HomeMy WebLinkAbout20130030 Ver 2_More Info Received_20130823Strickland, Bev
From: Dennison, Laurie
Sent: Friday, August 23, 2013 1:12 PM
To: Strickland, Bev
Subject: FW: Bass Lake Outfall Greenway
Attachments: updated_page5_sub20130822.pdf
119noraTeTs =1
Laurie Dennison
A• . e j
919-807-6303
Wetlands, Buffers, Streams, Compliance — Permitting (Webscape) Unit
NCDENR/Division of Water Resources — Wetlands and Stormwater Branch
Website: www.ncwatergualitV.org
From: Smith, Cherri L
Sent: Friday, August 23, 2013 12:25 PM
To: Dennison, Laurie
Subject: FW: Bass Lake Outfall Greenway
Laurie,
Here's a corrected page 5 of the application for 13- 0030v2 Bass Lake Outfall Greenway. Thank you and hope you have a
good weekend. It's not even supposed to rain!
Cherri
From: jennifer .yenawineCa)kimley- horn.com [ mai Ito: jennifer.yenawineCa)kimley- horn.com]
Sent: Friday, August 23, 2013 11:58 AM
To: Smith, Cherri L
Cc: Elizabeth. LynchCa)kimley- horn.com; Todd. StJohnCa)kimley- horn.com
Subject: Bass Lake Outfall Greenway
Cherri,
Attached is the updated impact table (sheet 5 of the PCN application) for the Bass Lake Outfall Greenway project. Sorry
for the mix -up! Would you like us to send hard copies as well? Please let me know if you need anything else.
Thanks!
Jennifer Yenawine, E.I.T.
Kimley -Horn and Associates, Inc.
Office: (919) 677 -2072
Cell: (479) 530 -7259
Jennifer.Yenawine(@Kimiev-Horn.com
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary (T)
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require miticlation, then vou MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number—
Permanent (P) or
Temporary T
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f. 6g.
Zone 1 Zone 2
impact impact
(square (square
feet ) feet
B1 P
Fill
UT to Bass Lake
No
3,523
B2 T
Silt fencing
UT to Bass Lake
No
6,105
B3 P
Fill
UT to Bass Lake
No
6,973
B4 T
Silt fencing
UT to Bass Lake
No
5,122
B5
Yes /No
B6
Yes /No
6h. Total Buffer Impacts: 9,62$ 12,095
6i. Comments: