Loading...
HomeMy WebLinkAboutGW1-2021-06324_Well Construction - GW1_20210915 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Joseph Bailey Weil Contractor Name FROM TO DESCRIPTION�'i '�"' ,—�^'ft .rl^ ft. 3271-A � 242� ft ft . NC Well Contractor Certification Number __0 B & K Well Drilling Inc ,� f = &VUFERCASINc f6ir'u:n-ea'sedwens OR LINER tta iicabie ., FROM TO DIAMETER THICKNESS MATERIAL Company Name t J1 �r'ta� 0 ft. / ft. 61/4 ! in- SDR-21 PVC f6,INNER CASING OR TITBING ebtlierniai.closed ioo „_ ,„, 2.Well Construction Permit#• FROM TO I DIAMETER I THICKNESS I MATERIAL S ft ft List all applicable well construction permits(i.e.U1C,Cannrv,State.Variance.etc.) in. 3-Well Use(check well use): AA ft. ft in. Water Supply Well: 17.SCREEN, FROM TO DIAMETERV, SLOTSIZE THICKNESS I MATERIAL ❑Agricultural ❑�M�unic—ipal/Public ft ft. ❑Geothermal(Heating/Cooling Supply) �sidential Water Supply(single) ft ft ti7rlAdustrial/Commercial ❑Residential Water Supply(shared) I&GRUUP- ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft- 20 ft Bentonite Four ❑Monitoring ❑Recovery ft. ft Injection Well: n. n. 0Aquifcr Recharge ❑Groundwater Rcmcdiation ]9;SANI)lGRAVEL PACK ittap' 'cable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL- FMPLACEMENT METHOD ❑Aquifer Test ❑Stornrwater Drainage fL fL ❑Experimental Technology ❑Subsidence Control ft ft ❑Geothermal(Closed Loop) ❑Tracer DRILLING LOG attachadditiouid Wei&ffaccess ❑Gcothcnnal(Hcating/Coolin FROM TO DESCRI TION(c(or,hardness,sail/rock e, in size,etc.)Return) OOther(explain under#21 Remarks) ft ft r �Q 0 43i 4.Date Well(s)Completed: fJ ,� Well ID# fit' ft It aAli n • 5a.Well Location: 1 ft t ft f f 5an 0J ft rr p Facility/OwncrNa Facility ID#(if applicable) ft ft Physical A dress,City,and Zip i F' ft ft County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one[at/long is sufficient) 22.Certification: N W I ullvll 6.is(are)the well(s): .-anent or ❑Temporary g tare o i e eK_C actor Date 11 B signing this form.1lierebv certify that the ells)was(were)constructed in accordance ivith 7.Is this a repair to an existing well: ❑Yes or o SA NCAC 02C.0100 or 15.NCAC 02C.0200 Well Construction Standards and that a copy tf this is a repairt,(ill out known well construction information and explain the nature q('the I this record has been provided to the well owner, repair under21 remarks section or on the hack of this form 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-I is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 11/e � (ft.) Submit this GW-I within 30 days of well completion per the following: For multiple wells list a0 depths if different(ecnrnple-3(3a 200'uad 2@100') 40 24a. For All Wells: Original farm to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1 6 1 7 1f water level is above casing,use- 6 1/18 24b. For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 11.Borehole diameter: Program,1636 MSC,Raleigh,NC;27699-1636 12.Well construction method:Air Rotary j 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: Air Lift Permit Program,1611 MSC,Raleigh,NC 27699-1 61 1 13b.Disinfection type: Chlor. Tabs Amount: 1 1/2 LbS Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-201 R F 1 i