Loading...
HomeMy WebLinkAboutSW6110204_COMPLIANCE_20110203STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE )COMPLIANCE EVALUATION INSPECTION DOC DATE911 YYYYMMDD 9 PLATE REFERENCE NUMBER Lowther, Brian From: Randall, Mike Sent: Thursday, February 03, 2011 7:09 AM To: Lowther, Brian Subject: FW: Ft. Bragg Stormwater Management Plan. From: O'Rourke, Michael rmailto:morourkelouisberger.coml Sent: Wednesday, February 02, 2011 3:24 PM To: Randall, Mike Cc: Dydula, Rana S Subject: Ft. Bragg Stormwater Management Plan. Mike, It seems like forever since our kick off meeting for,Ft. Bragg's Stormwater Management Plan for 108" ASP, but the good news is it is completed. We sent it to the installation a few weeks ago and received word from Lee Ward that he had check in hand and was mailing it off on the 21" . Hopefully by now, it is on your desk. I wanted to let you know that since the projects inception we have switched project engineers and now Rana Dydula is the PE for this effort. If you wouldn't mind, please copy Rana and me on any comments when you respond to the installation. Taking out one leg of the relay will help us get you a timely response. Thanks. If you have any questions, please fee free to reach out to us and we will be glad to help. Michael Michael O'Rourke Senior Environmental Scientist The Louis Berger Group, Inc. 1001 Wade Ave. Suite 400 Raleigh, NC 27605 (919) 866-4421 Direct (919) 866-4400 Main (919) 755-3502 Fax (919) 368-5603 Cell morourke(iMoui sberger. com W W W.louisberecr.com DENR—FRO Architecture & Engineering 4000 Westchase Boulevard, Suite 280 Raleigh, NC 27607 P. 919.828.1876 F. 919.828.1677 www.clarknexsen.com transmittal SEP 10 2012 M DATE: We transmit the following: April 17, 2012 ® Drawing PROJECT: Ammo Pointe Boulevard ❑ Change Order TO: Mike Randall ❑ Computer File(s) Stormwater Staff Engineer ❑ product Literature NC DENR-DWQ APR 1 8 2012 ❑ Specifications ❑ Shop Drawings ❑ Samples ® Supplements/Spreadsheets Wetlands and Stormwater Copies Description Branch Stormwater Permitting Unit 1 Drainage Area Map 1617 Mail Service Center 1 Updated BUA Table, Raleigh, NC 27699-1617 Supplements/Spreadsheets FROM: Josh Hurst, PE Remarks: SUBJECT: Fort Bragg - 108`h ADA Complex Mike, Stomwater Update COMMISSION NUMBER: As discussed on the phone the drainage areas for the 108th 3818 Complex at Fort Bragg have changed slightly during the many VIA: Mail years of construction on that site. Attached you will find the ROUTE TO: documentation that shows the revised drainage areas, 1 corresponding supplements and design spreadsheets. Drainage 2 3 areas 1 & 4 increased in size. BUA for drainage area 1 4 increased in size, while 4 stayed the same by allocating for S future BUA. Drainage areas 2 and 3 decreased in size; however, 6 their BUA was held to be the same by allocating for future BUA. 7 8 The supplements and design spreadsheets have been updated 9 and show that all of the ponds well exceed NCDENR surface 101 area and storage requirements. Please do not hesitate to contact us if you have any questions. CC: Lee Ward (with attachments) Regards, Josh Hurst, PE, LEED AP BD+C Page 1 of 2 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater.will- ie collected via pipine networks that<will,dischargeFinto the Wet DetentiomPonds. The Wet . Detention Ponds are sized to remove 90% TSS for the Coastal region. In addition. the Wet Detention Basins wilftreat the difference between the pre -construction and post -construction'flows for the 1-year and 2-year storm event to meet LEEDs requirements. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑,Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.lf claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW —1995 ❑ Ph II — Post Construction 3. Stormwater runoff from this project drains to the 4. Total Property Area: 215.36 acres River basin. 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area': 204.96 . acres 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 49.70 9. How many drainage areas does the project have?4 (For high density, count I for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information _ . _ _ _ _ _ . Drainage Area 1 Drainage Area 2 : -Drainage Area 1. Drainage Area 4_ Receiving Stream Name Bones Creek Bones Creek Bones Creek Bones Creek Stream Class " C C C _ _ C Stream Index Number * 18-31-24-2 18-31-24-2 18-31-24-2 18-31-24-2 Total Drainage Area (sf) 1,762,578 2,138,790 2,682,475 2,035,130 On -site Drainage Area (sf) _1,762,578 2,138,790 2,682,475 2,035,130 Off -site Drainage Area (sf) 0 1 0 0 1 0 Proposed Imervious Area** (so 772,541 1273259 1613462 778417 % Impervious Area" (total) 43.83 59.53 60.15 38.25 Iin`ervious** Surface Area _ — Draina a -Area 1 Drama" e Area 2 Dfaina e Area 3 Drainage Area 4 On -site Buildings/Lots (so 58,608 145,851 _ 169,254 74,044 On -site Streets (sf) 2,068 88,680 139,095 93,895 On -site _Parking .(sf) " "_. _ _ _ 710,541 864,709 _ 1,157,196 346,515 _ On -site Sidewalks (sf) 1,324 123-,471 32,718 75,304 Other on -site (sf) Future (sf) 0 1 50,548 115,199 1 188,659 Off -site (sf) 0 0 0 0 Existing BUA*** (so 0 0 0 0 _ Total (sf):_ 772,541 1273259 1613462 778417 * Stream Class and Index Number can be determined at: htty:/42ortal_ncdenr.orghoeb/wg4 s/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07Jun2010 Page 3 of