Loading...
HomeMy WebLinkAboutNCC192471_NOT Closeout Documents_20211004North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: NCDOT US 70 Havelock Bypass River basin: Neuse Person financially responsible: DUKE ENERGY PROGRESS LLC - Thomas C Project #: CRAVE-2019-023 Williams, Manager of Transmission Engineering Address: 410 S. Wilmington Street, Raleigh, NC 27601 1. Project Location: various, Havelock Pictures: Yes - Digital 2. Weather and soil conditions: sunny, hot, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: October 01, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the 10. Comments: SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: httt)s:Hedocs.dea.nc.t!ov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: James Edwards Others present: No one. Date of inspection: September 27, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM cc: