HomeMy WebLinkAboutNCC191798_NOT Closeout Documents_20210920North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
FB-ON-00021-19, Lift Stations 53, 80
County: Cumberland Project: & 148 to Gravity River basin: Cape Fear
Person financially responsible: American States Utility Services, Inc. - Justin Project #: CUNME-2020-019
Nyland, Senior Engineer NCC 191798
Address: P.O. Box 73316, Fort Bragg, NC 28307
1. Project Location: Longstreet Road, Normandy Driv, Fort
Pictures: No Bragg
2. Weather and soil conditions: Cloudy/partly sunny workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Wesley Holmes Title: ASUS
Inspection report: Sent Report Date given/sent: September 17, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Penny Markle Others present: Andrew Moore
Date of inspection: September 15, 2021 Time arriving on site: 10:47 AM Time leaving site: 11:17 AM
cc: