measures are necessary. If soft or loose soils are present that cannot be adequately compacted, recommendations for remedial measures should be provided by our project engineer. Proofrolling should facilitate the identification of soft or loose surficial soils, but should not be expected to reveal soft conditions more than 2 feet below the ground surface at the time of proofrolling. Footing examinations will be required to evaluate the presence of deeper soft soils, which could adversely affect foundation support. Footing examinations will be discussed later in this report. The placement of significant quantities of fill will likely result in settlement of the finished ground surface due solely to the weight of the fill soils. If site preparation can be performed early in the development of the property, then the sandy nature of the existing soils present near the ground surface at the site will likely allow this settlement to occur prior to building construction. Based on our experience on similar sites, there may be buried foundations, burn pits or trash pits located on the property. On sites located near developed areas this is not an unusual occurrence. All too frequently such buried material occurs in isolated areas which are not detected by the soil test borings. Any buried waste, construction debris or trash which is found during the construction operation should be thoroughly excavated, and the waste material should be removed from the site prior to placement of Fill soils. Seasonal High Ground Water Table and Infiltration Testin The estimated depth to the seasonal high ground water table was evaluated and water infiltration testing was performed in the approximate location of test boring B-8. The estimated depth to the seasonal high ground water table is based on our visual observations of the soil samples retrieved during our drilling operations and our review of soil survey maps. Based on our evaluation, we estimate the elevation of the seasonal high ground water table to be approximately G feet below the existing ground surface elevation in the test location. Page 8 Tg-RP4TECH F N G 1 N F E A 5- I N C CeatechnicaL 6nyineering r nanonmentaL Consutliny Construction Materials Toting The highest ground water observations generally occur in the late winter and early spring and can vary with fluctuations in precipitation, evaporation, surface water runoff, and other factors. If long term ground water levels are crucial for the planned construction, we recommend that water levels be — monitored over an extended period of time using wells or piezometers. Our representative also performed water infiltration tests in the approximate location of test boring B-8 as shown in Figure I. The water infiltration rate was measured using a double ring infiltrometer to general accordance with ASTM D 3385-03. Based on the results of our testing, the maximum measured infiltration rate of the near surface soils in the test location was 16.5 inches per hour. The average _ infiltration rate over the test period was 14.2 inches per hour, and the minimum recorded infiltration rate was 11.9 inches per (tour. It should be noted that soil type and relative density have a significant effect on the surface water infiltration rate We recommend that the infiltration rate of the soils in the location of the planned storm water pond be verified after the pond's bottom elevation is established. Ground Water Control — Based on our soil test boring results, the expected seasonal high ground water level is approximately 6 feet below the existing ground surface. If only minimal excavation is expected during construction, the control of ground water may not be required. However, ground water control may be required during the installation of underground utilities. In general, we expect that control of ground water in utility trench excavations can be performed by pumping directly from the trench excavation. If pumping from trench excavations proves to be ineffective, then the use of well points or other methods _ may be required. Pumping from dewatering trenches should be done with care to prevent loss of soil fines, boils, or instability of slopes. In certain cases, gravity flow in a trench may be sufficient for effective dewatering. We must emphasize that dewatering requirements will be dictated by ground water conditions at the time of construction. The contractor should use a technique or combination of techniques which achieves the desired result under actual field conditions. Foundation Desien After the above described site preparation and site grading are complete, it is our opinion that the proposed structures may be supported on conventional shallow foundations. Based on the test boring results, and our past experience, we recommend that the shallow foundations be designed using an _ allowable soil bearing pressure of 2,000 pounds per square foot (pso. Based on our assumed loading conditions, the estimated post -construction foundation settlement is expected to be less than I inch, if the recommended foundation bearing pressure is used. We recommend a minimum width of 18 inches for continuous wall footings and 24 inches for isolated column footings to prevent localized shear failure. Footings should bear at a minimum depth of 18 inches below the prevailing exterior ground surface elevation to provide the recommended bearing capacity. . Detailed footing examinations should be performed in each footing excavation prior to placement of reinforcing steel. These inspections should be performed by our representative to confirm that the TERRATECH f N G I N L MY 1 B14. I� Iris J 10 1 _ t ;�"'Ee.i �¢.ENOnOr�fZle+Gll y)r,,(� }!�"�..-•`— (+�` ^(� ' 6-9 tI i i Figure 1. Boring Location Plan Not to Scale TerraTech Engineers, Inc.(C-1356) 4905 Professional Court Raleigh, NC 27609 919-876-9799 1'roject: Alpha Charter Acadenp I'a Ycllcvillc, North Carolina Our Project Number 121-III-62530 ALPHA CHARTER ACADEMY SCHOOL FAYETTEVILLE, NORTH CAROLINA STORMWATER / EROSION CONTROL NARRATIVE Prepared for: ALPHA ACADEMY INC. P.O. BOX 35476 FAYETTEVILLE, NC 28303 Prepared by: pARAMouNTE L= N G 1 N E E R 1 N G. 1 N G. 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 NC License #: C-2846 Project #11128.PE May 2011 REVISED PER NCDENR COMMENTS 05/26/11 Project Name: Alpha Charter Academy Client: Alpha Charter Academy Project Number: 11128.PE Prepared By: RPB Date: 6/6/11 Infiltration Basin Calculations Stormwater Quality Requirement: Drainage Area to System = 4.95 Ac. Impervious Area = 3.00 Ac. Impervious 60.61 Runoff Coefficient (Rv) = 0.595 in/in Req. 1.0" Runoff Volume = 10,699 cf Storage Volume Elevation = 217.92 EL. Storage Volume Surface Area = 5,322 sf Soils Information: (See Attached) PARAMOUNTE Soil Type = Wagram-Urban (WgB) EL. At Test Location = 218.00 Depth to SHWL = 72.0 in SHWL = 212.00 Infiltration'Rate = 7.1 in/hr (1/2 Actual average rate) Infiltration Basin Storage CONTOUR INCR. ACCUM. CONTOUR AREA VOLUME VOLUME [sq ft] [cu ft] [cu ft] 214.0 404 0 0 215.0 1,435 920 920 216.0 2,700 2,068 2,987 217.0 4,039 3,370 6,357 218.0 5,439 4,739 11,096 219.0 6,895 6,167 17,263 220.0 8,408 7,652 24,914 Draw Down Analysis: Bottom Area of Basin 404 sf Bottom Elevation of Basin 214.0 ft Basin Depth 6.0 ft Draw Down Time = 0.16 days (from Darcy's Equation) 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 6, 2011 Hyd. No. 1 DA#1: PRE Hydrograph type = SCS Runoff Peak discharge = 3.753 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 1 min Hyd. volume = 17,933 cuft Drainage area = 4.950 ac Curve number = 51 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 11.00 min Total precip. = 5.52 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 3.00 r �M 1.00 MP DA#1: PRE Hyd. No. 1 -- 10 Year Q (cfs) 4.00 3.00 Fail#] 1.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) --®� Hyd No. 1 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 6, 2011 Hyd. No. 2 DA#1:POST Hydrograph type = SCS Runoff Peak discharge = 17.31 cfs Storm frequency = 10 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 53,315 cuft Drainage area = 4.950 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.52 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 •M . m 3.00 PF DA#1: POST Hyd. No. 2 -- 10 Year Q (cfs) 18.00 15.00 12.00 . GV . 10 3.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) —^— Hyd No. 2 3 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 6, 2011 Hyd. No. 3 INFILTRATION BASIN Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 741 min Time interval = 1 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - DA#1: POST Max. Elevation = 219.26 ft Reservoir name = INFILTRATION BASIN Max. Storage = 25,373 cuft Storage Indication method used. Exfltration extracted from Outflow. Q (cfs) 18.00 15.00 12.00 •M . 8 3.00 W INFILTRATION BASIN Hyd. No. 3 -- 10 Year u i yr. ,N. Q (cfs) 18.00 ff•A1p1 [oI11Il1 3.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) — Hyd No. 3 — Hyd No. 2 1 Total storage used = 25,373 cult Pond Report a Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 6, 2011 Pond No. 1 - INFILTRATION BASIN Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 214.00 ft Stage I Storage Table Stage (ft) Elevation (ft) 0.00 214.00 1.00 215.00 2.00 216.00 3.00 217.00 4.00 " 218.00 5.00 219.00 6.00 220.00 7.00 221.00 Contour area (sqft) Incr. Storage (tuft) 1,240 0 2,494 1,867 3,826 3,160 5,234 4,530 6,707 5,971 8,237 7,472 9,824 9,031 11,467 10,646 Total storage (tuft) 0 1,867 5,027 9,557 15,528 23,000 32,030 42,676 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 16.00 0.00 20.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 219.30 0.00 219.60 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 216,00 0.00 0.00 0.00 Weir Type = Riser - Ciplti -- Length (ft) = 30.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (i = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 1 Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 7.100 (by Contour) Multi -Stage = nla No No No TW Elev. (ft) = 0.00 Note', Culvervorifice outflows are analyzed under inlet (ic) and outlet (cc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage I Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C Pi Wr A Wr B Wr C Wr D Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 214.00 0.00 --- --- --- 0.00 --- 0.00 --- 0.000 --- 0.000 0.10 187 214.10 0.00 -- --- --- 0.00 --- 0.00 --- 0.041 --- 0.041 0.20 373 214.20 0.00 -- - --- 0.00 -- 0.00 --- 0.082 -- 0.082 0.30 560 214.30 0.00 - - --- -- 0.00 -- 0.00 - 0.123 - 0.123 0.40 747 214.40 0.00 --- -- --- 0.00 -- 0.00 --- 0.164 -- 0.164 0.50 934 214.50 0.00 --- --- --- 0.00 --- 0.00 -- 0.205 --- 0.205 0.60 1,120 214.60 0.00 --- -- -- 0.00 --- 0.00 --- 0.246 --- 0.246 0.70 1,307 214.70 0.00 -- -- -- 0.00 --- 0.00 - 0.287 --- 0.287 0.80 1,494 214.80 0.00 -- - - 0.00 -- 0.00 - 0.328 --- 0.328 0.90 1,680 214.90 0.00 --- -- --- 0.00 - 0.00 -- 0.369 - 0.369 1.00 1,867 215.00 0.00 --- --- --- 0.00 --- 0.00 -- 0,410 -- 0.410 1.10 2,183 215.10 0.00 --- --- --- 0.00 --- 0.00 --- 0.432 --- 0.432 1.20 2,499 215.20 0.00 --- -- --- 0.00 --- 0.00 - 0.454 --- 0.454 1.30 2,815 215.30 0.00 -- -- --- 0.00 --- 0.00 - 0.476 --- 0.476 1.40 3,131 215.40 0.00 --- -- -- 0.00 -- 0.00 --- 0.497 --- 0.497 1.50 3,447 215.50 0.00 --- --- --- 0.00 -- 0.00 --- 0.519 --- 0.519 1.60 3,763 215.60 0.00 --- --- --- 0.00 --- 0.00 --- 0.541 --- 0.541 1.70 4,079 215.70 0.00 --- --- --- 0.00 --- 0.00 --- 0.563 -- 0.563 1.80 4,395 215.80 0.00 -- --- --- 0.00 -- 0.00 -- 0.585 -- 0.585 1.90 4,711 215.90 0.00 --- -- --- 0.00 --- 0.00 -- 0.607 -- 0.607 2.00 5,027 216.00 0.00 --- --- -- 0.00 --- 0.00 --- 0.629 --- 0.629 2.10 5,480 216.10 0.00 --- --- --- 0.00 --- 0.00 --- 0.652 --- 0.652 2.20 5,933 216.20 0.00 --- --- --- 0.00 --- 0.00 --- 0.675 --- 0.675 2.30 6,386 216.30 0.00 --- --- --- 0.00 --- 0.00 --- 0.698 --- 0.698 2.40 6,839 216.40 0.00 --- --- --- 0.00 --- 0.00 --- 0.721 -- 0.721 2.50 7,292 216.50 0.00 --- --- . --- 0.00 --- 0.00 --- 0.745 --- 0.745 2.60 7,745 216.60 0.00 --- --- --- 0.00 --- 0.00 --- 0.768 --- 0.768 2.70 8,198 216.70 0.00 --- --- --- 0.00 --- 0.00 --- 0.791 --- 0.791 2.80 8,651 216.80 0.00 --- --- --- 0,00 --- 0.00 --- 0.814 --- 0.814 2.90 9,104 216.90 0.00 --- --- --- 0.00 --- 0.00 --- 0.837 --- 0.837 3.00 9,557 217.00 0.00 --- --- -- 0.00 -- 0.00 --- 0.860 --- 0.860 3.10 10,154 217.10 0.00 --- --- --- 0.00 --- 0.00 --- 0.884 --- 0.884 3.20 10,751 217.20 0.00 --- --- --- 0.00 --- 0.00 --- 0.909 --- 0.909 3.30 11,348 217.30 0.00 --- --- --- 0.00 --- 0.00 --- 0.933 --- 0,933 Continues on next page... 5 INFILTRATION BASIN Stage I Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.40 11,945 217.40 0.00 --- --- --- 0.00 --- 0.00 --- 0.957 --- 0.957 3.50 12,542 217.50 0.00 --- --- --- 0.00 --- 0.00 --- 0,981 -- 0.981 3.60 13,139 217.60 0.00 --- -- --- 0.00 --- 0.00 --- 1.005 - 1.005 3.70 13,736 217.70 0.00 --- --- --- 0.00 -- 0.00 - 1.030 --- 1.030 3.80 14,333 217.80 0.00 --- --- --- 0.00 --- 0.00 --- 1.054 --- 1.054 3.90 14,930 217.90 0.00 --- --- --- 0.00 --- 0.00 --- 1.078 --- 1.078 4.00 15,528 218.00 0.00 -- -- --- 0.00 --- 0.00 - 1,102 -- 1.102 4.10 16,275 218.10 0.00 --- --- --- 0.00 --- 0.00 --- 1.127 --- 1.127 4.20 17,022 218.20 0.00 --- --- --- 0.00 --- 0.00 -- 1.153 --- 1,153 4.30 17,769 218.30 0.00 --- --- --- 0.00 -- 0.00 - 1.178 --- 1.178 4.40 18,516 218.40 0.00 -- --- --- 0.00 --- 0.00 --- 1.203 - 1.203 4.50 19,264 218.50 0.00 -- --- --- 0.00 --- 0.00 --- 1.228 --- 1.228 4.60 20,011 218.60 0.00 --- --- --- 0.00 --- 0.00 --- 1.253 --- 1,253 4.70 20,758 218.70 0.00 - --- --- 0.00 -- 0.00 -- 1.278 --- 1.278 4.80 21,505 218.80 0.00 --- --- -- 0.00 -- 0.00 -- 1.303 -- 1.303 4.90 22,252 218.90 0.00 --- --- --- 0.00 --- 0.00 --- 1.329 -- 1.329 5.00 23.000 219.00 0.00 --- --- --- 0.00 --- 0.00 --- 1.354 --- 1.354 5.10 23,903 219.10 0.00 -- -- --- 0.00 -- 0.00 -- 1.380 -- 1.380 5.20 24,806 219.20 0.00 - --- --- 0.00 -- 0.00 --- 1.406 -- 1.406 5.30 25,709 219.30 0.00 --- --- -- 0.00 --- 0.00 --- 1,432 --- 1.432 5.40 26,612 219.40 1.71 oc --- --- --- 1.68 --- 0.00 --- 1.458 -- 3,143 5.50 27,515 219.50 4.83 oc -- --- -- 4.77 --- 0.00 -- 1,484 -- 6.250 5.60 28,418 219.60 8.76 oc - -- --- 8.75 --- 0.00 --- 1.510 --- 10.27 5.70 29,321 219.70 13.48 oc --- --- --- 13.48 --- 2.11 --- 1.536 --- 17.12 5.80 30,224 219.80 18.84 oc --- --- --- 18.84 --- 5.96 -- 1.562 --- 26.36 5.90 31,127 219.90 23.39 oc -- -- -- 23.39 s - 10.95 - 1.589 - 35.93 6.00 32,030 220.00 24.89 is - --- --- 24.89 s --- 16.85 -- 1,615 -- 43.35 6.10 33,095 220.10 25.73 is --- --- --- 25.73 s --- 23.55 --- 1.642 --- 50.92 6.20 34,159 220.20 26.40 is --- - --- 26.40 s --- 30.95 --- 1.669 --- 59.02 6.30 35,224 220.30 26.98 is --- -- --- 26.98 s --- 39.00 --- 1,696 --- 67.68 6.40 36,288 220.40 27.51 is -- --- --- 27.50 s --- 47.65 --- 1.723 -- 76.88 6.50 37,353 220.50 27.99 is --- --- --- 27.98 s --- 56.86 --- 1.750 --- 86.59 6.60 38,417 220.60 28.45 is -- -- --- 28.44 s --- 66.60 - 1.777 --- 96.81 6.70 39,482 220.70 28.89 is --- -- -- 28.88 s -- 76.83 - 1.804 - 107.52 6.80 40,546 220.80 29.31 is --- --- --- 29.29 s --- 87.55 -- 1,831 - 118.67 6.90 41,611 220.90 29.72 is --- --- --- 29.70 s --- 98,73 --- 1,858 --- 130.28 7.00 42,676 221.00 30.13 is --- --- --- 30.12 s --- 110.32 -- 1.885 -- 142.33 ...End ALPHA CHARTER ACADEMY SCHOOL FAYETTEVILLE, NORTH CAROLINA STORMWATER / EROSION CONTROL NARRATIVE Prepared for: ALPHA ACADEMY INC. P.O. BOX 35476 FAYETTEVILLE, NC 28303 Prepared by: .PA1R-AMOL71**'4TE 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 Project 91 1128.PE May 2011 X ALPHA CHARTER ACADEMY SCHOOL FAYETTEVILLE, NORTH CAROLINA Project it11128.PE Table of Contents Design Narrative Proposed Improvements Maintenance Erosion and Sedimentation Control Specification Soils Map USGS Map Calculations Page X ' ALPHA CHARTER ACADEMY SCHOOL FAYETTEVILLE, NORTH CAROLINA Project #] I128.PE DESIGN NARRATIVE Alpha Academy Inc. proposes to school along Hwy. 410 (Raeford Road) in Fayetteville North Carolina. The proposed site is within Cumberland County and the City of Fayetteville. Please find this design narrative, plan, and supporting calculations sufficient for the stormwater quality and quantity control according to NCDENR and City of Fayetteville regulations. The address of the property is 8030 U.S. Hwy. 410, Fayetteville, NC 28303 with a latitude and longitude of 35' 02' 03" N, 79' 04' 03" W (Parcel ID# 9476-97-7406; Deed Book 7490/8349 page 116/582). There are currently a few existing buildings across the property and the ground cover is mostly fair open space with a few sparse trees. The soils consist of Wagram-loamy sand (WaB) according to the provided soils map from NRCS and have a HSG classification of A. Site specific soils information has been included in the following pages of this report; this information includes the depth of the seasonal high water table and infiltration rates sealed by a Geotechnical Engineer. According to the attached USGS map, the project drains to Rockfish Creek which has a stream classification of B (18-31-18) and is within the Cape Fear River Basin. PROPOSED IMPROVEMENTS It is proposed that all runoff resulting from impervious surfaces will be collected by a storm drainage system and then be conveyed to an infiltration basin where both stormwater quality and stormwater quantity requirements will be met. The infiltration basin has been designed to NCDENR and City of Fayetteville requirements. As illustrated within the design, all stormwater runoff will be collected into an infiltration basin where it will be stored until the entire design storm has infiltrated back into the ground. Stormwater from greater storm events will be allowed to exit the infiltration basin by means of an outlet structure and a secondary spillway during emergency situations. Note that the riser outlet structure has been set in order to hold back the entire amount of runoff from the 1" storm and to discharge the 1 & 10 year post development events at a rate less than pre development. All greater events, including the 25, 50, and 100 year storms will discharge through the outlet structure to the existing storm drain system along the existing entrance drive. In regard to erosion control, please find that it is proposed to use the infiltration basin as a sediment basin during construction activities. As a result, please find that we have designed the sediment basin to NCDENR land quality requirements (per NCDENR Erosion and Sediment Control Design and Planning Manual (June 1-91, 2006)) and have also added a skimmer to a temporary draw down orifice in order to prevent sediment from leaving the outlet structure prior to the site being fully stabilized. It is noted on the plans for the contractor to remove and plug the draw -down orifice once the site is fully stabilized and the sediment basin has been completely converted to the proposed infiltration basin. Other than the sediment basin, it is proposed to install inlet protection to the storm drain inlets to prevent sediment from entering the system as well as silt fence and temporary construction entrances. Please see sheet C-1.0 for all Erosion Control and Sequence of Construction notes. The sedimentation and erosion control design will commence as depicted in the construction sequence. Please find all reference material and stormwater / erosion control calculations in the following pages of this report. Note that some calculations have also been located on the plans for easy reference during construction. MAINTENANCE Contractors shall be responsible for periodic inspection and maintenance of all indicated erosion control devices in accordance with the plans and specifications. In addition, inspection and any necessary maintenance will be required immediately following any significant storm event. Any erosion control measure that fails to function as intended shall be repaired immediately. Upon completion of construction and the establishment of stabilized ground cover, the property owner shall be responsible for any on going site maintenance. EROSION AND SEDIMENTATION CONTROL SPECIFICATION PART1-GENERAL 1.1 RELATED DOCUMENT A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 WORK INCLUDED A. Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. B. Contractor shall, upon suspension or completion of land -disturbing activities, provide protection covering for disturbed areas. Permanent vegetation shall be established at the earliest practicable time. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and sediment control throughout the construction and post construction period. 1.3 RELATED SECTIONS A. Related Sections — The following Sections contain requirements that relate to this Section: 1. 01011 — Existing Underground Utilities 2. 01015 — Special Conditions for this Contract 3. 01070 — Shop Drawings, Project Data & Samples 4. 02200 — Earthwork, Excavation Trenching, and Backfilling 5. 02230 — Site Clearing 6. 02240 — Dewatering 7. 02485 — Seeding General Areas 1.4 REGULATORY REQUIREMENTS A. Contractor shall be responsible for prevention of damage to properties outside the construction limits from siltation due to construction of the project. The Contractor will assume all responsibilities to the affected property owners for correction of damages that may occur. Erosion control measures shall be performed by the Contractor, conforming to the requirements of, and in accordance with plans approved by applicable state and local agencies and as per the erosion control portion of the construction drawings and these specifications. The Contractor shall not allow mud and debris to accumulate in the streets. Should the Contractor pump water from trenches during construction, appropriate siltation preventative measures shall be taken prior to discharge of pumped water into any storm drain or stream. PART 2-PRODUCTS 2.1 Open mesh biodegradable mulching cloth. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground 1 limestone containing not less than 10 percent magnesium oxide. 2.4 Phosphate shall be 20 percent super phosphate or equivalent. 2.5 Provide grass seed mixture as shown on the plans. 2.6 Silt fence shall consist of non -biodegradable filter fabric (Trevira, Mirafi, etc.) wired to . galvanized wire mesh fencing and supported by wood or metal posts. 2.7 NCDOT Class B stone for erosion control. PART 3-EXECUTION 3.1 CLEARING A. Clearing and grubbing shall be scheduled and performed in such a manner that subsequent grading operation and erosion control practices can follow immediately thereafter. Excavation, borrow, and embankment operations will be conducted such that continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover within 21 calendar days after completion of active construction. 3.2 STABILIZING A. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion control devices or structures. All disturbed areas not to be paved and left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with either temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. 3.3 REGULATORY REQUIREMENTS A. Whenever land disturbing activity is undertaken on a tract, a ground cover sufficient to restrain erosion must be planted or other wise provided within 21 calendar days on that portion of the tract upon which further active construction is to being undertaken. B. If any earthwork is to be suspended for any reason whatsoever for longer than 21 calendar days, the areas involved shall be seeded with vegetative cover or otherwise protected against excessive erosion during the suspension period. Suspension of work in any area of operation does not relieve the Contractor of the responsibility for the control of erosion in that area. PART 4-CONSTRUCTION PHASE 4.1 PRACTICES A. Avoid dumping soil or sediment into any streambed or watercourse. Backfill for stream crossings shall be placed dry and compacted to minimize siltation of the watercourse, where applicable. B. Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. C. Avoid equipment crossings of streams, creeks, and ditches where practicable. PART 5 - SEDIMENT CONTROL FEATURES 5.1 GENERAL A. All devices (silt fences, retention areas, etc.), for sediment control shall be constructed at the locations indicated prior to beginning excavation on the site. All devices shall be properly maintained in place until a structure or paving makes the device unnecessary or until directed to permanently remove the device. 5.2 DESIGN APPLICATIONS A. Mulch shall be used for temporary stabilization of areas subject to excessive erosion, and for protection of seed beds after planting where required. 1. Jute, mesh, etc. should be installed as per manufacturer's instructions. B. Silt fences shall be used at the base of slopes and in drainage swales to restrict movement of sediment from the site. Straw bales may be required for reinforcement. C. Riprap shall be used at the proposed outfall pipes as indicated on plans. D. Establish vegetative cover on all unpaved areas disturbed by the work. 1. Preparation of Seedbed. Areas to be seeded shall be scarified a depth of 6 inches until a firm, well -pulverized, uniform seedbed is prepared. Lime, phosphorous, and fertilizer shall be applied during the scarification process in accordance with the following rates. a. Lime — 2 ton per acre b. Nitrogen —100 pounds per acre C. P2O5 — 200 pounds per acre 2. Seeding. Disturbed areas along roads and ditches shall be permanently seeded with 10-20 pounds per acre of centipede during the period from March through September. Seeding performed during the period from April to August shall be temporarily seeded with 40 pounds per acre of German Millet. The permanent vegetative cover will be over seeded at the earliest possible time as specified above. 3. Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. 5.3 MAINTENANCE A. The Contractor shall be responsible for maintaining all temporary and permanent erosion control measures in functioning order. Temporary structures shall be maintained until such time as vegetation is firmly established and grassed areas shall be maintained until completion of the project. Areas which fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. 5.4 REMOVAL OF SEDIMENT CONTROL DEVICES A. Near completion of the project, when directed by the Owner's agent, the Contractor shall dismantle and remove the temporary devices used for sediment control during construction. All erosion control devices in seeded areas shall be left in place until the grass is established. Seed areas around devices and mulch after removing or filling temporary control devices. END OF SECTION 02410 P Hydrologic Soil Group —Cumberland County, North Carolina 3 2'8" 35' 158" 676230 676260 676290 67MM 626350 676360 E/e41u Y Y � "0 �•. Yy ,� V r y V 5T g t 1 R1�xJ x �1 ' t 4 A t � � % da• x" y �a�'Y 4£ 1�� 7 a � ✓ '� r� � �' w �� t � i��,�'i j�, hTr r�' { a �al I�x »✓s n'��, �iT' �5 r � 1�1f uw� r „ n 3 t,✓1 xl ✓1 '1 t6 1 7 h'�! is M 0 A.h lirgl 1 fl s' s �, '. 1 It��✓w 1(���5"�F sy �i>r39( ' r i . rj� � :� x^. F'11P' Y ';1 ,�,� n � '�"•�.���;aC t'��y+F�mi±�Jtvp Al Y �` .t.k". In uv'^ � a P �'I^. sy1�j? r"��r r,n,^`��I,✓�1�� ,�l rely 1 ,A.y'� �f6 : ¢'t� `�" � r"� *✓�7t-. �<k�,�y t.�gyri'�81a;���lo'°���„a a � , t 1 4 '' 'P _ r" �, a SrIC la +%µ hiP t l� �5{cw �( a > r or x NAh Y S#+V1 ��(«NA���y x e i P `A' R ,yb�2�{c m� �. . rf, q 4;nF�+Y�'. :A t/S ✓C i t'k,.7+`'�., r ��✓^.