Loading...
HomeMy WebLinkAboutSW3131204_APPROVED PLANS_20140305STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW��j%� DOC TYPE ❑ CURRENT PERMIT PPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE1���5� YYYYMMDD MARSHVILLE, NC O Q Tp,W Nj Q SITE tic Nc F�SN Tp p p�kTpw� SURVEY: BLUE RIDGE GEOMATICS, PA 1305 SOUTH COLLEGIATE DRIVE WILKESBORO, NC 28697 LICENSE: C-3576 CITY/TOWN: MARSHVILLE, NC VICINITY MAP (NTS) ENGINEER: BLUE RIDGE ENVIRONMENTAL CONSULTANTS, PA 1305 SOUTH COLLEGIATE DRIVE WILKESBORO, NC 28697 LICENSE: C-3448 NORTH CAROLINA COUNTY MAP (UNION COUNTY) SHEET INDEX: CS1 COVER SHEET CS2 NOTES CS3 NOTES Cl SITE PLAN C2.1 GRADING PLAN C2.2 STORMWATER DRAINAGE AREAS C3 EROSION CONTROL PLAN C4.1 UTILITY PLAN C4.2 SEPTIC LAYOUT PLAN C5 DEMOLITION PLAN G1 LANDSCAPE PLAN D1 DETAILS D2 DETAILS D3 DETAILS D4 DETAILS D5 DETAILS D6 DETAILS c SITE COORDINATES: LATITUDE = 35.131971 ° N LONGITUDE =-80.369966' W a �a J � y a Q Z J z V U) Z 0 a Z Oz af J W LL 0Z Z Z Lu Z uLwuj Z Q Z o 2 F r — z o W F9 2 Z Z W N W w J 0 z W W Ly m U p Z H Z O x Z m y w LJ.I W o J J � � m 14 W i D 7 D Z O r U co 0 U OZ w J J o w m Q N LJ J J = J W/�// Z w W � Q W U O a o a Z Z W OW CLM CD D L W W �m Q �W o_ mY W Lu o a >a3 > W ]ATE: 02126/°t 14 �}1 IROJECT NUMBER: U 0700172013 Z BRAWN BY: W J.EDWARDS Q APPROVED BY: J.CHURCH 0 SCALE: LL NTS (H) 0 Lu M Cn Q SHEET: Lu CS1 © COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED, OR GIVEN TO UTHERS. REPRODUCTION OR PHU I UGUF'YING Or I HIS FLAN WI I HUU I I HE WKI I I EN UUNSENT OF BLUE KIUGE ENVIKUNMEN IAL CUNSULTAN IS, P.A. IS HKUHIBI I EU ANU IS A VIOLA I ION Ur hEUEHAL COPYKIGH I LAWS, PUNISHAP1 L BY FINES UP TO $100,000 PER OFFENSE. F- W NPDES INSPECTION NOTES 1. THIS GENERAL PERMIT IS APPLICABLE TO POINT SOURCE DISCHARGES FROM CONSTRUCTION ACTIVITIES DISTURBING ONE OR MORE ACRES OF LAND. THE SUBMISSION OF A PROPOSED EROSION AND SEDIMENTATION CONTROL PLAN TO THE DIVISION OF LAND RESOURCES OR DELEGATED LOCAL PROGRAM SHALL BE CONSIDERED TO TAKE THE PLACE OF A NOTICE OF INTENT FOR COVERAGE UNDER THIS GENERAL PERMIT FOR THOSE PROJECTS REQUIRING THIS PERMIT COVERAGE. COVERAGE UNDER THIS GENERAL PERMIT SHALL BECOME EFFECTIVE UPON ISSUANCE OF AN APPROVAL FOR THE EROSION AND SEDIMENTATION CONTROL PLAN BY THE LAND QUALITY SECTION OF THE DIVISION OF LAND RESOURCES OR DELEGATED LOCAL PROGRAM. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND LAND DISTURBING ACTIVITIES APPROVAL OF THE EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE OBTAINED. 2. THIS PROJECT IS SUBJECT TO THIS PERMIT IN ADDITION TO THE APPROVED E&SC PLAN BECAUSE ALL CONSTRUCTION ACTIVITIES DISTURBING 1 OR MORE ACRES OF LAND ARE SUBJECT TO STORMWATER PERMITTING REQUIREMENTS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES). REFER TO A COPY OF GENERAL PERMIT NO. NCGO10000 AND GRANTED COVERAGE UNDER THIS GENERAL STORMWATER PERMIT. 3. THE APPLICANT MUST COMPLY WITH THE APPLICABLE TERMS AND CONDITIONS OF THIS STORMWATER PERMIT, AND ARE SUBJECT TO ENFORCEMENT BY THE DIVISION OF WATER QUALITY FOR ANY VIOLATIONS. 4. APPLICANT MUST IMPLEMENT THE EROSION AND SEDIMENTATION CONTROL PLAN APPROVED FOR THE PROJECT BY THE NC DIVISION OF LAND RESOURCES (DLR) OR BY AN APPROVED LOCAL PROGRAM. ADHERENCE TO THAT E&SC PLAN IS ENFORCEABLE COMPONENT OF THE STORMWATER PERMIT. 5. A RAIN GAUGE MUST BE KEPT ON SITE. 6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE A WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH (DURING A 24-HR PERIOD). IF ANY DEVICE FAILURE IS SEEN, IMMEDIATE CORRECTIVE ACTION MUST BE TAKEN. 7. ALL OUTLETS WHERE STORMWATER RUNOFF IS LEAVING THE SITE MUST BE INSPECTED AND EVALUATE THE EFFECT ON NEARBY STREAMS OR WETLANDS. CORRECTIVE ACTION MUST BE TAKEN (AND RECORDED) IF SEDIMENT IS BEING DEPOSITED OFF SITE OR IN A STREAM OR WETLAND OR IS CAUSING A VISIBLE INCREASE IN TURBIDITY (CLOUDINESS) OF ANY AFFECTED STREAM. 8. IF SEDIMENT IS BEING DEPOSITED IN A STREAM OR WETLAND, DWQ MUST BE CONTACTED WITHIN 24 HOURS. 9. RECORDS MUST BE KEPT OF THESE INSPECTIONS. 10. PROVIDE THE OPERATION AND MAINTENANCE (0&M) NECESSARY TO MAINTAIN OPTIMAL PERFORMANCE OF STORMWATER CONTROLS. THIS MEANS TAKE CORRECTIVE ACTION IF E&SC FACILITIES ARE NOT OPERATING PROPERLY. 11. REGULAR INSPECTIONS ARE A CHANCE TO CHECK IMPACTS TO NEARBY WATERS. IF SIGNIFICANT AMOUNTS OF SEDIMENT ARE OBSERVED, NOTIFY DWQ WITHIN 24 HOURS AND PROVIDE WRITTEN NOTICE WITHIN 5DAYS (SEE PART II, SECTION E OF THE PERMIT). PLEASE COPY CORRESPONDENCE TO DLR. 12. PREVENT STORMWATER CONTAININATION FROM EQUIPMENT USED DURING CONSTRUCTION. THIS INCLUDES PREVENTING SPILLS OF OIL, FUELS, COLLANTS, CEMENT, HYDRAULIC FLUIDS, ETC. FEDERAL GUIDELINES MUST BE FOLLOWED AND LABEL RESTRICTIONS WHEN USING HERBICIDES, PESTICIDES, AND FERTILIZERS. 13. DEMOLITION DEBRIS AND OTHER BUILDING MATERIAL MUST BE DISPOSED OF PROPERLY. MANAGE DISPOSAL OF LITTER AND SANITARY WASTE. PROJECT: DAIAICAI I . NPDES INSPECTION RECORD MONITORING FOR THE WEEK BEGINNING: ADAIAI rAl Arc cuel I BE MA!MTAIucn rwziTF Amn A RFr.nRn OF: THE nAB Y RAINFALL AMOUNTS SHALL BE KEPT. DAY OR DATE: RAINFALL AMOUNT (INCHES): INITIALS: Moor ooIVICIY1 Vr VV1•If WV MEASURE INDENTTIFACTION (i.e., SILT FENCE, SEDIMENT POND, SEDIMENT TRAP, GROUND COVER) DATE OF INSPECTION ...... INITIALS OF INSPECTOR _._..._._-_... OPERATING PROPERLY (G CORRECTIVE ACTIONS TAKEN DATE CORRECTIVE ACTION TAKEN OTnOILAAIATCD nlCf"LJ ADI-r f11 ITCAI I Q'. ­." m" A.lcn„se„e leT nF,.c.FrTFn AT I PASTONCE PERSEVEN CALENDAR DAYS ANDATFAIN 24 HOURSAFTER ANY STORM EVENT OF GREATER THAN 0.51NCHESOF RAIN PER 24 HOUR PERIOD. STORMWATER DISCHARGE OUTFACE IDENTIFICATION DATE OF INSPECTION INITIALS OF INSPECTOR IS EROSION SEEN NEAR OUTFALL? (Y/N) DESCRIBE EVIDENCE OF OTHER POLLUTANTS DISCHARGING FROM THE SITE SUCH AS OIL SHEEN, DISCOLORATION, CEMENT WASTES, SANITARY WASTE, FERTILIZERS, OR FUEL OR MATERIAL STORAGE LEAKAGE. VISIBLE SEDIMENT AND/OR STREAM TURBIDITY: RECORD CORREGTIVE AG I IUNs I AKtN IN Atato0MrN I yr wIN 1 nvL me QUun Q V • IS THERE ANY VISIBLE SEDIMENT DEPOSITED IN A STREAM, WETLAND OR BUFFER? YES NO DATES) DWO CONTACTED? • IS THEREANY VISIBLE SEDIMENT DEPOSITED ON ADJACENT PROPERTY(IES)? YES NO DATE(S) • IS THERE ANY VISIBLE DECREASE IN STREAM CLARITY? (Y/N) HAS THE FINAL PERMANENT GROUND COVER BEEN COMPLETED & ESTABLISHED? (Y/N) BY THIS SIGNATURE, I CERTIFY, IN ACCORDANCE WITH PART II SEC. B(10) OF THE NCG10000 PERMIT, THAT THIS REPORT IS ACCURATE AND COMPLETE TOTHE BEST OF MY KNOWLEDGE SIGNATURE OF PERMITTEE OR DESIGNEE: DATE: MANDATORY SELF INSPECTION PROGRAM THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE SELF -INSPECTION REPORT FORM WILL ALSO BE AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND QUALITY WEB SITE AT HTTP://WWW. DLR.EN R. STATE. NC.US/PAGES/SED I M ENTATION_N EW. HTM L EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES LARGER THAN ONE ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING. DOES THIS ONLY APPLY TO PROJECTS APPROVED AFTER OCTOBER 1, 2010? NO, IT APPLIES TO BOTH OLD AND NEW PROJECTS. WHO CAN CONDUCT THE INSPECTION? THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER OR THEIR AGENT MAY CONDUCT THE INSPECTION. IS A SPECIAL CERTIFICATION REQUIRED TO DO THE INSPECTION? NO WHAT IS THE GOAL OF THE SELF -INSPECTION PROGRAM? TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED, INCLUDING THE INSTALLATION AND MAINTENANCE OF MEASURES, AND THE PROVISION OF GROUND COVER IN A TIMELY MANNER. WHAT HAS TO BE INSPECTED? ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED. WHAT ELSE HAS TO BE CHECKED? THE NEED FOR GROUND COVER SHOULD BE CHECKED. TEMPORARY OR PERMANENT GROUND COVER MUST BE PROVIDED ON EXPOSED GRADED SLOPES AND FILLS WITHIN 21 CALENDAR DAYS OF THE COMPLETION OF A PHASE OF GRADING. PERMANENT GROUND COVER MUST BE PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (60 DAYS IN HQW ZONES), WHICHEVER TERM IS SHORTER, UPON THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT. DO NEWLY INSTALLED SEDIMENTATION CONTROL BASINS HAVE TO BE MEASURED? YES, THE ACTUAL DIMENSIONS OF THE BASINS HAVE TO BE CHECKED, USUALLY WITH A TAPE MEASURE, AND COMPARED TO THE DIMENSIONS ON THE APPROVED PLAN. DO NEWLY INSTALLED SEDIMENTATION CONTROL BASINS HAVE TO BE MEASURED BY A PROFESSIONAL LAND SURVEYOR? NO. GENERALLY THE WIDTH AND LENGTH OF BASINS CAN BE MEASURED WITH A TAPE MEASURE. A LEVEL AND SURVEY ROD MAY BE USEFUL IN CHECKING THE DEPTH OF A BASIN. ONLY RELATIVE ELEVATIONS, COMPARING THE BOTTOM AND TOP ELEVATIONS ARE NECESSARY. WHAT IS A SIGNIFICANT DEVIATION FROM THE APPROVED PLAN? A SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS THE MEASURE FROM PERFORMING AS INTENDED. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN CANNOT BE FOLLOWED, A REVISED PLAN SHOULD BE SUBMITTED FOR REVIEW. DOES IT REQUIRE A SPECIAL FORM? A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1" IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A NCAC 04B. 0131 STATES THAT "... DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN." CAN I JUST USE THE NPDES SELF -MONITORING REPORT? THE NPDES SELF -MONITORING REPORT MAY ONLY BE USED TO REPORT THAT THE MAINTENANCE AND REPAIR REQUIREMENTS FOR ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES AND DEVICES HAVE BEEN PERFORMED. WHEN DO THE INSPECTIONS HAVE TO BE DONE? UNLIKE THE NPDES SELF -MONITORING REPORT, THE SELF -INSPECTION REPORT FOR LAND -DISTURBING ACTIVITY DOES NOT HAVE TO BE WEEKLY, RATHER, THIS REPORT IS COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS COMPLETE. NOT EVERY PROJECT WILL HAVE ALL THE POSSIBLE PHASES, BUT THE LIST OF PHASES INCLUDES THE FOLLOWING: INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; CLEARING AND GRUBBING OF EXISTING GROUND COVER; COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS; INSTALLATION OF STORM DRAINAGE FACILITIES; COMPLETION OF CONSTRUCTION OR DEVELOPMENT; ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. WHERE DO I MAIL THE REPORT? DO NOT MAIL THE REPORT. THE RECORDS MUST BE MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR AT THE SITE. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ANY INSPECTION REPORTS SHALL ALSO BE MADE AVAILABLE ON THE SITE. NPDES GROUND STABILIZATION CRITERIA SITE AREA DESCRIPTION STABILIZATION TIMEFRAME STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS I NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) *BASED ON AUGUST 3, 2011 NCDWQ REVISIONS NPDES NOTES: • THE PERMIT CONTAIN CONDITION REQUIRING GROUND COVER WITHIN 14 DAYS ON DISTURBED FLAT AREAS AND 7 DAYS ON "ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL." SEE GROUND STABILIZATION CRITERIA TABLE ABOVE. THIS IS DIFFERENT FROM THE PROVISIONS OF THE NC SEDIMENTATION POLLUTION CONTROL ACT AND THE SEDIMENT CONTROL COMMISSION'S RULES. IN ADDITION TO THE QUICKER TIME FOR STABILIZATION, IT MUST OCCUR "AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 [OR 7] CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY." • THE PERMIT REQUIRES STABILIZATION WITHIN 7 DAYS FOR PORTIONS OF PROJECTS WITHIN THE SEDIMENT CONTROL COMMISSION - DEFINED "HIGH QUALITY WATER ZONE." • TO MEET THE FEDERAL REQUIREMENT FOR SETTLING BASINS"OUTLET STRUCTURES SHALL BE UTILIZED THAT WITHDRAW WATER FROM THE SURFACE." FOR BASIN OR TRAPS THAT HAVE A DRAINAGE AREA OF LESS THAN 1 ACRE, THE EXISTING STANDARD REQUIREMENTS APPLY. • THE NCG 010000 PERMITTEE MUST "LOCATE AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE. THIS LOCATION SHALL BE AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE." • THE PERMITTEE MUST "LOCATION OF STOCK PILES - LOCATE EARTHEN - MATERIAL STOCK PILE AREAS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATER UNLESS IF CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE." • DESIGNATION ON THE PLANS WHERE THE SPECIFIC GROUND STABILIZATION REQUIREMENTS APPLY AS PER SECTION II.B.2 OF THIS PERMIT. • DESIGNS OF BASIN WITH SURFACE WITHDRAWAL AS PER SECTION II.B.4 OF THIS PERMIT. SELF INSPECTION FORMS NAME OF INSPECTOR: AFFILIATION*: ('LANDOWNER, FINANCIALLY RESPONSIBLE PARTY OR AGENT) ADDRESS OF INSPECTOR: TELEPHONE NUMBER: SIGNATURE: (*LANDOWNER, FINANCIALLY RESPONSIBLE PARTY OR AGENT) DATE: PHASE OF APPROVED EROSION AND SEDIMENTATION CONTROL PLAN: MARK (X) INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES CLEARING AND GRUBBING OF EXISTING GROUND COVER COMPLETION OF ANY PHASE OF GRADING OR SLOPES FOR FILLS INSTALLATION OF STORM DRAINAGE FACILITIES COMPLETION OF CONSTRUCTION OR DEVELOPMENT ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION EROSION AND SEDIMENTATION CONTROL MEASURE INSPECTED: NAME/NUMBER/ LOCATION OF MEASURE (LIST ALL MEASURES ON PLAN) MEASURES INSTALLED SINCE LAS REPORT MEASURE OPERATING PROPERLY (YES/NO) SIGNIFICANT DEVIATION FROM PLAN? (YES/NO) DESCRIBE CORRECTIVE ACTIONS NEEDED* PROPOSED DIMENSIONS (FEET) ACTUAL DIMENSIONS (FEET) GROUND COVER ON SLOPES (BY LOCATION) DATE PHASE OF GRADING COMPLETE DATE GROUND COVER PROVIDED IS GROUND COVER SUFFICIENT TO RESTRAIN EROSION? (YES/NO) DESCRIBE CORRECTIVE ACTIONS NEEDED PERMANENT GROUND COVER (BY LOCATION) DATE CONSTRUCTION COMPLETE DATE GROUND COVER PROVIDED IS GROUND COVER SUFFICIENT TO RESTRAIN EROSION? (YESINO) DESCRIBE CORRECTIVE ACTIONS NEEDED* LOCATION OF DEVIATION OR SEDIMENT DAMAGE ACTIONS TAKEN TO CORRECT DEVIATION OR RESTORE SEDIMENTATION DAMAGE DATE ACTION TAKEN USE ADDITIONAL SHEETS AS NECESSARY U) uj — O Z a ze a W Z U) z U z of J LU LL z z W Z Z Lu 2 W > a z � z o 0_ d z 6 w z z Z W N W Ir w of z z p �o z Nw W w o "3 co Q LLI W W Of W m U) Z Q J Z O F— U F— U) Z O U z O z Ld LL J S Cl W W a N ILLJ J = J W z m w_ � N O a z Z Lu o I z a m O cwa w wpm 3 w zmY W o a >a5 W DATE: 02/26/2014 � PROJECT NUMBER: U 0700172013 Z DRAWN BY: W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: LL NTS (H) (V) CW Q SHEET: W CS2 Oc COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT HE HI7.-UbLU, 'jULI) LUArqt-I!, Jn--fV'N I '.' U I MI`7N� rcrrcUUuurIVV 'irrl)iulu !NO;urInlavvllrl.,IJImr arIICNI,VIVJCILIUr9W:KI'_1Utt�'INUINMCIVIALLUNJULIANIJ,r.A.ormk,"mi!CVHIVUIJHVNJIIIVIVVrrC'rmmL' Irrn,I-- I"v",rurvwnrnr'yTrINtJUYIV�ILIQ91UPtKOhhEN5E. Lr' '.1 1 ti 1 .�`.'A I. .� 1i1.� � ,., '• ..0. � ... ��. i. .I' r,l r 1 ,r,,l t... DEVELOPER NOTES: 1. ALTHOUGH THE CONTRACTOR EXCLUDES WORK REQUIRED THAT IS NOT SHOWN ON/IN THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR'S PRICE SPECIFICALLY INCLUDES ALL INCIDENTAL WORK THAT SHOULD BE TYPICALLY REQUIRED TO COMPLETE A COMMERCIAL PROJECT REGARDLESS OF WHETHER SAID WORK IS REFLECTED IN THE PLANS OR SPECIFICATIONS, HOWEVER, A VALID CHANGE IN THE CONTRACT SCOPE WILL REQUIRE A CHANGE ORDER AND SAID WORK WILL NOT BE PERFORMED WITHOUT A CHANGE ORDER. 2. CONTRACTOR AGREES THAT ITS BONDS AND BUILDERS RISK INSURANCE CARRIERS WILL REFLECT THE INTEREST OF THE OWNER, TENANT AND THE OWNERS LENDERS AS MAY BE REASONABLE REQUIRED BY OWNER, INCLUDING BUT NOT LIMITED TO, REFLECTING THE OWNER AS AN ADDITIONAL INSURED FOR THE PURPOSES OF PROVIDING ALL RISK PROPERTY INSURANCE. 3. CONTRACTOR SHALL OBTAIN A COPY OF ALL APPLICABLE PERMITS FOR THE PROJECT AND MAKE ADHERE TO ANY ITEMS NOTED OR REQUIRED PER THE PERMITS. 4. THE CONTRACTOR'S PRICE INCLUDES: A. APPROPRIATE BONDING FOR NCDOT WORK AND BUILDER'S RISK/LIABILITY INSURANCE IF APPLICABLE. B. ALL PERMIT FEES AND TAP FEES AS OUTLINES IN THE GENERAL CONTRACT BID, C. ALL FEES AND EXPENSES OF THE SOILS (AND OTHER) TESTING AGENCY (ICES) REQUIRED TO DEVELOP THE PROJECT IN ACCORDANCE WITH THE CONTRACT. D. ALL DEMOLITION AND CLEARING (AND OFF -SITE DISPOSAL OF DEMOLITION MATERIALS AND STUMPS) REQUIRED FOR THE PROJECT. E. ALL ENERGY MANAGEMENT SYSTEMS, SWITCH GEAR, AND GENERATORS, SHOWN ON THE PLANS OR REFERENCED IN THE SPECIFICATIONS. F. ALL UTILITY EXTENSIONS, ENTRY AND INSTALLATIONS REFERENCED IN THE PLANS AND SPECIFICATIONS INCLUDING ONSITE SEPTIC SYSTEMS. G. ALL REQUIRED RAIN LEADERS, FIRE EXTINGUISHERS, SODDING AND SEEDING. H. ALL ITEMS IDENTIFIED AS OWNER PROVIDED ITEMS; IN THE PLANS AND SPECIFICATIONS. I. ALL ITEMS RELATED TO PROVIDING A COMPLETE COMMERCIAL PROJECT AS DEFINED IN THE PLANS AND SPECIFICATIONS. J. ALL WORK RELATED TO PROVIDING COMPLETE EROSION CONTROL SERVICE FOR THE ENTIRE PROJECT, FOR THE DURATION OF THE PROJECT. THIS INCLUDES THE CONTRACTOR BEING RESPONSIBLE FOR ANY FINES ASSOCIATED WITH THE CONTRACTOR'S FAILURE TO STRICTLY ADHERE TO ANY AND ALL LOCAL, STATE, OR FEDERAL REQUIREMENTS. THIS ALSO INCLUDES THE CONTRACTOR PERFORMING ANY AND ALL INSPECTIONS OF ITS EROSION CONTROL SYSTEM, MAKING REPORTS, AND COPYING THE OWNER OR ANY OTHER REQUIRED ENTITY WITH SAID REPORTS. CONTRACTORS DUTIES RELATED TO EROSION CONTROL SHALL NOT END UNTIL THE CONTRACTOR HAS RECEIVED A FINAL SIGN OFF FROM NCDENR OR LOCAL PROGRAM. K. ALL WORK REQUIRED TO PROPERLY ADHERE TO ANY PERMITTING REQUIREMENTS, INCLUDING ACTUAL WORK, KEEPING OF PAPER WORK, INSPECTIONS, AND FILING FOR COMPLETION NOTICES, AS REQUIRED IN THE PERMITS ATTACHED TO THE CONTRACT. L. APPROPRIATE BONDING FOR THE STORMWATER BMP AS REQUIRED BY LOCAL AND STATE AGENCIES (IF PROJECT INCLUDES A STORMWATER BMP). M. CAPPING OF ALL ON SITE WELLS. N. PROPER REMOVAL OF ANY ABOVE GROUND OR BELOW GROUND STORAGE TANKS OR SEPTIC SYSTEMS. 5. CONTRACTOR SHALL FURNISH AN APPROPRIATE FOUNDATION SURVEY, 6. THE CONTRACTOR SHALL TIMELY ORDER ALL EQUIPMENT AND MATERIALS THAT HAVE LEAD TIMES POTENTIALLY IMPACTING THE SCHEDULE. THE CONTRACTOR SHALL TIMELY PROVIDE OWNER WITH ALL REASONABLY REQUESTED WORK SCHEDULES INCLUDING RECOVERY AND/OR MILESTONE SCHEDULES. 7. THE CONTRACTOR ACCEPTS THE RESPONSIBILITY TO COORDINATE BETWEEN THE CONTRACTOR'S TRADES (INCLUDING COORDINATION BETWEEN THE ARCHITECTURAL AND CIVIL DRAWINGS) TO ENSURE THAT ALL NECESSARY SCOPES OF WORK ARE INCLUDED IN THE CONTRACTOR'S PRICE. 8. IN THE EVENT MEASUREMENTS OF SOIL MATERIALS BECOME NECESSARY, CONTRACTOR AGREES TO USE "IN PLACE" MEASUREMENT. THE CONTRACTOR'S PRICE INCLUDES SOILS HANDLING IN A MANNER STRICTLY CONSISTENT WITH THE PLANS, SPECIFICATIONS, AND SOILS REPORT. 9. OWNER CHANGE ORDERS. ANY ITEM FOR WHICH THE CONTRACTOR MAY REQUEST AN OWNER CHANGE ORDER SHALL BE SUBMITTED IN ADVANCE TO OWNER FOR OWNER'S WRITTEN APPROVAL PRIOR TO CONTRACTOR PERFORMING THE WORK. THE OWNER IS NOT FINANCIALLY RESPONSIBLE FOR ANY CHANGE ORDER WORK PERFORMED WITHOUT WRITTEN APPROVAL. 10. AS CONSTRUCTION NEARS COMPLETION, THE CONTRACTOR SHALL SUBMIT TO THE OWNER APPROPRIATE "FIRM UP" LETTERS) THAT THE OWNER OR TENANT MAY RELY UPON. 11. ROCK: A. IN NO CIRCUMSTANCE WILL OWNER PAY FOR ROCK COST IF THE ROCK CAN BE RIPPED WITH A D-8 DOZER OR EQUIVALENT. THE QUANTITY OF ANY ROCK SHALL BE MEASURED PRIOR TO BLASTING. B. IN THE EVENT OF ROCK THE CONTRACTOR SHALL TIMELY PROVIDE ROCK BLASTING LIABILITY INSURANCE TO OWNER NAMING OWNER AS CERTIFICATE HOLDER AND ADDITIONAL INSURED TOGETHER WITH THE APPROPRIATE CERTIFICATES OF INSURANCE. SAID INSURANCE SHALL BE FROM A FINANCIALLY STABLE INSURANCE CARRIER LICENSED TO DO BUSINESS IN THE STATE OF NORTH CAROLINA. FURTHER, CONTRACTOR HEREBY INDEMNIFIES AND SAVES OWNER HARMLESS FROM ANY LIABILITY RELATED TO ROCK BLASTING. 12. THE CONTRACTOR'S EXCLUSION OF UNDERCUTTING UNSUITABLE CUT EXCAVATIONS ASSUMES THAT THE CONTRACTOR HAS DILIGENTLY PROTECTED THE CUT EXCAVATIONS AND NOT ALLOWED PONDING IN UNPROTECTED AREAS. t 4 jt�Jl_) i�llJ I 03�i{•i�� m N m a U) ¢ f— z w m Z Z O a o z it J LU LL H C7 z z z z w z Lu Lu > Z Q z 0 J R W z > o w w z Z U) w Cif Lj Jo z z p �o w z N w w w o J � 3 m W Cn W w J 0- 0 U 0 W U W W m H C/) C/) Z Q J EL W J C/) H O Z O 0 Z _O U H CA Z O U U Lr- Z O L J 2 'LLJ <aD ?SN W J J = J w�// U r Lu J Lu� N O U 0 a z w0 0p � EL w wpm 5 L ZmY W_ J o a Lu >a3 Lu W� DATE: L f 02/26/2014 } PROJECT NUMBER: U 07001720131 aZ DRAWN BY: W J.EDWARDS Q :APPROVED BY: J.CHURCH 0 SCALE: LL NTS (H) 0 M SHEET: W CS3 w I ,r i n, vN l KY J.,it." :,,A_-„)' M+ v, II ... .ii 1-vo.: IIN' tiP '1 .< p:.r hp.; v( n N1 Al nv; ,'�P''c i-.lY"�. i}n ,,, n,❑,... p. �- ".A ,t.,r-r W11.1I LIAM-. "JIVIOMPOLC O'I"' I! ©COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS FLAN MAY Nu i tit rct-uatu, ..n.,, wNry �Iv�ry I u u I ncna K_ rn uL, , r . L I w, ti t.VN. J I t .�-Ur t m.At= ,U. J -.J_ �A , rr is { I. x t < Q' 43„E"E JAMES F MCCLELLAN JR CALCULATED POINT cti 3Q0 P L ID# 01144013A DEED B . PG: 790 EDGE OF WATER /� _► 5'770 ZONED RA - EXISTING POND - >r 40 166 88, FOUND "PK" NAIL NORMAL POOL ELEV. = 502.70 FOUND 5/8" REBAR '13' CREEK / I ` / FOUND 1/2" REBAR 25 �Ei 28.80' 7/ SAC/ SET 5/8" CAPPED REBAR SIG BUFFER 50' POND SEP — JI PROPOERTYAND/OR / SFpT/Cq / /ci LEASE LINE / RFATp 00 'xl8' CONCRETE DU R PAD A/N�NO/STD l S� / tl / 16'xl6' CO TIE / /^ Sp: DELIVERY PAD ° NEW SALEM VOLUNTEER RETAINING WALL TO BE FIRE DEPARTMENT DESIGNED BY OTHERS. SAFETY / ' W x 50' L - 5" 31000 PSI CONCRETE co � PARCEL ID# 01144014 FENCE TO BE INSTALLED ALONG DEED BK: 203, PG: 236 EXTENTS OF RETAINING WALL vim/ ZONED B4 SEE DET. 3/D4 Al e O / 0J/ icy ti / r,y ; / s k 43 MASONRY RETAINING WALL �2� / r h 2 ' xr \! k x HEAVY DUTY ASPHALT / ' SEE DET. 1/D1 < 12 REVISION 2/24/2014 PYLON SIGN POLE BASE - /x: 0 POINT IN CENTER -. ; `� � ?; 920 \Py OF NC 218 \ Rrlr �- 0STANDARD DI * R� PAVEMENT MARKINGS STp ASPHALT SEED T.21D1� �R TO BE 4", WHITE AND TO MEET NCDOT \ �R STANDARDS lve WHEELSTOPS 4� pq* SEE DET. 6/Dl R� 4" DOUBLE YELLOW LANE MARKING 0 � .0Gy a , 2" TOP COAT OF S9.5C, T' R� I-19.0C, 8" B25.00 PER NCDOT 5�.,/ , \ ?o 00, R� Rom\ R \R,a �R R� \R mow\ R� \R �\R POINT IN CENTER OF NC 218 9 i� &06j r 5/8" 0 PA HVAC & I RANFORMER UNITS co q 0 Y iQ / Cq T041, D REBAR / VENTURE PROPERTIES VII, LLC PARCEL ID#:01144015 / REF. DEED BK: 5773, PG: 867 h� 2.001 AC TOTAL441 ho /3.5' DOLLAR GENERAL 9,100 SQ.FT. / 32 PARKING SPACES ' F.F.E. - 523.00 0 � l HANDICAP RAMP & / / SIGNAGE SEE DET. 3-5/D1 / / // FOUND "PK" / NAIL BOLLARDS SEE DET. 1/D2 GREGORY SCOTT KUNTZ PARCEL ID# 01144017 DEED BK: 513, PG: 098 ZONED B-4 ! h / J i 0 k / / X xSI 'k x x Cb' xk �R 2" TOP COAT OF S9.5C, 3" I-19.00, E" B25.00 PER NCDOT 4 �R� \R 0 tis60 \ \` \ 11,10 kp PARKING REQUIREMENTS 1 SPACE/400 SQ.FT. 23 SPACES REQUIRED TOTAL PROVIDED 32 SPACES LEGEND — — PROPERTY LINE — — — —100 — — — — EXISTING CONTOURS 1' c0 PROPOSED CONTOURS GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2, ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANTS PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. PARKING AND PAVEMENT NOTES 1. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC DEVICES, 2012 EDITION AS AMENDED. 2. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC WHITE ON ASPHALT IN NCDOT ROW. 3. ALL DIMENSIONS ARE TO FACE -OF -CURB UNLESS INDICATED OTHERWISE. 4. ALL CURB RADII ARE 5' UNLESS OTHERWISE INDICATED. 5. CONTRACTOR SHALL FURNISH AND INSTALL PAVEMENT MARKINGS AS SHOWN ON THE PLANS. 6. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES WITH OTHER CONTRACTORS ON SITE. 7. JOINTS OR SCORE MARKS ARE TO BE SHARP AND CLEAN WITHOUT SHOWING EDGES OF JOINTING TOOLS. 8. CONTRACTOR SHALL SAW -CUT TIE-INS AT EXISTING CURBS AS NECESSARY TO INSURE SMOOTH TRANSITIONS. CONTRACTOR SHALL SAW -CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS NECESSARY AND AS DIRECTED BY INSPECTOR TO INSURE POSITIVE DRAINAGE (TYPICAL AT ALL INTERSECTIONS). 9. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" ISSUED BY AGC OF AMERICA, INC. AND THE HEALTH AND SAFETY REGULATIONS FOR CONSTRUCTION ISSUED BY THE US DEPARTMENT OF LABOR. 10.CONTRACTOR SHALL FULLY COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. 11. ALL EXISTING ON -SITE STRUCTURES SHALL BE REMOVED PER LOCAL CODES AND DISPOSED OF OFF -SITE, INCLUDING ALL ATTACHED UTILITIES AND APPURTENANCES. ANY AND ALL WELLS ON -SITE SHALL BE IDENTIFIED TO THE ENGINEER BEFORE CONSTRUCTION AND CAPPED PER HIS INSTRUCTIONS. 12. ALL AREAS NOT IDENTIFIED AS HEAVY DUTY PAVING SHALL BE CONSTRUCTED AS STANDARD DUTY PAVING (SEE DETAILS FOR STANDARD AND HEAVY DUTY PAVING REQUIREMENTS). 13. ALL SIGNS SHALL MEET LOCAL REQ UIREMENTS. QUIREMENTS. 14. PAINTED STANDARD PARKING SPACE AND ISLAND STRIPE COLOR SHALL BE YELLOW FOR ASPHALT PAVEMENT AND CONCRETE PAVEMENT. COLOR FOR PAINTED HANDICAP ACCESSIBLE PARKING SPACE STRIPES, ACCESS AISLE OR ISLAND STRIPES, HANDICAP SYMBOLS, SHALL BE PAINTED PER THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. BOLLARDS SHALL BE PAINTED YELLOW. PAINT SHALL BE REFLECTIVE TYPE. STRIPING LEGEND SURFACES SHOULD BE CLEAN, DRY AND METAL SURFACES FREE YELLOW CURBING AND BOLLARDS - OF HEAVY RUST. 2 COASTS PARKING LOT SHERWIN WILLIAMS - KEM 4000 ACRYLIC ALKYD ENAMEL SAFETY YELLOW B55Y300 SURFACES SHOULD BE CLEAN, STRIPING - PARKING LOT DRY. TOP COAT SHERWIN WILLIAMS - PROMAR TRAFFIC MARKING PAINT YELLOW TM5495 SURFACES SHOULD BE CLEAN, HANDICAP STRIPING - PARKING LOT DRY, TOP COAT SHERWIN WILLIAMS - PROMAR TRAFFIC MARKING PAINT "H.C." BLUE 6j z 0 w :! m Z J Lu U) U) z A H W m t M Z M z � O z _I Lu 4 Z CD Z z w z w �z w of z g z 0 d z Q rn _ > U' w w N z Z U J Lu of w 0z LLI z z O CD Lu W N y m 3 co U z J J U) N U = J J z > 0 w �c � F m N J qa z 0 w o w 0 IL M ir CW7 w u m o 3 ¢ 0 w w zm� o a > a 3 uj Lu LLJ _J O a LLJ Lu Lu L11 m own I Z 0 D L t u J C 7 a uu DATE: � 02/26/2014 PROJECT NUMBER: U 0700172013 Z DRAWN BY: W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: LL (v) co SHEET: Lu 1 w C w © COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NO Lit? HE-USkD, 'U -U, I-UANr:., UN .:!VtN i v U i lrl"', Ktrt. - - u rVw vn rry i,�, -IrT PW- yr 1 r` ILP") 'vn r _,,.,1 1 nt wm 1 1 rw t.vivarw1 .,r OLUr' PULIbt MNVRCUNMCIN i Al- ,vwwu AN 10, r A. io rr%vnioi i cu mm,, n v IVLP I wT, v, I I "I'll , vnw, , �, w r ., V, =u' 43_"E JAMES F MCCLELLAN JR CALCULATED POINT 30•��' P LID#01144013A / r DEED B PG.790 EDGE OF WATER D /0 �= �'/7- ZONED V PON o /o. - o 40 43„ EXISTING POND ZN =$g' (To1 C) FOUND "PW NAIL / NORMAL POOL ELEV. = 502.70 _ A BEFORE YOU DIG! - FOUND S/8"REBAR = .38.88' l_ CREEK rY. / r CALL 1-800-632-4949 D-4/2"REBAR SOS��N / ZgSTPTEVEGEIA� N.C. ONE -CALL CENTER v505 � �� • ---- `._- 02 - -88 , Fx l 36. /, INV IN= IT'S THE LAW! 15" HDPE /* /�� ___O'B Af(DING ,SET 5/8" CAPPED REBAR 6" SCH 40 PVC UFFE -_ - f / 1 ti I r / Alp/ �° v / o h^ ,' / T RETAINING WALL O BE / a' _ v NEW SALEM VOLUNTEER ^ / ' Y n a \ co FIRE DEPARTMENT DESIGNED BY OTHERS. SAFETYCIO PARCEL ID# 01144014 FENCE TO BE INSTALLED ALONG EXTENTS OF RETAINING WALL �sz2aoeoR c / o / l DEED BK: 203, PG 236 SEE DET. 3/D4 / a. 522.A TO ZONED B-4 � `` 4 C. D REBAR i L o` v TcREVISION 522.40 2/12/20114 \ / 5 VENTURE PROPERTIES VII, LLC` . PARCEL ID#:01144015 1 / 2/26/2014 9 / REF. DEED BK. 5773, PG: 86 A CONTRACTOR RESPONSIBLE 2.001 ACTQTAL FOR STRUCTURAL DESIGN OFTHECHAMBEKS fr % l/i` 10' W x 35' L UNDERGROUND 8"HDPE SAND FILTER WITH INTERNAL 3. $CH 40 PVC S' r BYPASS�SEE DET. 1/D6 �� ' OUTLtT � MASONRY RETAINING WALL JUNCTION BOX I / 'DOLLAR�ENERAL 15" HDPE IN. INV. = 513.75 _ \ / ti9, 00 SQ. FT. / 15"HDPE OU INV. = 513.65 V / 2 PARKING PACES SEE DET. 2/D6/ _ F F.E: - 523 �5 on CURB INLET.. , FLOW SPLITTtR - _ ---- SEE DET. 2/D4 '. 15" HDPE INV. IN = 59`7.00 ♦ INV. IN = 517.25 6" HDP€ ROOF', V / UQVJOUT= 15" HDPE INV. OUT=�14.00 ♦ INV. OUT = 517.15 /� \pRAINS \ p 1 61 12" HDPF-4ML edf= 514.00 fi ORIrICE INV. OUT = 514.00 / a SSE 8"HDPE \ \ \ 4' WEIR ELEV. 516.00 �' / / SEE DET. 41D4 / FO N PK „ / /CURB I 1 ' ,. 6„'HDPE ROOF, I V, / / / U D / DRAINS / 51 BB / / n NAIL POLE BASE / GREGORY SCOTT KUNTZ PARCEL ID# 01144017 DEED BK: 513, PG: 098 IAZONED B-4 V 0 T= /� `"� ARC / /• / 52210H� p �� •7 . �^ / 512. 2 / I A / zz. a - / BRIVEWAY I INV IN I f PROFILE R \ 1 w,Te i � I 51�!42 ALL EXISTING CMP v. 8" HDPE / 1 IS TO BE REMOVED 525 DROP lil 6l T I / SEE DET.3/DN ,ROPINLET -1 \ 't r _ NV POINT IN CENTER OF NC 218 �v� / / �7 _- I \R B AR O r. INV �\ t �36 °0 QCj 6 1 ' Rom\ oor� \R / sus R4 53� \oo / \R,,,\ �o%TD s I ET5/8 PE4_-.., R '' I !i DRIVEWAY PROFILE _ R STATION R� °\ �V > \R� POINT IN CENTER \R OF NC 218 V AR�k 1\R © COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED. OR GIVEN TO OTHERS, REPRODUCTION OR PHOTOCOPYING OF THIS PI. AN ..... UT THE WRITTEN CONSENT OF BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A. IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS, PUNISHABLE BY FINES UP TO $100,000 PER OFFENSE. T 7 - - LEGEND - - PROPERTY LINE - - - - EXISTING CONTOURS �1oa PROPOSED CONTOURS GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION, 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. GRADING NOTES 1. PROPOSED CONTOURS SHOWN ARE TOP OF FUTURE PAVING/GRAVEL IN AREAS TO RECEIVE PAVEMENT/GRAVEL AND TOP OF TOPSOIL IN AREAS TO BE SEEDED AND/OR LANDSCAPED. 2. AREAS OUTSIDE OF THE PARKING LOT PERIMETERS SHOWN TO BE SEEDED AND/OR LANDSCAPED. 3. CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING, OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION WITH ALTERATION OF OR RELOCATION OF THE FACILITY. 4. ALL AREAS NOT COVERED BY BUILDING OR PAVING ARE TO BE GRASSED. 5. UNUSABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED TO AN APPROVED OFF SITE LOCATION BY CONTRACTOR, 6. ALL EXCAVATING IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 7. BEFORE ANY MACHINE WORK IS DONE, CONTRACTOR SHALL STAKE -OUT AND MARK OUT THE ITEMS ESTABLISHED BY THE SITE PLAN. CONTROL POINTS SHALL BE PRESERVED AT ALL TIMES DURING THE COURSE OF CONSTRUCTION. LACK OF PROPER WORKING POINTS AND GRADE STAKES MAY REQUIRE CESSATION OF OPERATIONS UNTIL SUCH POINTS AND GRADES HAVE BEEN PLACED TO THE OWNER'S SATISFACTION. 8. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EARTHWORK QUANTITIES. ENGINEER MAKES NO STATEMENT EITHER IMPLIED OR EXPRESSED REGARDING CUT/FILL QUANTITIES. 9. FINISHED GRADE AT EXTERIOR WALLS SHALL BE A MINIMUM OF 6" BELOW FINISHED FLOOR AT ALL NON -PAVED AREAS. 10. TOP SOIL, SHALL BE STRIPPED FROM ALL CUT AND FILL AREAS, STOCKPILED AND REDISTRIBUTED OVER GRADED AREAS, PROVIDE EROSION AND SEDIMENTATION CONTROLS AROUND STOCKPILES DURING CONSTRUCTION. 11. TILL SOIL TO A DEPTH OF 4" MINIMUM. 12. REMOVE ALL ROCKS LARGER THAN 1" MEASURED IN LARGEST DIRECTION. 13. ALL HDPE IS TO BE ADS N-12 ST IB DUAL WALL WITH SOIL TIGHT JOINTS AND DUAL WALL FITTINGS OR APPROVED EQUAL. ABBREVATIONS TC TOP OF CURB BC BOTTOM OF CURB TOR TOP OF RAMP BOR BOTTOM OF RAMP TOW TOP OF WALL BOW BOTTOM OF WALL BOD BOTTOM OF DITCH HP HIGH POINT EX. TC EXISTING TOP OF CURB EX. BC EXISTING BOTTOM OF CURB EP EDGE OF PAVEMENT EC EDGE OF CONCRETE NO WETLANDS PRESENT ON SITE AS DETERMINED BY DEREK GODDARD SEE INCLUDED PROFESSIONAL QUALIFICATIONS. 20 10 0 20 J 0 R. GJ N o� ¢ $� !- z W V i J Z V M E" Z z 0 4k z O w Z J W LL cD Z z Z W w M z w z z g z o 0_ d z Q rn V W N z ? N W W w Lu o z z z =m w z ow Lu W y 7 J m 3 m w 0 Lu 0 Lu m 0 cl Lu _J Lu Lu all DATE: 02/26/2014 >. PROJECT NUMBER: C) 0700172013 Z W DRAWN BY: J.EDWARDS Q APPROVED BY J.CHURCH 0 SCALE: IL 1" = 20' (H) (V) 0 cn 40 W SHEET: C2.1 BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! \R� \R �k\ 014311E JAMES F MCCLELLAN JR CALCULATED POINT 30•pp' P LID# 011440 / r _ -_ DEED B PG: 79090 EDGE OF WATER PON d / O S7 ZONED RA- ° o• _ 40 43 EXISTING POND _ __ _ E - 166 .� FOUND "PK" NAIL NORMAL POOL ELEV. = 502.70 _( FOUND 5/8" REBAR 38 CREEK FOUND -112" REBAR SED \505aiN 25SiPjs\tE � I — — J 502 8801 F.36" CP• j/• INVIN= 502.54' 15" HDPE 40B1NG ' / SET 5/8" CAPPED REBAR 6" SCH 40 PVC / �/* 50' POND _ POST CONSTRUCTION #3 15% IMPERVIOU / PRE -CONSTRUCTION: 1 1.95± ACRES F 32.3%IMPERVIOUS � �, / � � , o !//� NEW SALEM VOLUNTEER RETAINING WALL T E \ / / FIRE DEPARTMENT DESIGNED BY OTHERS. S TY FENCE TO BE INSTALLED LONG,,_ h / PARCEL ID# 01144014q� r DEED BK: 203, PG: 236 EXTENTS OF RETAI G WALL ,� / ..�• 52230`BOfi ZONED B 4 S DET. 3/D4 CONTRACTOR RESPONSIBLE i FOR STRUCTURAL DESIGN,, I OF THE CHAMBERS / 10' W x 35' L UNDERGROUND L� SAND FILTER WITH INTERNAL BYPArSS SEE DET. 1/D6 ? i MASONRY RETAINING WALL j i r i JUNCTION BOX / r i �• 1 v Z 'PARCEL I REF 1 1 WF4 Fill of -� 1• t • C DO LAR HDPE • SEE DET. 2/D6/ OPACES =�. 01 RB INLET, 15" HDPE INV. IN = 5t7.00 fto 15" HDPE INV. OUT=�14.00 12" HDPE4NV Odf 514.00 fi QRIrICEINV.OUT=514.00 !1 n 4' WEIR ELEV. 516.00 SEE DET. 4/D4 jr /CURB 1 1- — POLE 'BASE / �R� I � • ti� 4 t R 1 DRIVEWAY R dr a PROFILE � R � 525 / r POINT IN CENTER \ o OF NC 218 \ o INV IN = 517.25 \ \ 6" HDPF ROOF INV. OUT = 517.15 61 8" HDPE \ w „ D • 1 1• '• C j fpNAIL y�� O PARCEL I 1 • 01144017 ZONED B-4 iY! I 8" HDPE DROPIN6€T SEE DET. 3/D2. \ PROP INLET -1 cPOST CONSTRUCTION #1 v p .49± CRE \\ RVI US p\ O' \R \ ET 5/8 PER R POINT IN CENTER \ OF NC218 \ �• LEGEND - - PROPERTY LINE - - - - EXISTING CONTOURS —� PROPOSED CONTOURS GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4, EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. GRADING NOTES 1. PROPOSED CONTOURS SHOWN ARE TOP OF FUTURE PAVING/GRAVEL IN AREAS TO RECEIVE PAVEMENT/GRAVEL AND TOP OF TOPSOIL IN AREAS TO BE SEEDED AND/OR LANDSCAPED. 2. AREAS OUTSIDE OF THE PARKING LOT PERIMETERS SHOWN TO BE SEEDED AND/OR LANDSCAPED. 3. CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING, OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION WITH ALTERATION OF OR RELOCATION OF THE FACILITY. 4. ALL AREAS NOT COVERED BY BUILDING OR PAVING ARE TO BE GRASSED. 5. UNUSABLE EXCAVATED MATERIALS AND ALL WASTE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED TO AN APPROVED OFF SITE LOCATION BY CONTRACTOR. 6. ALL EXCAVATING IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 7. BEFORE ANY MACHINE WORK IS DONE, CONTRACTOR SHALL STAKE -OUT AND MARK OUT THE ITEMS ESTABLISHED BY THE SITE PLAN. CONTROL POINTS SHALL BE PRESERVED AT ALL TIMES DURING THE COURSE OF CONSTRUCTION. LACK OF PROPER WORKING POINTS AND GRADE STAKES MAY REQUIRE CESSATION OF OPERATIONS UNTIL SUCH POINTS AND GRADES HAVE BEEN PLACED TO THE OWNER'S SATISFACTION. 8. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EARTHWORK QUANTITIES. ENGINEER MAKES NO STATEMENT EITHER IMPLIED OR EXPRESSED REGARDING CUT/FILL QUANTITIES. 9. FINISHED GRADE AT EXTERIOR WALLS SHALL BE A MINIMUM OF 6" BELOW FINISHED FLOOR AT ALL NON -PAVED AREAS. 10. TOP SOIL, SHALL BE STRIPPED FROM ALL CUT AND FILL AREAS, STOCKPILED I AND REDISTRIBUTED OVER GRADED AREAS, PROVIDE EROSION AND SEDIMENTATION CONTROLS AROUND STOCKPILES DURING CONSTRUCTION. 11. TILL SOIL TO A DEPTH OF 4" MINIMUM. 12. REMOVE ALL ROCKS LARGER THAN 1" MEASURED IN LARGEST DIRECTION. 13. ALL HDPE IS TO BE ADS N-12 ST IB DUAL WALL WITH SOIL TIGHT JOINTS AND DUAL WALL FITTINGS OR APPROVED EQUAL. • 10 • 20 40 d OJ N 'a F J Lu Z MM # Z O z Of J W ILL z z Z W Z z Lu w z g z o 0 EL z w Q Ci W U Z Z U) J N WLu w W oz ? z o �o w W W y y � r'3 m C/) W H W _J O W U Lij Of LLI m (n Z J w J U) O O 0 N N 0 O U O U LL 0 Icl Lu J Cf- LLI w w �•, U Z DATE: 02I26I2014 PROJECT NUMBER: 0700172013 w Q O LL. 0 DRAWN BY: J EDWAZj APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (v) (W W SHEET: C2.2 w f� © COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RE5EKVtU. I HIS PLAN MAY NU I Dt Kt-uStU, SVLU, LUANtU, UK UlVtN I U U I rltKo. Ktrr VUUu , I IUN um mu i uuurT iNu ur i nw rLAIN vW i nuu i i nt vvKi i i tN wNotN I Ur DLUt KiUUt tNVIMUNmtN I AL UUNouL AN i o, r.A, io rRunirm i to ANu w M VIULM i IU14 ur rtUtnAL wr T nwn i LMVVO, ruNIDnMDLM O T rmco ur i u y iuu,uuu rtn urrtrvot. BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! v 40' 43_1,E JAMES F MCCLELLAN JR CALCULATED POINT `3p• 00, P L ID# 01144013A r -- DEED B . PG: 790 EDGE OF WATER PONQ / �� S7/� ZONED 40'43"E / / l EXISTING POND 16 T "' FOUND "PK" NAIL / NORMAL POOL ELEV. = 502.70 • 13 I �TAL)_ • _ - I / B' W z 16' L TEMPORA� CREEK r • RY 30'Wx90'Lx3'DSKIMMER BASIN OUTLET PROTECTION / 1.5" SKIMMER WITH 1.4" KNOCKOUT ORIFICE \ SEE DET. 5/D3 EMERGENCY SPILLWAY = 507.00 �505 --'--- -- , \\ 2880, SEE DET. 1-3/D3 _ / %8'� __. _. SET 5/8" CAPPED REBAR V/� / �' __ t I r / . �I r _ DITCH TO BE LINED WITH I �ReFp - TEMPORARY CURLEX II SEE DET. 1/D4DIVERSION 0 / SEE DIET. '8/D2LO _ RETAINING WALL TO BE NEW SALEM VOLUNTEER DESIGNED BY OTHERS. SAFETY '� / ' .. ° r ,°Go FIRE DEPARTMENT FENCE TO BE INSTALLED ALONG.. h PARCEL ID#01144014 q� ° q� STONE OUTLET EXTENTS OF RETAINING WALL DEED BK: 203, PG 236 - ° v / / / / / i= SEE DET. 7/D3 SEE DET. 3/D4 e' 1 \ \ / / / / ZONED B 4jA / / ` \ �t OUTLET PROTECTION ^ D R SEE,DET.7/D2 �F` \ _ / / / / /o \ \ / VENTURE PROPERTIES VII, LLC` SILT FENCE PARCEL ID#: 01144015 SEE DET. 5/D2 REF. DEED BK: 5773, PG: 867 2.001 AC rrOTAL / �S TEMPORARY 20 v DIVERSIONco SEE DL=T 8/D2 1 SILT FENCE pp V A 4 �j SEE DET 5/D2 MASONRY RETAINING WALL _ \ / DOLLAR�ENERAL j / l \ i . N CE ^` \ LIMITS OF DISTURBANCE / ! F.F.E' 523bQ / y � � / 1.77t ACRES t, / � l , _ /CURB I 1 ` \ \ / FOLAD „PK„ t NAfL POLE BASE GREGORY SCOTT KUNTZ PARCEL ID# 01144017 DEED BK: 513, PG: 098 ZONED B-4 �� I /• / \ V \� F� // . A / r / / / DITCH TO BE LINED i WITH CURL EX II SEE SB-1 CALCULATIONS DET. I ID4 1. DA = 1.77 ACRES 2. DU = 1.77 ACRES 3. to =5 minutes q l / i-.5nr R INLET PROTEQTI 6. Q10 = CiDA = (0.6)(7.54)(1.77) = 8.01 ft3/s i SEE DET.61DD2 V �_ r r 7. SAreq = 325Q10 = (325)(8.01) = 2,604 ft23 - a 8. V eQ = 1800DU = (1800)(1.77) - 3,168 ft \\ 525 4 \ \ \ i PROP INLET 1 ` / r , 3.0 10. depth 0 11. W= 30 ft - L = 90 ft 12. SApvd _ (30)(90) = 2,700 ft2 13. V 6,084 tP 14. V = 4,504 ti3 POINT IN CENTER OFNC218 0 t V�x� /may / r 15. T�water 3 days s j f ti f ` \ 's 16. Qdewater = V j 17. Baffles: top 2 dewater= 1, 501 It% es 81= 0.35L = (0.35) (90) = 31.5 It "�Tyc A / �� ��o� / b. B2 = BY + 0.25L = 31.5 + (0.25)(90) = 54 It c. 63 = 82 + 0.25E = 54 + (0.25) (90) = 76.5 ft 11 I e, 49 \ l TEMPORARY DIVERSION CALCULATIONS w 0 ` R ' tiSso �'�� - ` 1. S = 0.06 ft/ft 0 �s 2. b = 1 ft, Z = 2 ft/ft, Q = 13.08 ft3/s \R* 2 S3" �0 , R� / j --- l 3. Liner = American Excelsior Curlex II = n = 0.035 r = 2 25 lbs/ft2 R� 4p�T I \R� 1 \R �Iv\ R� \R R� \a R�\R �\R �\R P 4. Solve Qr1 149�S AR2 = 0 b trial and error, d = 0.1 It ( )- 3 - Y normal - \ TEMPORARY CONSTRUCTION 5. R = A/Pw = 1.9113.58 = 0.53 ft E7 5l8 PED.._ . R 'w A ENTRANCE SEE DET. 4/D2 6. To = yRS = (62.4)(0.53)(0.06) = 2.00 Ibs/ft2 < rp LEGEND - - PROPERTY LINE - - - -100 - - - - EXISTING CONTOURS ^� PROPOSED CONTOURS SILT FENCE TEMPORARY DIVERSION m m m m m m LIMITS OF DISTURBANCE GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. MAINTENANCE PLAN 1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EXISTING BUILDING DEMOLITION. 2. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS AND SHALL COMPLY WITH THE LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL MANUAL. 3. PER NPDES REQUIREMENTS, CHECK ALL EROSION AND SEDIMENTATION CONTROL DEVICES AND STORMWATER RUNOFF DISCHARGES FROM EACH OUTFALL SHOULD BE INSPECTED EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT. A RAINFALL GAUGE SHALL BE KEPT ON SITE, AND A RECORD OF RAINFALL AMOUNTS AND DATES MUST BE RECORDED AND KEPT ON SITE. RECORDS OF INSPECTIONS OF DEVICES AND OUTFALLS SHOULD BE KEPT AND VISIBLE SEDIMENTATION OUTSIDE THE DISTURBED LIMITS SHOULD BE NOTED. ANY ACTIONS TO CONTROL FUTURE RELEASES AND CLEANUP OF SEDIMENT MUST BE RECORDED. A SAMPLE LOG FOR RECORD KEEPING IS AVAILABLE FROM NCDENR DIVISION OF WATER QUALITY, STORMWATER AND GENERAL PERMITS UNIT. 4. CHECK ALL EROSION CONTROL DEVICES WEEKLY AND AFTER EACH RUNOFF PRODUCING STORM EVENT AND MAKE ANY NECESSARY REPAIRS AS NEEDED TO ENSURE DEVICES ARE FUNCTIONING AS INTENDED. 5. REMOVE SEDIMENT DEPOSITS FROM SILT FENCE AND STONE OUTLETS WHEN DEPOSITS REACH HALF CAPACITY, REPAIR ANY BREAKS IMMEDIATELY. 6. REPLACE GRAVEL CONSTRUCTION ENTRANCE AS NECESSARY. 7. CONTRACTOR WILL BE FINANCIALLY RESPONSIBLE FOR ANY AND ALL FINES LEVIED DUE TO NOT MAINTAINING PROPER EROSION CONTROL MEASURES AT ALL TIMES. EROSION CONTROL CONSTRUCTION SEQUENCE 1. OBTAIN NECESSARY PERMITS FROM ALL REGULATORY AUTHORITIES. 2. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. 4. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE TO PROVIDE ACCESS FROM ARMY ROAD. 5. INSTALL SILT FENCE AND STONE OUTLET ALONG LIMITS OF DISTURBANCE. DO NOT DISTURB SEPTIC AREA DURING SILT FENCE INSTALLATION. 6. INSTALL SKIMMER BASIN WITH FAIRCLOTH SKIMMER. SKIMMER BASIN IS TO REMAIN IN PLACE DURING MASS GRADING OPERATIONS. 7. INSTALL TEMPORARY DIVERSIONS TO CONVEY RUNOFF TO SKIMMER BASIN. ADJUST TEMPORARY DIVERSIONS AS NECESSARY AS FILL PROGRESSES. 8. INSTALL RETAINING WALL. PLACE FILL IN REQUIRED LIFTS AS RETAINING WALL IS ERECTED. ALL OFF -SITE FILL MUST COME FROM AN APPROVED SITE. CONTRACTOR IS RESPONSIBLE FOR PERMITTING BORROW SITE. ADJUST TEMPORARY DIVERSIONS AS NECESSARY TO TO CONVEY RUNOFF AROUND WALL TO SKIMMER BASIN. 9. PROCEED WITH MASS GRADING OPERATIONS. STABILIZE AREA WITH SEED AND STONE BEFORE PROCEEDING TO FINISH GRADING. INSTALL DITCH LINERS AS SWALES ARE GRADED. 9. INSTALL SAND FILTER. 10. INSTALL CATCH BASIN AND CURB INLET WITH INLET PROTECTION AND PIPE NETWORK WITH OUTLET PROTECTION. DO NOT CONNECT STORMWATER NETWORK TO SAND FILTER UNTIL SITE IS STABILIZED. 11. SEED ALL EXPOSED AREAS PER NPDES SEE SHEET CS2. 12. REMOVE EROSION CONTROL MEASURES AFTER SITE STABILIZATION AND RELEASE BY PERMITTING AUTHORITIES. 20 10 0 20 40 J 0 Z O O W z 0 LU U) r- z LU 0 0 U w z w 0 U z M W N ~Q N 0 m a U) z a F Z w M z z O z J LU lL z z z LU Z LUz w r z g z 00- z a� LU Z Z C J N W ww Jo z LU LU LU M z z �o o w Z y w LU LU J m m Z 0 U O U Ir- 0 0 LLj LU J w Z r UJI LoJ la > a 3 Ii LU DATE: w 02I06I2014 � PROJECT NUMBER: C ) 0700172013 Z DRAWN BY: L U J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: LL 1" = 20' (H) M CO SHEET: J C3 uj ©COPYRIGHT2014BYBLUE RIDGE ENVIKONMENTALCONSULIANIS,P.A.,ALL KIUHISKtbtKVtU. INIOFLAN MAY NUI DtKr-UOrU,OULU,LUMI\CU,UmUIVCIV IV VInrmo. mcrmuuuwiuNunrnuiuuvrTiNoVr inlorLANminuul i r1r .... il I I I UN UUIVOI:NI UrDLUrMIUUCCIVVIKVNMCIVIALUUNOULIANIJ Y.N.IormVnlD1ICUAIVUIOAvIULNIIUIVVrrCUrmALUVrIAlUnI L}Avro-UIVIOnV DLCDr rancour w;Iiuu,uuurcnvrrcNot. -.. t i.0-;-w a m DOIKIT im rC:KITCD 0' 43_°E JAMES F MCCLELLAN JR i CALCULATED POINT�I � 30.00' P LID# 01144013A EDGE OF WATER / �� /�O _ S° DEED B PG: 790 / PON /�- _= 40 ZONED RA- f 43 166. EXISTING POND �� $$ FOUND 'I NAIL / NORMAL POOL ELEV. = 502.70 t OTq� i FOUND 5/8" REBAR i ,�. 5 ' �� CREEK / FOUND 1l'2_REBAR 25 /EV� �P� ' _ ryo� / 2120/201EVIS'4 2$•$0 / �0 BIDING i SET 5/8" CAPPED REBAR / SIC BUFFER / 50' POND SEP � r� i / TO 1 f / a NEW SALEM VOLUNTEER / , ° RETAINING WALL TO BE CO i / / a DESIGNED BY OTHERS. SAFETY FIRE DEPARTMENT FENCE TO BE INSTALLED ALONG h / PARCEL ID# 01144014 W / 4 EXTENTS OF RETAINING WALL DEED BK: 203, PG: 236 V 9 / _ ZONED B-4 SEE DET. 3/D4 hoe/ a q 4 / �^ (yam <-4 IF/ D REBAR / JA Ao TSCH40PV/SLEEVE /.Q 7 VENTURE PROPERTIES VII, LLC PARCEL ID#:01144015 REF. DEED BK: 5773, PG: 867 / 2.001 AC TOTAL / ve a f q h // WQCi � �'/ MASONRY RETAINING WALL DOLLAR GENERAL / a f 9,100 SQ.FT. / //f 32 PARKING SPACES / 1" ELECTRICAL CONDUIT / F.F.E. = 523.00 a O FOUND "PK" SEE SHEET C4.2 / / / i NAIL POLE BASE / �/ ` EXISTING WELL TO BE FOR SEPTIC DESIGN BANDONED (SEE UNION A / COUNTY HEALTH / a J GREGORY SCOTT KUNTZ DEPARTMENT PERMIT. / / / PARCEL ID#01144017 / AK DONMENT SHALL S,0 a i DEED BK: 513, PG: 098 RM��WA COPPER IRRIGATION \R BE PEDIVISION OF ZONED B-4 BY OTHERS WATERIWALITY OR O / a a WATER LINE (IRRIGATION LOCAL HEAL'ItSDEPT. q� o REGULAY / a / / / 3/4" RPZ BACKFLOW PREVENTION \ / �"Q WITH BF PRODUCTS, INC. HEATED FIBERGLASS ENCLOSURE (MODEL #232-APD) SEE DET 3-4/D6 � 1" ELECTRICAL � I'V// a R� WIA VICOPPER WATER LI a / �-pip A \ \ (BACKFLOW PREVENTION INSTALL PRESSURE REDUCING VALVE ON i WATER TAP AS REQUIRED BY UNION EXISTING METER TO COUNTY PUBLIC WORKS BE USED FOR 3/4" IRRIGATION LINE REVISION \ LOCATED INSIDE BUILDING) a / a f / 2/20/2014 \ / / EXISTING 8" PVC (C-900) '"ten a a a WATER MAIN 2/242014 a� WATER SERVICE IS LOCATED ACROSS ARMY ROAD. TAP WILL REQUIRE BORE UNDER ARMY ROAD ti CONTRACTOR IS RESPONSIBLE FOR MAKING TAP. /�� / COORDINATE WITH UNION COUNTY PUBLIC WORKS / f DEPARTMENT. SEE UNION COUNTY DET. 5 ti a / 1" COPPER SERVICE LINE K Cp f 1" POTABLE WATER /� METER SEE UNION / a / l�J=�� + COUNTY DET. 6 / a / ja / a / / r i D \ P R \ Q�k f n..,,Wy wlr.H Gl!4 !".r li :IYIUbt CNVI11I NmtN! MIL 'J)INSIP.. LEGEND — — PROPERTY LINE — — — —1D0 — — — — EXISTING CONTOURS ^� PROPOSED CONTOURS P OVERHEAD ELECTRIC GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. ON -SITE UTILITY NOTES 1. FOR GENERAL SITE WORK, SEE SHEET Cl. 2. ALL SANITARY SEWER PIPE SHALL BE SCH 40 PVC PIPE (BEDDED IN STONE) CONFORMING TO ALL STATE AND LOCAL STANDARDS. 3. THE MINIMUM HORIZONTAL SEPARATION BETWEEN THE CLOSEST TWO POINTS OF THE WATER AND SEWER LINE IS TEN FEET (10'). THE MINIMUM VERTICAL SEPARATION BETWEEN THE CLOSEST TWO POINTS OF THE WATER AND SEWER LINE IS EIGHTEEN INCHES (18'). 4. ALL SPRINKLER, DOMESTIC, AND SANITARY LEADS TO THE BUILDING SHALL END 5' FROM THE EDGE OF BUILDING AS SHOWN ON PLAN AND SHALL BE PROVIDED WITH A TEMPORARY PLUG AT END (FOR OTHERS TO REMOVE AND EXTEND AS NECESSARY). 5. ALL GATE VALVESIBOXES SHALL BE TO TOWN/CITY STANDARDS. 6. ALL TRENCHING, PIPE LAYING, AND BACKFILLING SHALL BE IN ACCORDANCE WITH FEDERAL OSHA REGULATIONS. 7. SITE CONTRACTOR SHALL HAVE APPROVAL OF ALL GOVERNING AGENCIES HAVING JURISDICTION OVER THIS SYSTEM PRIOR TO COMPLETION. 8. INSTALLATION OF THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE WITH SITE WORK SPECIFICATIONS. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COST ASSOCIATED WITH INSTALLING TRANSFORMERS. LOCATION SHOWN ON PLANS IS APPROXIMATE. CONTRACTOR TO COORDINATE EXACT LOCATION WITH POWER SUPPLIER. 10. SEE MECHANICAL SHEETS FOR CONTINUATION OF FACILITIES INTO AND OUT OF THE BUILDING. LOCAL UTILITY COMPANIES UTILITY COMPANY NAME PHONE WATER UNION COUNTY PUBLIC WORKS (704) 2964210 POWER DUKE ENERGY (800) 452-2777 TELEPHONE AT&T (877)253-0009 SANITARY SEWER UNION COUNTY HEALTH DEPARTMENT (704) 283-3553 20 10 0 20 40 LU Lu F— w J CL Q Lu Lu cr- L1J U) m U) Q CL i W J u) O 0 N N 0 Z J J a �ti J oa Z F W J � Z O O j U z J W LL z z z w z z w w z g z o d z Q rn 7 0 W c� z Z Lu xw oZ w Lu z K z LLJ W y m LAJ DATE: w 02126/2014 PROJECT NUMBER: U 0700172013 Z w 10 Q O LL DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH SCALE: 1" = 20' (H) (V) 0 U) w SHEET: C4.1 NWN 1..1.E . , I IJ IRA :02 / 4 v .4 a v 4 4 q4 IJ / / IJ / DOLLAR GENERAL 9,100 SQ.FT. 32 PARKING SPACES F.F.E. = 523.00 \ ;i U r 0 m / / / / / / 8 -125' DRIP TUBING / , 1 / C / �0 :� O / Go / 4 / a V 4 c 4 4 /4 4.. c 3" SCH 40 PVC SLEEVE / 4 / c h / / a/ a / / 1 _ i_ ANV / a a e a a / a / / 6 a / 1 a / _ SEPTIC SYSTEM DRAWING LEGEND A. 4" INCOMING SEWER LINE FROM BUILDING ro /� U/NH)LL B. SEWER CLEANOUT T o C. 1,500 GALLON PRECAST CONCRETE SEPTIC TANK 70" W X 142" L X 63" H (TANK ID: DELLINGER-STB-797-1500) , D. 4" GRAVITY DISCHARGE LINE FROM SEPTIC TANK TO PRETREAT UNIT E. 1,060 GALLON FRALO PRE -TREAT HDPE TANK 62" W X 133" L X 51" H CONTAINING A SEPTITECH M4000V ENGINEERED PRETREAT UNIT (TANK ID:M4000V), SEE DET. 6/D4. GOULDS LSP03 PUMP BACK AND DISCHARGE PUMP AND TSURUMI 50PN23.25S RECIRCULATING PUMP F. 2" PVC AIR INTAKE LINE WITH AIR-INTAKE SNORKEL G. 1-1/2" PUMP -BACK LINE FROM PRETREAT UNIT TO SEPTIC TANK SITE H. 3/4" PVC ELECTRICAL CONDUIT TO BUILDING PANEL, WITH 1-120V, 1-PHASE, 20-AMP CIRCUIT FOR PUMP POWER AND 1-120V, 1-PHASE, 15A CIRCUIT FOR ALARM AND CONTROLS pia Ntn2 I. PRETREAT SYSTEM CONTROL PANEL N� J. 1-1/2" PIPE FROM PRETREAT DISCHARGE PUMP TO PUMP TANK �\sNaora K. 2" ELECTRICAL CONDUIT FROM CONTROL PANEL TO PRETREAT UNIT L. 1,000 GALLON PRECAST CONCRETE PUMP TANK 61" W X 97" L X 59" H WITH *DRIP SYSTEM DISCHARGE PUMP AND FLOAT TREE (TANK ID: DELLINGER-PT-2831000), SEE DET. 5/D4, 5/D5 M. * DRIP SYSTEM CONTROL PANEL, SEE DET. 6/D5 N. 1-112" PVC ELECTRICAL CONDUIT FROM PUMP TANK TO DRIP CONTROL PANEL 0. 1-1/2" DISCHARGE PIPING FROM DRIP SYSTEM PUMP TO HEADWORKS UNIT P. * DRIP SYSTEM HEADWORKS UNIT WITH INSULATED VALVE BOX ENCLOSURE, SEE DET. 1/D5 R. 1-1/2" PVC BACKWASH LINE FROM HEADWORKS UNIT TO SEPTIC TANK VICINITY MAP S. 1" PVC RETURN LINE FROM DRIP SYSTEM RETURN MANIFOLD TO HEADWORKS UNIT (NTS) T. 1" PVC SUPPLY LINE FROM DRIP SYSTEM HEADWORKS UNIT TO SUPPLY MANIFOLD U. * DRIP SYSTEM SUPPLY MANIFOLD WITH AIR RELEASE VALVE, SEE DET. 2/D5 V. * DRIP SYSTEM RETURN MANIFOLD, WITH AIR RELEASE VALVE AND CHECK VALVE, SEE DET. 2/D5 LEGEND W. * 125' DRIP TUBING, INSTALLED 6" BELOW GRADE, 2' ON CENTER BETWEEN ROWS, SEE DET. 2/D5 X. BLACK SCH. 40 FLEX HOSE AND FITTINGS, SEE DET.4/D5 - - PROPERTY LINE Y. 1/2" SCHEDULE 40 PVC - - - -100 - - - - EXISTING CONTOURS Z. 1" ELECTRICAL CONDUIT FROM DRIP SYSTEM HEADWORKS TO CONTROL PANEL COMPONENTS ARE PART OF AMERICAN MANUFACTURING COMPANY DRIP KIT MODEL ASD151-S122. VERIFY KIT PROPOSED CONTOURS COMPONENTS WITH MANUFACTURER. P OVERHEAD ELECTRIC DRIP SYSTEM GENERAL INFORMATION 1. ALL TANK LOCATIONS AND EACH DRIP LINE END SHALL BE FLAGGED AND IDENTIFIED PRIOR TO STARTING THE PROJECT. 2. A PRE -CONSTRUCTION MEETING SHALL ALSO BE HELD WITH THE COUNTY REPRESENTATIVE, SOIL SCIENTIST, SYSTEM ON -SITE SEPTIC SYSTEM COMPONENT ELEVATIONS DESIGNER AND INSTALLING CONTRACTOR PRIOR TO STARTING INSTALLATION. (INNOVATIVE WASTEWATER SYSTEM NO: IWWS-93-1-R6B) 3. DRIP LINE SHALL BE INSTALLED 6" BELOW THE SURFACE, 2' ON CENTER AND INSTALLED ON CONTOUR. (CONTROLLED DEMONSTRATION NO: CDWS-2006-01) 4. DRIP LINES SHALL BE INSTALLED TO MAINTAIN MINIMUM SETBACK OF 10' OFF THE RETAINING WALL AND 10' OFF THE PROPERTY LINE. PROPOSED GRADE ELEVATION AT TANK LOCATION: 523.00' 5. THERE IS VERY FEW STUMPS AND TREES IN THE INITIAL DRIP AREA SO BLANKING SHALL BE MINIMAL. TOP OF SEPTIC TANK: 520.68' 6. TANKS SHALL BE LOCATED 5' FROM THE BUILDING FOUNDATION AND SHALL BE SPACED A MINIMUM OF 2' APART. BOTTOM OF SEPTIC TANK: TANK IS 63" TALL: 515.43' 7. PRETREAT SYSTEM SHALL BE INSTALLED TO PERFORM AT A TS2 LEVEL OF TREATMENT. BOTTOM OF SEPTIC TANK INLET, 50"AFF: 519.59' 8. REPAIR AREAS SHALL BE DESIGNATED FOR FUTURE USE AND SHALL BE LEFT UNDISTURBED. BOTTOM OF SEPTIC TANK OUTLET, 48" AFF: 519.43' 9. INITIAL DRIP FIELD AREA SHALL BE MARKED PROTECTED FROM TRAFFIC DURING CONSTRUCTION. TOP OF PRE-TREATMENT TANK: 520.00' SEPTI TECH GENERAL NOTES BOTTOM OF PRE-TREATMENT TANK: TANK IS 51"TALL: 515.75' BOTTOM OF PRE-TREATMENT TANK INLET, 43" AFF: 519.33' • TANK INSTALLATIONS REQUIRING A DEPTH GREATER THAN 24-INCHES FROM TOP OF TANK TO FINISHED GRADE NEED BOTTOM OF PRE-TREATMENT TANK OUTLET, 40" AFF: 519.08' PRIOR APPROVAL FROM SEPTITECH. BOTTOM OF PRE -TREAT DISCHARGE, 9" BELOW TOP OF TANK: 519.25' • TANK RISERS REQUIRED TO BRING THE ALUMINUM HATCHES TO GRADE ARE THE RESPONSIBILITY OF THE BOTTOM FLOAT HEIGHT, 18" ABOVE TANK FLOOR: 517.25' CONTRACTOR. HIGH-LEVEL ALARM FLOAT IN PRE -TREAT, 24" ABOVE TANK FLOOR: 517.75' • TANK(S) SHALL BE INSTALLED WITH A MINIMUM OF 12-INCHES OF COMPACTED CRUSHED STONE BEDDING. SELECT FILL SHALL BE USED FOR BACKFILLING AROUND TANKS. TOP OF PUMP TANK: 520.00' • WATER TESTING: CONTRACTOR IS RESPONSIBLE FOR WATER TESTING THE CONCRETE TANK(S) ONCE THE TANK(S) BOTTOM OF PUMP TANK, TANK IS 59" TALL: 515.08' INSTALLATION HAS BEEN COMPLETED AND ALLOWED TO SET OVERNIGHT. WATER TESTING SHALL BE CONDUCTED IN BOTTOM OF PUMP TANK INLET, 47" AFF: 518.99, ACCORDANCE WITH ASTM C1227.9.2. BOTTOM OF PUMP TANK OUTLET, 45" AFF: 518.82' • CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CLEAN WATER FOR THE TESTING AND FILLING THE TANKS. DRIP SYSTEM REDUNDANT OFF FLOAT, 18" ABOVE PUMP TANK FLOOR: 516.58' • EXTERIOR PIPING: CONTRACTOR IS RESPONSIBLE FOR SUPPLYING AND INSTALLING ALL EXTERIOR PIPING PER DRIP SYSTEM DOSE -ENABLE FLOAT, 23" ABOVE PUMP TANK FLOOR: 516.99' SEPTITECH INSTALLATION DRAWINGS. DRIP SYSTEM PEAK -ENABLE FLOAT, 30" ABOVE PUMP TANK FLOOR: 517.58' • AIR INTAKE PIPING: AIR INTAKE SNORKEL SHALL BE INSTALLED WITHIN 100 FEET OF THE PROCESSOR TANK. AIR DRIP SYSTEM HIGH-LEVEL ALARM FLOAT, 33" ABOVE PUMP TANK FLOOR: 517.83' INTAKE PIPING SHALL BE INSTALLED SUCH THAT A POSITIVE PITCH IS PROVIDED BACK TOWARDS THE PROCESSOR TANK. SEPTIC DESIGN NOTES: • PIPE INSULATION: CONTRACTOR IS RESPONSIBLE FOR INSULATING ALL PIPING EXTERIOR TO THE SEPTITECH 1. TOTAL COMMERCIAL AREA = 9,100 FT' 2 TOTAL RETAIL SALES AREA (RSA) = 7,106 FT PROCESSOR INCLUDING THE DISCHARGE LINE FROM THE PROCESSOR TO THE DISPOSAL FIELD. 3. TANK DESIGN FLOW (Q) =120 GPD/1,000 FT2 RSA = (120)(7.106) = 853 GPD • TANK INSULATION IN COLD CLIMATES: AFTER CONCRETE TANKS HAVE BEEN INSTALLED AND WATER TESTING IS (PER 15A NCAC 18A.1949) COMPLETED, CONTRACTOR SHALL INSULATE THE TOP AND SIDES OF THE PROCESSOR TANK BELOW FROST DEPTH 4. DRAIN FIELD DESIGN FLOW = 200 GPD (PER NC EHS MEMORANDUM FOR (4-FEET MIN.) DOWN THE SIDES OF THE TANK WITH 2" RIGID FOAM (BLUE) BOARD INSULATION AND THEN COMPLETE DOLLAR GENERAL FLOW REDUCTION DATED 7/30/2012) BACKFILLING. CONTRACTOR IS RESPONSIBLE FOR INSTALLING INSULATION OVER THE TOP OF THE FORCEMAIN FROM 5. PRE-TREATMENT DESIGN FLOW = (2)(DRAIN FIELD DESIGN FLOW) = (2)(200) _ THE SEPTITECH SYSTEM TO THE DISPOSAL FIELD WHEN SHOWN ON APPROVED PLANS. 400 GPD • ELECTRICAL: ALL ELECTRICAL WORK IS THE RESPONSIBILITY OF THE CONTRACTOR'S LICENSED ELECTRICIAN AND IS 6. SEPTIC TANK SIZE = (1.17)(Q)+500 = (1.17)(853)+500 = 1,498 GALLONS 1,500 NOT PROVIDED BY SEPTITECH. SYSTEM CONTROLLER SHOULD BE INSTALLED IN A HEATED BUILDING WHERE AN GALLON TANK AMBIENT TEMPERATURE RANGE OF 60 TO 90 DEGREES F IS MAINTAINED. IF THE CONTROL PANEL MUST BE LOCATED 7. PRE-TREATMENT TANK SIZE = 1,060 GALLON TANK OUTSIDE, PLEASE NOTIFY SEPTITECH, INC. SO A HEATER MAY BE INSTALLED WITHIN THE ENCLOSURE 8. PUMP TANK SIZE = 2/3(SEPTIC TANK SIZE) = 1,000 GALLON TANK • SEPTITECH PROCESSORS CAN ALSO BE BUILT TO 3-PHASE POWER REQUIREMENTS. IF 3-PHASE IS REQUIRED, PLEASE SPECIFY TYPE OF 3-PHASE POWER (208V / 230V) AND NOTIFY SEPTITECH AT THE TIME OF PLACING ORDER. • INTERNET OR PHONE CONNECTION: OWNER IS RESPONSIBLE FOR INSTALLING A DEDICATED ANALOG PHONE LINE OR AN INTERNET LINE TO THE PROCESSOR CONTROL PANEL FOR REMOTE ACCESS BY SEPTITECH. SEPTITECH PREFERS THE INTERNET CONNECTION BECAUSE IT IS FASTER AND LESS EXPENSIVE IN TERMS OF ELECTRICAL COMPONENTS. THE TYPE OF REMOTE ACCESS NEEDS TO BE CONFIRMED AT TIME OF PLACING ORDER. EITHER LINE MUST BE INSTALLED AND WORKING IN ORDER TO HAVE ANY WORK PERFORMED UNDER WARRANTY. ANY WORK PERFORMED ON THE SYSTEM WITHOUT THE INSTALLATION OF THE INTERNET OR PHONE LINE CONNECTION SHALL BE AT THE EXPENSE OF THE OWNER. • FLOAT ELEVATION SHOWN ON PLANS ARE APPROXIMATE. THE SEPTITECH PROCESSOR HIGH AND LOW WATER ELEVATIONS ARE A FUNCTION OF THE TANK WORKING VOLUME AND SUCH FINAL ELEVATION OF FLOATS WILL BE DETERMINED BY SEPTITECH DURING START-UP SERVICES. • TANK FABRICATION OF THE SEPTITECH PROCESSOR TANK NEEDS TO BE SUBMITTED TO AND APPROVED BY SEPTITECH PRIOR TO FABRICATION AND DELIVERY TO THE PROJECT SITE. CONTACT SEPTITECH ENGINEERING AT 207-333-6940. 55 TOP OF TANK ELEV - 520.68 INV. IN - 519.59 54 INV. OUT = 519.43 r' 53 z 52 511 SEPTIC PROFILE STATION -UTLi UTUU 1+ (J MAX SOIL COVER = 2.5' C E 50 -0+25 u+uu TOP OF TANK ELEV. = 520.00 INV. IN = 519.33 INV. OUT = 519.08 �COPI'RIGHT2014BYBLUE RIDGE ENVIRONMENTAL CONSULTA.NTS,P.A..AILRhHTSRESERVED. THIS PLAN MAVNOTBERE-US=nSOLUL'IANLP0HUIVENPUUIH�rS KrPKI'";IIVNc!trrvlucurrm�urinlsrtu!wllrvUI! tit- '��KI"FN(-t)N'tiLNIUFbLUtKIUGttNT"UNP.ItNIALUUMULIANIJ,r.A.WrKUNIbiItUANUR)AVIVLAIIVIVUrrtUCKALWrYMUM ILAW0,rUlNl0MMDLtbYNIVLOUrIUZ�IUUP!UrtKUtttNJt. . ! , 1 4T y, 50 10 30 20 10 00 1+00 TOP OF TANK ELEV. = 520.00 INV. IN = 5%59 INV. OUT = 518.82 SL13r312u C3c: 10 5 1 10 20 J 0 J U Lu U) a m� o� z e J w $ 7 N p U Z Ix 4t O z J LU lLL ¢ - c0 z z Z W Z W > Z z Z Q z o 4 z ¢ rn j c0 W w Z Z U W Ix j O z ? z �o W Lu y y m 1 4* 3 Lu Lu Lu Lu I- 2 J a- LLJ D 7 D 0 0 0 C) m 0 U) Lu J cro Lu Lu w DATE: 02/26/2014 } U Z PROJECT NUMBER: 0700172013 W Q DRAWN BY: J.EDWARDS APPROVED BY: J.CHURCH O LL SCALE: 1" = 10' (H) M 0 Q W SHEET: C4.2 w af "o , DOINT IM rr:NTFD EDGE OF WATER EXISTING POND NORMAL POOL ELEV. = 502.70 NEW SALEM VOLUNTEER FIRE DEPARTMENT PARCEL ID#01144014 DEED BK: 203, PG: 236 ZONED B-4 ?6 v e "44// CALCULATED POINT M PON ^ / Q 40rr 143„E 30. oo, � / FOUND 1/2" REBAR / / '\ i� *\ \ GI)lygY278 yV A 10 / .. X ;\ ti360 ��� R� *� 00, EXISTING STRUCTURES & UTILITIES TO BE REMOVED/TERMINATED. SET 5/8" CAPPED REBAR \R4\ *\ \ Rk * \ R� R� ~R� POINT IN CENTER* \ OF NC 218 ;\\ ® a a/ JAMES F MCCLELLAN JR P LID# 01144013A • DEED B . PG:790 / 40 ZONED RA 43" �66.$$' /T FOUND "PK" NAIL / FOUND 5/8" REBAR /3 = �TA�� + CREEK r / _ 4F INV502 T' 28'$0' INV IN= Cp .� 502.54' SET 5/8" CAPPED REBAR /� w /co a Go / �a SET 5/8" CAPPED REBAR 0 / � a VENTURE PROPERTIES VII, LLC / /E PARCEL ID#5773 , REF. DEED BK: 5773PG: 867 2.001 AC TOTAL / / a a / k AV OUT= � V�jj 61 E / V � FOUND "PK" IN //� NAIL ' 5 ° / X / s h ' a GREGORY SCOTT KUNTZ / PARCELID# 01144017 a DEED BK: 513, PG: 098 ZONED B-4 / c 4GV 0 T- [ 512.. 2 ` INV IN= / % a/ 51�42 a { </ / INVOk1T= � ' 518,"19 cv `�� a < j`V ��_ A2C � a / I�INV = / a 5 7jN6 / * t \ f R� v / / NS6'°Oo V LEGEND — — PROPERTY LINE — — — —100 — — — — EXISTING CONTOURS �o PROPOSED CONTOURS P OVERHEAD ELECTRIC GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. 1 10 1 20 41 a O. CO N 0 a z W m a ZO w O j U z J W lL z w Z K > M z w 22 z :5z o !L A Of z ¢ j c7 w ED z Z U) w ofLu W oz Lu C7 Z U x K 0 z m z y Y � M3 m m Lu W W H J 0 Q 0 W M Q 1 W U 0 0 0 0 U) 0 Er- 0 0 Lli W J Lu 1 w L � 1 la > a '> W DATE: 02/26/2014 } PROJECT NUMBER: U 0700172013 Z DRAWN BY: W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: IL 1"=20' 0 Lu (V) U) SHEET: W C5 w Of i1 COPYRIGHT 9 1 M. ITN S A AI'. PI T� RccFR`Jrn 'CHI P! 4P' AAY Nn RF Pr I.l E .. .;... COf RIGHT _0 4 BY BLUE RIDGE ENVIRONMENTAL CO .SU . A T, . P ., GH '�-A',' V' -1) Ti I I tN UO NStN I Uh CLUt KlUlit tNVIKUNMtN I AL UUNSUL I AN I5, Y.H. IJ KK' It1ItlI I tU FMJ lb H VItA Al IUN OF hCtJtl-:;aL U:I LHVVS. OT hlNt` ull ' I U T IU!!." Ull !'tK J"tNSt. +- POINT IN CENTER OF NC 218 0' 43"E JAMES F MCCLELLAN JR CALCULATED POINT 3p•pp, P L ID# 01144013A DEED B PG: 790 / EDGE OF WATER O� 0 ZONED RA NORMAL POOL ELEV40, EXISTING ND 502.70 = =88' (TOTq() FOUND "PK" NAIL / OUND 5/8.$EBAR .y CREEK r JFOUNDI/2"`REBAR YH - 30 6 PtEV=jam / TYPE'A' RB-J _ 25il _ ' 28 80' � SCREEN OPAQUE � DET.4/D6_ • M r r -�40 ZtDIIV / SET 5/8" CAPPED REBAR ;� NL L �1� �L K� TYPE'B' / OPAQUE �/ '1/ / NI/ 4" SEP gp N l: l R � \ • SCREEN SE / 'go POND -�v DET. 7/D6 � �L hi.- \Y WB - 34 \t/Av 4' GREEN 4WYL 1 y ARC rORFy7q� L �L �L Ji �L • / COAT AIN LINK ryU y FENCE WiHPRIVACY SLATE j, \l/ 1L �L ryD� Red p 1L \L 1-L / • • IF �!S / /4 �p �L �L L �L SEED \/ L 11, / L \46 N 0 NEW SALEM VOLUNTEER RETAINING WALL TO BE co FIRE DEPARTMENT DESIGNED BY OTHERS. SAFETY r> j /� W 4 .L .y .1/ .1/ .1/ .y \4/ G7 PARCEL ID# 01144014 FENCE TO BE INSTALLED ALONG h /4f W W W + • ' • /� DEED BK: 203, PG: 236 EXTENTS OF RETAINING WALL y� y W ° ' ° y y y / y / 0 SEE DET. 3/D4 / m� ZONED B-0 O / � / W W "° ^ry �� .r�L �• WO-4 0 V` /, •Y W J`4• W �, EBAR \y 0 04� %4/ ` /� W W W .y •� .y .O VENTURE PROPERTIES VII, LLC PARCEL ID#: 01144015 • / REF. DEED BK: 5773, PG: 867 W W •Y �• 2.001 AC TOTAL COIJ j 3. MASONRY RETAINING WALL ��� v W / DOLLAR GENERAL 9,100 SUT. / ." / 32 PARKING SPACES KID 3 ' W W / F.F.E. = 523.00 W SY 8 •Y W W , /` / W / �L /W W W W W `k•' ``�♦ I / y / W W/ W W W W W W FOUND "PK" eA FOR SHADING OF PAVED VEHICLE / NAIL W `I' v v •f - W ACCOMMODATION AREAS POLE BASE v v 41 • \1/ / GREGORY SCOTT KUNTZ SOD r ` / W W / PARCEL ID# 01144017 3/4" COPPER IRRIGATION DEEDZONED B 4G: 098 / WATER LINE (IRRIGATION BY OTHERS) �� r• �1 ¢0'e� / W W �• v. / 3/4" RPZ BACKFLOW PREVENTION W `�� v l��IO�N� v r �• /v W 20 WITH BF PRODUCTS, INC. HEATED o W W0+ 1 W� v GSFTe\�� W / #232 APD) FIBERGLASS ENCLOSURE (MODEL EE DET3-4 WB.Y4 ' SY - 1 J• Q YYO�W W so EXISTING METER TO BE USED FOR 3/4" IRRIGATION LINE w W H• W W ` / W Air* W R�� W W \ / µ- W W •Y W / •+• W W W O W W W Y ��• W O \ pp�' cv WO ;•3 WR�•W O O �r i r V� W W W J• W RQL • Nay •t- W W W W \ip�`� W � O / / 9Y2 W W y WB *17 W R W W W B- J00, S R 60 '! W W W SO4 W W W W W W •� VGB 5- / \R� O� \� • V 701 W W W W W W •W • W W W / C / \R 00, J j ET.5I8"(;APPEQREBSft '� W W%2 O/ \R W W W� •Y W W .L R� / R� \A� \R� \R �\R POINT IN CENTER - OF NC 218 15 R� \R R� \ R� \R R� LEGEND - - PROPERTY LINE - - - -100 - - - - EXISTING CONTOURS ^0� PROPOSED CONTOURS GENERAL NOTES 1. CONTRACTOR IS TO VERIFY ALL UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 2. ALL WORK IS TO BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 3. ALL PERMITS ARE TO BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 4. EXISTING UTILITIES ON SITE SHALL BE RELOCATED AS REQUIRED. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED WITH RELOCATION. 5. CONTRACTORS ARE TO FULLY ACQUAINT THEMSELVES WITH ALL UTILITIES WITHIN THE CITY AND STATE ROW AND WITHIN THE PROPERTY BOUNDARIES WHICH WILL REQUIRE RELOCATION. ALL COSTS ASSOCIATED WITH RELOCATION SHALL BE INCLUDED IN THE BASE BID. 6. ALL WORK PERFORMED WITHIN NCDOT ROW SHALL BE PER NCDOT SPECS AND SHALL BE INSPECTED FOR COMPLIANCE BY STATE INSPECTORS AT THEIR DISCRETION. 7. IF AN UNOBSTRUCTED VIEW EXISTS OF A RESIDENTIAL BUILDING BETWEEN TENANT PARCEL AND ADJACENT PARCEL, THEN LESSOR SHALL CONSTRUCT A PRIVACY FENCE IN ACCORDANCE WITH TENANT'S PROTOTYPE CRITERIA SET PLANS AND ANY APPLICABLE GOVERNMENTAL REQUIREMENTS. FORMULA FOR CALCULATING 20% SHADING OF PAVED VEHICLE ACCOMMODATION AREAS 1. CALCULATE SQUARE FOOTAGE OF THE VEHICLE ACCOMMODATION AREA. INCLUDE PARKING SPACES, DRIVEWAYS, LOADING AREAS, SIDEWALKS, AND OTHER CIRCULATION AREAS. DO NOT INCLUDE BUILDING AREA AND ANY AREA WHICH WILL REMAIN COMPLETELY UNDEVELOPED: 24,434 SQ.FT. 2. MULTIPLY X .20: 4886.8 SQ.FT. 3. AREA TO BE SHADED: ADD: 4. AREA SHADED BY EXISTING TREES TO BE RETAINED IN AND AROUND THE VEHICLE ACCOMMODATION AREA: " 0 SQ.FT. 5. AREA SHADED BY REQUIRED SCREENING TREES, IF ANY:' 2124 SQ.FT. 6. AREA SHADED BY REQUIRED STREET TREES, IF ANY: " 0 SQ. FT. 7. SUBTOTAL: 2124 SQ. FT. (IF LINE [7] IS GREATER THAN LINE [3], THEN THE SHADING REQUIREMENT HAS BEEN MET. IF NOT, GO ON TO LINE [81.) 8. ENTER THE DIFFERENCE BETWEEN LINE [7] AND LINE [3]: 4886-2124 = 2762 SQ.FT. 9. DIVIDE LINE [8] BY 354 (CREDITED FOR HAVING HALF A CROWN OVER THE VEHICLE ACCOMMODATION AREA): 8 10. TOTAL NUMBER OF SHADE TREES REQUIRED WITHIN THE VEHICLE ACCOMMODATION AREA: 8 REQUIRED (9 PROVIDED) LANDSCAPE PLANTING LEGEND SYMBOL LABEL OTY. SCIENTIFIC NAME COMMON NAME SIZE AT PLANTING TYPE OF PLANT STY 9 Plantus Occidentalis AMERICAN SYCAMORE 2.5" CALIPER/8' HEIGHT/B&B TREE WB 80 Berbeds julianae WINTERGREEN 3 GAL]T HEIGHT SHRUB BARBERRY KD 3 Comus kousa KOUSA DOGWOOD 2" CALIPER/5' HEIGHTS&B TREE RB 6 Betula nigra RIVER BIRCH 2.5" CALIPER/8' HEIGHT/B&B TREE YH 30 Ilex vomitoda YAUPON HOLLY 3 GAL. SHRUB WO 12 Quercus phellos WILLOW OAK 2.5" CALIPER/8' HEIGHT/B&B TREE r SOD LAWN SEEDED LAWN I , W MAINTAIN BY PRUNING TO MAX HEIGHT OR 15' (ANY TREE IN DUKE ENERGY R.O.W.) v N N O � a F J O ze z z z O z J LU LL z z W z o ZQ Lu Z z o J d 2 z ¢ m W W N W Ir,j JO z Lu c o U z 0 Q Z = m � LLJ W y CO Wz Q J ILL. 2 N uj `^ v! N [u ---� = J Lu Z > Cif r m L O z Wa Z Z W 0 CL M W ' 0 w W m m �xm ZmY Lu J o a > (L L1J ;DATE: 02/26/2014 PROJECT NUMBER: U 0700172013 Z DRAWN BY: UJI J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: u- M Q SHEET: Lu G1 w „ .vr N „ ru r:, r inn^wv v�rir rv� or rtc-r�cr/..,. .: �: �vnrvr.0 vn "riv"�vinrno, n�rnvwwivry vn rnv n._.,_, v:�vr ,n,.. rani-rvnn,'c: nrvv,.,_:.:,.l!'1_;�:.. _, ,:.-rt i, ...,,v�r.. _,.,_•,�:,.h,.....�,. w.��rrt:.._.. _.w..�,� �nvNv-,�rnr��.: ,.-.nl�,.-. ruw�. nrrn env-„i I ., ui�l sr- ...F' C._ .. IA UY t'..Jt!t1UOt .11<V MtNIHLLLN.JL.'NN,J,. N.LL r<IU ��'{..JCItVCU R J J [ _ J -r .t'IU.!U ,IU Vt7K tN HEAVY-DUTY ASPHALT PAVING 1"ASPHALT SURFACE COAT r 2.5" ASPHALT BINDER 8" ABC COMPACTED STONE BASE (COMPACTED TO 100% MODIFIED PROCTOR) COMPACTED SUB -GRADE (PER SPECS.) PRIME COAT GENERAL NOTES: 1. VERIFY EXACT PAVING DESIGN WITH GEOTECHNICAL ENGINEER FOR PROJECT HANDICAPPED PARKING SIGN STANDARD ALUM. HANDICAPPED PARKING SIGN R7-8 BOLT TO STEEL TUBE WITH 3/8" CADIUM PLATED NUTS, BOLTS, & WASHERS1�1 STANDARD ALUM. MAXIMUM PENALTY —--------_.. SIGN R7-8D BOLT TO STEEL TUBE WITH 3/8" RESERVED CADIUM PLATED NUTS, BOLTS, & WASHERS. PARKING (IF REQUIRED) 2"x2"x188'STL. TUBE EXTEND INTO CONC.FILLED PIPE 2'. PROVIDE WELDED WATER -TIGHT CAP PAINT P&L #6118"BLACK COFFEE"PAINT PIPE BASE YELLOW8" STD.STL. PIPE FILLED WITH CONCRET PAVEMENT 1.5' #6 BARS 14" LONG THRU PIPE EACH WAY j--'- MAXIALMUM i NAL PENLY 2" 12" SIDEWALK/CURB SECTION ALL SIDEWALKS TO HAVE 3000 PSI CONCRETE WITH SEALED ISOLATION JOINTS W2.9 X W2.9 W.W.F. OR #TS AT 18" SIDEWALKS TO HAVE BROOM FINISH 1/2"ROUND ASPHALT PAVING 2% SLOPE SEE DETAIL Z �I 187URNDOWN 4" WASHED STONE #4 BAR CONT. STANDARD ASPHALT PAVING 2" ASPHALT SURFACE COAT 6" ABC COMPACTED STONE BASE (COMPACTED TO 100% MODIFIED PROCTOR) COMPACTED SUB -GRADE CONTRACTOR TO APPLY SEALER PRIME COAT COAT PER SPECS AND STRIPE GENERAL NOTES: 1. VERIFY EXACT PAVING DESIGN WITH GEOTECHNICAL ENGINEER FOR PROJECT HANDICAP RAMP COLORED TOOLEDISERRATED SLIP RESISTANT SURFACING AND/OR TACTILE WARNING DEVICE AS REQUIRED BY AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES AND CODE REQUIREMENTS At ACCESSIBLE] ! I SHOPPING CART 7 SLC RAMP TO BE I 1:12 CENTERED /SIDEWALK III ABOUTTHE RF FRONT DOOR. 4' MIN. H 6'1 DIL&iu1 1:10 MAX. SLOPE — BOLLARD WITH PAINTED YELLOW ACCESSIBLE PARKING SIGN, NOTE: AS REQUIRED. ALL ACCESSIBLE RAMPS AND ACCESS AISLES SHALL MEET ALL CODES AND ADAAG REGULATIONS. /-1:10 MAX. SLOPE PAINTED YELLOW BOLLARD WITH ACCESSIBLE T�PARKING SIGN, AS REQUIRED. I STANDARD ACCESSIBLE PARKING SYMBOL PAINTED ON PAVEMENT. PAINT COLOR TO BE PER THE AUTHORITY HAVING JURISDICTION. 0o 4" STRIPES @ O.C. AT 45 DEGREES. PAINT COLOR TO BE PER THE ` AUTHORITY HAVING JURISDICTION. ^ STANDARD ACCESSIBLE PARKING SYMBOL PAINTED ON PAVEMENT. PAINT COLOR TO BE PER THE AUTHORITY HAVING JURISDICTION. — 30:L ,C 4" PARKING SPACE PAINTS-' ELLOW STRIPE. PAINT COLOR TO BE PER THE AUTHORITY HAVING JURISDICTION. ASPHALT TERMINATION VAN ACCESSIBLE PARKING SIGN THIS SIGN TYPICAL AT ALL "VAN ACCESSIBLE" PARKING SPACES STANDARD ALUM. HANDICAPPED PARKING SIGN R7-8 BOLT TO STEEL TUBE WITH 3/8" CADIUM PLATED NUTS, BOLTS, & WASHERS. STANDARD ALUM. MAXIMUM PENALTY SIGN R7-8D BOLT TO STEEL TUBE WITH 3/8" CADIUM PLATED NUTS, BOLTS, & WASHERS. (IF REQUIRED) 2"x2"x188'STL. TUBE EXTEND INTO CONC, FILLED PIPE 2'. PROVIDE WELDED WATER- TIGHT CAP PAINT P&L #6118 "BLACK COFFEE" PAINT PIPE BASE OSHA YELLOW 4" DIA. STL. PIPE FILLED WITH CONCRETE PAVEMENT 1.5' CONC. BASE #6 BARS 14" LONG THRU PIPE EACH WAY 2" AA V ISLE RESERVED PARKING m ONE SIGN PER HANDICAP PARKING SPACE/ WHERE 2 SPACES FACE EACH OTHER, ONE POST SHALL BE USED WITH SIGNAGE ON EACH SIDE. CONCRETE WHEEL STOP 6 D1 4" PAINTED LINES 18" 6' LONG CONC. WHEEL STOP ANCHORED WITH (2) #4 BARS co 6" #4 BAR DUMPSTER PAD SECTION 9 D1 4500 PSI CONCRETE WITH W2.9 X W2.9 W.W.F. ASPHALT PAVING SEED TAIL -X— XE D t . -I 11=1 I I- 4" SABC —IIIIII (2) #4 CONT. COMPACTED SUB -GRADE J W 0 Q a �N U) o a Q m F_ Jw Z z � � O W z J W LL Z z Z Z W Z w > ZLLJ < z o � a W r Z ¢ rn �%" W U' z Z Tn N W w w J oz z Z O 0� z �w LLA W y J 0 J_ � � m r W U) W Lu J 0 0 a U) Lu 0 Lu W F_ W W J d W J Z O 0 W 0 0 U Oz u LL. J W U) 05 Q N W U J J W = J N Z �l LV r � r W � ga Z �oz W 0 LL a n W 0w wmm g W Z m Y W o a > a W DATE: 02/26I2014 } PROJECT NUMBER: U 0700172013 z DRAWN BY: W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: LL_ NTS (H) 0 (0 cn Q SHEET: W D1 w w @ COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL HIGH IS RESERVEL). IHISFLAN MAY NUItstltt-Us!:U.SULU,LU.ANrUUrtl-'«vILlL' rr'-:�.'IcrIV...A r' 1 k,z,l rin,,UrIlll•'LAIN VrI!nvUI IMt'1"flIitNUUNOt:NIUPnLUtKIUUttINVIKUP11WNI1ALUUINOULIAIV15.r.A.WrMUM1011tL1AP'l10AVr1LnuvNUrrtutrtn!-UUt-TMIUHILMVYJ,rOrvwnhOLrOTrIN[JUrIUI)IUU,UUI!YtKUrr'tN5t i BOLLARD 6" % Tx ROUND CONC. TOP OF PIPE SMOOTH 60 GA. STEEL BOLLARD FILLED SOLID WITH 3000 PSI CONCRETE PAINT OSHA YELLOW i- FINISH GRADE/PAVING CONCRETE FOOTING 3000 PSI MIN. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE GENERAL NOTES: 1. A STABILIZED ENTRANCE PAD OF COARSE AGGREGATE OR RAILROAD BALLAST SHOULD BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHOULD BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHOULD BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THE MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN, 6. CDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THROUGHFARE. 7. PLEASE REFER TO NCESCPDM SECTION #6.06 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING TEMPORARY GRAVEL CONSTRUCTION ENTRANCES/EXITS. 6" MIN EXISTING GROUN 50' MIN PUBLIC STREET SOIL STABILIZATION FABRIC UNDER 2-3" COARSE AGGREGATE STANDARD PIPE OUTLET TO WELL-DEFINED CHANNEL GENERAL NOTES: 1. LA= THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (INCHES). 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" (INCHES) ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. LA 1�1-%I ABRIC SECTION 'A -A' DETAIL REMOVED SILT FENCE 5 WIRE FENCING STEEL POST D2 WIRE FENCING FILTER FABRIC WOVEN FILTER FAB #5 WASHED STONE 30" MIN Q � Lu �O m 5 N J FLOW ����,a E " 8" MIN 4" MIN GENERAL NOTES: MAINTEFANCE NOTES: 1. WIRE FENCING SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY LINE WIRES WITH 12" STAY SPACING. RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY MORE THAN 30 DAYS. REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS 12" STAY SPACING. NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12" OPENINGS. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH 7. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE 8. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND 9. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA SEEDED. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. % DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. 11. PLEASE REFER TO NCESCPDM SECTION #6.62 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SILT FENCES. ■ll■III■■■■■■■■■■■■■■■■■■■■■I■■■ `■■■III■■■■■■■■■■■■■■■■■■■■■1■■■ `■■■III■■■■■■■■■■■■■■■■■■■■■1■■■ �■�1■III■■■■■■■■■■■■■■■■■■■■■1■■■ �■■■III■■■■■■■■■■■■■■■■■�■■■1■■■ TEMPORARY DIVERSION 2' MIN GENERAL NOTES: PLEASE REFER TO NCESCPDM SE6TION #6.20 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING TEMPORARY DIVERSIONS. 3000 PSI CONCRETE APRON WITH 6X610/10 WWF (COLOR DARK GRAY) F.:IJ:1•iK�7Ji 4" WASHED STONE (COMPACTED) DROP INLET TEMPORARY DIVERSION 2' MIN GENERAL NOTES: PLEASE REFER TO NCESCPDM SE6TION #6.20 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING TEMPORARY DIVERSIONS. 3000 PSI CONCRETE APRON WITH 6X610/10 WWF (COLOR DARK GRAY) F.:IJ:1•iK�7Ji 4" WASHED STONE (COMPACTED) DROP INLET GRATE AND FRAME STYP. USF 4139-6002 SLOPE °/" UNLESS SPECIFIED OTHERWISE STEPS REQ'D FOR BOXES > 4' DEEP X ,o GRATE FOOTING BEYOND :.�. AST BOX WING CRETE I I oo Ly..lr-�It�. CONCRETEAPRON I I NOTE: PIPE ALIGNMENTS AROUN-111-1 SHOWN ARE EXAMPLES ROCK DOUGHNUT INLET PROTECTION 1 5' CROSS-SECTION 3.75' VIEW GENERAL NOTES: 1. REFER TO NCESCPDM SECTION #6.54 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING ROCK DOUGHNUT INLET PROTECTION. CLASS B RIPRAP FLOW ROCK PIPE INLET PROTECTION o� RIPRAP WASHED STONE PLAN VIEW U) _J W 0 rf a M N o n J z ¢ �e J W w � 8 � z "' z � 6 O j � U z � ,J W LL z z Z w Z w 2z w w Z S Z o 0 a z am � C7 w w � Z ? W � W � 11J JO Z p ? Z o0 Of h w W w o � m u u u J L t Z u u i J L i J 0 LL Q W J W f- 0 Z W L ° I la > a � I� DATE: 02126I2014 } PROJECT NUMBER: U 0700172013 Z DRAWN BY: � W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: LL_ NTS (H) cl Lu SHEET: W D2 w Oc' I UR; 111 L.vn.. rt4, NP'I1 IDi:.�, r„'. ,i-, �. 111 ,I II-N I'( 'I -":'-.,.I I rrr,.. '11.n. ,q'q`-411•.'r-"I\l In,� 4 t'fl IC IJVl IH u1, L. prv', ,., ,.. ., ,L rn:. v.,. .. v:'r> p., r'..,, iHl'... .., iy, t_�..µ ,-MV F:01•-.ql Y:rlc91 11 M,II- COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LogNtu OR �rotN I �� OI rlr +5. Krrkl_ �J..�, I wn .,!+ rely I Lu.- r,a � , ,N ,. N ( ,N�, I t.r N r I 1 I L � 1 IIJ UU Nr' rtN�t. I u u u J L t Z u u i J L i J 0 LL Q W J W f- 0 Z W L ° I la > a � I� DATE: 02126I2014 } PROJECT NUMBER: U 0700172013 Z DRAWN BY: � W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: LL_ NTS (H) cl Lu SHEET: W D2 w Oc' I UR; 111 L.vn.. rt4, NP'I1 IDi:.�, r„'. ,i-, �. 111 ,I II-N I'( 'I -":'-.,.I I rrr,.. '11.n. ,q'q`-411•.'r-"I\l In,� 4 t'fl IC IJVl IH u1, L. prv', ,., ,.. ., ,L rn:. v.,. .. v:'r> p., r'..,, iHl'... .., iy, t_�..µ ,-MV F:01•-.ql Y:rlc91 11 M,II- COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LogNtu OR �rotN I �� OI rlr +5. Krrkl_ �J..�, I wn .,!+ rely I Lu.- r,a � , ,N ,. N ( ,N�, I t.r N r I 1 I L � 1 IIJ UU Nr' rtN�t. I S BAFFLES - PLAN VIEW INFLOW AVERAGE. AREA* \ WIDTH LENGTH *AREA OF BASIN WATER SURFACE AT TOP OF PRIMARY SPILLWAY KIMMER SEDIMENT BASIN 2f z LU Y Z m LU LU SKIMMER DEWATEF DEVICE VFREEBOARD BAFFLES 6" MIN. INVERT ELEV. OF INFLOW EMERGENCY SPILLWAY 2' DEWATERING r ZONE FILTER FABRIC .- �..�..11 11 -. n.-, 1' SEDIMENT MASONRY BLOCK TO STORAGE ZONE PREVENT SUBMERSION CROSS-SECTION VIEW DETAIL REMOVED GENERAL NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SKIMMER SEDIMENT BASINS. 2. REFER TO STD. #30.19 FOR BAFFLE SPACING AND INSTALLATION. EMERGENCY SPILLWAY EMBANKMENT EMERGENCY SPILLWAY N-12 HDPE STORM TRENCH INSTALLATION RECOMMENDED MINIMUM TRENCH WIDTHS T FINAL BACKFILL ? O Ew �� CIE INITIAL SPRINGLINE BACKFILL HAUNCH 4" FOR 12*-24" PIPE 6" FOR 30"-60"PIPE -., BEDDING MIN. TRENCHWIDTH SUITABLE NOTES: (SEE TABLE) FOUNDATION 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED. 3. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" (100mm) FOR 4'-24" (100mm-600mm); 6" (150mm) FOR 30"-60" ) 750mm-900mm . c 5. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. 6. MINIMUM COVER: MINIMUM COVER, H, IN NON -TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 54"-60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. PIPE DIAM. WIN. TRENCH WIDTH 4" 21" 6' 23" B" 26' 10' 28' 12' 30' 15, 34' 18" 39' 24' 48" 30. 561, 36" 64" 42' 72' 49' 80" 54" 88" 60" 96" MINIMUM RECOMMENDED COVER BASED ON VECHICLE LOADING CONDITIONS SURFACE LIVE LOADING CONDITION PIPE DIAM. H-25 HEAVY CONSTRUCTION (75T AXLE LOAD)' 12'-48' 12" 48' 54"-60" 24' 60" VEHICLES IN EXCESS OF 75T MAY REQUIRE ADDITIONAL COVER MINIMUM RECOMMENDED COVER BASED ON RAILWAY LOADING CONDITIONS COOPER PIPE DIAM. E-eo" UP TO 24" 24' 30'd6' 36" 42'-60" 48' COVER IS MEASURED FROM TOP OF PIFE TO BOTTOM OF RAILWAY TIE. " E-80 COVER REQUIREMENTS, ARE ONLY APPLICABLE TO ASTM F 2306 PIPE. INLET SECTION VIEW AT OPENING TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE #57 STONE STEEL FENCE POST WIRE FENCING - HARDWARE CLOTH #57 STONE __� 16" MIN. i BURY WIRE FENCE AND HARWARE CLOTH BAFFLE GENERAL NOTES AND SIDES AY, CE. IN LENGTH). :S. THE TOP OF \FTER EACH ADDITIONAL CROSS SECTION DETAIL REMOVED SILT FENCE STONE OUTLETS 4' MIN. FRONT VIEW 16" MIN. 13" FILTER FABRIC II ON GROUND II BURY 6" OF UPPER EDGE OF u FILTER FABRIC IN TRENCH SECTION VIEW SILT FENCE BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO SOLID GROUND GENERALNOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE #57 STONE AS NEEDED TO ENSURE DEWATERING. FENCING SHALL 3. WIRE FE L BE A MINIMUM OF 32 IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. SKIMMER 3 D3 ARM ASSEMBLY "C"ENCLOSURE WATER ENTRY u UNIT PERSPECTIVE VIEW PVC END PVC VENT SCHEDULE 40 CAP PVC ELBOW PIPE -)qPVC PIPE WATER SURFACE PVC END (PERMANENT POOL) CAP PVC PIPE ORIFICE 1/2" HOLES IN SCHEDULE 40 PLATE PVC TEE UNDERSIDE PVC PIPE PVC TEE FLEXIBLE HOSE 9 BOTTOM SURFACE END VIEW FRONT VIEW NOTE: 1. ALL SKIMMERS SHALL BE FAIRCLOTH SKIMMERS UNLESS OTHERWISE SPECIFIED. E & SC TEMPORARY SEEDING SCHEDULE * DO NOT USE WITHIN 25' RIPARIAN BUFFER. SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS LATE WINTER & EARLY SPRING (FEB 15-MAY 15) SPECIES RATE (LB/ACRE) RYE GRAIN 120 AND KOREAN LESPEDEZA 50 SUMMER (MAY 15-AUGUST 15) SOIL PREPARATION: SPECIES RATE (LB/ACRE) SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE GERMAN MILLET 40 THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE OR NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. TALL FESCUE 50 CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE FALL (AUGUST 15-DECEMBER 15) PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR SPECIES RATE (LB/ACRE) REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. RYE GRAIN 120 THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A SOIL AMENDMENTS SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 2000 LB/ACRE GROUND DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. INCREASE FERTILIZER SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED RATE TO 1000 LB/ACRE IN THE FALL. TILLER WILL ADEQUATELY TILL THE SOIL. TAKE CARE NOT TO DESTROY THE MULCH EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL APPLY 4000-5000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OR ANOTHER SUITABLE TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE. TREES CAN ALSO BE MULCHING MATERIAL. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING. OR A MULCH SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL. IF ADDITIONAL SOIL IS ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A NECESSARY AT A TREE BASE, CONSTRUCT A "TREE WELL." MULCH ANCHORING TOOL. MAINTENANCE REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE REFERTILIZE IF GROWTH IN NOT FULLY ADEQUATE. RESEED, FERTILIZER, AND MULCH TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA. ALLOW FOR AT LEAST IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TOPDRESS WITH 50 LB/ACRE OF 6 TO 8 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE. IMPROVE THE SOIL BY 15, OVERSEED WITH 50 LB/ACRE KOREAN LESPEDEZA IN LATE FEBRUARY OR EARLY ADDING ORGANIC MATTER. THIS IMPROVES WATER RETENTION IN SANDY SOILS MARCH. AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. E & SC PERMANENT SEEDING SCHEDULE * DO NOT USE WITHIN 25' RIPARIAN BUFFER. SEE RIPARIAN SEEDING SCHEDULE FOR BUFFER SEEDING SPECS SEEDING MIXTURE SPECIES RATE (LB/ACRE) MAINTENANCE KENTUCKY BLUEGRASS 100 REFERTILIZE THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MOW NO TALL FESCUE 20 MORE THAN ONCE PER YEAR. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS REDTOP 10 IMMEDIATELY. SERICEA LESPEDEZA 5 KOREAN LESPEDEZA 5 SOIL PREPARATION: SOIL TEST: SOIL TESTING WILL DETERMINE WHETHER THE SOIL PH AND NUTRIENT SEEDING NOTE (PHOSPHORUS, POTASSIUM, CALCIUM AND MAGNESIUM) LEVELS ARE IN A RANGE 1. AFTER AUGUST 15. USE UNSCARIFIED SERICEA LESPEDEZA SEED. THAT FAVOR TURFGRASS GROWTH. THE SOIL TEST REPORT WILL INDICATE 2. WHERE APPEARANCE IS A CONSIDERATION, OMIT SERCIA LESPEDEZA AND NEEDED AMOUNTS OF FERTILIZER AND/OR LIME. INCREASE KOREAN LESPEDEZA TO 40 LBIACkE. CLEAN AND ROUGH GRADE: REMOVE ALL DEBRIS FROM THE LOCATION TO BE NURSE PLANTS PLANTED. THIS INCLUDES ROCKS, BOTTLES, LARGE ROOTS AND OLD TREE TRUNKS. BETWEEN MAY 1 AND AUGUST 15 ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE TALL IF EXTENSIVE GRADING IS NEEDED, REMOVE THE TOPSOIL AND STOCKPILE IT FOR FESCUS, PRIOR TO MAY 1 OR AFTER AUGUST 15, ADD 40 LB/ACRE RYE GRAIN. IT MAY BE REPLACEMENT AFTER THE ROUGH GRADE IS ESTABLISHED. BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER AND OVERSEED THE LESPEDEZA IN MARCH. THE SUBSURFACE MAY BECOME COMPACTED DURING ROUGH GRADING, SEEDING DATES BEST POSSIBLE ESPECIALLY IF THE GROUND IS WET. THIS COMPACTED LAYER MUST BE BROKEN UP. A SPRING -TOOTH HARROW WORKS WELL ON LIGHTLY COMPACTED SOILS; A BELOW 2500 FT: AUG 15-SEP 1 JULY 25-SEP 15 SMALL ROTOTILLER MAY BE NEEDED FOR MORE HEAVILY COMPACTED SITES. MAR 1 -APR 1 MAR 1- MAY 10 DEEP TILLAGE: ROTOTILLING LOOSENS COMPACTED SOIL AND IMPROVES THE ABOVE 2500 FT: JULY 25- AUG 15 JULY 15-AUG 30 SPEED AND DEPTH OF ROOTING. A TRACTOR -MOUNTED OR SELF-PROPELLED MAR 20 - APR 20 MAR 5-MAY 15 TILLER WILL ADEQUATELY TILL THE SOIL. TAKE CARE NOT TO DESTROY THE EXISTING TREES IN THE LAWN. CUTTING TOO MANY TREE ROOTS DURING SOIL COMPLETE SEEDING EARLIER IN THE FALL, AND START LATER IN THE SPRING ON NORTH TILLAGE CAN SEVERELY DAMAGE OR KILL A TREE. TREES CAN ALSO BE AND EAST FACING SLOPES. SUFFOCATED BY DEEPLY COVERING THE ROOTS WITH SOIL. IF ADDITIONAL SOIL IS NECESSARY AT A TREE BASECONSTRUCT A "TREE WELL.' ' SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4000 LB/ACRE REPLACE THE TOPSOIL: ONCE THE SUBSURFACE IS ESTABLISHED, RETURN THE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 5-10-10 FERTILIZER. TOPSOIL AND SPREAD UNIFORMLY OVER THE ENTIRE AREA. ALLOW FOR AT LEAST MULCH 6 TO 8 INCHES OF DEPTH AFTER THE SOIL HAS SETTLED. THIS MEANS PLACING APPLY 4000-5000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE ABOUT 8 TO 10 INCHES OF TOPSOIL OVER THE SUBSURFACE. IMPROVE THE SOIL BY MULCHING MATERIAL. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING. ADDING ORGANIC MATTER. THIS IMPROVES WATER RETENTION IN SANDY SOILS NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. AND DRAINAGE IN CLAY SOILS AND REDUCES FERTILIZER LEACHING. U) J Q W 0 n a F J N za z �e z Z z O j U z of J W LLL z z z LU R z z ¢ a O a 0 w i CD LU Z Z W N J W ofILLI LU z LU UU co U O 0Z o Z �m Of z N w W LU Y 247 C) Q W W U W w W Cn c/) Z J OIL J a U U) O Z 0 0 J �f DO _0 //r� �VJ ► r_ <h* W O U U Lr- 2 ui LL_ J = 0 W g Q ySN w S J J = J W/�// z > Y� r � F_ W O LU z Z O LU O W a CWD w carom Q O O w w a__1 ULl z [7 Y 0 of d > d W DATE: 02/26/2014 PROJECT NUMBER: U 0700172013 Z DRAWN BY: W J.EDWARD] APPROVED BY: Q J.CHURCH O SCALE: NTS (H) ui M C0 Q SHEET: W D3 w of ,1 _1p .,:1 ..,. tu., n. -n I,1 rr L,.F.,.; ii I• :.., y.•*.•,,. ,,. y,:q•_.,* :...., rl "t1 n'P ^r `/ Kli tr , t/V rlVl Lt3t K'I n.