Loading...
HomeMy WebLinkAboutNCC215556_ESC Approval Submitted_20211007Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: October 4"' 2021 LETTER OF APPROVAL WITH MODIFICATIONS George Bartley Carroll DR Horton Inc. 8025 Arrowridge BIvd Charlotte, NC 28273 RE: Project Name: Calvin Creek Acres Approved: 89 Project ID: TRTMN-2020-087 Project Location: PIN 4740090982.000 Submitted By: ESP Associates, Inc. Date Received: April 13" 2020 Plan Type: Transfer of Financial Responsible Ownership Dear Mr. Carroll: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 413.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the Letter of Approval with Modifications Calvin Creek October 4`t' 2021 Page 2 of commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jonathan Williams Erosion Control Inspector II Enclosures: Modifications Fact Sheet on the New NCGO1 Permit Letter of Approval with Modifications Calvin Creek October 41h 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Calvin Creek Project ID: TRTMN-2020-087 County: Iredell Reviewed by: Randall Moore Original Approval: May 15"' 2020 c Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. No more than 20-25 acres disturbed at one time. Construction sequence needs to be detailed to account for this requirement. -RC 2. All basins need diversions and berms to direct runoff to slope drains for runoff entering basins. -RC 3. Turn silt fence up at basin outlets, extend PVC pipe outlet from basins to limits of disturbance so treated water discharges outside of disturbed area. -RC 4. All basin outlets should merge over stream buffer, not intersect perpendicularly. -RC 5. Skimmer Basin 8 is in a poor Iocation, needs to be adjusted. Cannot have treated runoff discharging in the middle of the disturbed area. -RC 6. Wrap all downslope sides of stockpiles with silt fence. Stockpiles shall be located a minimum of 50 feet from diversions and basins. -RC 7. Slopes greater than 10 feet in height shall be terraced per NC Sediment and Erosion Control Planning & Design Manual. -RC 8. Slopes greater than 10 feet in height need more protection than silt fence. -RC 9. Silt fence shall be 10 feet off toe of slopes. -RC 10. Diversions are to remain in place to carry runoff to basins until areas draining to basins are stabilized. -RC 11. Lots to be graded to drain to the road. Not over rear slopes. -RC 12. SB-2 surface area too small, needs 45,059 feet squared. -RC 13. SK-3A skimmer orifice could go to 2.25". -SC 14. SK-8 skimmer orifice could go to 1.5". -SC 15. SK-10 skimmer orifice could increase in size by ' inch. -SC 16. Provide basin calculations for basins receiving increased runoff in Phase 2 of the plan, once inlets and piping are installed. -RC