Loading...
HomeMy WebLinkAbout20130030 Ver 2_More Info Received_20130823Strickland, Bev From: Dennison, Laurie Sent: Friday, August 23, 2013 1:12 PM To: Strickland, Bev Subject: FW: Bass Lake Outfall Greenway Attachments: updated_page5_sub20130822.pdf 119noraTeTs =1 Laurie Dennison A• . e j 919-807-6303 Wetlands, Buffers, Streams, Compliance — Permitting (Webscape) Unit NCDENR/Division of Water Resources — Wetlands and Stormwater Branch Website: www.ncwatergualitV.org From: Smith, Cherri L Sent: Friday, August 23, 2013 12:25 PM To: Dennison, Laurie Subject: FW: Bass Lake Outfall Greenway Laurie, Here's a corrected page 5 of the application for 13- 0030v2 Bass Lake Outfall Greenway. Thank you and hope you have a good weekend. It's not even supposed to rain! Cherri From: jennifer .yenawineCa)kimley- horn.com [ mai Ito: jennifer.yenawineCa)kimley- horn.com] Sent: Friday, August 23, 2013 11:58 AM To: Smith, Cherri L Cc: Elizabeth. LynchCa)kimley- horn.com; Todd. StJohnCa)kimley- horn.com Subject: Bass Lake Outfall Greenway Cherri, Attached is the updated impact table (sheet 5 of the PCN application) for the Bass Lake Outfall Greenway project. Sorry for the mix -up! Would you like us to send hard copies as well? Please let me know if you need anything else. Thanks! Jennifer Yenawine, E.I.T. Kimley -Horn and Associates, Inc. Office: (919) 677 -2072 Cell: (479) 530 -7259 Jennifer.Yenawine(@Kimiev-Horn.com 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miticlation, then vou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. 6g. Zone 1 Zone 2 impact impact (square (square feet ) feet B1 P Fill UT to Bass Lake No 3,523 B2 T Silt fencing UT to Bass Lake No 6,105 B3 P Fill UT to Bass Lake No 6,973 B4 T Silt fencing UT to Bass Lake No 5,122 B5 Yes /No B6 Yes /No 6h. Total Buffer Impacts: 9,62$ 12,095 6i. Comments: Page 5 of 10