Loading...
HomeMy WebLinkAbout20211337 Ver 1_ePCN Application_20211008 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20211337 1 Is a payment required for this project?* ✓ No payment required What amout is owed?* ✓ Fee received 6' $240.00 ✓ Fee needed-send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Wilmington Regional Office-(910)796-7215 Hannah Sprinkle:eads\hhsprinkle Information for Initial Review la.Name of project: Greenville Loop Trail-Holly Tree Road 1a.Who is the Primary Contact?* Brett Feulner lb.Primary Contact Email:* 1c.Primary Contact Phone:* bfeulner@dewberry.com (919)746-9583 Date Submitted 10/8/2021 Nearest Body of Water Heweletts Creek Basin White Oak Water Classification SA;HOW Site Coordinates Latitude: Longitude: 34.194305 -77.886529 A. Processing Information L) County(or Counties)where the project is located: New Hanover Is this a NCDMS Project ✓ Yes ( No Is this project a public transportation project?* (7 Yes r No Is this a NCDOT Project?* ✓ Yes ( No Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes ( No ID# Version Pre-fling Meeting or Request Date Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop ties here to attach document Re type nest be FOE la.Type(s)of approval sought from the Corps: 7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) n Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ( No lb.What type(s)of permit(s)do you wish to seek authorization? 17 Nationwide Permit(NWP) n Regional General Permit(RGP) n Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes ( No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: (7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express n Non-404 Jurisdictional General Permit In Riparian Buffer Authorization n Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: ( Yes r No For the record only for Corps Permit: ( Yes r No If.Is this an after-the-fact permit application?* ✓ Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo lh.Is the project located in any of NC's twenty coastal counties? ✓ Yes rNo 11.Is the project located within a NC DCM Area of Environmental Concern(AEC)? ✓ Yes ( No r Unknown 1j.Is the project located in a designated trout watershed? ✓ Yes ( No B. Applicant Information 1d.Who is applying for the permit? n Owner 17 Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ( Yes r No 2.Owner Information 2a.Name(s)on recorded deed: City of Wilmington 2b.Deed book and page no.: 2c.Contact Person: Sterling Cheatham 2d.Address Street Address City of Wilmington PO Box 1810 Address Line 2 Oty State/Rrovince/Region Wilmington NC Postal/Zip code Country 28402 USA 2e.Telephone Number: 2f.Fax Number: (910)341-7810 (910)341-7810 2g.Email Address:* sterling.cheatham@wilmington.gov 3.Applicant Information(if different from owner) 3a.Name: Brett Feulner 3b.Business Name: Dewberry Engineers 3c.Address Street Address 2610 Wycliff Road Address Line 2 Suite 410 Coy State/Province/Region Raleigh NC Postal/Zip code Country 27607 USA 3d.Telephone Number: 3e.Fax Number: (919)746-9583 (919)746-9583 3f.Email Address:* bfeulner@devvberry.com 4.Agent/Consultant(if applicable) 4a.Name: Brett Feulner 4b.Business Name: Dewberry Engineers 4c.Address Street Address 2610 Wycliff Road Address Line 2 Suite 410 (Sty State/Province/Region Raleigh NC Postal/Zip Code Country 27607 USA 4d.Telephone Number: 4e.Fax Number: (919)746-9583 (919)746-9583 4f.Email Address:* bfeulner@dewberry.com C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) NA 1c.Nearest municipality/town: Wilmington 2. Project Identification 2a.Property Identification Number: 2b.Property size: NA NA 2c.Project Address Street Address Holly Tree Road Address Line 2 atY State/Rovince/Region Wilmington NC Postal/Zlp Code Country 28409 USA 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Heweletts Creek 3b.Water Resources Classification of nearest receiving water:* SA;HQ W 3c. What river basin(s)is your project located in?* White Oak 3d.Please provide the 12-digit HUC in which the project is located. 030203020502 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The existing land use within the boundaries of the site is a public roadway.Adjacent to the project area is a mixed use of residential,and light commercial. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes G No C' Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0.05 4g.List the total estimated linear feet of all existing streams on the property: 25 4h.Explain the purpose of the proposed project:* The purpose of the project to provide the residents of Wilmington with an alternative transportation source in the form of a greenway trail. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The project includes constructing a greenway trail adjacent to Holly Tree Road,starting approximately 300-feet east of College Road to approximately 300 feet west of Pine Grove Drive.No indirect impacts are anticipated.The land use in the project vicinity is already developed and no new access to undeveloped land will occur from this project.Anticipated equipment to be used includes typical equipment used for greenway construction such as back hoes,graders and excavators. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* a Yes C No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* a Preliminary C Approved C Not Verified r Unknown C N/A Corps AID Number: SAW-2021-01211 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Brett Feulner and John Merritt Agency/Consultant Company: Dewberry Engineers Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR June 14,2021 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes a No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): fJ Wetlands r Streams-tributaries r Buffers r Open Waters r Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* Wetland WA avoiding utility lines P Bottomland Hardwood Forest WA Yes Both 0.020 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0.020 2g.Total Wetland Impact 0.020 2i.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The majority of the project is constructed within the previously impacted existing Right of Way and fill are for Holly Tree Road. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The path narrows to 8 feet near the wetland impact area. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes 6 No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Impact quantities do not require mitigation F. Stormwater Management and Diffuse Flow Plan (required by DWR) L) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes ( No If no,explain why: The greenway will utilize the existing roadway storm water system 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ✓ Yes 0' No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? ✓ Yes F No 2c.Does this project have a stormwater management plan(SMP)reviewed and approved under a state stormwater program or state-approved local government stormwater program? ✓ Yes r No ✓ N/A-project disturbs<1 acre Comments: The greenway will utilize the existing roadway storm water system G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ✓ Yes r No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* ✓ Yes 6' No Comments:* No document required because the location of the project is within the existing ROW for the road,no land use change is occurring. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes 6' No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes 6 No 3b.If you answered"no,"provide a short narrative description. The land use in the project vicinity is already developed and no new access to undeveloped land will occur from this project. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes ( No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes (•' No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* (' Yes rNo 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* ✓ Yes 6' No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ✓ Yes (' No 5g.Does this project involve bridge maintenance or removal? ✓ Yes (' No 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes (' No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ✓ Yes ( No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC and NC-NHP,onsite surveys 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes 6 No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* No streams are impacted. 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* C Yes ( No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NC SHPO 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* C Yes f• No 8c.What source(s)did you use to make the floodplain determination?* https://msc.fema.gov/portal/search#searchresultsanchor Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upbad button or drag and drop files here to attach document NCDWR_Pre-filingMeeting_GreenvilleLoopTrail.pdf 245.52KB final signed Holly Tree PJD.pdf 7.84MB WilmingtonGreenwayPCN_Memo.pdf 7.92MB 2TRST21911 Greenville Loop Trail Section 1-65%Plans.pdf 29.07MB Re must be RT or IQVE Comments NCDWR waived the prefiling meeting-correspondence attached Signature * fJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Brett Feulner Signature cY7�9�Yz`��llim'H� Date 10/8/2021