HomeMy WebLinkAboutSW3170501_HISTORICAL FILE_20170602STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO. SW %> J 7fl f
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Engineering • Land Surveying • Construction Inspection
April It, 2017
Ms. Bethany Georgoulias
Stormwater Permitting
NC DEQ Land Quality Section
512 North Salisbury Street
Raleigh, NC 27604
Re: Phase ❑ Stormwater Plans
Filltech USA —New Manufacturing Plant
380 Palmer Road
Rockwell, NC Rowan County
Dear Ms. Georgoulias:
16509
G
o� P l�
dddref0
�P
Please find attached for your review and approval:
A Stormwater Management Permit Application Form which includes:
• A copy of the property deeds
• A copy of the Corporations Report for Jones & Hughes Real Estate, LLC
• A draft operations and maintenance plan
An Application Review Fee of $505.00
Two (2) sets of site plans.
A copy of the design calculations, which also includes:
• A Project Narrative
• A Location Map
• A copy of the USGS map with the site located
• A copy of the NRCS Soils Map
• A copy of the Seasonal High Water Table Evaluation for the project
• Drainage basin maps.
• Proposed BMP easements
This project consists of the construction of a new manufacturing building at the intersection of Palmer
Road and Industrial Drive. The total area being disturbed is 5.0 acres. An application for a sediment and
erosion control plan approval has been submitted to Rowan County.
Please contact me at (704) 938-1515 if you have any questions or need any additional information.
Sincerely,
ALLEY, WIL MS, CAR E AND KING, INC. , `ECEIVED
ti1AY .12 2017
UNR.Lft WAL,1Ty
Wesle Webb, PE t'IICiRMWAT F MIT' ln
120 South Main Street • P.O. Box 1248 • Kannapolis, North Carolina 28082
TeL - 704-938-1515 • Fax - 704-938-6810 • awck.com
ESTABLISHED • 1960