� ,•'.t`.d:. ,4 676230 6/fi2fi0 67fi290 6]6320 fi163A 676380 676410 Map Sale: 1:1,4006 onrR on A see(8S x 11') sheet. N Meters 7, 0 10 20 40 60 N Feet 0 50 100 200 300 USDA Natural Resources Web Soil Survey 5/13/2011 Conservation Service National Cooperative Soil Survey Page 1 of 3 35" 2' 8" 35' i' 58' Hydrologic Soil Group —Cumberland County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils J Soil Map Units Soil Ratings O A 0 AID =01 B Q BID (] C I] CID O D Not rated or not available Political Features U Cities Water Features Q Oceans - . Streams and Canals Transportation yy Rails N Interstate Highways US Routes Major Roads �y Local Roads MAP INFORMATION Map Scale: 1:1,400 if printed on A size (8.5" = 11 ") sheet. The soil surveys that comprise your AOI were mapped at 1:24,000 Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsuNey.nres.usda.gov Coordinate System: UTM Zone 17N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Cumberland County, North Carolina Survey Area Data: Version 10, Jun 5, 2009 Date(s) aerial images were photographed: 6/22/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 5/13/2011 W10 Conservation Service National Cooperative Soil Survey Page 2 of 3 Hydrologic Soil Group -Cumberland County, North Carolina s' Hydrologic Soil Group Hydrologic Soil Group —Summary by Map Unit —Cumberland County, North Carolina Map unit symbol Map unit name Rating Acres in AOI Percent of AOI WaB Wagram loamy sand, 0 to 6 percent slopes A 6.4 100.0% Totals for Area of Interest _ 6.41 _ 100.0 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when 'thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or hear the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff., None Specified Tie -break Rule: Lower USDA Natural Resources Web Soil Survey 5/13/2011 611M Conservation Service National Cooperative Soil Survey Page 3 of 3 UNITED STATES DEPARTMENT OF T14E INTERIOR GEOLOGICAL SURVEY �/ EaYJCN�p� NI �Lmapwl M� �uea+vr�w�nr �werruww UNITED STATES DEPARTMENT OF THE A CORPS OP ENGINEER SIE CLIFDALE QUADRANGLE !,f ONTH LwftOLINw ;' ].6 NINVTE SERIES (TOPCGRAPNI[� /( W. cuenu . co.ruv L.FDALE�•N. C� x.�w wATlls Name of Steam Description Curr. Class Date Basin stream Index # Stewarts Creek From source to C 04/01/59 Cape Fear 18-31-21 Upchurches Pond, Rock fish Creek Unnamed From source to dam at B 04/01/59 Cape Fear 18-31-22-(1) Tributary near Permastone Lake Hope Mills (Permastone Lake) Unnamed From dam at Permastone C 09/01/74 Cape Fear 18-31-22-(2) Tributary near Lake to Rockfish Creek Hope Mills Little Rockfish From source to mouth C 09/01/74 Cape Fear 18-31-24-(l) Creek (Lake of Bones Creek William) Little Rockfish From mouth of Bones B 04/01/59 Cape Fear 18-31-24-(3) Creek Creek to Unnamed Little Rockfish From Unnamed Tributary C 06/03/92 Cape Fear 18-31-24-(4) Creek at Lakewood Lake to backwaters of Hope Mills Lake Little Rockfish From backwaters of B 08/03/92 Cape Fear 18-31-24-(6.5) Creek [Hope Hope Mills Lake to dam Mills Lake at Hope Mills Lake (Number Four Lake)) Little Rockfish From dam at Hope Mills C 09/01/74 Cape Fear 18-31-24-(7) Creek Lake to Rockfish Creek Bones Creek From source to Little C 07/01/73 Cape Fear 18-31-24-2 Rockfish Creek Unnamed From source to Little B 04/01/59 Cape Fear 18-31-24-3.5 Tributary at Rockfish Creek Lakewood Lake (Lakewood Lake) Beaver Creek From source to Little C 09/01/74 Cape Fear 18-31-24-5 (Beaver Creek Rockfish Creek Pond) Big Branch From source to Beaver C 04/01/59 Cape Fear 18-31-24-5-1 Creek Jacks Ford Branch From source to Beaver C 03/01/77 Cape Fear 18-31-24-5-2 Creek Persimmon Creek From source to Beaver C 04/01/59 Cape Fear 18-31-24-5-3 Creek Pond, Beaver Creek Stewarts Creek From source to Beaver C 04/01/59 Cape Fear 16-31-24-5-4 Creek Pond, Beaver Creek Buckhead Creek From source to Little C 03/01/77 Cape Fear 18-31-24-6 (Buckland Creek) Rockfish Creek Big Sandy Run From source to C 04/01/59 Cape Fear 18-31-25 (Lake Lynn) Rockfish Creek Locks Creek From source to Cape C 09/01/74 Cape Fear 18-32 (near Vander) Fear River Cedar Creek From source to Cape C 04/01/59 Cape Fear 18-33 Fear River Page 4 of 6 2011-04-30 07:08:;1 Project Name. Alpha Charter Academy Client: Alpha Charter Academy Project Number: 10179.PE Prepared By: CWM Date: 5/13/11 Basin: DA #1 [PRE] pARAMOUNTE rz� . N r_ r". N N Drainage area= 4.95 acres = 0.008 mil Area Calculations Land Use Area Ac. % of Basin Existing Impervious (Total) = 0.00 0.0% Open Space - Fair 4.95 100.0% Sum: 4.95 100% Project Name: Alpha Charter Academy Client: Alpha Charter Academy Project Number: 11128.PE Prepared By: RPB Date: 5/13111 pARAMOUNTE Basin: DA #1 [PRE] Drainage area= 4.95 acres = 0.008 miz ' Curve Number HSG: A B C D Sum of Basin 100.0 .0.0 0.0 0.0 100.0 Land Use % of Basin CN A CN B CN C CN D Weighted CN Open Space - Fair 97.5 49 69 79 84 ;;: 47i78; Impervious 2.5 98 98 98 98 2.45 Sum: .100.0 Sum:. 