Loading...
HomeMy WebLinkAboutSW6090903_HISTORICAL FILE_20091005STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT N0. BW�J��� DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE -�17)(-I' ho�� YYYYMMDD LNG;INLLRIN(; LAND ')URVLYINC, CONSTRUCTION LAYOUT C,P.S .SLRVICLS LAND DLVLLOPMLNT A09 CLJICA,�O DRIVE SUITL 112 FAYLTTLVILLL NC 285o6 PIJONL 910 426-6777 FAx 910 426-5777 4P 6M: 60LuTioN6, iNc. October, 5; 2009 NCDENR Division of water Quality Attn* Brian Lowther, 512.1N. Salisbury -Street Raleigh,,NC27604 RE' Phase II' Storm water Resubmittal, Ft. Bragg Green:Fuel' Facility;: F6rt`.Bragg, North Carolina. Brian; we are resubmitting the Phase; II Storm .WAter revised'detaiI sheets` for -the Ft Bragg,Green Fuel. Facility. The following:,changes:were.made in accordance with,your review: comments- 1 riser detail adjusted to eliminate orif ces 2- trash rack for riser deleted I look forward to working with you on this project. If you have any questions or concerns, please feel -free to contact us., Sincerely, 4D Site Solutions Inc. Scott: Brown Professional Engineer Enclosure o �I z CD CD 0 C �gLO o �� r - ini.-^ t� DWQUSEONLY . , e Date Leceived Fee Paid Permit Number 2-4 CPr iT> c5D- O� b3 Applicab e Ru es: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 R`Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM�VVQ This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Ft. Brae Green Fuel Facilitv 2. Location of Project (street address): north of intersection with Gruber Road and Longstreet Road City:Ft. Bragg County:Cumberland Zip: 3. Directions to project (from nearest major intersection): Go through the All American Highway check point when intering Ft. Bragg After passing through the check point, exit onto the Gruber Road off ram. Head north on Gruber Road. Continue through the intersection of Gruber and Longstreet. The site will be immediatley on the right side 4. Latitude:35° 08' 41.56" N Longitude:79° 02' 03.57" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started . ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, `' 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:NCDENR erosion control - FB-Fort Bragg Green Fuel Facility CUMBE- 2010-011 Form SWU-101 Version 07July2009 Page 1 of 6 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organiza tion:Wi 11 bros Government Services (US), IJ,C Signing Official & Title:Richard G. Grossman - Vice President b. Contact information for person listed in item 1a above: Street Address: 2087 E. 71st Street City: Tulsa State: OK Zip: 74316 Mailing Address (if applicable):2087 E. 71st Street City :Tulsa State:OK Zip:74136 a Phone: (918 ) 499-2870 Fax: (918 ) 491-9436 Email: Rick.Grossman®willbros.com Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ® Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) 0 Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Ft. Bragg DPW Signing Official & Title: Gregory Bean - Director b. Contact information for person listed in item 2a above: Street Address:_ Building 3-1631 Butner Road City: Ft. Bragg State: NC Zip: 28310 Mailing Address (if applicable): City: Phone: (910 ) 396-4009 Email: gregory.g.bean@us.army.mil State: Zip: Fax: ( 910 ) 396-6908 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Form SWU-101 Version 07JUly2009 Page 2 of 7 Zip: ' Phone: Email: Fax: 4. Local jurisdiction for building permits: Point of Contact: IV. PROJECT INFORMATION Phone #: 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. ,The storm water generated by the site will be treated by a bioretention cell then released along the natural drainage wad_ 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date:° ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 1.51 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) Total Surface Water Area (6) = Total Project Area+:1.51 acres + Total project area shall be calculated to exchtde the follmving:.the normal pool of im onnded stritctnres, the area between the banks of streams and rivers, the area belozv the Normal High Water (NHM line or Mean High Water (MHW) line, and coastal zvetlands landzvard from the NHW (or MHM line. The residtant project area is used to calculate overall percent built upon area (B UA). Non -coastal zvetlands landzvard of the NHW (or MHW) line may be inchcded in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 79.4 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version 07July2009 Page 3 of 7 ` R3 ( fmf Basin Information��;;�„� a:4• .ei`E6"$Rka'e tGyr.