Loading...
HomeMy WebLinkAboutGW1-2021-06670_Well Construction - GW1_20211007 WELL CONSTRUCTION RECORD GW-1 For Internal Use Only: i 1 tractor Informati <WATER=ZONESMe I ntract Name O �,`�\\ FROM TO DESCRIPTION f\� V rt. ft. I a4 ZZ pC �?v"�'e �� ft. ft. ! NC Well Contractor Certification Number \O� COS- , 15 OUTER':CASING:for".miil0-cased:weIIs OR-ISNERi tf-a bcable;i.:' Morgan Well 8t Pump, I N `� p\'�� FROM T° DLSMETER THICKNESS MATERIAL ft. b ft 61/8 In sdr21 I PVC Company Name :16'INNER`CASING:01(:TUBING"'e"'othertni ii closed'Ioo 2.Well Construction Permit#: FROM I TO I DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc) ft. fL 3.Well Use(check well use): ft. ft 1 17;SCREEN Water Su PP Y Well FROM TO DLAMETER 1 SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) `12esidential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18:'GROUT ❑Irrigation ❑Wells>100,000 GPD FROM TO r MATERIA.L EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft. 20 ft. bentonite poured ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation >19 SAND/GRAVEL-FACE tf a "livable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer :2vi`DRILLIIVGI OG attachhaddtaouali'sheets`d'uecess y _. .. FROM TO DESC TION col r,hardness sorUrock y e,- m size,etc. ` ❑Geothermal(Heating/Cooling etum) ❑Other(explain under#21 Remarks) � ft. ft. n 4.Date Well(s)Completed: ` Well ID# l ft. ft Ze Location: '50 ft. fL SWY! roL AA t. " (AA t e— Facili / t Nam Facility ID#(if applicable) ft. ft 1�-re-� ( ft. ft. s,all Address,City,and Zip it ft ft COa � � ARKC County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well fireld,one lgat/long is sufficient) Q C j22.0 leatio'3 -Y -` - N y . J W a 6.Is(are)the well(s): JPermanent or ❑Temporary of Certified Well Contractor Dati gn g this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or IrNo 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this faro. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page;to provide additional well construction info (add'See Over'in Remarks Box).You may also attach additional pages if necessary. construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3Q200'and 2©100D f� 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: V (ft-) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 if water level is above casing,use"+" 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) I1.Borehole diameter: 6 0 (in.) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed 6 . FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: air pressure Permit Program,1611 MSC,Raleigh,NC 27699-1611 4 13b.Disinfection typ4�4)YlV`'C� Amount: 7 3 cw, d Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018