50.23 Curve numbers taken from: TR-55 Use:.-:51 = values input by user = values calculated by spreadsheet Project Name: Alpha Charter Academy Client: Alpha Charter Academy Project Number: 11128.PE Prepared By. RPB Date: 5/13/11 Basin: DA #1 [PRE] Drainage area= Time of Concentration Overland Flow Hydraulic Length = 650 ft. Slope = 2 % Ground Cover = Short Grass V (Figure 12.7) = 1 fps T = 10.8 min. Tc _ 10.8arum PARAMOUNTE 4.95 acres = 0.008 mi' Project Name: Alpha Charter Academy i VT� .1.V Lr�7�' Client: Alpha Charter Academy PA,RAMO E Project Number: 11128.PE Prepared By: RPB Date: 5/13/11 Basin: DA #1 [POST] Drainage area= 4.95 acres = 0.008 miz Area Calculations Land Use Area (Ac.) % of Basin Buildings 1.12 Pavement 1.46 Sidewalks 0.29 Other 0.13 Impervious (Total) = 3.00 60.6% Open Space - Good 1.95 39.4% Sum: 4.95 100% Project Name: Alpha Charter Academy Client Alpha Charter Academy Project Number: 11128.PE Prepared By: RPB Date: 5/13/11 pARAMOUNTE Basin: DA #1 [POST] Drainage area= 4.95 acres = 0.008 miz Curve Number HSG: A B C D Sum % of Basin 100.0 0.0 0.0 0.0 _ 100.0' Land Use, % of Basin CN A CN B CN C CN D Weighted CN Impervious 60.6 98 98 98 98 '. 59.39' Open Space - Good 39.4 39 61 74 80 -1537 Sum: 100.0 Sum: 74.75 Curve numbers taken from: TR-55 Use: 75 = values input by user = values calculated by spreadsheet Project Name: Alpha Charter Academy Client: Alpha Charter Academy Project Number: 11128.PE Prepared By: RPB Date: 5/13111 Basin: DA #1 [POST) Drainage area= Time of Concentration Overland Flow (Grassed) Hydraulic Length = 350 ft. Slope = 1.9 Ground Cover = Grass V (Figure 12.7) = 2.8 fps T = 2.1 min. Overland Flow (Paved) Hydraulic Length = 260 ft. Slope = 0.75 Ground Cover = Paved V (Figure 12.7) = 1.8 fps T = 2.4 min. T, = 4.5 min. PARAMOUNTE 4.95 acres = 0.008 mil Use 5 min. Project Name: Alpha Charter Academy Client: Alpha Charter Academy Project Number: 11128.PE Prepared By: RPB Date: 5/13/11 Infiltration Basin Calculations Stormwater Quality Requirement: Drainage Area to System = 4.95 Ac. Impervious Area = 3.00 Ac. % Impervious 60.61 Runoff Coefficient (Rv) = 0.595 in/in Req. 1.0'I Runoff Volume = 10,699 cf 1� Storage Volume Elevation = 217.92 EL. Storage Volume Surface Area 5,765 sf Soils Information: (See Attached) Soil Type = Wagram-Urban (WgB) EL. At Test Location = 218.00 Depth to SHWL = 72.0 in SHWL = 212.00 Infiltration Rate = 14.2 in/hr Infiltration Basin Storage CONTOUR INCR. ACCUM. CONTOUR AREA VOLUME VOLUME [sq ft] [cu ft] [cu ft] 214.0 404 0 0 215.0 1,435 920 920 216.0 2,700 2,068 2,987 217.0 4,039 3,370 6,357 218.0 5,439 4,739 11,096 219.0 6,895 6,167 17,263 220.0 8,408 7,652 24,914 Draw Down Analysis: Bottom Area of Basin 404 sf Bottom Elevation of Basin 214.0 ft Basin Depth 6.0 ft Draw Down Time = 0.08 days PARAMOUNTE .. C 1 N C G 13 1 N G. I N C. (from Darcy's Equation) 2 LV ES-1 Qiorr = 3. 8S c C5 Do: 18'n. Appendices +u eu 50 100 zoo 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rc . 11N3 8.06.3 Appendices M EFE5-Z] Q)uyr.= SCFS be = / 8 Lt. s'_3o outs r w = De + La Z ).5,+ Y : I D• 5 pipe (Do)1 diameter ([19, T ilwa ter < 0. 5Do � p.Q o'� 60 Leo ,rlId ' b0 100 Discharge (ft3/sec) X 10 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T., < 0.5 diameter). Rev. 12,93 8.06.3 Appendices ' �F tS- Q/oyr. (r-3 4 3 .� cu 50 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T„. < 0.5 diameter). Rc. 1293 8.06.3 Project Name: Alpha Charter Academy Client: Alpha Academy, Inc. Project Number: 11128.PE Prepared By: RPB Date: 5/12/11 :ical Constants ity of Water = 62.4 Ibs/cf ity of Concrete (in Air) = 150 Ibs/cf ity of Saturated Soil = 47.6 Ibs/cf :rete Outlet Structure (Assume fully submerged) it of Structure (to slab) 5 ft h of Structure (outside) 5 ft mess of Structure 0.5 ft :cure Depth in Soil 2 ft :rete Slab Information rete Slab Thickness = 4 in Width (outside) = 6 ft pARA MOUNTE Buoyant Force Structure Volume = 57 cf Buoyant Force = 3,557 Ibs Concrete Ballast Force Structure Conc. Volume = 45 cf Bottom Slab Conc. Volume = 12 cf Soil Column Volume = 22 cf Ballast Force = 9,597 Ibs 'Net = 6,040 Ibs Okav: Ballast Size is adeauate