�r :ln.�.,.nr-I`.I �i , r v 1 Y IVI.I I,' p., - :rr.N 1,vrr I HY Uln tllr Vt- © COPYRIGHT 2014 BY BLUE RIDGE ENVIRONMENTAL CONSULTANTS, P.A., ALL RIGHTS RESERVED. I HIS FLAN MAY Nu I bt: Rt JStu, S _7: AIN u. !t- 1 V 1, ut. I v, ry , I - V� rs t7IYY:n t AI I�VN_,-..: v, , ,., ..A, ID rr<unlDl I to A L. rutun L Ya, ruIYiJnMDLC D1 r114CO ur I Q 0 NJ tK rtNJt. - - - - - - STEP 1 - SITE PREPARATION PREPARE SITE TO DESIGN PROFILE AND GRADE. REMOVE DEBRIS, ROCKS, CLODS, ETC.. GROUND SURFACE SHOULD BE SMOOTH PRIOR TO INSTALLATION TO ENSURE BLANKET REMAINS IN CONTACT WITH SLOPE. STEP 2 - SEEDING SEEDING OF SITE SHOULD BE CONDUCTED TO DESIGN REQUIREMENTS OR TO FOLLOW LOCAL OR STATE SEEDING REQUIREMENTS AS NECESSARY. STEP 3 - STAPLE SELECTION AT A MINIMUM, 6" LONG BY 1" CROWN, 11 GAUGE STAPLES ARE TO BE USED TO SECURE THE BLANKET TO THE GROUND SURFACE. INSTALLATION IN ROCKY, SANDY OR OTHER LOOSE SOIL MAY REQUIRE LONGER STAPLES. STEP 4 - EXCAVATE ANCHOR TRENCH AND SECURE BLANKET EXCAVATE A TRENCH ALONG THE TOP OF THE CHANNEL SIDE SLOPES AND THE UPSTREAM TERMINAL END OF THE CHANNEL TO SECURE THE EDGES OF THE BLANKET. THE TRENCH SHOULD RUN ALONG THE LENGTH AND WIDTH OF THE INSTALLATION, BE 6" WIDE AND 6" DEEP. STAPLE BLANKET ALONG BOTTOM OF TRENCH, FILL WITH COMPACTED SOIL, OVERLAP BLANKET TOWARDS TOE OF SLOPE AND SECURE WITH ROW OF STAPLES (SHOWN IN FIGURES A, H, E AND F). STEP 5 - SECURE BODY OF BLANKET ROLL BLANKET DOWN SLOPE FROM ANCHOR TRENCH. STAPLE BODY OF BLANKET FOLLOWING THE PATTERN SHOWN IN FIGURE D AND I. LEAVE END OF BLANKET UNSTAPLED TO ALLOW FOR OVERLAP SHOWN IN FIGURE B. PLACE DOWNSTREAM BLANKET UNDERNEATH UPSTREAM BLANKET TO FORM SHINGLE PATTERN. STAPLE SEAM AS SHOWN IN FIGURE E. SECURE DOWNSTREAM BLANKET WITH STAPLING PATTERN SHOWN IN FIGURE D AND I. STAPLING PATTERN SHOWN IN FIGURE D AND I REFLECTS MINIMUM STAPLES TO BE USED. MORE STAPLES MAY BE REQUIRED TO ENSURE BLANKET IS SUFFICIENTLY SECURED TO RESIST MOWERS AND FOOT TRAFFIC AND TO ENSURE BLANKET IS IN CONTACT WITH SOIL SURFACE OVER THE ENTIRE AREA OF BLANKET. FURTHER, CRITICAL POINTS REQUIRE ADDITIONAL STAPLES. CRITICAL POINTS ARE IDENTIFIED IN FIGURE G AND J. STEP 6- CONTINUE ALONG SLOPE - COMPLETE INSTALLATION OVERLAP ADJACENT BLANKETS AS SHOWN IN FIGURE C AND REPEAT STEP 5. SECURE TOE OF SLOPE USING STAPLING PATTERN SHOWN IN FIGURE E. SECURE EDGES OF INSTALLATION BY STAPLING AT 1.0' INTERVALS ALONG THE TERMINAL EDGE. ROLLED EROSION CONTROL MATTING INSTALLATION FIGURE F FIGURE E FIGURE C FIGURE F FIGURE I *SLOPE INSTALLATION - APPROXIMATELY 200 STAPLES PER ROLL (8' OR 4' *BED INSTALLATION - APPROXIMATELY 300 STAPLES PER ROLL (8' WIDTH) REQUIRED - WIDE BLANKET SHOWN OR 4' WIDTH) REQUIRED - WIDE BLANKET SHOWN FIGURE E FIGURE A - BED INSTALLATION I- 8" �I i 4" --, FIGURE H - SLOPE INSTALLATION FLOW �0N BLANKET 2 3„ 3 BLANKET 1 BLANKET 2 BLANKET 3 � 77 xI S f y: GROUND GROUND € - " SURFACE SURFACE FIGURE B - PROFILE VIEW FIGURE C - CROSS SECTION VIEW FIGURE F- PROFILE VIEW CREST OF CREST OF SLOPE SLOPE OF SLOPE FIGURE G- CRITICAL POINTS - BED INSTALLATION X- DENOTES STAPLE LOCATION FIGURE D -PLAN VIEW- BED INSTALLATION FIGURE I - PLAN VIEW - SLOPE INSTALLATION 1„-X 1„-x-1„ X-1" x-1" X-1"-x-1.. x-1"� 4„ FIGURE E- PLAN VIEW 1 CRITICAL POINT /1 CRITICAL POINT TERMIk1L END GROUND \ GROUND SURFACE .t SURFACE FIGURE J - CRITICAL POINT SECURING - SLOPE INSTALLATION FLOW SPLITTER STRUCTURE 4 DRIP PUMP TANK 5 D4 D4 MANHOLE FRAME& COVER NCDOT STD 840.9 Y 1W x 31/4•STAINLESS REVISION JUNCTION BOX LIMIT OF EXCAVATION ZONE SUPPLY PIPE MUST BE SLEEVED BMP t STEEL CONCRETE SCREW BYPASS (ONE PER CORNER) 2/26/2014 SCH 80 UNION FOR PUMPISEP`IC TANK FROM PUMP TANK TO UNDISTURBED 15"HDPE I STRUCTURE Oa- INV. IN=518.50 c_ ... v' r' . • FRAME &COVER WEIR PLATE SEALED TO FLOAT BAR EARTH WITH 4" SCH 40 PVC AS SHOWN. MAY BE ADJUSTED STRUCTURE WALL WITH I HYDRAULIC CEMENT BOTH ENDS OF 4" PIPE SHOULD BE I 1 •. DRAINAGE INaccoaDANCE CHECKVALVE l'/2 BE SEALED X -- INFLOW 15" HDPE I / f 1 I /Si MI 1 y7 STRUCTURE WITH NCDOT STD y16'PLATE DIA PIPE. Z � STEPS NCDOT � 8d0��5 STEEL WEIR �, J � i}}} �, .� 30' MAXIMUM DISTANCE X STDB 060 PLATE ---- 4" PVC SCH 40 SLEEVE eyss �f t. -'a . < WATERTIGHT SEAL EE INSET'A• FLOW COLLAR ATTACHED— TO CENTRAL UNIT A TO PUMP TANK ...IS BMP IWFIR Imp INSET "A" INLET4- SCH40 UNDISTURBED INV. IN = 518,50 Y ,�X T PVC GATE VALVE WATER EARTH ' Z 15' HDPE I ALARM INV. OLI 515.00 TIGHT I _ PLAN SECTION Y-Y SEAL PEAK NOTES: ENABLE cy. 1. ALL CONCRETE SHALL BE 3600 PSI. I _ NOTE: 2. ALL JOINTSARE TO BE SEALED WATERTIGHT. ENABLE W NO WEEP HOLE IN PUMP DISCHARGE. 3. WEIR S TO BE POURED -IN -PLACE CONCRETE. 4" OFF LV 4' DIA 4. REFER TO NCDOT STANDARD DRAWINGS FOR BOX FLOW CELLAR f CONSTRUCTION. 18 15"HDPE 5 NOT ACCEPTABLE FOR USE IN STREET RIGHT OF WAY INVERT - INFLOW w INV. IN=518.50 WITHOUT CDOT/NCDOT APPROVAL.:`Lt.-._ v, WEIR ELEV. = 517.00 ORIFICE WEIR LENGTH =3' MINIMUM 15' HDFIE i HEIGHT OFWEIR INV. OUT =515.00 J� eff :� SIDE o WALLS 10" ORIFICE /-. n - INV. =515.00 !' BYPASS GROUT STRUCTURE 'K �:".t. '"• MINIMUMELEVATION. V' ` BOTTOM TO MATCH DROP FROM INFLOW INVERTS SECTION X-X INVERT TO BYPASS SECTION Z- SECTION WEIR ELEV.=517.00 INVERT WEIR LENGTH =3 AMERICAN MANUFACTURING CO. 22011 Greenhouse =aeo, Elkwoo0, V8. 22713 540-825-72M CURB INLET 1" RADIUS UNLESS OTHERWISE SPECIFIED INLET FRAME & GRATE USF 5130-6168 FOR SAG INLETS & USF 5130-6431 FOR ON GRADE INLETS UNLESS SPECIFIED OTHERWISE STEP REQ'D FOR BOXES > 4' DEEP CONC. GROUT AT10"O.C. oo CONCRETE BRICK OR PRE -CAST BOX _GROUT INTERIOR r ------ 10 WALLS o 0 o 0 0 0 8" o 0 0 'f • I oo : I� O #4 BAR AT 8" O.C.E.W. OE CONC.GROUT REVISION RETAINING WALL SAFETY FENCE 11/15/2013 OWNERTO SELECT FINISH i 8' MAX. 2 D4 REVISION 11/15/2013 2 2" X 2 2" POST & FLAT CAP 3 D4 2" 8" 2" II� 7,.._.._.. 7� M400 FRALO UV PRE-TREATMENT TANK 6 D4 11 9 10 6 4 12 5 3 7 0 2 ITEM OTY, DESCRIPTION 1 1 1000 GAL. FRALO PLASTIC TANK 2 1 DISCHARGE ASSEMBLY 3 1 SUPPORT STRUCTURE 4 1 SPRAY HEADER SUPPORT STRUCTURE 5 1 PUMP BACK ASSEMBLY 6 1 SPRAYHEADERASSEMBLY 7 1 RECIRCULATIONPUMP 8 1 EMPERORAOUATICS W UNIT •. _ 9 1 INLET PIPE 10 10 MEDIA BAGS (SMALL) 11 2 FRALO PLASTIC RISER AND LID 12 2 MECHANICAL FLOATS Q Lu 0 m N � J o a V z J w z z M z x O > g U z Of J W ILL. H Z Z Z z Lu Z o w M z Fr Z g z 0 a cD ~ m w w Z Z U LII cc w J z Z z 0 Z 0 W LU w o J 3 m :— uj U) Lu LU O U a CA Q 0 Lu Lu Lu Lu m ZD 2 LJ I Z 0 U U) 0 U U z O W J J i'0' U)Lu "' = a6 Q N w J = J uj Z U)� U r, w � LU N O J 0 a z w oU O 0 as �� ' ED Lu wp Q ? CoOf W XU w L1J CI F_ GOY o 0- > D_ 3 L1J DATE: 02126/2014 � PROJECT NUMBER: U 0700172013 Z DRAWN BY: W J.EDWARDS Q APPROVED BY: J.CHURCH O SCALE: V- NTS (\\H)) 0 n (•1 (n SHEET: W D4 W ry (� (7OPYR!OH? 2014 PY °!.UE RIDGE ENVIRONMENTAL CONSULTANTS, P A, A[! FIGHTS RFgEPVFD THIS PIAN n7AY 4QT RF RE- E., SpL,) I 1gN1-J (1 N I . . P -- -11 ' 3' I AL WNSUL I AN 16, N.A. IJ YKVFiItlI I tU ANJ i. A I lt,f SEPTIC TOP FEED MANIFOLDS AMERICAN MFG. COMPANY TWO -FILTER -15 GPM HYDRAULIC UNIT Normally Open Supply Valves Flowmeter Backflush Valves 11/2' Supply From Disc Filters Normally Closed Field Flush Valve 11/2" Return To Septic Tank 1" Normally Closed Zone Valves NOTE: IN THE EVENT THE DRIP ZONES ARE A DISCERNIBLE VERTICAL ELEVATION ABOVE THE HYDRAULIC UNIT, INSTALL A "RETURN PRESSURE ASSEMBLY." THE ASSEMBLY IS TO BE USED TO PREVENT THE RETURN LINE FROM DRAINING AFTER OR DURING A DOSE. REMOVE THE ZONE RETURN CONNECTION AND REINSTALL A SHORT 1" NIPPLE IN THE RETURN VALVE. INSTALL ASSEMBLY AS SHOWN ABOVE. THE HYDRAULIC TUBING PROVIDING PRESSURE FOR THE REST OF THE UNIT MUST BE PLUGGED AND THE NEW TUBING FROM THE ASSEMBLY CONNECTED TO THE PRESSURE SIDE OF THE SILENOID. i To Return Pressure Assembly RETURN PRESSURE ASSEMBLY (RPA) FINGER SCREEN wl6mm 90° ELL. RPA CONNECT 12" HYDRAULIC TUBING ��- 6mm90° ELL. PRESSURE RELIEF DRIPFIELD COMMON RETURN PRESSURE SEPTIC PUMP "COOL GUIDE" 1 112' SCH 40 - COUPLING ADAPTER COOLING CULLER 1-17 SCH 40 COUPLING uG BUT TO RISER NN CUT n EXTEND INTO RISER SON M PVC EXTENSION INLETS PROVIDED BY OTHERS / O60 000o o DD SDR 35 PVC O FLAT CAP 1 A. 000 0 See 35 WC COURNG PROVIDED BY OTHERS Patent Nit -4111111iff FLOW COLLAR (COOL GUIDE) -SPECIFICATION THE LAMINAR FLOW COLLAR SHALL BE MADE OF NON -CORROSIVE, GLUEABLE PVC AND HAVE SUFFICIENT HOLES IN THE OUTER GUIDE TUBE TO ASSURE LAMINAR FLOW FOR THE RATED CAPACITY. THE INNER FLOW COLLAR SHALL EXTEND NEAR THE BOTTOM TO PROVIDE SUFFICIENT COOLING FLOW FOR THE MOTOR. THE DIMENSION BETWEEN THE INNER COLLAR AND THE PUMP MOTOR SHALL NOT RESTRICT FLOW TO THE PUMP INTAKE, BUT WILL PROVIDE FOR SCOURING OF SURFACES. THE LAMINAR FLOW COLLAR SHALL BE A "COOL GUIDE" AS MANUFACTURED BY AMERICAN MANUFACTURING COMPANY, INC. PATENT # 6,262,689. "COOL GUIDE" - INSTALLATION INSTRUCTIONS 1. MEASURE THE DISTANCE FROM THE BOTTOM OF THE TANK TO 6' DOWN FROM THE TOP OF THE RISER. CUT THE EXTENSION PIPE (BY OTHERS) TO THE LENGTH NECESSARY TO REACH THIS HEIGHT. CUT 12 OF THE PIPE DOWN 12" TO 18" AWAY FROM THE TOP OF THE PIPE FOR PUMP DISCHARGE PIPE. 2. GLUE THE EXTENSION COUPLING (BY OTHERS) TO THE EXTENSION PIPE AND TO THE COOL GUIDE. 3. FOR REPAIRS: GLUE ON THE COOL GUIDE FLAT CAP AND PLACE THE COOL GUIDE FIRMLY IN THE THE TANK, ATTACH THE EXTENSION TO THE RISER, WITH THE ANCHORS As SHOWN. 4. FOR NEW CONSTRUCTION: ANCHOR THE FLAT CAP TO THE BOTTOM OF THE TANK IN THE PROPER LOCATION TO HOLD COOL GUIDE AND EXTENSION. THE CAP MAY OR MAY NOT BE GLUED TO THE DEVICE. ATTACH THE EXTENSION TO THE RISER WITH THE ANCHORS AS SHOWN. 5. PLACE THE PIPE DOPE ON THE COOL GUIDE ADAPTER THREADS AND THREAD THEM INTO PUMP DISCHARGE. 6. ATTACH COOLING COLLAR TO ADAPTER WITH SET SCREW PROVIDED. 7. GLUE PIPE INTO FLOW COLLAR AND WITH PUMP ATTACHED, LOWER INTO THE GUIDE TUBE. 8. ATTACH TO DISCHARGE PIPE, VALVES, AND CONNECT ELECTRICAL AS SPECIFIED. Installation Depth Supply line beptl is below most ION SEPTIC TOP FEED MANIFOLDS BELOW FROST LINE USE ON ALL SITES WITH A DISCERNIBLE SLOPE TO CONTROL DRAIN DOWN FROM UPPER LATERALS Patent No. 5,984,574B BURIED DRIP LOOP CONNECTION 4 D5 1/2" FLEX n R DRIPPER LINE , AMERICAN MANUFACTURING CO. 22011 Greenhouse Road Elkwwd, Va. 22718 540-825-7234 DRIP SYSTEM CONTROL PANEL FOR UsE 1NTr PANELS: at" mE =5a w` ..., p" eT e aE NOTE uI BMNcx t,BGurt o��°T�«, —S yo, cGwi. PB BYOT"ERS O c �•x- O O N01@ H 94STALLING A BL011FN N1114 PANEL IM111 O O O O O O O THE 'akx LNDT YUSF l7EroC>XWEC/ED M PARALLEL TO TIRE OLD RELAY FOR THE DW LOOKOUT TO FUNCTION. U U tntf IT :a.�,E,ETaw w NMTTO tE C U US AIAMUCAN PSItC-1tXWEV.OMMOL1111 M,mran.PMnurMun,q �., I,.c P O. N. SRR, Mwsss, xA, SZ. Simplex 2 Zone PERC-RITE Drip System INSiALLBTION GUEE PON 'DP" SERIES DRIP SYSTEM PUMP SYSTEM NOTES SITE CLEARING GUIDELINES General guidelines for preparing/clearing a site for installation of an American Mfg. "Pert -Rite@" Drip System: GENERAL REQUIREMENTS: The preservation of the original structure of the soil in the absorption area is essential to maintaining the percolative capacity of the soil. No activity other than the construction of the system is permitted within the absorption area. On sites where a majority of the vegetation needs to be removed, care must be taken to minimize the impact on the soils natural permeability. There shall be no cutting, filling, or storage of material on or within 20' of the adsorption area. Site clearing and preparation shall be performed by the installation contractor for the wastewater dispersal system. The absorption system is not to be constructed during periods of wet weather when the soil is sufficiently wet at the depth of installation to exceed its plastic limit. The plastic limit is exceeded when the soil can be rolled between the palms of the hands to produce threads 1/8 inch in diameter without breaking and crumbling. After installation of the dispersal system, or if after clearing installation is not to be performed for 60 days, seed the area liberally with native grasses. The standard Department Of Transportation specification is acceptable consisting of perennial rye and fescue. At all times protect the installation area from erosion. Local codes shall apply for best management practices to control runoff. SHALLOW INSTALLATIONS (surface to 8"): Clearing and removal should be by hand with minimal machine assistance and under optimum soil moisture conditions. Track machines are preferred to those with rubber tires and should only be used around edges of installation. Soil moisture conditions need to be confirmed prior to beginning clearing and system installation by the soil scientist of record. MID RANGE INSTALLATIONS (12" TO 24"): All trees and brush, as necessary, should be "pulled out" (grubbed out) or cut flush with the ground surface. Stumps may be ground to two inches below the installation depth and the hole backfilled with sandy material to 6" above installation depth and the remainder with natural soil. When the soil is disturbed at the installation depth by pulling a stump, backfill the hole with sandy material to 6" above installation depth and the remainder with natural soil. Digging and pushing over trees may be more detrimental to the soils infiltrative characteristics. Track machines are preferred to those with rubber tires and should only be used during optimal soil moisture conditions. Soil moisture conditions need to be confirmed prior to beginning clearing and system installation by the soil scientist of record. DEEP INSTALLATIONS ( 30" and deeper): All trees and brush, as necessary, should be removed. When the soil is disturbed at the installation depth, backfill the hole with sandy material to 6" above installation depth and the remainder with natural soil. Stumps may be ground to two inches below the installation depth and the hole backfilled with sandy material to 6" above installation depth and the remainder with natural soil. Digging and pushing over trees may be more detrimental to the soils infiltrative characteristics than "pulling" and are not recommended. Track machines are preferred to those with rubber tires and should only be used during optimal soil moisture conditions. Soil moisture conditions need to be confirmed prior to beginning clearing and system installation by the soil scientist of record. LARGE SCALE INSTALLATION TESTING: Larger systems typically do not have water available for zone installation testing on a timely manner. It is desirable to water test an installed zone while the supply and return manifold header ditches are exposed to better inspect for leaks. In order to facilitate site and equipment protection and erosion control, the installation contractor shall provide sufficient water and the means to deliver and monitor the water to both flush and leak test each zone or subzone prior to backfill. The flushing volume shall be five times the volume of the piping network being flushed. The flushing velocity shall be in excess of 2-1/2 feet per second. The leak testing volume shall be at least 3 times the volume of the pipe. The leak test shall continue until steady state flow is achieved and the flow rate is within 6% of the design flow rate or as approved by the manufacturer or engineer. After successful testing and inspection the supply and return pipe connection points shall be sealed and protected from dirt and debris from entering prior to final connection. COLD WEATHER INSTALLATION NOTES Minimum construction techniques for all American "Pert -Rite" Drip systems in cold weather climates: "Top feed" manifolds should be used on all sites with a discernible slope to allow for proper drainage of the manifolds and the 3/4" and 1/2" lateral connectors into the drip tubing. The main supply and return lines shall be installed below the frost line and shall feed the shallow "top feed" manifolds with a single vertical section of insulated sch 40 PVC pipe. Insulation shall be minimum 1/2" thick foam insulation (or equivalent). On flat sites where "top feed" manifolds will not drain therefore requiring the use of side feed manifolds, 12" cover is recommended between highest point of 1/2" black flexible PVC pipe (non loop connections) and final grade. On drip tubing installations less than 12" this would require additional cover over the header ditch area to create the 12" separation. Any additional cover is it to be graded and tapered into landscape. Please see note on loop connections below. Dense vegetation turf cover to be established over supply trench, return trench and tubing prior to 1st exposure to cold weather. If vegetation cannot be established, then trenches and tubing to be covered with a thick layer (minimum 6") of mulch, straw/hay, etc. until such turf cover is established. Cover must be stabilized and maintained until dense vegetative turf is established. Amount of cover may need to be adjusted to account for settling. All valve boxes that house "remote zone valves" shall be insulated by contractor. Insulation to consist of either blue board, bagged Styrofoam peanuts or equivalent. If fiberglass insulation is used it must be sealed to prevent it from becoming saturated. The "remote valves" shall be placed on a bed of gravel or screenings (4"-6"). Positive grade away from valve boxes is encouraged to reduce the volume of groundwater that may collect in valve box. Certain sites may require positive drains to daylight. All loops connecting drip runs with 1/2" flexible PVC shall be slightly elevated (minimum 1"-2") so that they drain into the drip tubing after the pump shuts off. It is contractors responsibility to ensure these loops stay elevated during and after the loops are backfilled. All main supply and return trenches to be installed below the local frost line. If this is not possible due to site restrictions then adequate soil must be added over the top of the trenches so that the effective depth remains below the frost line after settling occurs. The added soils must be prepared for turf cover and stabilized. If vegetation cannot be established then trenches are to be covered with an additional layer (minimum 6") of mulch, straw/hay, etc. until such turf cover is established. Sufficient ground cover around the hydraulic unit is required to insulate the unit. All pipes entering and leaving the hydraulic unit shall elbow vertically down 90 degrees to a depth below the frost line prior to extending away from the unit horizontally. Additional insulation inside the hydraulic unit is encouraged. Insulation to consist of either blue board, bagged Styrofoam peanuts or equivalent. If fiberglass insulation is used it must be sealed to prevent it from becoming saturated. All conduit entering into the control panel shall be sealed to prevent condensation inside the panel. Established vegetation height shall be minimum 4"-6" throughout winter months. Air release valves shall be placed below the ground surface inside a valve box but at an elevation above the highest drip line in that particular zone. General Construction Notes American Manufacturing ''Pert -Rite@" Drip 1. All installation and construction techniques shall conform to state and county codes pertaining to on site sewage systems and the permit for this site. 2. The installation of this system shall be in accordance with specifications and procedures as supplied by the Manufacturer of the equipment. 3. The drip tubing shall be installed using a vibratory plow, trencher, or by hand. 4. All tubing to be installed along contour. 5. All PVC pipe and fittings shall be PVC SCH 40 Type 1 rated for pressure applications. All glued joints shall be cleaned and primed with purple (dyed) PVC primer prior to being glued. 6. All cutting of PVC pipe, flexible PVC and dripper tubing of size 1 1/2" or smaller shall be accomplished with pipe cutters approved by American Manufacturing Company, Inc. No sawing of PVC, flexible PVC or dripper tubing of size 1 1/2" or smaller allowed. 7. All PVC pipe, Flexible PVC and dripper tubing in the work area shall have the ends covered with duct tape to prevent construction debris from entering the pipe. Prior to gluing, all joints shall be inspected for and cleared of any construction debris. 8. All automatic valves (zone valves & field flush return valves) shall be installed with isolation valves, bypass valves, and disconnects (i.e. unions, Flanges) for manual field operation during field maintenance events. All valves must be provided with at -grade access. 9. Drain field supply and return lines and manifolds to be installed at adequate depth to prevent freezing. Horizontal spacing between the dripper lines and the installation depth to be as specified. 10. No activity on drain field area other than minimum required to install system. Do not park equipment, drive large equipment over or store materials on drain field area. 11. No wet weather installation is permitted. 12. The contractor shall be certified by American Manufacturing Company, Inc. to install this type of system and shall hold a pre -construction meeting with the individuals responsible for soil evaluation, permitting and inspections prior to site work beginning to insure protection of the site conditions and to ensure the system is installed according to design. 13. If site conditions are determined to require the installation of the system to deviate from these plans, all work shall stop immediately and the designer shall be notified. Any ongoing work shall be at the sole responsibility of the contractor. 14. All force mains shall be tested for leaks prior to drip tubing installation and prior to system startup. Uncovered force mains shall be visibly inspected for leaks. If a leak is suspected in covered force mains then the force main shall be re -tested at a minimum pressure of at least percent above the design operating pressure, for at least 30 minutes. There shall be no discernible leakage. 15. ASD15 & 25 Hydraulic units to be placed on a bed of gravel for drainage. 16. If standing groundwater is a problem a screened drain to daylight is required. W 0 a Z F n` J Z LLI o' a Z CS Z a 0 O z J w LL U Z Z w Z z W Z Z g o d Z Ed Q m C7 w w Z Z Cn W w of w oZ 09 0 Z Of Sm aZ W N000 w Lu OD Do 3 m r W W W H J 0- 2 U Q U) W U W W m I­— U) W Z Q J d Z O U Z O U U O LET LL- J 2 0 W � Q N W J = W,�// Z LU m O E— C O N Q W U Z a a z wLIJ p O a CNI or w wpm Q 3 m UL _ LU Zx J W o a > 0- W DATE: 02/26/2014 PROJECT NUMBER: U 0700172013 Z DRAWN BY: W J.EDAIARDS Q APPROVED BY: J.CHURCH O SCALE: LL NTS (H) (V) W�/ �i SHEET: W D5 W - �.. •V !V V„u a \'...'11'. '.,Vlx V:_ ., ,l'V1 I IIVV .. I I!. , v 1. , VI,VI'YKIbt11 LU14 tlY tlLUt KlUbt tNVIKVIVMCIVIHL I.VIVJULIHNIJ, Y.H., ALL ttWr11J ttCJCRVCU. 1rI1J rLnry mnT lvvl oc nc vocu, .. Lu, only vn� c v ., .. .,. T, �v,�,.Iv vi L.1.4.� � .. � cv,_. � I\ L •n .+ c -.. r .. Sul Ill 7,1'-.. i.N rrClvJ[, �I ,{ 7Er - _ - I i _ - ,-, 1V N WN NIAN3 3`9016 3n19 A8 vw6 iHOt2indui J wv�iv �u� v JI LJNV 031181H08d SI V d S1NV1InSNOO WiN3tuNodu%ivj j v lur, �Nv a Ivy u3S(I as �a i nv naw Nv Ia .Hi 0andaSyv S1H�la lla V d aiwVi InbrvUO L 3 0 x m D cn 0 T 0 D m z^ J m m A Z 0 —I N m r m D m 0 0 n 0 0 Z n c A C C Z C cr l . r R A cr z cr rr rr C. rr rr U C z R R U. R 9a :133HS (A) (H) S1N :31VOS HOHnHO•f A9 (13AMM& SONVMa3'f Ae NMtlao £LOZLLOOLO :b39WnN 103fObd 6LOZ19ZIZ0 31tl0 0z Po 0r � CD m cnX� X O m o m zG � p O z Z 0 �p (') rn r N � m m � � r = N_ r In z W � , r � C x� m m In w z x v z o m m c= m z p ; m v, 2 z c) < m m 07 -a O m z z K < m Z m X 2 z � D n m r z n G O He ;o Z z an m rn z D fi� a� D z N CO D Y\ � 0" O :0 > N N N m a N y N 0 N 0 N o M m A A a Z n C z z n O m O z O m ;13 m O C m Z m 0 � V) A m z < zz v� 0 m D � r cn 1 I vLOZ/VZ/Z NOISIA3b MOIH 4-9 V3'dV atllnNNV .Z wnWINIW SNOLLV01HI03dS a3an10mnion XOe b3d SNOISN3W10 etllS 313b0N001Sd 000S.v •, y (Zdb HO 3ZIS 31-1130WLL WnWINIW) 3bnS010N9 HO 1nO 39YNMG 3N11SOd 301AObd -1bOd NI IG .9 3AlVA live_ .0-,I NOINn NIW A (IVNOI1dO) 310V1d303b lV01810313 10HO aVd ONILNnOW SStl108381H 03AOHddV HO 313HONOO 010380HORV 38nSO10N3 d00bdb3H1V3M a31V1nSN10901,3SSV'Z SSVYO b0 L SSVIO 30NV'dV3l0.t AlBN3SSV NOUN3A3bd MOIJNOW 3AIVA NO3HO 31e1100 =M�Na3dinO38 N3HM i L(H3HmovjnNvw 338) ao S31NVA Al9W3SSV NOUN3A38d MOlHN0V9 3160Nlbd 3HASS3bd a3on03b NIW.9 S1143W3bIn03b ONI1S31 ONV ONUICAb H11M 3ONVIldW00 ONtl A19W3SSV MOIHNOV9 30 NOUV83dO n ONtl 30NtlN31NItlW HOH 3191SNOdS38 39 lltlHS 83NM0 A1b3dObd '6 h 3000 m ONIeWnld '0 N 3H1 01 NOI1100V NI SNOIIVOIH103dS ONM S30NHNIMIO n NMOl 319VOIlddV llV HAM 30NVIldHOO NI 39 11VHS NOUVl1V1SNl 9 '(Eve Wlsv) SStlb9 80'04 3dA1) b3ddOO'(831139 b008'HOS) 0Ad 3S TVHS IVIb31VW 3dld "L c NOI1tlb3dO A A 80001(10 bOd 3000 ltl01810313 '0N 3H1 H11M 30NtlOb000M NI C1311VISNI 39 01 313Vid303H IVDIU0313 JOB AOZI, 1VNO11dO 9 '(1VNOI1dO 9NI1tl3H) 0381n03b 38nSO10143 HOObdb3H1tl3M 090E 3SSV 'II SStl10 b0 I SSV10 031VlASNI WNWINIW S 3bnSOl0N3 NIH11M 03b31N30 ONV OMd ONUNnOW SSVIO8391A 03AObddV 80 31380N00 NO a3831N30 39 11VHS Al9W3SSV NOI1N3A38d MOIHNOVS b 'XO9 b313W 3H1 HO ld-S NIH11M 0311VANl 39 11VHS Al9W3SSV NOUN3A38d MOIHNOVB £ 0190 VMMV R 9JOI, 3SSV H11M AldWOO IIVHS A19W3SSV NOI1N3A38d MOIHNOV9 3AIVA N031HO 319noo 'Z 1190 VAWV R £LOI, 3SSV H11M MMOO MIMS Al9W3SSV NOUN3A3bd MOIHNOVS 31dI0Nlbd 3bnSS3bd 030n03b 'I S310N A191N3SS`dMOIJNO O wooino ido1�j31NW00 ,Z/� Z Ol 90 Z E t f1 i 9 f B� 111wrwimmmut. t Ip, As :1 A t)YW0JH t P t.P® u Ni}€iVt90dt}#I7 �. 8010 01 t +A (a)M-31SII ONUNVId 33S'd31N30 NO X 031NV1d A8399nNHS 3003H NIRE)H3A3 HOIH ,£ 'Z '(0)OL-£ 1SI1 ONUNVId 33S 131N30 NO .OV 031NV1d S33a1 39W] l 90 N332JOS imVdO A, IdAi 1 (9)OL-31SI1 `JNI1NVId 33S'a31N30 NO ,V 331NV1d Ad389nNHS JNIN33HOS N338DH3A3 HOIH .9 Z '(V)O L-31S11 ON UNVld 33S 'd31N30 NO A£ a31NV1d S33di 1IMS L 90 N]3210S imVdO M 3dAi I ,9'L L 8ZL i OII 1SV0321d M'3'0'0 =81V 21V8 U# - 1n N 10 •. �• '.;i �.••'„ `, ,. •.. ° '. .� 38n100b1S WObH 13SHH0 �••° ' ° ' •, d COL (300d)1N3W3SM3 S1081N00 't • NOI10nb1SN001SOd tl 30n10Ni 3dld NI"(hJ30Nn O31tlbOdb3d ...y.' •: • .:: ; ; .�:' 3aVnos dod 331niusens 3iON • 38 NVo 1SV0 321d N33HOS SIb930 31"0 N01103dSNl • :'•�' I „9 NIMd081ONn WnNlWnly ivi3W 030NVdX3 8031OHNVW SS300V `'r •' •►' aNnoH E)NI1Vd 01AV2i1 ONno8v83AT13A"C-Z ►.., • • ' I _ 83AV1 '1N3Ob3d 9 0 613dOIS NltlbOb30Nn WnININIW Alna AAV3H '1'O'0 aid ONVS M0139 (INV 3AO0V 011d9VH 1btldV.06030VdS SMOH IVNIanllON01 t ONOIV'831N30 NO 3HON1 0 0 .A L 1V . _ _ .' .: ' NISVB HOM 1SV0 31id 83llld N3AOM-NON 319V31AI83d E 030VdS SNOI1VHOdb3d.9/E'3dld NIVbab30Nn OAd 031V80383d .9 .�. I d330 ,V < S3X08 ��.' � " "„` `r. F'',t :�. S`�.'v y", a �'a ;,.`'��t ',,,`'``' �` =J-fi .�''•v. .�.' Fl/�?r/�a�K^,:t' �' 'tt *.4h .+:i..ie�"Y ' —<i .: HOd GO3H d31s r ti 'K' • .' SI1VM _._.._ - _ '.\ '� • SCSO9 ='A313 ,,. _ — r'• MOTH r • • ° NOIH3AI 1nOH0 Mo,H t." •'.i'�.:r ;'�. u ) _ i" 1311n0 ! °, — . ► 1 NI"Ob301Mn _ 9Z 909= A31330VH8nS ..... 83604 °.. ..' - . • .• dV01H011-b31VM • I" .- ' b31tlM Atl - • • I H11M..... l0 - 31HdV8 - 30V48nS b31VM - — (139 ONUS (INV L — — aNOA39 `JNI100 — I (NVId 33S) 3 Ave38OA UI dW31 —J 11&40V9 HO lN3W3AVd : - SL'EI9="A313 (0313I03dS 3SIMd3H10 bL MZ/Z a7oatl SC4IS ='A313 MOIH ss31Nn a3Ao01X s99 dsn) 6LOZ/ZL/Z SS300tl - 3dId131N13dOHdt 3AVad (INV all 31OHNVW NOISIA32i b0 3'OHNVW SS300M 210 31OHNVW S5300tl X08 N0110Nnr 2AiIIJ GNUS GNf10 i9J 13aNn