Wanucha, Dave
From:Euliss, Amy
Sent:Thursday, September 23, 2021 4:36 PM
To:Wanucha, Dave
Cc:Librandi, Nicholas C; Jones, Scott A; Marciniak, Katherine J
Subject:R-2247EB sediment losses_Sept
Hi Dave. We have a couple losses to report from the rains on Tuesday and Wednesday. Our contractor and DOT
inspectors started the walk thru yesterday, and finished up today. Due to the rain the project was partially inaccessible
by vehicle which meant they had to do a lot of the inspection on foot. This is why it took a couple days. The losses are
detailed by our Assistant Resident, Nick Librandi, below:
From Nick:
Site 10H-VV had a loss of predominantly 57 stone mixed with some earthen material. The inlet dome was moved about
1 foot by the material coming down the ditch line allowing the surrounding 57 stone and dirt to get into the drop inlet
and exit through the pipe in the culvert headwall. This was the loss found yesterday and approximately 2 CY of stone
and dirt was lost and clean up was completed by noon today.
Site 7-LLL had the silt fence knocked over and material lost into the rip rap and stream. Approximately 6 CY of material
is lost and clean up efforts are ongoing.
-Amy