Loading...
HomeMy WebLinkAboutGW1-2021-06636_Well Construction - GW1_20211007 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: _ ,.. . ._' Well CtZct r ate _ ^ FROM ft TO DESCRIPTION fOG��SC(��J ft ft E NC Well Contractor Certification Number tt �>LQn �Qvl�Q� 15`OUTEIMASING for.'miiltt cased;we]Is"OR1Z4ER-if`a`Lcable Morgan Well & Pump, I N C `r&311 ' Q�,NR FROM TO DL4METER TffiCKNESS MATERIAL Company Name ^ ' l t`' t` 6 1/8 1° sdr21 JPVC` { €`4:MV M CASING;ORTUBING eothermilclosedloo 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) ft. ft in. 3.Well Use(check well use): ft. ft in. Water Supply Well: FROM TO DIAMETER� SLOT SIZE THICKNESS MATERIAL ❑Agricultural bMunicipal/Public ft ft in. ❑Geothermal(Heating/Cooling Supply) @4esidential Water Supply(single) ft ft. ln• ❑Industrial/Commercial ❑Residential Water Supply(shared) - t ❑hri ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft- 20 ft- bentonite poured ❑Monitoring ❑Recovery ft. ft Injection Well: ft. ft. , ❑Aquifer Recharge ❑Groundwater Remediation 19>`SANDlGRAVEL'P:ACIC`d a'-licalile Y<:..,>; ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer �20;DRILLINGT OG'ittach idditiouilsheets if-uecess _FROM TO DESCRIPTION color,hardness,soil/rock ty type, rain size,etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) D ft. , tt ry Q 4.Date Well(s)Completed: -\ - 1 Well ID# ft. ft 1 ^ �G� Sa.Well Location: ft. ot>ft- '.Aq�1 ft. ft V acilityC/(Owner Name fe~� Facility ID#i(if applicable) ft. ft 1 I I T✓ ICA � �/�tt I c �111�yC�U+( Physical Address,City,and Zip ft, ft County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/t/long is sufficient) 22.Ce • ation• N ���•��2&bG� wZ 6.Is(are)the well(s): CJPermanent or ❑Temporary Signature of C teed Well Contracto Date By signing thisform,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or C1No 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page!to provide additional well construction info construction,only 1 GW- is needed. Indicate TOTAL NUMBER of wells (add'See Over in Remarks Box).You-may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 7yo (ft) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths ifdifferent(example-3 00'and 2�a 100') (7 C) (ft. 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: ) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use 11.Borehole diameter: 6 (in-) 24b.For Injection Wells:Copy to'DWR,Underground Injection Control(IUC) o Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: f etary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed i FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 2 13a.Yield(gpm) Method of test: air pressure Permit Program, 1611 MSC,Raleigh,NC 27699-1611 �J f 13b.Disinfection type: f O0JOW— Amount: I Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018