Loading...
HomeMy WebLinkAboutNCC191404_NOT Closeout Documents_20210920C�OF 11� �y OAT PROJECT 623 Hillsborough St. (Block 83) - CAROyt PERMIT 4 LD- 116925 CERTIFICATE OF COMPLETION TRANSACTION T4 583794 City of Raleigh Stormwater Management Division (919) 996-3940 DATE 02/18/21 Chris Bridgers, CPESC-IT, CESSWI THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. ® City Permit(s) Closed The referenced permit(s) have been closed. ® NCDENR DLR Self -Inspections Suspended No additional erosion and sediment control self -inspections are required. ® Coverage Under NCG010000 Terminated The referenced project is released from coverage under the NPDES General Stormwater Permit for Construction Activities (NCG010000) issued by the NCDENR Division of Water Quality. COMMENTS: 1. Please note that permanent stormwater BMWs require periodic maintenance in order to function properly. 2. Annual BMP inspection certifications must be submitted to the City utilizing official forms, which may be downloaded from the City web site. 3. The annual due date for stormwater BMP inspection certifications associated with the referenced permit(s) is: February 18tb annually. Stormwater Inspections Form 502 Rev 1, Feb 2012 Page 1 of]