Loading...
HomeMy WebLinkAbout20130920 Ver 1_Approval Letter_20130909NOT A CAMA PERMIT NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary September 9, 2013 Roger and Connie Hudson PO Box 300 Columbia, NC 27925 DWR # 13 -0920 Tyrrell County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Hudson Barge Landing and Marina Dear Mr. and Mrs. Hudson: You have our approval for the impacts listed below for the purpose described in your application dated August 27, 2013 received by the Division of Water Resources (Division) on August 27, 2013. These impacts are covered by the attached Water Quality General Certification Number 3900 and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary 404/401 Wetlands 0.47 (acres) 0 (acres) Upland Basin Open Waters 0.46 (acres) 0 (acres) 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 -807 -63001 Fax: 9IM07-6492 Internet -w .ncwatemualityerq An Equal OpporlunitylAffrmative Action Employer TIM93q AMAO A TOM Roger and Connie Hudson DWR 4 13 -0920 401 APPROVAL Page 2 of 3 Access Channel Open Waters 0.23 (acres) 0 (acres) Man -Made Canal Open Waters 0.04 (acres) 0 (acres) Boat Ramp Open Waters 0.007 (acres) 0 (acres) Bulkhead Open Waters 0.03 (acres) 0 (acres) Pier Shading 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. ' 3. Marina Water Quality Monitoring The permittee shall begin monitoring water quality upon connection of the basin with the Scuppernong River. Monitoring is to be conducted twice per month during the months of June, July, August, and September. Measurements should be taken near surface, mid -water column, and one foot above the bottom. The permittee is required to submit a site monitoring plan to the Washington Regional Office for approval before the start of any required monitoring. The monitoring plan should include, but not be limited to, Dissolved Oxygen (DO), pH, temperature, salinity, and conductivity. Weather conditions should also be documented and include wind direction, wind speed, and ambient air temperature. Monitoring shall be conducted for (3) consecutive years. Copies of data collected are to be submitted to the Washington Regional Office before the end of the year in which data was collected. Calibration logs for monitoring equipment are to be available for review by DWR personnel upon request. 4. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). Roger ao',;Connie Hudson 6WR # 13 -0920 401 APPROVAL Page 3 of 3 The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699 -6714 Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This letter completes the review of the Division under section 401 of the Clean Water. Please contact Anthony Scarbraugh at 252- 948 -3924 or anthony.scarbraueh @ncdenr.aov if you have any questions or concerns. Sincerely, ate- ate- - Amy Adams Assistant Regional Supervisor DWR Washington Regional Office Enclosure: GC 3900 cc: Doug Dorman, Atlantic Environmental Consultants, LLC, PO Box 3266, Kitty Hawk, NC 27949 Raleigh Bland, USACE Washington Regulatory Field Office (via email) DWQ WaRO 401 files Jennifer Burdette, DWR Webscape Unit