HomeMy WebLinkAboutNC0005762_Facility Update_20021205J. P. Stevens update
Subject: J. P. Stevens update
Date: Mon, 18 Feb 2002 13:24:58 -0500
From: Don Register <don.register@ncmail.net>
To: Belinda Henson <belinda.henson@ncmail.net>
CC: Dale Lopez <dale.lopez@ncmail.net>, Kitty Kramer <Kitty.Kramer@ncmail.net>,
Paul Rawls <Paul.Rawls@ncmail.net>
I talked with Heman Benton today to get an update on the water plant
expansion and bar screen replacement at the WWTP. The water plant
solids thickener is in operation and working correctly. The new bar
screen (same as the old except it was all stainless steel to withstand
the high temp.) worked for 5 hrs. before disintegrating. It was not
installed properly and there was not an automatic cut-off, if there was
a problem with the operation. The manual screen is currently used until
the new screen can be replaced.
J
1 of 1 02/18/2002 1:44 PM
RE: WestPoint Stevens Permit NC0005762
Subject: RE: WestPoint Stevens Permit NC0005762
Date: Thu, 5 Dec 2002 12:22:31 -0500
From: Helton Yancy <Helton.Yancy@wpstv.com>
To: "'Paul Rawls"' <paul.rawls@ncmail.net>
CC: "'belinda.henson@ncmail.net"' <belinda.henson@ncmail.net>,
"'don.register@ncmain.net"' <don.register@ncmain.net>,
Lanier Eddie <Lanier.Eddie@wpstv.com>
Will do!
Original Message
From: Paul Rawls [mailto:paul.rawls@ncmail.net]
Sent: Thursday, December 05, 2002 11:19 AM
To: Helton Yancy
Subject: Re: WestPoint Stevens Permit NC0005762
Yancy:
Thank you for the report.
I don't know if you knew this but Kitty Kramer has retired as of last month.
All questions related to compliance and DMR's should go to Belinda Henson as
well as future reports of this nature.
If possible I would like for you to put Belinda as the first contact on your
e-mail reports but still continue to CC Grady Dobson, Don Register and
myself.
Per my conversation with Herman this morning it sounds like Moore Co. is
having
severe problems with ice, I hope everything near you home is OK.
Thanks Again
Paul Rawls
Helton Yancy wrote:
> Final effluent pH was 9.1 versus a limit of 9 or below, yesterday,
December
> 3, 2002. Today's measurement was compliant at 9.0.
> We are investigating the operational schedules at both the WestPoint
Plants
> and the Gulistan operation to determine the cause of the elevated pH.
1 of 1 12/5/2002 12:27 PM
WestPoint Stevens Permit NC0005762
Subject: WestPoint Stevens Permit NC0005762
Date: Tue, 31 Dec 2002 09:24:35 -0500
From: Helton Yancy <Helton.Yancy@wpstv.com>
To: 'Paul Rawls (E-mail)" <paul.rawls@ncmail.net>,
"Belinda Henson (E-mail)" <belinda.henson@ncmail.net>,
"'Grady Dobson (E-mail)" <Grady.Dobson@ncmail.net>,
"Don Register (E-mail 2)" <Don.Register@ncmail.net>
CC: Lanier Eddie <Lanier.Eddie@wpstv.com>, Adams Wesley <Adams.Wesley@wpstv.com>,
Benton Herman <Benton.Herman@wpstv.corn>,
Hughes Steve <Hughes. Steve@wpstv.com>,
"'Wayne Cate (E-mail)" <catew@gulistan.COM>,
"'Dennis McCurley (E-mail)" <MCCURLEYD@gulistan.COM>,
Harris Parker <Harris.Parker@wpstv.coln>
Final effluent pH was 9.6 versus a limit of 9 or below, this
morning, December 31, 2002. The reduced running schedule of the Gulistan
operation has contributed to this problem. We are investigating short term
measures to adjust pH until Gulistan resumes operations the end of this
week.