Loading...
HomeMy WebLinkAbout20130963 Ver 1_CAMA Application_20130909! "F- 2 01 3 0 9 6 g !CkDEN R North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Governor September 4, 2013 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Braxton C. Davis John E. Skvarla, III Director Secretary Karen Higgins ED ---- -- --- Division of Water Resources r,,, - 9 2013 Doug Huggett I o`NR - WATM Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review NC State Ports Authority (Southern and Northern barge fleeting area project) Project Location: Carteret County. Along the existing barge fleeting area (southern) adjacent to the NC Ports Authority property near Radio Island and along Marsh Island (northern) within the Newport RiverBogue Sound area. Proposed Project: Proposes two barge fleeting areas. The proposal consists of the reconfiguration of the southern barge fleeting area. The number of barges capable of being moored in the southern area will be reduced from 45 to a total of 9. The northern area would be configured for a maximum of four of the larger (53' X 260') barges or six of the smaller (35' X 20011) barges. Please indicate below your agency's position or viewpoint on the proposed project and return this form by September 24, 2013. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808 -2808. Ext: 216 When appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE 400 Commerce Ave., Morehead City, NC 28557 Phone: 252 -808 -28081 FAX: 252 - 247 -3330 Internet: www.nocoastalmanagement.net An Equal Opportunity %Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NC State Ports Authority (southern and northern barge fleeting Area project) C/O Todd Walton 2. LOCATION OF PROJECT SITE: Located along the existing barge fleeting area (southern) adjacent to the NC Ports Authority property near Radio Island and along Marsh Island (northern) within the Newport RiverBogue Sound area. Photo Index — (Northern Site) 2000: 41 -526 grids (M -N 2 &3) 2006: 41 -8036 grids (K -L 22 &23) (Southern Site) 2000: 42 -520 grids (D -E 18 &19), (F -19), (G -H 19 &20) 2006: 42 -6409 grids (O -T 5 &6) State Plane Coordinates — Northern Site - X: 2692216.8 Y: 362442.8 Longitude: 76 °41'45.95 Latitude: 34 °43'25.66 Southern Site- X: 2693779.1 Y: 359915.7 Longitude: 76 °41'27.94 , Latitude: 34 °43'00.31 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 8/20/13 Was Applicant Present — Yes 5. PROCESSING PROCEDURE: Application Received — 8/22/2013 Application Complete- 8/22/2013 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City dated 2007 Land Classification from LUP — Port Mixed Use /Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: pilings (yes) (D) Intended Use: commercial (E) Wastewater Treatment: Existing — Municipal sewer Planned - None (F) Type of Structures: Existing — Southern Site (Radio Island) — Buildings on high ground, road, storage tanks, piers, bulkhead, day marker, mooring buoys, pilings; Northern Site (Marsh Island) outfall pipe on Marsh Island, red channel buoy to the east of the project site. Planned — removal of four existing mooring as well as all attached anchors, chains and concrete sinkers southern site, relocation of an existing day marker # 24 and the installation of a total of 12 steel pipe monopoles (6 at each site) (G) Estimated Annual Rate of Erosion: N/A Source — N/A Field Investigation Report: NC State Ports Authority Page 02 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water (northern site N/A N/A 88,920ft2 Inc. includes mooring pilings and barge dimensions of approximately 55' x 260') (B) Open Water (southern site 57,200ftz Inc. includes mooring pilings and barge dimensions of approximately 55' x 260') (D) Total Area Disturbed: 146,120ft2 (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The southern site (Radio Island) for this project was previously permitted through CAMA major permit 122 -96 and expired December 31, 1999. Due to the expiration of the previous permit, the applicant is requesting a new major permit for the reconfiguration of the previously permitted southern barge fleeting area along Radio Island in addition to the construction of a new fleeting area at the proposed northern site east of Marsh Island within the Newport River. The applicant is proposing to relocate an existing day marker ( #24) to US Coast Guard standards, remove the existing mooring buoys along with all attached chains, concrete sinkers and anchors and reduce the number of barges allowed to moor within the southern fleeting area from a total of 45 to a maximum count of 9. The applicant proposes to construct a new barge fleeting area at the northern site east of Marsh Island and west of the USACOE channel setback. The applicant proposes the installation of a total of twelve 54" steel pipe monopiles. Six of the pilings would be at the northern Marsh Island site and six would be located at the southern site west of Radio Island and bordered by the AIWW. The new proposed northern fleeting area would be capable of allowing six smaller (35' x 200') barges or four larger (53' x 260') to be moored. The southern site would be capable of mooring six of the larger (52' x 260') barges and nine of the smaller (35' x 200') barges. 9. Narrative Description The NC State Ports Authority project would be located at two sites: one is locatedis located along Radio Island within the Morehead City ChannelBogue Sound area of the NC State Ports Authority property. The other side is adjacent to (east) of the spoil island (Marsh Island), which is owned by the NCSPA, and is located within the Newport River. The NCSPA project at both sites is located within Public Trust Area below normal high water and would usurp a total of 88,660 square feet of Public Trust Area within the southern site and 57,200 square feet within the northern site. Presently there is an existing barge fleeting area along the southern site (Radio Island) that allows a maximum of 45 barges to be moored. There are not any existing manmade structures along the northern Marsh Island site other than an existing red channel navigation buoy south of the proposed Field Investigation Report: NC State Ports Authority Page 03 project area and an earthen berm dredge spoil deposit dike with a spoil discharge pipe on Marsh Island. There are fringes of coastal marsh located along the northeast side of Marsh Island and north of the aviation fuel site for the NCSPA Radio Island southern barge fleeting area. The distance of the proposed development from coastal wetland areas is approximately 360' to the shore for the northern site and approximately 182' to 238', depending on location, for the southern site. No wetland impacts are proposed. No high ground development is proposed for this project. The Morehead City Land Use Plan classifies this property as Port Mixed Use, with all AEC's classified Conservation. This section of the Newport River and Morehead City Channel/Bogue Sound is not designated as Primary Nursery Area and is closed to the taking of shellfish. Both water bodies carry a water classification of SC. Riparian corridors were determined through the original permit # 112 -96 for the southern site and shall pertain to the newest proposal and all steel monopoles would meet all required setbacks. Marsh Island is owned by the NCSPA and does not have any immediately adjacent riparian properties; therefore riparian corridors are not an issue. Substrate in the Newport River and the Morehead City Channel/Bogue Sound area is mostly sand and silt. No SAV's or shellfish beds were observed within the proposal project area. The closest open shellfish harvesting area is approximately 3,781 feet to the east of the Northern site and approximately 3158' north of the southern site and is located within a cove area along the north side of the Morehead/Beaufort causeway. 10. Proiect Description: The existing major permit # 112 -96 was issued on September 4, 1996, and expired December 31, 1999. It authorized the construction of a mooring field along the Radio Island southern site for up to a maximum of 45 barges. The current proposal is for two barge fleeting areas. The proposal describes the reconfiguration of the southern barge fleeting area adjacent to Radio Island, the removal of the existing four mooring buoys with attached anchors, chains and concrete sinkers and the relocation of the existing day marker #24 per USCG guidelines. The number of barges capable of being moored within this area will be reduced from 45 to a total of 9. Six 54 inch steel concrete filled monopiles are proposed within this area. The proposal describes the construction of a new barge fleeting area at the northern site adjacent to Marsh Island with the placement of six 54 inch concrete filled steel monopiles. The northern fleeting area east of Marsh Island would be configured for a maximum of four of the larger (53' x 260') barges or six of the smaller (35' x 200') barges. The moored barges would be equipped with navigation lights for safety when moored in this area. The moorings would be 54 inch steel monopiles and filled with cast in place concrete. The piles would be a height of 20.5' above mean high water and would be equipped with self - contained solar powered navigation lights and mooring bollards. The proposed metal pilings within the northern site would be a distance of 100' to 110' landward (west) of the USACOE channel setback depending on location and approximately 360' waterward (east) of normal high water (shore) from Marsh Island. The barges would be aligned in a north to south configuration, moored side -to or shore parallel to the east side of Marsh Island and along the east side of the mooring pilings. The barge fleeting area location would be Field Investigation Report: NC State Ports Authority Page 04 landward of existing navigation routes. When the smaller barges (35' x 200') are in place a total of six can be moored and would remain outside of the USACOE channel setback. If the larger barges (53' x 260') are within this fleeting area then a maximum of four could be moored. When the larger barges are moored at the northern most portion of the northern fleeting area (Marsh Island), the barges could encroach 10' into the channel setback. The water depths within the northern site are an average of -11.5 nlw. The width of the Newport River in this area is approximately 3,100'. The existing southern fleeting area along Radio Island would be reconfigured to moor a maximum of six larger (53' x 260') barges and nine of the smaller (35' x 200') barges which would be equipped with navigation lights for safety when moored in this area. In order to accommodate this reconfiguration the existing mooring buoys with attached chains, concrete sinkers and anchors would be removed. Day marker #24 would be relocated to an USCG approved location as per USGC specifications. Once the applicant receives the USCG relocation coordinates, a copy will be sent to DCM. The final six pilings within this location would be equipped with self contained solar navigation lights and mooring bollards. The 54 inch steel pipe monopiles filled with cast in place concrete would be located a distance of approximately 140' to 330' landward of the USACOE channel setback depending on location and 240' to 440' (west) waterward of nhw (shoreline). The piles would be a height of 20.5' above mean high water and aligned in a north to south configuration. The barges would be moored side -to or shore parallel to the west side of the Radio Island site and along the east side of the mooring pilings. The barge fleeting area location would be bordered on the west by the existing federal navigation routes. When the barges are moored, the waterward barges would be lashed to the other barges tied to the monopiles. The water depths within the southern site are an average of - 17.9' nlw. The width of the Bogue Sound/Morehead City Channel is approximately 1,500'. 11. Anticipated Impacts: The proposed northern and southern barge fleeting areas would incorporate a total of 146,120 ft2 of open water /public trust area. The setting of pilings would cause temporary turbidity. There should be no hindrance to navigation due to the location of the pilings, However, there is a possible 10' encroachment into the USACOE AIWW setback with the larger barges (260' x 53') at the northern Marsh Island site. When the larger barges are lashed to the barges moored to the piles, the northernmost barges would encroach 10' over the channel setback within this area. The pilings along the northern site would be located a distance of approximately 100' to 110' landward of the USACOE channel setback, with the remaining six steel pipe monopiles along the southern site located a distance of approximately 140' to 330' landward of the USACOE channel setback. This project has the potential to help improve public use of the public trust area along the southern site by allowing the reduction of the previously permitted usurpation of public trust area from 5.4 acres (235,224 ft2) to 3 acres (146,120 ft2). Name: Heather Styron Date: 9/4/13 Morehead City NORTH CAROLINA PXCERTD PORTS , SEP 0 3 2013 Mark Blake, P.E. Director of Engineering and Maintenance 17L't4%1VIH11 Cliff' August 16, 2013 Ms Heather Styron Division of Coastal Management 400 Commerce Ave Morehead City NC, 28557 Subject: CAMA Major Permit Request Barge Fleeting Area North Carolina State Ports Authority Morehead City, Carteret County Dear Ms. Styron, The North Carolina State Ports Authority (NCSPA) is requesting a new major permit for the modification of a current barge fleeting area (southern) near Radio Island and construction of a new barge fleeting area east of Marsh Island (northern). The areas are needed to harbor a maximum of 15 barges between and during the off - loading events at the Port of Morehead City. The current permitted southern site, is west of Radio Island, approximately 238' from the shoreline of the former Aviation Fuel Terminals. The northern site is located east of Marsh Island, approximately 364' from the shoreline. Each mooring field will consist of six 54" metal piling being installed by a barge mounted crane administering blows to set the pilings. There will be no jetting or dredging associated with the installation of the pilings. The total disturbed area for the installation of the pilings will be 190.8 square ft. below MHW. The end pilings in each area will have navigational aids (lights) attached to the top of each piling. The barges will be secured to the pilings in a manner that will eliminate arc swing and the barges will have navigational aids (lights) attached to them. North Carolina State Ports Authority • 2202 Burnett Boulevard a PO Box 9002 • Wilmington, NC 28402 • www.ncports.com NORTH CAROLINA RECEWW 1'ORT� 11 •.SEP U 3 2013 Mark Blake, P.E. Director of Engineering and Maintenance DCA4 MHD Cffy As proposed, no land based activities such as wastewater pump out, trash disposal, or vehicle parking are associated with this request. The project does not entail any dredging or filling of wetlands. Please find enclosed copies of the certified mail receipts for the adjacent riparian property owners notification letters, permit drawings, permit application forms DCM- MP 1 and DCM -MP4, and a $400.00 application processing fee. Please call me at (910) 251 -5678 or email todd.walton@ncports.com if any additional information is needed. Thank you for your assistance in this matter. Sincerely, North Carolina State Ports Authority Todd C. Walton Environmental Supervisor Cc: files North Carolina State Ports Authority • 2202 Burnett Boulevard a PO Box 9002 • Wilmington, NC 28402 o www.ncports.com oaiOF4 wFucAnuftr Niger Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) North Carolina State Ports Authority Barge Fleeting Area x; Applicant 1: First Name MI Last Name AUG W3 Jeffrey E Miles Todd Applicant 2, First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Dcm-ym CiY'Sr' If additional applicants, please attach an additional page(s) with names listed. PO Box Mailing Address PO Box City State Wilmington 9002 Wilmington NC ZIP Country Phone No. 28402 FAX No. 28402 us 910- - 343 - 6430 ext. 910--343--6237 Street Address (rf different from above) City State ZIP 2202 Burnett Blvd Wilmington NC City 28401 - Email 2128 Burnett Blvd jeff.miles @ncports.com NC 28401 - 2. Agent(Contractor Information Business Name North Carolina State Ports Authority Agent/ Contractor 1: First Name MI Last Name Todd C Walton Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 9002 Wilmington NC ZIP Phone No. 1 Phone No. 2 28402 910 - 251 - 5678 ext. - - ext. FAX No. Contractor # 910 251 5686 Street Address (if different from above) City State ZIP 2128 Burnett Blvd Wilmington NC 28401 - Email todd.walton @ncports.com <Form continues on back> 252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net Form DCM MP -1 (Page 2 of 4) REW17 D APPLIPATION,for AUG 2 2 2013 Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret NA NA Subdivision Name City State Zip NA Morehead City NC 28557- Phone No. Lot No. (s) (if many, attach additional page with list) - - ext. NA, I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Newport RiverBogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed Wes ❑No work falls within. I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA Morehead City/Newport River 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) NA Southern area 88,660 Northern area 57,200 both below NHW c. Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or NA, I , NWL (normal water level) (If many lot sizes, please attach additional page with a list) NA []NHW or ❑NWL e. Vegetation on tract NA f. Man -made features and uses now on tract There are currently no structures in the Northern area. The Southern area is currently permitted as a barge fleeting area g. Identify and describe the existing land uses ad*acent to the proposed project site. Northern location -The site is adjacent to Marsh Island, a dredge disposal site to the west. The Port of Morehead City is located to the South. Southern location - The site is adjacent to Radio Island which is owned by the NCSPA and has a liquid bulk facility located on it. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? NA (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register fisted or eligible property? <Form continues on next page> 252 -808 -2808 :- .. www.nccoastaimanagement.net -Form DCM MP -1 (Page 3 of 4) RECEIVED APPLICATION for Major Development Permit AUG 2 2 2013 m. (i) Are there wetlands on the site? ❑Yes ®No M (ii) Are there coastal wetlands on the site? 3JCMHT) CITY ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. NA o. Describe existing drinking water supply source. NA p. Describe existing storm water management or treatment systems. NA 5, Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑PublictGovemment ❑Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The area will be used to moor barges while waiting for transport. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The installation of the pilings will be performed by a barge mounted crane. The piling will be driven using blows. No jetting or dredging is associated with this project. d. List all development activities you propose. Installation of 12 Mooring piles, 6 in each fleeting area. Exisitng Mooring buoys will be removed. An existing day marker ( #24) will be relocated per USGC direction. The relocation of the day marker will not be performed until instructeions from the USCG are obtained. The letter will be provided to NC DCM as soon as it is received. e. Are the proposed activities maintenance of an existing project, new work, or both? both; maintenance on the southern area and new work on Northern area and Southern area f. What is the approximate total disturbed land area resulting from the proposed project? 95.4 per mooring area / 190.8 total ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. NA i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ®No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252 - 808 -2808 :: 1- 888- 4RCOAST :: www.necoastaimanagement.net Form DCM MP -1 (Page 4 of 4) REWIVED AUG 2 2 2013 APPLIPATION for Major Development Permit 6. Addidonallnfonnation In addition to this completed application form, (MP -1) the following items below, AQA ,% X be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e. The appropriate application fee. Check or money order made payable to DENR f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mad. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No. Address P1c-- SE .SFE z/S7 A-m4 cwe;o n e o o!= Name /ca� — T� Phone No. Address Name Phone No: Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NCSPA CAMA Permit 112 -26 issued 9/4/1996 USACE GP permit#198000291 issued 2/11/1991 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owned k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. I I 3 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date /.fAo6 MA Print Name Jeffrey E Miles Signature Please indicate application attachments pertaining to yot)r,&posed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP-4 Structures Information 252 -808 -2808 .. 1- 888- 4RCOAST :. www.nccoastaImanagement.net f List of names and complete addresses of adiacent riparian property owners notified United States Army Reserve Attn: Commanding Officer 410 Fisher Street Morehead City, NC 28557 -4239 MCYB LLC 2645 Temples Point Rd Havelock NC 28532 NC Railroad Company 2809 Highwoods Blvd Suite 100 Raleigh NC 27604 Sea Spray LLC 113 Arendell St Rm 112 Morehead City NC28557 Williams 42 LLC 8300 Health Park Suite 217 Raleigh NC 27615 George Rubin Hall III 207W Drewry Ln Raleigh NC 27609 Radio Island Marina Club Inc 156 Radio Island Rd Beaufort NC 28516 Radio Island Yacht & Boating Club 156 Radio Island Rd Beaufort NC 28516 Rodney Ashworth 424 Moultonboro Ave Wake Forest NC 27587 RECMVp,i) AUG 22 2013 DCM -MHD CITY Tide Lines Inc 1450 E Arlington Blvd #A Greenville NC 27836 Eric and Jasa Ellis 205 Nottingham Ln Morehead City NC 28557 Peggy Scarboro 114 Rochelle Dr Morehead City NC 28557 RECEIVED AUG 222013 DCM - -MHD CrrY Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY /MARINA CHARACTERISTICS a. (i) Is the docking facility /marina• ®Commercial ❑Public/Govemment ❑Private /Community C. (i) Dock(s) and /or pier(s) (ii) Number NA (iii) Length NA (iv) Width NA (v) Floating []Yes ®No e. (i) Are Platforms included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes []No Note: Roofed areas are calculated from dripline dimensions. ®This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (!)Are Finger Piers included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes []No f. (i) Are Boatlifts included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width g. (i) Number of slips proposed h 6 barges north of bridge (ii) Number of slips existing 45 existing slios in the south area - this will be reduced to 9 barges south of the bridge i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel ®Open water, no dredging required ❑Other; please describe: Check all the types of services to be provided ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage (duet slips' only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ® Other, please describe: Only barges will be moored in the area: no loading or unloading will take Place in the barge mooring area j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Barges RECEIVED AUG 2 2 2013 DCM -MHD Cffy 252 -808 -2808 :: 1- 888.4RCOAST :: www.nccoastaimana_qement.net revised: 12/27/06 Forrlr>t DCM MP -4 (Structures, Page 2 of 5) k• Typical boat length: 260'x 52.5' I. (i) Will the facility be open to the general public? ❑Yes ®No m. (i) Will the facility have tie pilings? ®Yes []No (ii) If yes number of be pilings? 12 total - 6 south of the bridge. 6 north of the bridge 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: , Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of ° Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel- handling facilities, and describe the safety measures planned to protect area water quality. j What will be the marina policy on overnight and live- aboard dockage? k. Describe design measures that promote boat basin flushing? MCIAVtU A 11 1 2 2 2013 DCMINED MY 252 -808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP -4 (Structures, page 3 of 5) I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed wifhin a primary or secondary nursery area? ❑Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicably a. (1) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ❑Private /Community (ii) Number (iii) Length (iv) Width Note. Roofed areas are calculated from diipllne dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a• (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpi/e, etc.) ®This section not applicable a• Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6. MOORING PILINGS and BUOYS ❑This section not applicable a. is the structure(s): b. Number 12 Pilings ®Commercial ❑Public/Govemment ❑Private /Community RECEIVED AUG 2 2 2013 DCM MHD CffY 252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 . Forlrr>t DCM MP -4 (Structures, Page 4 of 5) c. Distance to be placed beyond shoreline Southern +/- 238': Northern 360'+/ - Note: This should be measured from marsh edge, if present. e. Arc of the swing Barges will be lashed at both ends therefore there will not be an arc of the swing 7.' GENERAL d. Description of buoy (color, inscription, size, anchor, etc.) Piles will be black, 54" in diameter, with the end piles having navigation aids (lights) attached. The top of the piles will be 22.04' above MHW. Marker lights will be attached to the perimeter barges. a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. The southern area is 75' from the adjacent riparian property Southern Area - 148' + /- to docking pilots dock line Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body Southern area 1500 + /- ft: Northern Area +/ -3100ft e. (i) Will navigational aids be required as a result of the project? ®Yes ❑No ❑NA (ii) If yes, explain what type and how they will be implemented. Blinking lights will be fixed on top of the outer pilings d. Water depth at waterward end of structure at NLW or NWL Northern area +/ -15' Southern area +/ -19' MOM AUG 2 2 2013 DCMNIHEIcrrx 252 - 808.2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 P=OEM 0CJW 'W-4 (Structures, Page 5 of 5) & OTHER 0This section not applicable a. Give complete description: Twelve (12) black steel piles will be driven into the river bottom by way of blows for the purpose of establishing 2 barge mooring areas. One west of Radio Island (southern) with six (6) piles and one east of Marsh island (northern) using 6 piles. There will be no dredging or jetting associated with this project. The southern mooring area was permitted in 1996 but with the use of buoys for mooring and was permitted for the mooring of 45 barges. This new project will remove the exisitng bouys and replace them with piles. The southern area will have the capability to moor 9 barges. The northern area will be an additional mooring area, with the capability to moor 6 barges. Navigation aid lights will be fixed upon the piles on each end of mooring areas. Marker lights will also be attached to the moored barges. 15 August 2013 Date NCSPA Barge Fleeting Area Project Name Jeffrey E. Miles, Acting Executive Director NCSPA Applicant Name A lica igna RECEIVM ,SIG 22 2013 oCMVMCNY Z52- 308 -2808 :: 4- 338- .:MG•, ;�3T .v :vfr +Yt_c�astalrnana�e,� ent.n t revi.ed: 1 >_ 27 06 y r w- yg„� IS lac {./1 �i'oC<�GaTE AA1w11 Mt 1 M4 CAL 7' f PS OVI'W i 12.8 13 ! 163 16.9 188 2 140 23.8 1 4 13.6 139 ]t 14.7 14.1 148 24.9 13. 12.3 13.9 14.9 14 5 4.7 15.9 DAY MARKER 27,7 14.5 12.3 14,2 14,5 14 9 �trJ 2�a1 x �"ai,S1 I 294 15. �ePG6 T3 7 14 14,E 2 307 166 27 134 14,4 15 c +4C 33,4 17,5 0 P 13 9 iQ" 20.6 8 137 14.9 v 25.3 129 22.1 y r w- yg„� IS lac {./1 �i'oC<�GaTE AA1w11 Mt 1 M4 CAL 7' f PS OVI'W i 12.8 13 ! 163 16.9 188 2 140 23.8 1 4 13.6 139 ]t 14.7 14.1 148 24.9 13. 12.3 13.9 14.9 14 5 4.7 15.9 DAY MARKER 27,7 14.5 12.3 14,2 14,5 14 9 �trJ 2�a1 x �"ai,S1 I 294 15. �ePG6 T3 7 14 14,E 2 307 166 27 134 14,4 15 c +4C 33,4 17,5 0 P 13 9 iQ" 4W-1 7,9 1414 15.3 425 38,8 24-7 140 1 43.4 38 7 29 -9 143 1 43,4 0 33,2 20.6 8 137 14.9 d " 25.3 129 13 4 . ,t 16,7 1', 9 V36 2 -` 13 5 338 136 T3 0 14,9 1 4W-1 7,9 1414 15.3 425 38,8 24-7 140 1 43.4 38 7 29 -9 143 1 43,4 0 33,2 I'�' -+3 43.6 4.5 34,0 RING8 1 A81 44.6 42. 35.0 1nj• �? t1 L 158 1 18 -6 1916 21 -7 1 .9 183 4 19.3 1 11 8 4 � 1 1 11,2 6.0 d 19,6 18,7 6MOORIN0,8 14,5 72 186 197 19.6 148 58 S*tw. Mvv�..AIL 20.2 17 144 6*v -&*,.isff, -ritp L %&*" CA Kr W) - r 0. 2015 - p 2 4' 12.0 38 +1� 21,1 19.1 'i .2 8.7 4.7 V9ao� is "Cat; S -&Ivr, 20.1 175 �d .9 TA 16,5 ,111,1 6 15 -7 Wl 3,8 174 12,5 2.3 L 2 r- . 16.5 12,0 O t� _ - WX. * 1 16.11 pt4*8 9,7 MOORING 16.6 14,1 9,4 �- APP%14 I, cA,..j OF 'Swac., 4 Ir AUG 2 9 W3 fiPVAaX ?¢dPC�.r ►a-S�C 456 432 368 24,9 18 0 18,4 176 1&2 E%ttiC, M+►spswll; -'o 16% 45,6 44,0 389 29 -1 17,3 28.6 186 , 149 12 064 T, aQVa4x ►.o¢o'n,J 00 �►�' S� ��- C+cZ'1.J�, Q74 E��yT. Coa4 Dc�vdiJ �sS»�'Ii`C"` H 1 22.1 3.1 12.8 136 4 151 148 145 156 163 169 188 205 140 23.8 1 4 136 139 14.7 14,1 148 4 158 166 186 196 217 1 249 13. 123 139 149 145 14 1$3 4 19.3 1 11.8 DAY MARKER 0240 27.7 145 12,3 14 2 14,5 149 15 18,5 191 161 11 2 ♦ 60 2914 15. 12 3 13 7 14.5 14 8 1 19 6 187 1,zi1�00RING 8 14.5 7.2 - t4cw 2401 {.lure, v 307 166 rte" .27 134 144 15.2 1 . 20,0 186 197 196 148 58 fi 334 17,5 31 0 139 147 153 1 .3 18,4 .2 202 177 144 17,0 107 C) X 356 2068 137 149 16,4 1 $ 205 147 12.4 120 38 JI V) 1 40.5 25.3 129 134 15,1 16.7 1 1 191 11 2 8.7 4 7 3.7 31.2 125 135 153 6 201 17.5 9.9 19 F 4 8 338 136 30 14,9 189 165 111 41 k4117,9 14 4 1 1 20 -0 186 15.7 18 42,5 Xa 243 140 15.9 1 174 125 2,3 43.4 387 299 14.3 15.8 1 16.5 110 2.2 AUG 2 9 ZQ13 43.4 Q;0 33,2 14,6 15,5 15.6 10.3 VC .Ni -WilD CiTy 43,6 5 34.0 169 4lOEIRING8 183 16.8 14.8 97 MOORING O 446 42. 350 208 17 181 178 16.6 14,1 94 456 432- 368 24.9 180 184 176 162r 45,6 440 389 29.1 17.3 28.6 18 6 14 9 12.0 6,9 ..,..,,` �►Aet,�.a�yt. �aQCE Lalo>T 14 8 104 40 r1Ev Zbo x 52.51 75 89 102 10.2 10.5 112 7.3 07 10.8 6.9 9.2 .5 ,0 too In/Out 74 91 119 95 11 5 1 1 9.7 1 1 1, 11 7 11 95 1 s 1 `* a_ o„ pig 89 11 11.9 12.4 123 13.9 N1e,Ja >P� t Tye . ,1 11 1 130 14.2 e� g s 82 11,3 6 14.8 73 11 3 171 Caas,�► ��+ Mww�� %7.6� t0.8 3 15.8 170 D+eS%,-JA'M%J 1 Y¢ 72 10.2 4 1 86 35 151 161 169 1 6 1��a taw �wt1K GN 8,7 11,1 160 167 176 1 5 7.5 9.8 114 14,5 18,6 317 • 106 112 1SOUY14,9 178 20.7 19.8 184 Casea.�w�AG14 11,6 139 15.1 16,3 197 21 9 21, 21.2 I �Xt4T. ��v1ta�.J 14 8 104 40 ►Jaw 200'>i. 34' SW,,, C. 4aoct L.,Iivr Aw Ont*- jI.)rq l•M &TWj Is TOIL S, As S1,va>, avMoi S*.*4w 1't.� f 75 89 10,2 102 105 112 7,3 8,4 107 108 69 92 110 11 9 In/out 74 91 08 11 9 1 1 3 115 1, 1 11. 11.7 13, +� T 95r 11, 12 124 13. 89 11 3 124 123 139 91 11-50 1 1 130 14,2 8.2 113 2.3 132 6 14.8 73 11,3 1 0 152 171 7,6 108 15 158 170 72 102 1 151 165 616 86 107 1 161 169 1 6 8.7 11,1 137 16,0 16.7 176 1 5 7.5 9.8 114 14.5 16.6 183 186 317 106 11.2RED I SOUY14.9 178 20.7 19,8 18.4 116 139 15.1 16.3 197 21 9 21.8 21 2 SW,,, C. 4aoct L.,Iivr Aw Ont*- jI.)rq l•M &TWj Is TOIL S, As S1,va>, avMoi a Q'mEWvfto`RwuT wm%l%gffft ff% A% sm&&% rA FUK K v E K . u E FLEETINGom" AREA NORTH CAROLINA STATE PORTS AUTHORITY MOREHEAD CITY, NORTH CAROLINA iMplD AUG 2 2 Z013 DGI ?mo Cat Twor M-41 NOTE: DEVELOPMENT WHICH WALL TAKE PLACE WITHIN THE LIMITS OF THE 100 —YEAR FLOODPLAIN AT ELEVATION +7.00 NAVD88 ( +7.96 NGVD29) IS DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF EXECUTIVE ORDER NO. 123 — UNIFORM FLOODPLAIN MANAGEMENT POLICY. INDICATES PLAN, DETAIL, ELEVATION, OR SECTION t INDICATES SHEET NUMBER WHERE DRAWN OR TAKEN FROM REFERENCE BUBBLE DESIGNATION � SSm r ire Us NWy ,o tame Ems' �"" 'wt WA - MOREHEAD `*ROJECT — \ BOGUE SITES F MACON e lE 8A I S FORT M ATLANTIC OCEAN INDEX OF DRAWINGS SHEET NO. SHEET TITLE 1 TITLE SHEET 2 GENERAL NOTES AND ABBREVIATIONS 3 DEMOLITION PLAN SOUTH FLEETING AREA 4 DEMOLITION DETAILS 5 ISTRUCTURAL NOTES 6 STRUCTURAL PLANS 7 STRUCTURAL DETAILS —_SHEET 1 OF 2 8 STRUCTURAL DETAILS — SHEET 2 OF 2 9 BORING LOGS — SHEET i OF 2 10 BORING LOGS — SHEET 2 OF 2 NOTE: DEVELOPMENT WHICH WALL TAKE PLACE WITHIN THE LIMITS OF THE 100 —YEAR FLOODPLAIN AT ELEVATION +7.00 NAVD88 ( +7.96 NGVD29) IS DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF EXECUTIVE ORDER NO. 123 — UNIFORM FLOODPLAIN MANAGEMENT POLICY. INDICATES PLAN, DETAIL, ELEVATION, OR SECTION t INDICATES SHEET NUMBER WHERE DRAWN OR TAKEN FROM REFERENCE BUBBLE DESIGNATION � SSm r ire Us NWy ,o tame Ems' �"" 'wt WA - MOREHEAD `*ROJECT — \ BOGUE SITES F MACON e lE 8A I S FORT M ATLANTIC OCEAN 1. GENERAL NOTES ARE NOT INTENDED TO REPLACE THE CONTRACT DOCUMENTS. SEE CONTRACT DOCUMENTS FOR REQUIREMENTS IN ADDITION TO THESE GENERAL NOTES. THE CONTRACT DOCUMENTS SHALL CONSIST OF THE COMPLETE PROJECT MANUAL (SPECIFICATIONS) AND WORKING DRAWINGS INCLUDING BUT NOT LIMITED TO: ADVERTISEMENT FOR BIDS; NOTICE TO BIDDERS; INSTRUCTIONS TO BIDDERS AND GENERAL CONDITIONS OF THE CONTRACT, SUPPLEMENTARY GENERAL CONDITIONS; DIVISION 1 REQUIREMENTS; TECHNICAL SPECIFICATIONS; AND ANY RELEVANT ADDENDA ITEMS. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS. 2. THE WORKING DRAWINGS ARE NOT NECESSARILY COMPLETE IN EVERY DETAIL THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, SERVICES, LABOR, ETC, FOR A COMPLETE INSTALLATION; INCLUDING WORK REASONABLY INFERRED FROM THE CONTRACT DOCUMENTS AS BEING NECESSARY TO PRODUCE THE INTENDED RESULTS, WHETHER SHOWN OR NOT ON THE DRAWINGS. 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE STARTING WORK. DO NOT SCALE PROJECT DRAWINGS, REPORT ANY DISCREPANCIES IN THE DRAWINGS AND /OR SPECIFICATIONS TO THE OWNER'S REPRESENTATIVE FOR CLARIFICATIONS OR ADJUSTMENTS PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL NOT BEGIN DEMOUTION /CONSTRUCTION IN ANY SUCH AFFECTED AREA UNTIL THE DISCREPANCY HAS BEEN RESOLVED. 4. SHOULD THERE BE A CONFUCT BETWEEN THESE GENERAL NOTES, WORKING DRAWINGS, AND /OR SPECIFICATIONS, THE MOST RESTRICTIVE INTERPRETATION SHALL PREVAIL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING FROM THE OWNER'S REPRESENTATIVE ANY CLARIFICATION OR INTERPRETATION OF THE GENERAL NOTES, WORKING DRAWINGS, AND /OR SPECIFICATIONS IN WRITING AND IN ADVANCE OF THE BEGINNING OF DEMOLITION /CONSTRUCTION. 5. ALL FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS ARE TO BE STRICTLY FOLLOWED. METHODS OF DEMOLITION /CONSTRUCTION AND INSTALLATION OF MATERIAL IS THE CONTRACTORS RESPONSIBIUTY. 6. THE CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL PROTECTION STANDARDS, LAWS, AND REGULATIONS. 7. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER THIS CONTRACT FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF WRITTEN ACCEPTANCE BY THE OWNER IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 8. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ANY CHANGES MADE TO THE DRAWINGS ON A SEPARATE WHITE SET OF PLANS PROVIDED BY THE DESIGNER. THESE ANNOTATED DRAWINGS SHALL BE RETURNED TO THE DESIGNER PRIOR TO APPROVAL OF THE FINAL PAYMENT APPLICATION. 9. THE NCSPA MOREHEAD CITY TERMINAL IS AN OPERATIONAL PORT FACILITY. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER'S REPRESENTATIVE IN REGARDS TO PORT OPERATIONS AND ACCESS TO THE PROJECT SITE. 10. UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL, ON A DAILY BASIS, REMOVE FROM THE SITE ANY DEBRIS RESULTING FROM DEMOUTION /CONSTRUCTION. DISPOSAL OF MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL MATERIALS TO BE REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR, UNLESS OTHERWISE NOTED, AND SHALL BE DISPOSED OF AS SPECIFIED. ALL DEBRIS SHALL BE PROPERLY DISPOSED OF IN A PERMITTED LANDFILL. 11. EXISTING CONSTRUCTION, INCLUDING UTIUTIES AND OTHER MISCELLANEOUS ITEMS WHICH ARE TO REMAIN SHALL REMAIN UNDISTURBED AND BE PROTECTED. UNLESS OTHERWISE NOTED. 12. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING. AT HIS OWN EXPENSE, ANY AND ALL DAMAGES THAT MAY OCCUR OUTSIDE THE LIMITS OF THIS PROJECT AS A RESULT OF DEMOLITION /CONSTRUCTION. 13. ALL AREAS DISTURBED DURING DEMOUTION /CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION, AT NO EXPENSE TO THE OWNER, UNLESS OTHERWISE NOTED. 14. THE CONTRACTOR SHALL PROTECT ADJACENT STRUCTURES, VTIUTIES, PEDESTRIANS, AND VEHICULAR TRAFFIC FROM POTENTIAL DAMAGE DUE TO CONTRACTOR'S OPERATIONS. 15. ALL CONSTRUCTION, EXCEPT THAT WHICH CAN BE PERFORMED FROM SHORE OR EXISTING STRUCTURES SHALL BE CONDUCTED FROM BARGES, WORK BOATS, OR OTHER TEMPORARY PLATFORMS PROVIDED BY THE CONTRACTOR, AS APPLICABLE. 16. ALL BUILDINGS, SURFACE, AND SUBSURFACE IMPROVEMENTS ON AND ADJACENT TO THE PROJECT SITE ARE NOT NECESSARILY SHOWN HEREON. 17. LOCATIONS OF EXISTING UTILITIES AND STRUCTURES SHOWN ON THE DRAWINGS ARE APPROXIMATE. UTILITIES SHOWN ARE UMITED TO FIELD LOCATION OF VISIBLE APPURTENANCES AND DO NOT NECESSARILY DEPICT ALL UTIUTY LOCATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UTILITIES PRIOR TO BEGINNING WORK. VERIFY DISCREPANCIES WITH THE OWNER'S REPRESENTATIVE. 18. THE OWNER SHALL HAVE THE AUTHORITY TO DESIGNATE AND /OR LIMIT AREAS OF CONSTRUCTION. 19. LIMITED STAGING AREAS WILL BE PROVIDED ON SITE FOR CONTRACTOR'S USE. THE CONTRACTOR SHALL CONFIRM THE EXTENTS OF STAGING AREAS WITH THE OWNER'S REPRESENTATIVE. 20. HORIZONTAL DATUM IS BASED ON THE NORTH CAROLINA STATE PLANE SYSTEM (NAD83). 21. ALL ELEVATIONS PROVIDED ON THE DRAWINGS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM (NAVD88). HYDROGRAPHIC SURVEY DATA (MUDUNE SOUNDINGS) ARE BASED ON LOCAL MLLW ELEVATIONS. 22. THE FOLLOWING DATA IS PROVIDED REGARDING TIDAL INFORMATION. TIDAL INFORMATION WAS OBTAINED FROM THE NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA), NATIONAL OCEAN SERVICE (NOS) BENCHMARK 865 6483 (BEAUFORT, NORTH CAROUNA). ELEVATIONS ARE REFERENCED ON THE 1983 -2001 EPOCH. MHHW = +1.46 FT (NAVD88) MHW = +1.17 FT (NAVD88) NAVD88 = 0.00 FT MSL - -0.37 FT (NAVD88) MTL = -0.38 FT (NAV068) NGVD29 = -0.96 FT (NAVD88) MLW = -1.94 FT (NAVD88) MLLW = -2.08 FT (NAVD88) 23. PROJECT SURVEY WAS PERFORMED BY NCDOT AND INFORMATION WAS PROVIDED TO THE DESIGNER BY THE OWNER. 24. THE OWNER MAKES NO REPRESENTATIONS ABOUT SUBSURFACE CONDITIONS THAT MAY BE ENCOUNTERED WITHIN THE LIMITS OF THE PROJECT. 25. GEOTECHNICAL INFORMATION WAS PROVIDED TO THE DESIGNER BY THE OWNER. STRUCTURE SUBSURFACE INVESTIGATION FOR THIS PROJECT WAS PERFORMED IN JUNE 2013 BY THE FOLLOWING. THE GEOTECHNICAL ENGINEER OF RECORD IS JACOB C. WESSELL, NORTH CAROUNA LICENSE No. 30395. THE "STRUCTURE SUBSURFACE INVESTIGATION" CAN BE FOUND IN APPENDIX "A" OF THE SPECIFICATIONS. CATUN ENGINEERS AND SCIENTISTS 220 OLD DAIRY ROAD WILMINGTON, NORTH CAROUNA 26. FOR DEMOLITION PLAN AT SOUTH FLEETING AREA, SEE SHEET 3. 27. FOR NEW CONSTRUCTION AT SOUTH AND NORTH FLEETING AREAS, SEE SHEET 6. OTITRI'D AUG 2 2 ?-013 DCM -Y.HD Cl'Y ACI = AMERICAN CONCRETE INSTITUTE AISC = AMERICAN INSTITUTE OF STEEL CONSTRUCTION AIWW = ATLANTIC INTRACOASTAL WATERWAY ALT = ALTERNATE ANSI = AMERICAN NATIONAL STANDARDS INSTITUTE APPROX - APPROXIMATE ASCE = AMERICAN SOCIETY OF STM = CIVIL ENGINEERS A AMERICAN SOCIETY FOR TESTING AND MATERIALS AWG = AMERICAN WIRE GAUGE AWS = AMERICAN WELDING SOCIETY BOTT = BOTTOM BTW = BETWEEN CF = CUBIC FEET CIP = CAST -IN -PLACE CJ = CONSTRUCTION JOINT CKD = CHECKED CLR - CLEAR CONC - CONCRETE CONN - CONNECTION CONSTR = CONSTRUCTION CONT = CONTINUOUS CY = CUBIC YARD DIA = DIAMETER DIM = DIMENSION DISCONT = DISCONTINUOUS DWN = DRAWN DWT = DEAD WEIGHT TONNAGE E = EAST EA = EACH EL - ELEVATION ELEV - ELEVATION EMBED = EMBEDMENT EO = EQUAL ETC = ET CETERA EW = EACH WAY EXIST. = EXISTING EXP = EXPANSION EXT = EXTENSION F- FAHRENHEIT FPS = FEET PER SECOND FT = FEET GALV = GALVANIZED GR = GRADE HWY = HIGHWAY [CC = INTERNATIONAL CODE COUNCIL ID = IDENTIFICATION IN = INCHES INC =INCORPORATED INFO = INFORMATION INT = INTERMEDIATE JT = JOINT K = KIPS OR 1000 POUNDS KLF = KIPS PER UNEAR FOOT KSI = KIPS PER SQUARE INCH L = ANGLE OR LENGTH LB = POUND LF - LINEAR FEET LG = LONG LONG. = LONGITUDINAL LT - LEFT MAX = MAXIMUM MHHW = MEAN HIGHER HIGH WATER MHW - MEAN HIGH WATER MIN = MINIMUM MISC = MISCELLANEOUS MLLW = MEAN LOWER LOW WATER MLW = MEAN LOW WATER MPH = MILES PER HOUR MSL = MEAN SEA LEVEL MTL = MEAN TIDE LEVEL N = NORTH N/A = NOT APPUCABLE NAD - NORTH AMERICAN DATUM NAVD = NORTH AMERCAN VERTICAL DATUM N.C. = NORTH CAROLINA NCDOT = NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NCSPA = NORTH CAROUNA STATE PORTS AUTHORITY NGVD = NATIONAL GEODETIC VERTICAL DATUM NIC = NOT IN CONTRACT NO. =NUMBER NOAA = NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOS = NATIONAL OCEAN SERVICE NIS = NOT TO SCALE O.C. = ON CENTER P/C = PRECAST P/S = PRESTRESSED PCF = POUNDS PER CUBIC F00T PEN = PENETRATION PSF = POUNDS PER SQUARE FOOT PSI = POUNDS PER SQUARE INCH QTY = QUANTITY R - RADIUS REINF - REINFORCEMENT OR REINFORCED REO'D - REQUIRED R/F = REINFORCEMENT OR REINFORCED S - SOUTH SCH = SCHEDULE SCO = STATE CONSTRUCTION OFFICE SF = SQUARE F00T SHT = SHEET SPA = SPACES SQ - SQUARE SS - STAINLESS STEEL STA = STATION STD = STANDARD STE = SUITE STL = STEEL SY = SQUARE YARD T = TON TEMP = TEMPORARY OR TEMPERATURE TYP = TYPICAL UDLL = UNIFORMLY DISTRIBUTED LIVE LOAD UFC = UNIFIED FACIUTIES CRITERIA UHMW = ULTRA HIGH MOLECULAR WEIGHT LION = UNLESS OTHERWISE NOTED U.S. = UNITED STATES VERT - VERTICAL VLF = VERTICAL UNEAR FEET W = WEST, WATER, OR WIDTH W/ = WITH WP = WORK POINT WT = WALL THICKNESS = SECONDS OR INCHES = MINUTES OR FEET • = ASTERISK = NUMBER OR POUND do = AND 0 =AT q = CENTERLINE 0 = PLATE 0 = DIAMETER = DEGREES i = PLUS OR MINUS X= PERCENT 737 f$4 14 147 15 16 I35 72 -21 114 151 148 tai, 756 tE5 tog lab EXIST. ADJACENT PILOT DOCK TO REMAIN #24 TO BE RELOCATED. 141 14 153 Ic f 1�1 S It) F +•' 141 DANARKER SEE NOTE 1 24 .1 Ir 1-1 3 123 1 14-) 14 '7'7 145 123 14t 145 14 153 15', 174 185 M 291 154 144 144 fo 4 172 Ift .5 3 I;c If" fag log 7 EXIST. MOORING BUOY TO BE REMOVED. TYP 13 4 144 152 is 1 176 150 (4 WVAL), gt� NOTE'� --Ac 5 a 3�� 4 1 7.f. "I 11-� I Ao 739 td' n? Is 3 184 192 =02 177 144 170 107 1 355 206 Ti ek 13• 149 164 1P0 Q% 8 208 147 124 170 38 •105 ZIS 12 •131 15 1 7 17.9 201 211 1? 1 112 67 a7 EXIST. MUDLINE SOUNDING, TYP (WATER DEPTH 143 312 125 5 153 Is fi 20-1 201 201 77 5 BASED OUWLLW) I EAST LIMIT OF -,--,—FEDERAL CHANNEL 1`8 338 t36 150 142 ILI 5 18s 19 189 165 ill ii APPROX LOCATION -11 2 35 0 17 ;1 14\ 4 15 3 t0 -o 187 2C. 0 15 1 OF SHORELINE r 425 388 247 14 01 15 1? 