Loading...
HomeMy WebLinkAboutNCC215215_ESC Approval Submitted_2021092002 ;>On PW ONE R Pat McCrory Donald R. van der vaaft Governor Secretary February 11, 2015 IIeamdon Stockbridge Builders ATT: Mr. William Darden 1001 Scenic Parkway, Suite 104 Chesapeake, Virginia 23324 RE: Erosion and Sedimentation Control Plan No.: Pasqu-2015-014 Project Name: Stockbridge at Tanglewood, Phase H Location: Halstead Extension, Elizabeth City County: Pasquotank River Basin: Pasquotank Date Received by LQS: January 12, 2015 Acres Approved: 48.5 Project Type: New Project Description: Construction of roadways, a stormwater pond and lot preparation for 129 single family homes. Dear Sir: This office has reviewed the subject erosion and sedimentation control plan. We ford the plan to be acceptable and hereby issue this Letter of Approval. (Note: Attached is a list of guidelines and statutory requirements for conducting land disturbing activates.) This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as required by 15A NCAC 4B.0129, unless modified by other legislation. Please be advised that 15A NCAC 4B.0118(a) requires that a copy of the approved erosion and sedimentation control plan be on file at the job site. Also, you should consider this letter as ggilre Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance oriented, requiring protection of eadsting natural resources and adjoining properties through the use of reasonable and appropriate Best Management Practices throughout the duration of the project. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (G. & 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations and rules. In addition, local city or county ordinances or Hiles may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Division of Energy, Mineral, and Land Resources .Land Quality Section Washington Regional Office 943 Washington Square Mall, Washington, Nodh Carolina 27869 Phone: 252-946-6481/ FAX: 252-975-3716 Internet: htto //portal ncdenrorg/web/inland-guality An Equal Opportunity 1 Affirmative Action Employer— 50 % Recycled \ 10% Post Consumer Paper Erosion and Sedimentation Control Plan No.: Pasqu-2015-014 Project Name: Stonebridge at Tanglewood, Phase II February 11, 2015 Guidelines and Statutory Requirements Page A AS THE DECLARED RESPONSIBLE PARTY, YOUR LEGAL RESPONSIBILTfl'Y is to understand the Act and comply with the following minimum requirements of the Act: A. In the event of a conflict between the requirements of the Sedimentation Pollution Control Act, the submitted plan and/or the contract specifications, the more restrictive requirement shall prevail; B. The land disturbing activity shall be conducted in accordance with the approved erosion and sedimentation control plan; C. The LATEST APPROVED erosion and sediment control plan will be used during periodic unannounced inspections to determine compliance and a copy of the plan must be on file at the job site. If it is determined that the implemented plan is inadequate, this office may require the installation of additional measures and/or that the plan be revised to comply with state law. D. All site revisions, including those required by other local, state or federal agencies, which affect site layout, drainage patterns, limits of disturbance and/or disturbed acreage must be submitted to this office for approval a minimum of 15 day prior implementing the revision; E. Revisions exceeding the approved scope of this project without this office's prior approval of the plan showing the changes can be considered a violation. Failure to comply with any part of the approved plan or with any requirements of this program could result in appropriate legal action (civil or criminal) against the financially responsible party. Legal actions could include Stop Work Orders, the assessing of a civil penalty of up to $5000 for the initial violation and/or a civil penalty of up to $5000 per day for each day the site is out of compliance. F. The CERTIFICATE OF PLAN APPROVAL must be posted at the primary entrance to the job site and remain until the site is permanently stabilized G. Incases of natural disaster related changes to the proposed land disturbing activity, all appropriate actions and adequate measure installations may be performed to prevent sediment damage, prior to submitting and receiving approval of the revised plan. A revised plan must be submitted for approval as soon as possible, but no later than 15 days after all emergency actions have been performed; Erosion and Sedimentation Control Plan No.: Pasqu-2015-014 Project Name: Stonebridge at Tanglewood, Phase H February 11, 2015 Guidelines and Statutory Requirements Page C O. All sediment and erosion control details for this project must conform to the standards as shown in the current Erosion & Sediment Control Planning and Design Manual; These details must be utilized for construction and incorporated in the plan. The Design Manual maybe found on-line at: hW://portal ncdenr org/web/lr/publications 2. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on -site natural watercourse or adjoining property. Given present workload and staffmg level, we are unable to perform "on call" inspections as may be required within the Erosion Control Construction Sequence. Any delays related to these items are not the responsibility of this office. Although preconstruction meetings are encouraged, installation of devices and groundcover must be installed in critical areas and as per the approved plan. Inspections will occur periodically but are not required prior to initiation of any phase of the project. NU N ® N cn U � Cd 4 � U _ Cd .Cd " d r (� � U � bjo b ® Ott GARO(pp Me a a .,,00 U Udffm Tj Q� d N Cd O ID vo -aid o Z En Fi En z 0 aUC7 vn ® 0 a, � •EI U .� v ® O U U r ocn cd > a a ® r � C14 rod cn U as �n/OwOON cod d a v a® as