�2 Drama e:Area,1�; ;' �y Draina e�Area�� - Drama e`Area''a�b �Dr`ama eArEta `� Receiving Stream Name y"�� Idt ,:„_ . c 11 L" ; Stream Class * �,, ..IT! Stream Index Number * q . 3 _ ;? 1i Total Drainage Area (so 65,796 On -site Drainage Area (so 65,796 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 52,256 % Impervious Area** (total)_52,256 Im ervious Surface AreaDiatna eA'rea� _Drama eArea3 ;Drama e AreaE;, «Drama e-Area:` On -site Buildings/Lots (so On -site Streets (so On -site Parking (so 52,256 On -site Sidewalks (so Other on -site (so Future (so Off -site (so Existing BUA*** (so Total (so: 52,256 Stream Class and Index Number can be determined at: http://h2o.enr.state.nc.uslbirns/reports/reportsWB.html Im ervious area is defined as the. built upon area including, but not limited to, buildings, roads, parking areas, sideezvalks, gravel areas, etc. ***Report only that amount of existing BUA that zvill remain after development. Do not report any existing BUA that is to be removed and which will be replaced by nezv BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Proiects in Union County: Contact DPVQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from ht!p://h2o.enr.state.nc.us/su/bmp—forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http:/ /h2o.enr.state.nc.us/su/msi ma sp htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from h_pt ://h2o.enr.state.nc.us/su/bmp forms.htm. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 53 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants N/A Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated, and O&M S-g agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to S�3 hU://www.envheIR.org/pages/onestopexl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) Form SWU-101 Version 07Juiy2009. Page 4 of 7 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor 13 the project. This is required in addition to the brief summary provided in the Project Information, item 1. S,3 6. -A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA'waters within.,/2 mile of 1he site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. S 3 .8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. A Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify 5 l3 elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) lN/ 10 11 A copy of the most current property deed. Deed book: Page No: For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. h!!p://www.secretaly.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the item's required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Form SWU-101 Version 07July2009 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Scott Brown, PE Consulting Firm: 4D Site Solutions, Inc. Mailing Address: 409 Chicago Drive, Suite 112 City: Fayetteville State: NC Zip: 28306 Phone: (910 ) 426-6777 ext. 102 Email: sbrown@4dsitesolutions.com Fax: (910 ) 426-5777 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Gregory Bean , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) Willbros Government Services (US), LLC provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the pro erty owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownershi a e Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid it. I derstand that the operation of a stormwater treatment facility without a valid permit is a violation C Ge ral Statue 143-215.1 and may result in appropriate enforcement action including the assessment o civil pen es of u to $25,000 per day, pursuant to NCGS 143-215.6. Signature: J1 Date:Algloq 1, . a Notary Public for the State of County of , do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version 07July2009 Page 6 of 7 X.'- APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 2) Richard G. Grossman certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NOAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Date: & a N tary Public for/the Stateof �fJl� � L , County of do hereby certify thatpersonally appeared before, me this day of and acknowlledge the due execution the application for,.. a stormwater permit. Witness my hand and official seal, i 14yz , SEAL My commission expires 'AL -�2w C o. E s� Form SWU-101 Version 07July2009 Page 7 of 7 E441NEE2iN(; LAND surzVEY1N� CON.'STZUCTION LAYOUT C, P5 .SERVICES LAND DEVELOPMLNT 4o9 cuicA(�o DRIVE SUITE 112 FAYETTEVILLE NC 283o6 PJONE 910 426-6777 FAX 910 426-5777 41) 51TE SOLuTIoNS.INC. October 21; 2009 NCDENR Division of Water Quality Attn: Brian Lowther 512 N. Salisbury Street Raleigh, NC 27604 RE: Phase II Storm Water Revision, Ft. Bragg Green Fuel Facility, Fort Bragg, North Carolina Brian; We are submitting a minor revision for the Ft. Bragg Green Fuel Facility. The oil/water separator was deleted and a baysaver was added as shown on the drawings. The outlet from the baysaver created the need for another small forebay in the bioretention cell. The only water flowing into the baysaver would be the rain water that possibly blew under the canopy and the rain water that fell on the depressed loading areas. I look forward to working with you on this project. If you have any questions or concerns, please feel free to contact us. Sincerely, D Site Solutions Inc. VsW Scott Brown Professional Engineer Enclosure D k�5@�n/72 O C T 2 2 2009 DEN Ws n s & WAR QUAII {ss .�.+-�. 4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 26, 2009 Mr. Richard G. Grossman Willbros Government Services (US), LLC 2087 E. 71 st Street Tulsa, OK 74316. Subject: Stormwater Permit No. SW6090903 Ft. Bragg Green Fuel Facility High Density Commercial Bio-Retention Project Cumberland County Dear Mr. Grossman: The Stormwater Permitting Unit received a Plan Revision for Ft. Bragg Green Fuel Facility on October 22, 2009. Staff review of the plans and specifications has determined that the Plan Sheets C-3.1 and C-3.2 are approved. We are forwarding stamped copies of the plan sheets, dated October 26, 2009, to replace the previously approved plan sheets. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Brian Lowther at (919) 807-6368; or brian.lowther@ncdenr.gov. Sincerely, x— ` / Brian C. Lowther cc: Fayetteville Regional Office Central Files SPU Files Scott Brown, 4D Site Solutions, Inc. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service:1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NoithCarofina Naturally {•s NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director October 26, 2009 Mr. Richard G. Grossman Willbros Government Services (US), LLC 2087 E. 71 st Street Tulsa, OK 74316 Subject: Stormwater Permit No. SW6090903 Ft. Bragg Green Fuel Facility High Density Commercial Bio-Retention Project Cumberland County Dear Mr. Grossman: Dee Freeman Secretary The Stormwater Permitting Unit received a Plan Revision for Ft. Bragg Green Fuel Facility on October 22, 2009. Staff review of the plans and specifications has determined that the Plan Sheets C-3.1 and C-3.2 are approved. We are forwarding stamped copies of the plan sheets, dated October 26, .2009, to replace the previously approved plan sheets. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Brian Lowther at (919) 807-6368; or brian.lowther@ncdenr.gov. Sincerely, x--L Brian C. Lowther cc: Fayetteville Regional Office Central Files SPUFiles Scott Brown, 4D Site Solutions, Inc. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-801-6494 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity \ Affirmative Action Employer One NorthCarolina QD 51TE SOLUTIONS, INC. ENC,INEERIN4 LAND JURVEYINC, CON5TRUCT10N LAYOUT C,PS .SERVICES LAND DEVELOPML-NT 4o9 C1.11CAC,o DRIVE SUITE 112 FAYETTEVILLE NC 283o6 PIJONE 910 426-6777 S FAX 910 426-5777 September 28, 2009 NCDENR Division of Water Quality Attn: Brian Lowther 512 N. Salisbury Street Raleigh, NC 27604 RE: Phase II Storm Water Resubmittal, Ft. Bragg Green Fuel Facility, Fort Bragg, North Carolina Brian; We are resubmitting the Phase II Storm Water revised plan sheets