Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSW1210602_Add Info Request_20210811ROY COOPER
A
Governor
_
v
y a2
ELIZABETH S. BISER
�.D
*fssrowv,v��"`*
Secretary
BRIAN WRENN
NORTH CAROLINA
Director
Environmental Quality
August 11, 2021
William R. Buie, PE
WGLA Engineering, PLLC
724 5th Avenue West
Hendersonville, NC 28739
Subject: Request for Additional Information
Stormwater ATC Project No. SW1210602
Suncap Warehouse
Henderson County
Dear Mr. Buie:
The Central DEQ Office received and accepted a State Stormwater Permit Application for the subject
project on June 29, 2021. A preliminary in-depth review of that information has determined that the
application is not complete and additional information is needed to determine whether the project
complies with 15A NCAC 02H.1043. To continue the review, please provide the following additional
information:
1. When the applicant is a corporation or LLC, documentation from the NC Secretary of State or
other official documentation showing the titles and positions held by the person who signed the
application is required. Because the business registration from the NC Secretary of State does not
list Jason K. Bria as a company official, other documentation from the LLC will be required to
verify that he has the authority to sign on behalf of the LLC.
2. The Supplement EZ form specifies that the vegetation in the bioretention cells will be trees and
shrubs; however, the details specify sod. Please correct this discrepancy and, if the bioretention
cells will have trees and shrubs instead of sod, submit a planting plan for the bioretention cells
(Bioretention MDC 10).
3. Please upload an electronic copy of the property deed.
4. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents. Pdfs must be uploaded using the form at:
h!Ltps:Hedocs.deq.nc.gov/Fonns/SW-SLapplemental-Uploa
Please remember to confirm that any revised information is presented consistently throughout the
application documents. Please also remember to provide two hard copies and one electronic copy of any
updated or requested documents per 15A NCAC 02H.1043(3).
The requested information should be received in this Office by September 10, 2021, or the application
will be returned as incomplete. The return of a project will necessitate resubmission of all required items,
E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA -
DepanmmmenWm mmUiawi� /� 919.707.9200
including the application fee. Please note that the Division is allowed 30 days from the receipt of a
complete application to issue the authorization to construct permit.
The construction of any impervious surfaces, other than a construction entrance under an approved
Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement
action pursuant to NCGS 143-215.6A.
Please reference the State assigned application number on all correspondence. If you have any questions
concerning this matter, please feel free to call me at (919) 707-3649 or email me at
Corey.Anen@ncdenr.gov.
Sincerely,
Steven Corey Anen, PE
Environmental Engineer
Stormwater Program
cc: Asheville Regional Office
D North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center 1 Raleigh, North Carolina 27699-1612
E Q��
NORTH CAROLINA
Oepartmeru of Environmeirtal Quad /`� 919.707.9200