HomeMy WebLinkAbout20190908 Ver 1_Compliance Evaluation Inspection_20210930Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190908
NCDOT - Replace Bridge 276 on SR 1104
Haywood
NCDOT - Replace Bridge 276 on SR 1104
NC DOT Division 14 - Sylva
9/30/2021
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 49' 54''+35° 26' 24''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on September 30, 2021. The
following are items that need attention:
- SDOs and silt fence need maintenance.
- Remove piece of geotextile fabric from the stream directly below bridge (Northwest side).
- Remove sediment from ditch line leading to stream. (~11+00-12+00 RT)
- Gravel between silt fence and JS needs to be removed.(~14+00 RT)
- Material accumulated below bridge during TS Fred. Some material has been removed. Please consult with hydraulic
engineer to ensure capacity meets design.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190908
9/30/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2