Loading...
HomeMy WebLinkAboutWQ0042775_Application Attachment_20211006 (2)WSACC WATER & SEWER AUTHORITY OF CABARRUS COUNTY ISO 14001:2015 • NC Star Public Sector • OHSAS 18001:2007 February 26, 2020 Mr. Guillermo Anzola Engineering Assistant Charlotte Water 5100 Brookshire Blvd Charlotte, NC 28216 Subject: Flow Acceptance Request Robinson Charter School Charlotte Water Project Number 2020629 Dear Mr. Anzola: 232 Davidson Hwy. Concord, NC 28027 704.786.1783 • 704.795.1564 Fax www.wsacc.org This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from Charlotte Water on February 24, 2020. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the commercial wastewater from the proposed project entitled Robinson Charter School. The referenced project will serve a school with 550 students, with a projected wastewater flow of 6,600 gallons per day (gpd). The wastewater generated by this project will be conveyed through a proposed gravity system, through an existing gravity system, and then enter WSACC's system at the existing 36-inch Reedy Creek Interceptor. If construction of this project does not commence within two (2) years of the date of this notice, the notice is rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC, in writing, when construction of this project is initiated. This sewer capacity allocation may also be cancelled pursuant to the conditions set forth in the WSACC Sewer Allocation and Commitment Policy. If you have any questions, please call me at (704) 788-4164, extension 104. Sincerely, s r "J. Thomas Hahn, PE Assistant Engineering Director cc: Keri Cantrell, PE/Charlotte Water Michael Wilson/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC Trent Gobble/WSACC WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: CCity of Concord ❑City of Kannapolis III Town of Harrisburg Town of Mt. Pleasant ®Charlotte Water Project Title, Description, and Number of Lots/Unit: Project Title: Robinson Charter School — Project # 2020629 Description: The Robinson Charter School engineering plans and specifications, as prepared and sealed by Douglas K. Draffen NCPE, with McKim & Creed foi wastewater sewer laterals to serve Robinson Charter School located on 8000 Robinson Church Road in Charlotte, NC, with a wastewater discharge of 6,600 GPD. *Number of Lots: OR *Number of Units: 550 students x 12 gpd/student. *Must be included in request. Where will the new line be connected: Directly into a WSACC Interceptor Into the Jurisdiction's existing collection system Into a private line ■ ■ Date: 02/04/2020 Describe the location of the tie-in line to which the new sewer line will connect: The proposed sewer laterals will tie- in to the existing 8-inch sanitary sewer system, which extends to the 36-inch RCP material WSACC Upper Ready Creek Interceptor. Which WSACC Interceptor will the flow ultimately be discharged into: 36-inch RCP WSACC Upper Ready Creek Interceptor What is the WSACC manhole number that the flow will be discharged into? 019102 What is the quantity of flow that will be discharged? 6,600 GPD Flow type: ❑ Domestic % Commercial 100 % ❑ Industrial Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided. Mark Lomax at 704-786-1783, ext. 231, must be notified 48 hours in advance of a connection into a WSACC interceptor. WSACC will inspect connection before, during, and after completion. If construction is not started within two (2) year from the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project. OA WSACC USE ONLY: DATE: ALI ❑ Current sewer model shows an Interceptor as being surcharged south of the manhole in question. [� ApproveM 6r 44Nr.) ❑ Not Approved ❑ Current Sewer Model shows: .gwl=rcir.'N(' t<kC"GSA (APA6_riar rue- t Gera) C Attouai 1?COft.t' AT A . AG Dt 4LY Fs' taw CI•c)'s t 0 .%)S DWI It Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10/18) (WSACC USE ONLY) Robinson Charter School (Charlotte Water Project No. 2020629) Section I. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 WWTP facility's permitted flow, MGD 26.500 Estimated obligated flow not yet tributary to the WWTP, MGD 2.235 WWTP facility's actual avg. daily flow, MGD 19.911 (75.14% of permit) Total flow for this specific request, MGD 0.007 Total actual and obligated flows to the facility, MGD Percent of permitted flow used 22.153 83.60% Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP. Pump (Name Number) Station or Pump Permit StationTotal No. Capacity Firm MGD Design Daily (Firm/pf) (A) MGD Average Flow ** Approx. Average Flow MGD (B) Current Daily Obligated, Tributary Flow MGD (C) Not Daily Yet = Plus (D) ObMGDd Current (B+C) Flow Flow ( Capacity*** E ) Available = MGD ( A-D ) Reedy PS Creek WQCS00009 16.500 6.600 1.835 0.468 2.303 4.297 Lower River Rocky PS NC0036269 37.000 14.800 12.346 1.752 14.098 0.702 * **Design Design ***A Capacity The Firm Planning Criteria. Average is Capacity < 0. Assessment Daily (design Flow Addendum flow) is the of firm any shall capacity pump be attached station of the is pump for defined each station as pump the divided station maximum by located a pumped peaking between factor flow the that (pf) project can not be less connection achieved than 2.5, with point per the Section and largest the pump 2.02(A)(4)(c) WWTP taken where of out the Available of Minimum service. Section III. WSACC Certification Statement: I, J. Thomas Hahn, PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I and Section II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates WSACC's guarantee of capacity for this wastewater flow. 1:4L 4/ZC�2 b;,v W CC's Signing Official Signature Da