Loading...
HomeMy WebLinkAboutSW3170801_HISTORICAL FILE_20171207STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW- DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Transmittal Letter Date: September 8, 2017 To: Mr. Rick Riddle NC Dept of Environmental Quality DEMLR Stormwater Program 512 N. Salisbury St. Raleigh, NC 27699-1612 919-807-6369 Project: DaVita — Spencer Rowan County, NC We Transmit: (X) herewith () under separate cover to Project #: 17-025/D AeW/o bon c�1/4e M svp 1 it , 2017 For Your: Q approval Q review and comment (X) signatures Copies_ Date Description O&M EZ form 1 EZ Form Comments: Please find attached a signed permit application along with two sets of construction plans for review and approval. Please contact me if you have any questions. Thank you. Copies: File Submitted by: Matthew W. Johnson, P.E. Civil Engineer 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-218-8282 F - 336-218-8010 1 www.triad-designgroup.com rol � r I Erosion Control and Stormwater Report RECEIVED AUG 01 2017 DENR-LAND QUALITY STORMWATER PERMITTING RECEIVE® DEC 7 2017 DaVita Spencer OENR -0EMLR Mo Land Quality Section esville Regional Once Project Location: Spencer, North Carolina Project #: 17-025 Designer: Triad Design Group, P.C. 4807-C Koger Blvd Greensboro, NC 27407 July 27, 2017 triaddesigngroup ARCHITECTURES ENGINEERING I INTERIOR DESIGN 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-218-8282 F - 336-218-8010 I www.triad-designgroup.com k,l � Stomwater Report DaVita Spencer Rowan County North Carolina 17-025 Narrative: The purpose of this project is to construct a 9,121 sf building with associated drive and parking aisles on the 4.951 acre site located at the physical address of 1287 Salisbury Avenue. The existing site currently has approximately 0.13 acres of BUA. An additional 0.94 acres of BUA are being proposed due to the proposed construction, with an area for a 0.07 acres building addition bringing the total BUA to 1.14 acres or 23.02% BUA. A wet detention pond will be constructed to treat hand detain the increased flow created by the additional BUA created due to the project. The 1, 2, and 10 year storm events have been modeled and the runoff from wet detention pond has been reduced to pre -development rates. A summary of the flows are listed below. Drainage Area 1- Pre-Development DA-1 Post -Development DA-1 Drainage Area 1.67 AC 2.23 AC CN 64 82 BUA 0.13 Acres 1.14 Acres Tc 10 min 5 min Flows — Flows Pre -Development Condition DA-1 Post -Development Condition DA-1 Routed Condition DA-1 1-yr 24-hr 0.587 cfs 4.453 cfs 0.016cfs 2 yr 24-hr 1.229 cfs 6.115 cfs 0.146 cfs 10 yr 24-hr 3.380 cfs 10.81 cfs 3.005 cfs 100 yr 24-hr 7.435 cfs 18.30 cfs 8.961 cfs 11Page rOND CHECK Future- RISER2.gpw 07/28/17 PERMANENT WET DETENTION POND DESIGN - RISER/BARREL Revised 8-24-99 GUILFORD COUNTY PLANNING & DEVELOPMENT DEPARTMENT DaVita bpencer INDEX NO: INDEX CHECKED BY: MWJ LOCATION: Spencer INC DATE: April 06, 2017 REVISED: SITE DATA TOTAL SITE AREA = 4.99 WATERSHED = RANDLEMAN DAM Existing _ BUILT UPON AREA = 0.13 CLASSIFICATION: WS - IV Proposed BUILT UPON AREA = 1.01 (GWAIWCA) _ GWA TOTAL ON -SITE _ BUILT UPON AREA = 1.14 PERCENT BUILT -UPON = 22.85% ON -SITE DRAINAGE AREA TO POND = 2.23 ON -SITE BUA TO POND = 1.14 NSITE % BUA FOR POND SUB -BASIN = 51.12% OFF -SITE DRAINAGE AREA TO POND = 0.36 MAX. OFF -SITE B.U.% = 70% TOTAL WATERSHED AREA TO POND = 2.59 DISTURBED AREA = 2.50 TEMP. SED. STOR. USED /N DESIGN DATA TEMPORARY SEDIMENT STORAGE 0.5 acre -inch per disturbed acre PERMANENT SEDIMENT STORAGE 0.125 _acre -in per total drainage area PERMANENT WATER QUALITY COMPOSITE B.U. % _ _ 53.75 _ percent DEPTH (minimum 3 feet) 3.4 feet SA/DA .(Figure 5.6-2) _ 3.26 percent TEMPORARY WATER QUALITY 1.0 rainfall to be controlled PRINCIPAL SPILLWAY TYPE X _corrugated aluminum reinforced concrete DESIGN STORM 10 year RAINFALL INTENSITY 6.89 inches per hour RUNOFF COEFFICIENT 0.63 EMERGENCY SPILLWAY TYPE X grass lined rip -rap lined DESIGN STORM 100 year RAINFALL INTENSITY _ 8 inches per hour RUNOFF COEFFICIENT 0.8 POND DATA ELEV. @ BOT. OF POND = 730.5 SURFACE AREA = 829 ELEV.@ BOT. OF PSS = 730.5 SURFACE AREA = 829 ELEV. @ BOT. OF PWQ = 732 SURFACE AREA = 1364 ELEV. @ NORMAL POOL = 736.5 SURFACE AREA = 5660 ELEV. @ TOP. OF RISER = 737.75 SURFACE AREA = 7978 ELEV. @ EMER. SPILLWAY = 738.5 ELEV_ @ TOP OF DAM = 740 INVERT OF BARREL = 728 POND DESIGN TEMPORARY SEDIMENT STORAGE VOLUME REQUIRED 4538 Page 1 POND CHECK Future- RISER2.gpw 07/28/17 VOLUME PROVIDED LEV. @ BOT. OF POND= 730.50 LEV. @ NORMAL POOL = 736.50 SURFACE AREA = _829 SURFACE AREA = 5660 ALLOW 75% OF BASIN VOLUME TO WQ ORIFICE = 14600 OK PERMANENT SEDIMENT STORAGE VOLUME REQUIRED VOLUME PROVIDED ELEV. @ BOT. OF PSS = 730.50 SURFACE AREA = 829 ELEV. @ BOT. OF PWQ = _732.00 SURFACE AREA = _ 1364 VOLUME PROVIDED = 1175 1645 OK PERMANENT WATER QUALITY SURFACE AREA REWD 3678 NORMAL POOL ELEVATION = SURFACE AREA PROVIDED = 736.50 5660 OK TEMPORARY WATER QUALITY STORAGE REQUIRED Rv= 0.534 VOLUME REQUIRED = 5018 VOLUME PROVIDED ELEV. @ BOT. OF TWO = _736.50 ELEV. @ TOP OF TWO = 737.75 SURFACE AREA = 5660 SURFACE AREA = _7978 VOLUME PROVIDED = _ 8524 OK Page 2 A 64 DaVita Spencer Average Pond Depth NC DEQ Stormwater Manual Figure 10-2b Depth 1 lent pool voulme divided by permanent pool surface area Volume Pv = 167322 n Pool Surface Aree PSA = 49924.08 Depth davg = 3.351529 E bottom shelf Abs = 4148 perm pool App = 5660 bottom pond Abp = 1366 :pth D = 4.5 davg = 3.424175 Hydro Flow Pond Check Sheet 4807-C Koger Blvd Greensboro, NC 27407 336-218-8282 ` 336-218-8010 Fax `, Water Quality Draw Down Time Size of Hole 1 0.75 1 0.003068 Storage Volume 6919 Surface Area of Pond ftA2 (As) 28067 Head of Water above Hole, ft (h) 2 Coefficient of Contraction of an orrifice (0.6) 0.6 Time to Dewater Days 3.83328 Q= 0.02089 cfs Qmin 0.01602 5 days Qmax 0.04004 2 days ,Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCADO Civil 3DO2016 by Autodesk, Inc. v11 1 2 Legend Hrd- Origin Description 1 SCS Runoff Pre Development 2 SCS Runoff Post Development 3 Reservoir Proposed Pond Project: Pond Routing.gpw Wednesday, 06 / 7 / 2017 2 , Hydrograph Return Period RegM y ow Hydrogrophs Extension for AutoCADrRJ Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 0.587 1.229 3.380 7.435 Pro Development 2 SCS Runoff 4.453 6.115 10A1 18.30 Post Development 3 Reservoir 2 0.015 0.096 1.681 8.035 Proposed Pond Proj. file: Pond Routing.gpw Wednesday, 06 / 7 / 2017 3 ,Hydrograph Summary Report Hydmflow Hydrographs Extension for AutoCAD® Civil MEN) 2016 by Autodesk, Inc. vl1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (curt) Inflow hyd(s) Maximum elevation (fl) Total strge used (cufl) Hydrograph Description 1 SCS Runoff 0.587 2 724 2,251 Pre Development 2 SCS Runoff 4.453 2 718 8,937 Post Development 3 Reservoir 0.015 2 1444 3,914 2 737.53 21,375 Proposed Pond Pond Routing.gpw Return Period: 1 Year Wednesday, 06 / 7 / 2017 Hydrograph Report 4 Hydmflow Hydmgmphs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 Pre Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.670 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.74 in Storm duration = 24 hrs Wednesday, 061712017 Peak discharge = 0.587 cfs Time to peak = 12.07 hrs Hyd. volume = 2,251 cuft Curve number = 64* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 ' Composite (Ama/CN) = [(0.130 x 98) + (1.540 x 61)] 11.670 Pre Development Q (cfs) Q (cfs) Hyd. No.1 —1 Year 1.00 0.so 0.80- . 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 2 4 Hyd No. 1 MIN , , IMENIZEEMEME t__ itttttt��t_tt_tt_tt_tt_tt_ ,,1 t r Hydrograph Report 5 Hydraflow Hydrographs Extension for Aul oCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.74 in Storm duration = 24 hrs Wednesday, 06 / 7 / 2017 Peak discharge = 4.453 cfs Time to peak = 11.97 hrs Hyd. volume = 8,937 cuft Curve number = 82* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Composite (Area/CN) _ [(0.800 x 61) + (1.070 x 98) + (0.360 x 78)) / 2.230 Post Development Q (cfs) Hyd. No. 2 — 1 Year Q (Cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v1 t Hyd. No. 3 Proposed Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 -Post Development Reservoir name = Proposed Pond Storage Indication method used. Wet pond routing start elevation = 736.25 ft. Wednesday, 06 / 7 / 2017 Peak discharge = 0.015 cfs Time to peak = 24.07 hrs Hyd. volume = 3,914 cuft Max. Elevation = 737.53 ft Max. Storage = 21,376 cuft Proposed Pond Q (cfs) Hyd. No. 3 -- 1 Year 5.00 4.00 3.00 M 1.00 I Q (ofs) 5.00 2.00 1.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) — Hyd No. 3 —Hyd No. 2 1 Total storage used = 21,376 tuft .Hydrograph Summary Report Hydraflow Hydrogrophs Extension for AutoCAD® Civil 3D®2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (fl) Total strge used (cufl) Hydrograph Description 1 SCS Runoff 1.229 2 722 3,821 Pro Development 2 SCS Runoff 6.115 2 716 12,347 Post Development 3 Reservoir 0.096 2 1098 5,946 2 737.76 23,270 Proposed Pond Pond Routing.gpw Return Period: 2 Year Wednesday, 06 / 7 / 2017 Hydrograph Report 8 Hydrafimv Hydrogmphs Extension for AutoCAD® Civil 31382016 by Autodesk, Inc. v11 Hyd. No. 1 Pre Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 1.670 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.31 in Storm duration = 24 hrs Composite (AreaICN) = [(0.130 x 98) + (1.540 x 61)] 11.670 Q (cfs) 2.00 1.00 CTTa� Wednesday, D6 I712017 Peak discharge = 1.229 cfs Time to peak = 12.03 hrs Hyd. volume = 3,821 cuft Curve number = 64* Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Pre Development Hyd. No.1 — 2 Year Q (cfs) 2.00 MVw 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 1 Time (hrs) 9 Hydrograph Report Hydraflow Hydregraphs Extension for AutoCAD® Civil 3DOD2016 by Autodesk, Inc. v11 Wednesday, 06 / 7l 2017 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Peak discharge = 6.115 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 12,347 cuft Drainage area = 2.230 ac Curve number = 82" Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = ](0.800 x 61) + (1.070 x 98) + (0.360 x 78)] / 2.230 'r 1 •r 11 -----_OEM IN1'1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No 2 Time (hrs) 10 Hydrograph Report Hydra6ow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 06I 7I 2017 Hyd. No. 3 Proposed Pond Hydrograph type = Reservoir Peak discharge = 0.096 cfs Storm frequency = 2 yrs Time to peak = 18.30 hrs Time interval = 2 min Hyd. volume = 5,946 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 737.76 ft Reservoir name = Proposed Pond Max. Storage = 23,270 cuft Storage Indication method used. Wet pond routing start elevation = 736.25 ft. Proposed Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (Cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0 00 000 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) — Hyd No. 3 —Hyd No. 2 — i Total storage used = 23,270 cult 11 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO2016 by Autodesk, Inc. v11 Hyd. No. Hydrograph type (origin) Peak flow (cry) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.380 2 722 9,118 Pm Development 2 SCS Runoff 10.81 2 716 22,082 Post Development 3 Reservoir 1.681 2 726 15.673 2 737.91 24.429 Pmposed Pond Pond Routing.gpw Return Period: 10 Year Wednesday, 06 / 7 / 2017 12 Hydrograph Report Hydmflow Hydrographs Extension for AuWAD® Civil 3138 2016 by Aulodesk, Inc. v11 Wednesday, 06 / 712017 Hyd. No. 1 Pre Development Hydrograph type = SCS Runoff Peak discharge = 3.380 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 9,118 cult Drainage area = 1.670 ac Curve number = 64' Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 4.81 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN)=1(0.130 x 98) + (1.540 x 61)] 11.670 Q (cfs) 4.00 KM 1.00 0.00 ' 0 2 4 Hyd No. 1 6 8 Pre Development Hyd. No. 1 —10 Year Q (cfs) 4.00 3.00 r't 1.00 ' 'r ' ' ' ' I ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 13 Hydraflm Hydrographs Fxdension for AutoCAD® Civil 3DOD2016 by Autodesk, Inc. v11 Wednesday, 06 / 7 / 2017 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Peak discharge = 10.81 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 22,082 cuft Drainage area = 2.230 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.81 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.800 x 61) + (1.070 x 98) + (0.360 x 78)) / 2.230 Q (cfs) 12.00 t tt c rt 4.00 2.00 0.00 0.0 2.0 Hyd No. 2 Post Development Hyd. No. 2 — 10 Year 4.0 6.0 8.0 10.0 12.0 Q (cfs) 12.00 10.00 Mr MIN 4.00 2.00 ' 0.00 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report 14 Hydra6ow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Proposed Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 -Post Development Reservoir name = Proposed Pond Storage Indication method used. Wet pond routing start elevation = 736.25 ft Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wednesday. 06/7/2017 = 1.681 cfs = 12.10 hrs = 15,673 cuft = 737.91 ft = 24,429 cult Proposed Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (s) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No. 3 —Hyd No. 2 _J Total storage used = 24,429 tuft 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31382016 by Autodesk. Inc. vtt Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 7.435 2 720 19,431 Pre Development 2 SCS Runoff 18.30 2 716 38,305 Post Development 3 Reservoir 8.035 2 722 31,889 2 738.51 29,571 Proposed Pond Pond Routing.gpw Return Period: 100 Year Wednesday, 06 / 7 / 2017 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2016 by Autodesk, Inc. v11 Wednesday, 06 / 7l 2017 Hyd. No. 1 Pre Development Hydrograph type = SCS Runoff Peak discharge = 7.435 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 19,431 cult Drainage area = 1.670 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.14 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = ((0.130 x 98) + (1.540 x 61)) / 1.670 Q (cfs) 8.00 6.00 m 41111 0.00 0 2 4 Hyd No. 1 Pre Development Hyd. No. 1 —100 Year Q (cfs) B.00 4.00 2.00 ' T'*1 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) ,Hydrograph Report 17 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Aulodesk. Inc. v11 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.14 in Storm duration = 24 hrs Composite (Area/CN) = [(0.800 x 61) + (1.070 x 98) + (0.360 x 78)] 12.230 Q (cfs) 21.00 18.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Development Hyd. No. 2 —100 Year Wednesday, 06 / 7 / 2017 = 18.30 cfs = 11.93 hrs = 38,305 cult = 82* = 0 ft = 5.00 min = Type II = 484 Q (cfs) 21.00 18.00 Ii rT1 12.00 "IN, . tt 3.00 0.00 18.0 20.0 22.0 Time (hrs) 18 Frydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Proposed Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 -Post Development Reservoir name = Proposed Pond Storage Indication method used. Wet pond routing start elevation = 736.25It Wednesday, 061712017 Peak discharge = 8.035 cfs Time to peak = 12.03 hrs Hyd. volume = 31,889 cuft Max. Elevation = 738.51 ft Max. Storage = 29,571 cuft Proposed Pond Q (Cfs) Hyd. No. 3 -- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0000 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No. 3 —Hyd No. 2 — ___ 1 Total storage used = 29,571 cult 19 Hydraflow Rainfall Report Hydmnow Hydmgmphs Extension for AutoCAD® Civil 3D®2016 by Autodesk, Inc. v11 Wednesday, 06 / 7 / 2017 Return Period Intensity-0uration-Frequency Equation Coefficients (FHA) (Yrs) B 0 E (NIA) 1 62.3444 12.9000 0.8970 - 2 69.3303 12.8000 0.8761 3 0.0000 0.0000 0.0000 - 5 70.1736 12.6000 0.8315 - 10 72.6290 12.7000 0.8116 - 25 60.3885 11.1000 0.7422 - 50 47.4392 9.2000 0.6687 - 100 47.9028 9.2000 0.6571 - File name: Rainfall Curve -Alamance Foods 15-083.IDF Intensity = B I (Tc + D)AE Ratum Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.69 3.76 3.15 2.72 2.39 2.14 1.94 1.77 1.64 1.52 1.42 1.33 2 5.56 4.48 3.77 3.26 2.88 2.58 2.34 2.15 1.98 1.84 1.72 1.62 3 OM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.46 5.25 4.45 3.87 3.44 3.10 2.83 2.60 2.41 2.25 2.11 1.99 10 7.05 5.76 4.90 4.28 3.82 3.45 3.15 2.91 2.70 2.53 2.37 2.24 25 T68 6.28 5.36 4.71 4.22 3.83 3.52 3.26 3.04 2.85 2.69 2.55 50 8.05 6.58 5.63 4.97 4.47 4.08 3.77 3.50 3.29 3.10 2.93 2.79 100 8.38 6.87 5.90 5.22 4.70 4.30 3.97 3.70 3.48 3.28 3.11 2.96 Tc = time in minutes. Values may exceed 60. Preci . file name: Sample.pc storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.74 3.31 0.00 3.30 4.81 5.81 6.80 7.14 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff -1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4lh 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 1.75 0.00 2.80 3.90 5.25 6.00 7.10 ,ydraflow Table of Contents N Pond Routing.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Wednesday, 06 / 7 / 2017 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre Development.................................................................. 4 Hydrograph No. 2, SCS Runoff, Post Development................................................................. 5 Hydrograph No. 3, Reservoir, Proposed Pond... ...................................................................... 6 2 - Year SummaryReport ......................................................................................................................... 7 HydrographReports................................................................................................................... 8 Hydrograph No. 1, SCS Runoff, Pre Development.................................................................. 8 Hydrograph No. 2, SCS Runoff, Post Development................................................................. 9 Hydrograph No. 3, Reservoir, Proposed Pond....................................................................... 10 10 - Year SummaryReport ....................................................................................................................... 11 HydrographReports................................................................................................................. 12 Hydrograph No. 1, SCS Runoff, Pre Development................................................................ 12 Hydrograph No. 2, SCS Runoff, Post Development............................................................... 13 Hydrograph No. 3, Reservoir, Proposed Pond....................................................................... 14 100 - Year SummaryReport ....................................................................................................................... 15 HydrographReports................................................................................................................. 16 Hydrograph No. 1, SCS Runoff, Pre Development................................................................ 16 Hydrograph No. 2, SCS Runoff, Post Development............................................................... 17 Hydrograph No. 3, Reservoir, Proposed Pond....................................................................... 18 IDFReport .................................................................................................................. 19