141 200 174 125 23 434 299 14 Y3 15F 170 194 182 168 120 22 CHANNEL SETBACK UMIT 434 1co 0 -.12 14•6 1755 ttS 183 IB7 156 10.1 43 C, 4111 -- D 119 18; 7B 14 3 14.7 APPROX PROPERTY BOUNDARY 4' 35 f) 2 181 178 1- 141 '? 4 4f 6 .33 55 U 24 J IJ5 n 1,3 4 17 F; 4-1.6, _Iz-2— Tm— APPROX PROPERTY EXIST. CONC DOLPHIN BOUNDARY EXT, TYP TO 4Z 6 44 291 1-3 REMAIN 149 120 69 DEMou-nON PLAN — SOUTH LOCA-nON ALI G -9 -2 2013 SCALE: 1"-1201 EXIST DAY MARKER #24 TO BE RELOCATED .A DAY MARKER PHOTO \'3 SCALE: NIS NOTES: 1. REMOVE EXISTING DAY MARKER #24 AND EXTRACT EXISTING TIMBER SUPPORT PILE. REINSTALL AT LOCATION AS INDICATED ON THE PROJECT DRAWINGS. 2. REMOVE EXISTING MOORING BUOY (4 TOTAL). INCLUDING BUOY, CHAINS, CONCRETE SINKERS, AND ANCHORS, AND DELIVER TO THE OWNER. EXIST DAY MARKER #24 TORE RELOCATED EXIST. MOORING BUOY, TO BE REMOVED. TYP,- MOORING BUOY PHOTO \13 1/ SCALE: NIS 120' w 120' 240' SCALE: 1-=--120' c REMOVE EXISI 12,000 LB ANCHOR, TYP -v EXIST. WATERUNE REMOVE EXIST. ANCHOR wti"1 REMOVE EXIST. 6'x3'x3' CONCRETE SINKER ELEVATION MOORING BUOY REMOVAL 3 NOT TO SCALE REMOVE EXIST. 2" MARINE GRADE STUD LINK CHAIN REMOVE EXIST. MOORING BUOY W/ MOORING TEE do MARINE LANTERN REMOVE EXIST. MOORING BUOY EXIST. MUDLINE tSilzcf.me D AUG 2 2 2013 Dic" .-:amG7ey NORM — DEMOLITION DETAILS BARGFLEETING NEWPORT REA CAROLINA APPLICATION BY: MOFFATT & NICHOL PORTS . NORTH CAROLINA STATE PORTS AUTHORITY "Ito ION air an MOREHEAD CITY, NORTH CAROLINA DATUM: NAVD88 SHEET 4 OF 10 DATE: JULY 2013 DESIGN CODES ANN REMBENCE51 1. THE FOLLOWING CODES AND REFERENCES WERE UTILIZED FOR THE DESIGN OF THIS PROJECT: A. ACI (AMERICAN CONCRETE INSTITUTE), 318 -08, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" B. AISC (AMERICAN INSTITUTE OF STEEL CONSTRUCTION), 9th EDITION, 1989, MANUAL OF STEEL CONSTRUCTION — ALLOWABLE STRESS DESIGN" C. ASCE (AMERICAN SOCIETY OF CIVIL ENGINEERS), 7 -02, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES" D. ASTM (AMERICAN SOCIETY FOR TESTING AND MATERIALS). 43rd EDITION, 2006, ASTM STANDARDS IN BUILDING CODES" E. AWS (AMERICAN WELDING SOCIETY ), D1.1, 2006, "STRUCTURAL WELDING CODE — STEEL" F. ICC (INTERNATIONAL CODE COUNCIL), 2009, 'NORTH CAROLINA STATE BUILDING CODE (2006 INTERNATIONAL BUILDING CODE WITH NORTH CAROLINA AMENDMENTS)" G. UFC (UNIFIED FACILITIES CRITERIA). 2005, U.S. DEPARTMENT OF DEFENSE, "DESIGN: PIERS AND WHARVES" 1. ALL CONCRETE WORK SHALL BE PERFORMED IN ACCORDANCE WITH ACI 301 'SPECIFICATIONS FOR STRUCTURAL CONCRETE UNLESS OTHERWISE NOTED ON THE DRAWINGS. ALL REINFORCED CONCRETE MATERIALS SHALL BE PROPORTIONED, FABRICATED, DELIVERED, AND PLACED IN ACCORDANCE WITH ACI 318 -08 'BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE". 2. ALL CAST —IN —PLACE CONCRETE SHALL BE NORMAL WEIGHT CONCRETE (145* PCF). 3. CONCRETE MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED. CEMENT SHALL BE TYPE II CONFORMING TO ASTM C 150. A. CIP CONCRETE ..........................4000 PSI ® 28 DAYS STRL1MRAL AND MIS 1 ®NEQ S SIM " 1. ALL STEEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AISC SPECIFICATIONS FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL. ALL WELDING SHALL CONFORM TO AWS D1.1, UNLESS OTHERWISE NOTED. 2. ALL STEEL SHAPES, PLATES, MISCELLANEOUS FABRICATIONS, AND HARDWARE SHALL BE ZINC — COATED OR GALVANIZED BY THE HOT —DIP PROCESS IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A 123 AND /OR ASTM A 153 AS APPLICABLE AFTER FABRICATION, UNLESS OTHERWISE NOTED. FIELD TREAT DAMAGED GALVANIZED STEEL FINISH WITH TWO COATS OF HIGH ZINC DUST OXIDE PAINT, COLD GALVANIZED COMPOUNDS, OR APPROVED EQUAL CONFORMING TO THE REQUIREMENTS OF ASTM A 780. IN ADDITION, ALL EXPOSED THREADED SURFACES ON BOLTS AND ANCHORS SHALL RECEIVE TWO COATS OF HIGH ZINC DUST OXIDE PAINT AFTER INSTALLATION OF THE NUT. 3. STRUCTURAL AND MISCELLANEOUS STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED: A. MISC PLATES. BARS & SHAPES........ ASTM A 572, GR 50, GALV, LION B. STEEL PIPE .................... ASTM A 53, GALV, LION C. HIGH— STRENGTH STEEL BOLTS ......... ASTM A 325, GALV, LION D. STEEL ANCHORS .................ASTM A 449, GALV, LION E. STEEL NUTS .................... ASTM A 553. GALV, LION & ANSI B18.2.2 F. STEEL WASHERS ..................ASTM F 436, GALV, LION & ANSI B18.22.1 (TYPE 2. STEEL PIPE PILES SHALL CONFORM TO THE FOLLOWING MINIMUM PROPERTIES, LION: A— PLAIN), ANSI B 18.21.1 (LOCKING) G. SS BOLTS /ANCHORS .............. ASTM A 193 OR ASTM F 593, TYPE 316L H. SS NUTS .......................ASTM A 194 OR ASTM F 594, TYPE 316L & ANSI BE PERMITTED. 618.2.2 I. SS WASHERS ....................ANSI 818.22.1 (TYPE A— PLAIN), ANSI 818.21.1 WITH OR BE DETRIMENTAL TO THE CONCRETE PLACEMENT AND CURING OPERATIONS. (LOCKING), TYPE 316L F0UAIDAmObl: 1. STEEL PIPE PILES SHALL BE DRIVEN TO THE MINIMUM TIP ELEVATION INDICATED ON THE DRAWINGS. IF THE MINIMUM TOP ELEVATION CANNOT BE ACHIEVED, THEN NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY. DRIVING SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS, USING HAMMER OF AN APPROVED TYPE, WITH A CAPACITY EQUAL TO THE HAMMER4CEYV MANUFACTURER'S RECOMMENDATION FOR THE TOTAL WEIGHT OF THE PILE AND CHARACTER OF SUBSURFACE MATERIAL TO BE ENCOUNTERED. 2. STEEL PIPE PILES SHALL CONFORM TO THE FOLLOWING MINIMUM PROPERTIES, LION: 2 20 EI U ;7 AUG 9 9 A. 54 70 PIPE PILE ASTM A 252, GR 3 3. SPUDDING AND /OR JETTING OF PRESTRESSED CONCRETE PILES OR STEEL PIPE PILES WILL NOT BE PERMITTED. xnCITY 4. THE CONTRACTOR SHALL COORDINATE THE PILE DRIVING SCHEDULE SO AS NOT TO INTERFERE WITH OR BE DETRIMENTAL TO THE CONCRETE PLACEMENT AND CURING OPERATIONS. NORTH FLEETING AREA - PLAN 6 SCALE: 10120' '4 S 1; EXIST. ADJACENT PILOT DOCK %•E+ t1't� 1; 1.0 ,Y ,1 '4d 4'4 _N I ., . f O (j P IILE33¢¢ k4i 151 1 ?S 1Sb '40 145 14' 1;.; �t =; te3E269383��54', 277 14" ,t 17? 14i 14 '4� !;'•A I''� 7 4 i�5. ��`- tF,i it t2 (''7:>t• 1 �PS –O6 i - 6 a 5.1 t,3 t17 as as 164 172 i is �PB -05£7 1- � c 5 14 1,6 t.7 1s. ,:4< 'c7 163 t-: •- -4+tL_ 700 1? CL 'J7 13: 14 't 5 I ' 3;4 t: I'11, 9 14, 1 1&Z 1841 1, . 7GL t77 1 e t %� t07 35� _Ub I_?1 t37 la a t54 t4n 1, _ 26a 21,15 147 'o '4 12 L• 3 7 ! 1 _ APPROX LOCATION OF PB -04 ' �-� o EXIST. MUDLINE / SOIL, BORING, 7. FOR f PS -03 n SOUNDING, TYP f 1 to 4q 5 253 ,SOIL, BORING L00.PSEE tE 179 :q t <t t 191 11 0 8 T (WATER DEPTH 1 SHEETS 9 do 10 I o BASED ON MLLSM� I c 4S % 312 12 13° t5' 166 205 �91 ,01 _ 175 99 19 t CHANNEL 111 SETBACK LIMIT J ti 4,8 3.'8 136 7j (• t1 �j 1,0,< 188 1198 in9 iti 5 Ill a / 1 1 H t + (\-APPROX LOCATION 144 151 78(1 ;97 200 l06 157 33 OF SHORELINE 11 �PB -02 3 141�0 f — _ 4_ 5 ft,a t4 f•, 15 9 17 5 t4 1 2G 0 t 2 2 1 B -Ot'- STEEL PIPE MONOPILE, TYP, SEE 434 'l 387 299 143 t t5S 2. 194 t82 165 1:0 22 /i 434 ' +Cl ) n '532 14e 1155 17.5 IS P, 1 I WP $4 1 I PILE ILE BENT N 359817.46 '36 4� EAWLIMIT'0F9 ,61 I.+a t� t; I 693964.86 a 7 DESIGNATION, TYP FEDERAL CHANNEL 'I S j OILE APPROX PROPERTY ' DE SGN W ON I BOUNDARY 44 0 42 c" ;5 C• .7 8 1 . ` Oil t7 A t6 0 APPROX PROPERTY BOUNDARY EXT, TYP� `t 4y r• 432 ^.6 249 140t 1A4 1-" APPROX LOCATION OF EXIST. CONC DOLPHIN - LOCATON FOR REINSTALLATION OF + `= EXISTING DAY MARKER 44 C- t .2 ° ?; t 17 3 t t8. is 9 t2 n b 3 BE COORDINATED WITH THE OWNER. . t AUG 2 2 2013 t/rm�� m��m�p•� �" SOUTH F�T1NG AREA - PLAN 120' 0' 120' 240' �I.tVA- tvli3.V c-•� a ; 6 SCALE: 1'°120 SCALE: 1' =120' reR�'STRUCTURAL PLANS NEWPORT RIVER NORTH BARGE FLEETING AREA pows NORTH CAROLINA STATE PORTS AUTHORITY APPLICATION BY: MOFFATT & NICHOL piarlwotea MOREHEAD CITY, NORTH CAROLINA DATUM: NAVD88 SHEET 6 OF 10 DATE: JULY 2013 EXIST. 