Loading...
HomeMy WebLinkAboutGW1-2021-06675_Well Construction - GW1_20211007 f WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: ontractor In o m tion: 4 o FROMWATER.,ZONES _. Well Co' r Name TO DESCRIPTION ft. ft t ft NC Well Contractor Certification Number (��CcC X,On +15;OiTlER CASINGt fo"r"iintilh caied:wells`OR LMR'[f,"a- hcabl6 ' Morgan Well & Pump, IN 'f��= ��'otiN J��J EOM O DLOSTER T)3ICIINESS MATERIAL ft. ft. 6 1/8 i" Sdr21 PVC Company Name ;16 R CAS G`ORTUBING."eoflrermal;eldsed loo I FROM TO DIAMETER THICKNESS N MATERIAL 2.Well Construction Permit#: O List all applicable well construction permits(i.e.UIC,County,State, Variance,etc.) ft. ft in. 3.Well Use(check well use): ft. ft in. Water Supply Well: FROM�ErTO x{' DL4METER ~SLOT SIZE THICKNESS • MATERIAL ❑Agricultural ❑Municipal/Public ft. ft in. ❑Geothermal(Heating/Cooling Supply) *Residential Water Supply(single) ft ft in. ❑IndustriaUCommercial ❑Residential Water Supply(shared) 18QUI r x _ ❑Irrigation ❑Wells>100,000GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 f[ 20 ft bentonite poured ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation r19 SAND/GRAVERTACK'[fa'Ikatile) s. ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology El Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer '20c;DRUA NGLOG'attaeti add[ttonal"sheets:ifriecess `; _:x, "t;:;" ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM To DESCRIPTI (co or,hardness soil rock a ram size,etc.) t 4.Date Well(s)Completed:C�-1� Well ID# R. Rft TT ft. 5 Well Location- ft. Facility/Ow erName Facility ID#(ifapplicable) ft. ft. sical Address,City,and Zip ft. ft 21'12E1VIARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one I t/long is sufficient)N , �� W 22.Certification: 6.Is(are)the weU(s): fFermanent or ❑Temporary Si e of ertified W Tractor a[e io nin th form,1 hereby certify that the well(s)was(were)constructed in accordance udth 7.Is this a repair to an existing well: ❑Yes or ONO 15A NCA C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this farm. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: /���J'� 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 3�-' (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-�200'and 2@100) 71 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft-) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+'• 11.Borehole diameter: 6 (in.) 24b.For Injection Wells:Copy to'DWR,Underground Injection Control(IUC) Program, 1636 MSC,Raleigh,NC 2.699-1636 12.Well construction method: Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA air pressure Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: 13b.Disinfection ty Amount: IZ Z_ { Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources' Revised 6-6-2018