for the Ft. Bragg Green Fuel Facility. The following changes were made in accordance with your review comments: 1. cross section of the actual bioretention cell has been included to show the existing and proposed grade 2. the underdrains and cleanouts have been shown in plan view 3. the riser was revised for a maximum depth of 9 inches 4. note was added to the forebay to provide compacted clay below forebay to prevent water from moving directly to the media and underdrains; underdrains do not extend to the forebay I look forward to working with you on this project. If you have any questions or concerns, please feel free to contact us. Sincerely, 4D Site Solutions Inc. \0 � Scott Brown Professional Engineer Enclosure a a -�' -V NCDENR North Carolina Department of Environment and Natural Resources Beverly caves Perdue 11 Governor Directorate of Public Works Attn: Gregory G. Bean 2175 Reilly Road, Stop A. Fort Bragg, NC 28310-5000 Division of Water Quality Coleen H. Sullins Director September 18, 2009 Subject: Installation of OilMater Separator Green Fuels Facility Fort Bragg, Cumberland County, NC Dear Mr. Bean: Dee Freeman Ser.i etch! v Based on our recent telephone conversations; it is this office's understanding that DPW is seeking guidance concerning the installation of an oil/water separator to be connected to the proposed onsite stormwater system or the existing sanitary sewer for the subject project. Upon review of our regulations, there does not appear to be any prohibition for allowing stormwater to enter the sanitary sewer collection system provided that the owner/operator of the sanitary sewer collection system grants their approval. This decision should be based on the guidelines set forth in the applicable sewer use ordinance. However, allowing stormwater flow that may contain potentially volatile substances from a fueling facility to enter the sanitary sewer collection system and subsequently the receiving treatment plant is not advisable. Considering this, the Division of Water Quality recommends the connection of the oil/water separator, which according to plans provided by e-mail on September 15, 2009 would receive stormwater via several catch basins located throughout the project site, to the proposed stormwater system that leads to a permanent bio-retention cell. Please be advised that the fueling operations must have secondary containment that can be secured during loading and unloading operations. If the oil/water separator serves the loading and unloading area, written procedures must be in place and implemented whenever loading and unloading take place to secure the area in the event of a spill. Regular inspections and maintenance of the oil/water separator must be documented. Any release other than stormwater to the bio-retention cell would be considered a" release to the environment and subject to the issuance of a Notice of Violation. If our office can provide any further assistance in this matter, please contact Mike Lawyer or myself at (910) 433-3300. ,Sincerely, 11 z Belinda S. Henson Regional Office Supervisor Surface Water Protection Section BSH: ML/ml cc: Audrey D. Oxendine, Chief -Environmental Compliance Branch -Directorate of Public Works (via e-mail) Michael J. Myers, Utility Manager -Old North Utility Services, Inc. (via e-mail) FRO -Surface Water Protection Section Stormwater Permitting Unit . Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301 ?hone: 910433-33001 FAX: 910-486-07071 Customer Service: 1-877-623-6748 Internet www.ncwaterguality.org 01 NC)rdhC i-ol lia d�l` An Equei Op;>ortun;Iy 1 Affirmative Action Employer Natural Resources Beverly Eaves Perdue Coleen H. Sullins Governor Mr. Scott Brown 41) Site Solutions, Inc. 409 Chicago Drive, Suite 112 Fayetteville, NC 28306 Dear Mr. Brown: Director September 24, 2009 Subject: Request for Additional Information Ft. Bragg Green Fuel Facility Cumberland County Dee Freeman Secretary The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on September 21, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide a cross-section of the bioretention cell. 2. Please show the underdrain locations on the plan sheets. 3. The narrative indicates there is an orifice at nine inches above the invert of the cell and the top of the riser is additional nine inches. This creates the potential for ponding up to eighteen inches. The ponding depth must be 12 inches or less and nine inches is preferred. Please revise the overflow structure so the ponding depth is less than 12 inches. 4. The design includes a forebay. It is difficult to tell on plan sheet C-3.1 if the forbay elevation is for the sediment and erosion control or for the bioretention cell. Please provided more detail on the forebay because there is a risk that water in the forebay could flow into the underdrains without first following through the cell. The forebay should be lined. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 24, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (919) 807-6368. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer One Noi-thCarolina atur711# Mr. Scott Brown Ft. Bragg Green Fuel Facility September 24, 2009 Sincerely, ZLK-'� Brian Lowther Environmental Engineer cc: Fayetteville Regional Office DWQ Central Files Stormwater Permitting Unit Files Richard Grossman, 2087 E. 71" Street, Tulsa, OK 74316 Gregory Bean, Building 3-1631 Butner Road, Ft. Bragg, NC 28310 4P,51TF- 50LUTION,5, INC. r-MC;INEE2I14�; LAND SURVEYING CONSTRUCTION LAYOUT C,P5 SERVICE.') LAND DLVLLOPMLNT .� 4o9C0ICA(�o DRIVE SUITE 112 FAYLTTLVILLE NC 2e3o6 PIJONL 910 426-6777 3 FAX 910 426-5777 September 18, 2009 NCDENR Division of Water Quality Attn: Robert Patterson 512 N. Salisbury Street Raleigh, NC 27604 RE: Phase II Storm Water Submittal, Ft. Bragg Green Fuel Facility, Fort Bragg, North Carolina Robert; We are submitting the Phase II Storm Water permitting package for the Ft. Bragg Green Fuel Facility. Please find enclosed 2 copies of the construction drawings, application and supplement form, calculations, storm water narrative and a check for $505.00. I look forward to working with you on this project. If you have any questions or concerns, please feel free to contact us. Sincerely, 41) Site Solutions Inc. Vow 4�� Scott Brown Professional Engineer Enclosure �SEP 2 1. 2009 N12 - v��vTEi" QUYALIfY J IV 3 S S d "�J o J S � 4 ! O � 4D 51TE SoLuTIoNS. INC. LN('INEERIN� LAND '5URVEYIN(; CONSTRUCTION LAYOUT CAPS .56-RVICE.S LAND DEVI1LOPMI=NT ,dog cflICA(�O DRIVE SUITE 112 FAYLTTr-VI LLE NC 283o6 PIAONE 910 426-6777 FAX 910 426-5777 Ft. Bragg Green Fuel Facility Storm Water Narrative The site is currently undeveloped. The site is being developed as an alternative fueling station. The site has average slopes with drainage generally from north to south. The site meets the qualifications of a high density development. There is one drainage area for the site. The storm water from the site is treated by a grassed bioretention cell. The storm water enters the bioretention cell through storm drain pipe. A forebay treats the storm water prior to entering the main body of the bioretention cell. The storm water leaves the cell through a standard riser. There is an orifice located nine inches above the invert of the cell to prevent the storm water from ponding above nine inches. The top of the riser is located an additional three quarters of a foot above the orifice and a half a foot below the top of the cell. The difference between the orifice and the top of the riser is for storage of stormwater above the minimum required 1 year storm event. 4P,51T�: u ENC,INLLRINC Green Fuel Facilty Required Storm Volume LAND SURVEYING, CONSTRUCTION Drainage Area: 1.5 acres. LAYOUT G'P5 JERVICLS Impervious Area: 50,256 sf (1.15 ac) LAND - °fo Impervious: 76.7% DLVLLOPMLNT 1 inch Storm Event: Rv=0.05+0.009 I Rv= runoff coefficient I= percent impervious Rv=0.05+0.009*76.7 = 0.74 For volume that must be controlled: Volume=3,630*Rd*Rv*A , Volume = 3,630*(1 inch)*(0.74)*1.5 acres = 4,029 cf ----Use a grassed bioretention cell to satisfy the Phase II storm water requirements Dimensions: 212 ft x 42 ft With maximum ponding depth of 9 in, total volume = 6,678 cf 6,678 of provided > 4,029 of required Additional storage is also provided between the orifice outlet for the 9 in ponding depth and top of the riser. CA 00 n 0 0 409 CuICA(o o SEAL e DRIvL P o 027452 0 SUITL 112 FAYLTTLVILLE °° O® NC 28306 OB/O�i,6BrT ON PUONL 9to 426-6777 FAX 910 426-5777 Ft. Bragg Green Fuel Facility Bioretention SCS curve number Hydraulic Soi Group: A Area SCS CN Pavement (sf) 50,256 98 Open space (sf) 15,540 49 Total (ac) 65796 86 Rational Coefficient Area C Pavement (sf) 50,256 0.95 Open space (sf) 15,540 0.30 Total (ac) 65796 0.80 Green Fuel coefficient calcs.xls Printed 9/18/2009 DATE DESIGN PHASE PRELIM / / • f ,., ,', ., - .: .,.... 08.14-09 PROJECT NAME PROJECT NO CONSTR I 1 Green Fuel Facility 463 REVISION / LOCATION BY RECORD Ft. Braga North Carolina CSB OTHER ( / _ CHECKED BY (SPECIFY) n= o.oi3 STORM DRAINAGE SCHEDULE CONTINUED -- a= 226 n= 26 INLET INLET Cc INLET 0 (+) UPSTREAM 00 INLET CAPTURED INLET TOTAL INLET PIPE Tc TIME I Cc RUNOFF FROM TO AREAS AREA RUNOFF DISCHARGE BYPASS BYPASS DISCHARGE AREAS TIME TIME OFCONC. INTENSITY COEFF. (INLETS) AC COEFF. CFS) (CFS) CFS) (CFS) (AC) (MIN MIN (MIN) . (INIHR CI.7 � CI-8 CI-7 0.50 0 95 3 48 0_00 r 0.00 � 3.46 I Q 50 I 5 00� 0 00 I 5.00 � 7.29 I— 0.95 CI-8 FCS•9 CI-8 1.OU 0.80 5 83 0.20 L_0.00 1.50 _ 5.00 0.08 —, 5.08 17.27 _ 0 85 —_-- Graon Fuel Storin Orninags As 10-YEAR Data: 911=009 Time: 7:33 AM Page 1 of 4 GRADE LINE DATE DESIGN PHASE PRELIM 1 08-14-09 PROJECT NAME PROJECTNO CONSTR / X / !Green Fuel Facility 463 REVISION / I ;LOCATION BY _ RECORD I / Ft. Braga, North Carolina CSB OTHER r CHECKED BY (SPECIFY) n= o.013 STORM DRAINAGE SCHEDULE - ¢ONTINUED g= 226 h= 26 •0;�: O SIDE- 4 CAPACITY' SEGMENT UPPER LOWER UPSTREAM TOP FROM TO D16CHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV, INV. ELEV. i (CFS)l„. (CFS) IN' (CFSi - (FPS) (F (MIN) (FT,(FT) (FT) CI_7 f CI-E 3 4d 0.00 0 0185 18 14_'s 1 I 36 ]_ 0 OB 294.50 29'+ 80 298 4 _ 6I_8� _ i� FES-9 _ 9 2'_ 0,60 ` �0 013 `� _ 18 _ _�8 I 12_ 6,8 _ _ 23.__�— DOG `rt--293 60 — F 293.50 _ 298.32 Gaon FuelSiooa Drair,ago.u's 10�YEAR Date: 9116=09 Time: 7.33 AM Page 2 of o e o o DATE DESIGN PHASE PRELIM 1 08-14-09 PROJECT NAME PROJECT NO CONSTR I Green FDeI Facility _ 463 REVISION I I LOCATION BY RECORD Ft. Braga North Carolina CSB OTHER I CHECKED BY � (SPECIFY) n= 0.013 HYDRAULIC GR AIDE LINE CONTINUED a= 226 BEND LOSS K'S h= 26 90 DEG=b.7 30 DEG= 0.e"8 PIPE HYDRAULIC SIDESTREAM _ 60 DEG=0,55. 15 DEG--O. 10 HEAD LOSS BEND FRICTION FRICTION FROM TO AREA RADIUS SUMMATION Hf He He H'u Ht LOSS SLOPE VELOCITY (10 (Fn (CFS) K FTlFTl (FPS) _ CI7 �. CI-3 t7871_0.3750 _i —_—i--�------ -- 0T 1.95 FES-9_ 1.7671 0.3750 _-0.00-0 18 011 0.1 s 0.30 0.73 3 0.70 0 0077 i 5.22 _CI _ _ l3recn Fuel Sto�in Dral;aperJe 10-YEAR Dsto: 9/182000 Time; 7:33 AM Pape 3 of 4 - U'- eE' ' - ' , 03001 DATE DESIGN PHASE JPRELIM ! I 08-14-09 ;PROJECT NAME PROJECT NO CONSTR t X / G rEEn FUEL F&Ci11ty 463 REVISION L_ 1 ,LOCATION BY RECORD ! I Ft. Braga, N rth Carolina CSB A OTHER i 1 CHECKED BY (SPECIFY) ._.. - DESIGN CRITERIA: n= 0 o13 HYDRAULIC GRADE LINE • CONTINUED 1. DESIGN FOR THE 10 YR STORM g= 226 2. ASSUME TIME OF CONCENTRATION TO h. 26 AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) OUTLET INLET W.S. ELEV_ FLOW, n f FREE- 3. INTENSITY = y!(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity- __ OUTLET INLET ISE FRCM TO W.S. ELEV CONTOL CONTROL CONDITION E.�ARO COMMENTS Duration -Frequency Charts, REF: NC Erosion and (FT) rFT iFT) IFT CONTROL , I: ` ';F1) Sediment Control Planning and Design Manua!) 4, MANNINGS "n" FA,CTOR= 0.013 CI 7 CI-8 295.74 L 295.86 295.42� 2 5.86 L ^:iP ET I� 2.61 I OK 5. RUNOFF CO-r_FICIENT Cc-0.50 (Per CR-7107) L FPS- 9 294.70 .43 ; 2,9574 I 29�74 I INLET .I_R..-_ i I WATER SURFACE I � u e' i;,ecn F,;ol Stearn Cn:,i,a�a,xla 1p.Y=- r, Nta: 9118=09 Tire: 7:33 AM Page 4 of 4 Ft. Bragg Green Fuel Facility Underdrain sizing for Bioretention Design Q (flowrate) 9.3 cfs Safety Factor 10 Roughness Factor (n) 0.011 Internal slope (s) 0.5 % Determine diameter (D) of single pipe D= 8 in Therefore, the system will use 6" underdrains spaced at 10, OC Green Fuel underdrain sizing.xls Printed 9/18/2009 r Sep 10 09 08:20a michael eaker 9108224540 p.5 Southeastern Soil & Environmental associates Inc. P.O. Box 9321 9 Fayetteville, NC 28311 Phone/Fax (910) 822.4540 Email mikeesoutheastemsoil.com September 10, 2009 Mr. Scott Brown, PE 4D Site Solutions, Inc. 409 Chicago Drive, Suite 112 Fayetteville, NC 28306 Re: Hydraulic conductivity (permeability) analysis & seasonal water table determination (SHWT) for bioretention area, Green Fuel Facility, Gruber Road, Fort Bragg, Cumberland County, North Carolina Dear Mr. Brown, An evaluation of soil properties and hydraulic conductivity (Ksat) has been conducted at your request on the aforementioned property. The purpose of the investigation was to determine soil water table depths. In addition, Ksat was to be provided at varying depths for use with bioretention pond design. Saturated hydraulic conductivity of the unsaturated zone was measured in a similar method as described in the Soil Science Society of America Journal, Vol. 53, no 5, Sept. - Oct. 1989, "A Constant Permeameter for Measuring Saturated Hydraulic Conductivity of the Vadose Zone" and Comparison of the Glover Solution with the Simultaneous Equations Approach for Measuring Hydraulic Conductivity." Soils at this site are most similar to the Blaney soil series (see attached boring log). Two borings were advanced to 10 feet. Seasonal High Water Table (SHWT) as determined by evidence of colors of chroma 2 or less (and/or concentrations of high redox mottles) was encountered at 96 inches below the ground surface (no free water was noted within 120 inches of the soil surface during the day of testing). Three compact constant head permeameter (CCHP) tests were conducted at depths ranging from 2 to 7 feet. The two Ksat measurements in the Bt horizon averaged 0.419 cm/hr (.165 in/hr). The Ksat measurement in the E horizon was 14.20 cm/hr. SOIL/SITE EVALUATION - SOIL PHYSICAL ANALYSIS - LAND USEISUBDIVISION PLANNING GROUNDWATER DRAINAGEJMOUNDING - SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION A DESIGN Sep 10 09 08:20a michael eaker 9108224540 p.4 The attached map shows approximate locations of sample points as well as Ksat locations. The attached chart provides a list or measured rates at the pond location. I trust this is the information you require at this time. Sincerely, Mike Eaker President NEL D. lot SOIL S v P Sep 10 09 08:19a michael eaker 9108224540 p.3 Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax(910)822-4540 Email mike@southeastemsoll.com Soil Boring Log Green Fuel Facility, Ft. Bragg, Gruber Road This map unit consists of well drained soils on uplands. These soils formed in loamy and sandy sediments. Slopes range from 2 to 8 percent. A - 0 to 3 inches; dark grayish brown (IOYR 4/2) loamy sand; weak fine granular structure; very friable; many fine roots; abrupt smooth boundary. E - 3 to 32 inches; light yellowish brown (2.5Y 6/4) loamy sand; single grained; loose; very friable; abrupt smooth boundary. Bt1 - 32 to 41 inches; brownish yellow (IOYR 6/6) sandy clay loam; weak medium subangular blocky structure; firm; brittle in place; gradual wavy boundary. Bt2 - 41 to 96 inches; reddish yellow (7.5YR 6/6) sandy clay loam; weak coarse subangular blocky structure; firm; brittle in place; clear wavy boundary. Cl - 96 - 107 inches; gray (10YR 6/1) sandy clay; massive; very firm. C2 - 107 to 120 inches; gray (10YR 6/1) sandy clay loam; massive; firm; pockets of sand. SHWT @ 96 inches (IOYR 6/1) SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS • LAND USEISUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING • SURFACEISUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION & DESIGN Sep 10 09 08:19a michael eaker 9108224540 p.2 Southeastern Soil & Environmental Associates, Inc, P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910)822-4640 Email mike@southeastemsoil.com Green Fuel facility, Ft. Bragg Ksat Ksat Location De th(in),cm/hr in/hr 1 26 14.2 36.07 2 53 .400 .157 3 83 .438 .172 SOIUSITE EVALUATION • SOIL PHYSICAL ANALYSIS • LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING + SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION & DESIGN Sep 10 09 08:19a michael eaker 9108224540 p.l L - ,�D00 �4