1 SOUNDINGNG, . TYP TYP l t , (WATER DEPTH 3 9 X100' BASED ON MLLW) 1 5 t� t,i CHANNEL WP �jf a9 I SETBACk 1. UyIT q. PILE i N 363227.61 i E 2692,480.41 ! � a-- s t ' 1 r.4 4.i I I;,S 11S IttC: t19 1 � f � PB -09 bs A. I � It 7 i 121 ®4 13 5� 250' -0`t �PB -08 1' 8? i 114 124 1391 1 11 I ' 1 91 t'.-sb_.s�3 - -- ��4, I '42 EAST LIMIT OF f FEDERAL CHANNEL J O I STEEL PIP ar10NOP1'.F3, I TYP, SEE + 173 1 32 113 142 1 I ' 1 WEST LIMIT OF � I t FEDERAL CHANNEL ' 1 1 713 122? —_13 4D lit 171 1 APPROX LOCATION OF PB -07 ' SOIL BORING, TYP, POR t) 4 13 1 139 1515 , 5a 1:70 l SOIL BORING LOG, SEE I } SHEETS 9 do 10 ' I , _ 1 2 134 142 - 1511 .�, 1 5 i 0E PILE' BENT c 17 WP- V2 It, 1 10 9 DESIGNATION, TYP I N t PILE ROW q PILE N 362680.57 1 DEISGNATION E 2692537.38 11 t >7 111 li- 1°0 16 7 176 17, 1` g� t °d '1 4 EXIST. NAVIGATION BUOY i i tnF il' J 1; L 140 171? 2177 1. 19 Et ;?4� NORTH FLEETING AREA - PLAN 6 SCALE: 10120' '4 S 1; EXIST. ADJACENT PILOT DOCK %•E+ t1't� 1; 1.0 ,Y ,1 '4d 4'4 _N I ., . f O (j P IILE33¢¢ k4i 151 1 ?S 1Sb '40 145 14' 1;.; �t =; te3E269383��54', 277 14" ,t 17? 14i 14 '4� !;'•A I''� 7 4 i�5. ��`- tF,i it t2 (''7:>t• 1 �PS –O6 i - 6 a 5.1 t,3 t17 as as 164 172 i is �PB -05£7 1- � c 5 14 1,6 t.7 1s. ,:4< 'c7 163 t-: •- -4+tL_ 700 1? CL 'J7 13: 14 't 5 I ' 3;4 t: I'11, 9 14, 1 1&Z 1841 1, . 7GL t77 1 e t %� t07 35� _Ub I_?1 t37 la a t54 t4n 1, _ 26a 21,15 147 'o '4 12 L• 3 7 ! 1 _ APPROX LOCATION OF PB -04 ' �-� o EXIST. MUDLINE / SOIL, BORING, 7. FOR f PS -03 n SOUNDING, TYP f 1 to 4q 5 253 ,SOIL, BORING L00.PSEE tE 179 :q t <t t 191 11 0 8 T (WATER DEPTH 1 SHEETS 9 do 10 I o BASED ON MLLSM� I c 4S % 312 12 13° t5' 166 205 �91 ,01 _ 175 99 19 t CHANNEL 111 SETBACK LIMIT J ti 4,8 3.'8 136 7j (• t1 �j 1,0,< 188 1198 in9 iti 5 Ill a / 1 1 H t + (\-APPROX LOCATION 144 151 78(1 ;97 200 l06 157 33 OF SHORELINE 11 �PB -02 3 141�0 f — _ 4_ 5 ft,a t4 f•, 15 9 17 5 t4 1 2G 0 t 2 2 1 B -Ot'- STEEL PIPE MONOPILE, TYP, SEE 434 'l 387 299 143 t t5S 2. 194 t82 165 1:0 22 /i 434 ' +Cl ) n '532 14e 1155 17.5 IS P, 1 I WP $4 1 I PILE ILE BENT N 359817.46 '36 4� EAWLIMIT'0F9 ,61 I.+a t� t; I 693964.86 a 7 DESIGNATION, TYP FEDERAL CHANNEL 'I S j OILE APPROX PROPERTY ' DE SGN W ON I BOUNDARY 44 0 42 c" ;5 C• .7 8 1 . ` Oil t7 A t6 0 APPROX PROPERTY BOUNDARY EXT, TYP� `t 4y r• 432 ^.6 249 140t 1A4 1-" APPROX LOCATION OF EXIST. CONC DOLPHIN - LOCATON FOR REINSTALLATION OF + `= EXISTING DAY MARKER 44 C- t .2 ° ?; t 17 3 t t8. is 9 t2 n b 3 BE COORDINATED WITH THE OWNER. . t AUG 2 2 2013 t/rm�� m��m�p•� �" SOUTH F�T1NG AREA - PLAN 120' 0' 120' 240' �I.tVA- tvli3.V c-•� a ; 6 SCALE: 1'°120 SCALE: 1' =120' reR�'STRUCTURAL PLANS NEWPORT RIVER NORTH BARGE FLEETING AREA pows NORTH CAROLINA STATE PORTS AUTHORITY APPLICATION BY: MOFFATT & NICHOL piarlwotea MOREHEAD CITY, NORTH CAROLINA DATUM: NAVD88 SHEET 6 OF 10 DATE: JULY 2013 NAVIGATION LIGHT HALF STL PIPE RUB STRIP, TYP O MOORING BOLLARD, TYP BARGE BERTHING LINE, TYP PLAN STL CAP PLATE FOR NAVIGATION LIGHT, SEE NOTE 2 & SEE SELF CONTAINED SOLAR POWERED NAVIGATION LIGHT ® BENTS 1 & 6 ONLY, SEE NOTE i PILE TOP EL +24.00 (NAVD88) SIDE FACING MOORING BOLLARD, - - - TYP, sEE C4 HALF STL PIPE RUB STRIP, SEE® e STABBING POINT EL +2.50 (NAVD88) — J rQ MHHW EL +1.46 (NAVD88) FIELD STABBING POINT, SEES\ EL —3.00 (NAVD88V 54 "0 x 314" WT STL PIPE PILE— R MLLW EL —2.08 (NAVD88) .00 EXIST. MUDUNE, EL VARIES PILE TIP EL —76.00 (NAVD88) I. CO TRACTOR SHALL PROVIDE AN AUTOMATIC POWER PHAROS MARINE CLASS C SINGLE LIFT ASSEMBLY OR APPROVED EQUAL. OPTIC COLOR AND CHARACTERISTICS SHALL BE FIXED RED. 2. FOR BENTS WITHOUT NAVIGATION LIGHT, OMIT STEEL CAP PLATE AND CREATE ROUNDED TOP FOR DRAINAGE WITH CONCRETE FILL. ELEVATION alN STEEL PIPE MONOPILE 6 SCALE: 1/2'-I• -O" SEE NOTE — STABBING POINT ELEVATION 54 "0 STL PIPE PILE I 1 I PEN, UT `STABBING PLATE, SEE®7 NOTE: CONTRACTOR SHALL CUT TOP OF PILE SQUARE AND GRIND SMOOTH FOR SPLICE WELDING. CONTRACTOR SHALL ESTABLISH STABBING POINT ELEVATION AS NECESSARY FOR INSTALLATION PROCEDURE AND PILE DRIVING EQUIPMENT EMPLOYED. SUBMIT PROPOSED FIELD STABBING POINT ELEVATION FOR APPROVAL PRIOR TO COMMENCING FABRICATION. C2 FlELD STABBING POINT 7 SCALE: 12 "0 SCH 40 PIF 1/2- TH STABBIh "0 STL IE PILE /2" THICK STL 'TABBING 'LATE, TYP STABBING PLATE 7 SCALE: NTS PIPE 1' -3" 9" TYP I /8- STL CAP PLATE 10 "0 SCH 80 STL PIPE 5/16 TYP 4'0 SCH 80 STL _ , iI PIPE & CAP, TYP m ii t� I ° I FULL , PEN 3/8" x 11 1/2"0 STL CAP PLATE 1 I 1\ IPE RECCE M AUG 2 2 2013 STL PIPE PILE 2' -0" 12 "0 SCH 80 STL PIPE C SIDE FACE BOLLARD 7 SCALE: r =1' -0" STL CI PLATE I r Li►1 IAVIVA IIVN IGHT 12 "0 HOLE FOR PUMPING CONC PE PILE BELOW 1/2" THICK STL 1/2" CAP PLATE ' TYP I i PIPE PILE I I I I I I ELEVATION STEEL CAP PLATE kl.L� SCALE NTS 2• -0• V -0• 2' -0' 4' -0" SCALE: 1/2"=l'-O" 1' -0• 01-0" V -0" 2• -0" SCALE: 1 " =1' -0" 6" 0• -0" 3" 6" SCALE: 3 " =1' -0" I.- E SEAL END W/ 1/2' STL CAP PLATE, TYP— Ar— PILE TOP EL +24.00 (NAVD88) —JA HALF STL PIPE RUB STRIP, TYP STABBING 'DINT 8 "0 SCH 8( STL PIPE R STRIP, TYP STABBING PORTION io STABBING 8 "0 SCH 8C POINT STL PIPE Ri STRIP, TYP I I I $s o M I I I I'v I EL —3.00 io I (NAVD88) PIPE PILE DRIVEN PORTION 1 RUB STRIP 7 SCALE: 1 * -1' -0- t• LE CONNECTION TYP, SEE e NO R B STRIPS SHALL BE SHOP WELDED TO STABBING PORTION OF PIPE PILE AND COMPLETELY SEALED WITH STEEL CAP PLATES. 2. RUB STRIPS ON DRIVEN PORTION OF PILE SHALL BE BOLTED TO PIPE PILE IN THE FIELD. n n /, 11 /! 11 // 11 STL TAB PLATE WELDED TO RUB STRIP, TYP PIPE PILE HALF STL PIPE RUB STRIP PLAN RECUVED AUG 2 2 2013 DCU --TYMD MY ELEVATION CONNECTION 8 SCALE: NTS 1 "0 SS MECHANICAL ANCHOR, TYP 1/2' THICK STL TAB PLATE, TYP RIP V —o- W —o" I'—o' Z —o' I SCALE' 1 " =1' —O" C-4 O ID IL 0 z 0 co (L 0 z rE 0 tt I. j1b-; =rR1l ��t� cl ll O O m (L Ix 0 03 i fill # ka I Ila ; L 29j1 -- if ip. 1w n! vF Ulf a O O m (L Ix 0 03 i fill # ka I Ila ; L to O a. 0 z 0 co 29j1 -- if ip. 1w n! vF a ol A 1. � iei 7 � Y� f' (.�le !� i fit. TI • 1 3 3 s 3 s I L to O a. 0 z 0 co I IRECEIVED AUG 2 2 2011 DCM-NMD CiTy O to (L 0 z FR C) m ip. 1w n! vF a ol A 1. S ii =11 gal I L J.—L, I IRECEIVED AUG 2 2 2011 DCM-NMD CiTy O to (L 0 z FR C) m 1w vF ol A gal I L it III, • , CID 0 o NIP IL . 1-4-4- IL co Mxvivw, AUG- 2 2 2013 Dcryf-F m, C-.,Ty BORING LOGS — NEWPORT RIVER SHEET 2 OF 2 BARGE FLEETING AREA CARMNA roffirs , NORTH CAROLINA STATE PORTS AUTHORITY APPLICATION BY: MOFFATT & NICHOL MOREHEAD CITY, NORTH CAROLINA DATUM: NAVD88 SHEET 10 OF 10 DATE: JULY 2013 gip. }��j` it III, • , CID 0 o NIP IL . 1-4-4- IL co Mxvivw, AUG- 2 2 2013 Dcryf-F m, C-.,Ty BORING LOGS — NEWPORT RIVER SHEET 2 OF 2 BARGE FLEETING AREA CARMNA roffirs , NORTH CAROLINA STATE PORTS AUTHORITY APPLICATION BY: MOFFATT & NICHOL MOREHEAD CITY, NORTH CAROLINA DATUM: NAVD88 SHEET 10 OF 10 DATE: JULY 2013