Loading...
HomeMy WebLinkAbout20180786 Ver 1_Notice of Initial Credit Release Review_20210517Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Monday, May 17, 2021 2:32 PM To: Dow, Jeremiah J; Jason Lorch Cc: Crocker, Lindsay; Harmon, Beth; Baumgartner, Tim; Gibby, Jean B CIV USARMY CESAW (USA); Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Haywood, Casey M CIV (USA); Wilson, Travis W.; Bowers, Todd; kathryn_matthews@fws.gov; Munzer, Olivia; McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release/ NCDMS Sandy Branch Mitigation Site / SAW-2018-01167 / Chatham Co. Attachments: Sandy Branch_100060_CF 03_STR_RW_Initial Release.pdf; Sandy Branch Figure 10 Markup (GWG Location Requests).pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. The 15-Day Record Drawing and MY-0 review for the Sandy Branch Mitigation Site (SAW-2018-01167) ended May 15, 2021. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. There were no objections to issuing the initial credit release. Please find attached the current signed ledger, and IRT comments below. Please reply to this email with a response to the questions below, particularly to DWR's first comment given that gauge location was discussed as a contingency of approval of the draft mitigation plan. (Attached is a gauge location PDF from DWR sent 11-OCT-2019) The IRT is not requesting a site visit at this time. USACE Comments, Casey Haywood: 1. Section 4.3: Please annotate in this section the plan to fence in the easement. 2. The AB drone footage was helpful and appreciated. 3. Please mark location of photo points to include crossings and culverts. USEPA Comments, Todd Bowers: I have no serious issues or concerns with the site as constructed and approve of/concur with full credit release (30% released on April 8, 2021) for this milestone. I have few minor comments pertaining to the report that I would like to see Wildlands correct and carry forward with future reports for this site and others which may benefit from these comments. * In Table 1, fencing is missing from the site objectives to meet the goal of permanently protecting the site from harmful uses. * Section 2.3: Whenever percentages of a growing season are referenced it is important to clearly state the actual number of consecutive days required to meet the hydrology standard threshold. * Section 4.3: Fencing could be addressed again here to align with site boundary marking. * Table 6b: Total area for the 3 random plots should be 3 areas instead of 2. * Planting Tables on Page 85 should list the wetland indicator status for each listed species. * Planting Plan on Page 85: I recommend superimposing the fixed veg plot locations on this map to illustrate that all planting zones are being monitored adequately. Figure 3 does a decent job at this so perhaps it is redundant. i * General: I am very pleased with all the relevant photos in the document illustrating the structures, groundwater wells, cross sections and vegetation plots. The added bonus of the handheld video presented is great too as I watched it before reading the report. This allowed me to anticipate some aspects of the site (such as the lack of boulder sills) that were answered in detail by the as -built report and red -line changes from the final mitigation plan. The only request I would have with photos would be to cover the culverts in detail. NCDWR Comments, Erin Davis: 1. Many of the monitoring well and plot stations shifted slightly from the mit plan monitoring figure, which is expected to a degree. But four of wetland wells appear to have moved from being within a re-establishment area towards or within a rehabilitation area (GWG 7, 8, 10, 12). Particularly looking at GWG 7 (which was originally proposed square within a non-hydric re-establishment area) and GWG 8, will stationed well data adequately represent functional uplift and performance standards for the re-establishment credit areas as described in the approved mit plan? 2. Please confirm there were no changes from the approved mit plan planted species and percentages (an updated/redline as -built planting table was not included). Please contact the Mitigation Office if you have any questions. Regards, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 2 OdivilerWILDLANDS ENGINEERING 0 150 300 Feet l 1 I i 1 Project Location _ —Proposed Proposed Conservation Easement (18.10 ac) Proposed Stream Approach Restoration No Credit (Easement Break) Non -Project Proposed Wetland Approach Re -Establishment - Non-Hydric Re -Establishment - Hydric Rehabilitation Cross Section i Photo Point Groundwater Well — c3 1 Ota41On * Crest Gauge v h i Fixed Vegetation Plot P1 Random Vegetation Plot Reach Break Figure 10 - Monitoring Components Map Sandy Branch Mitigation Site Cape Fear River Basin (03030003) Chatham County, NC Mitigation Project Name Sandy Branch USACE Action ID 2018-01167 DMS ID 100060 DWR Permit 2018-0786 River Basin Cape Fear Date Project Instituted 4/20/2018 Cataloging Unit 03030003 Date Prepared 4/8/2021 County Chatham Stream/Wet. Service Area Cape Fear 03030003 Kimberly Danielle Browning i n Digitally signed by Kimberly Danielle Browning g Date: 2021.05.17 14:12:39 -04'00' Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 985.800 985.800 0.000 985.800 2021 4/8/2021 3 - Year 1 Monitoring 10.00% 328.600 2022 4 - Year 2 Monitoring 10.00% 328.600 2023 5 - Year 3 Monitoring 10.00% 328.600 2024 6 - Year 4 Monitoring 5.00% 164.300 2025 7 - Year 5 Monitoring 10.00% 328.600 2026 8 - Year 6 Monitoring 5.00% 164.300 2027 9 - Year 7 Monitoring 10.00% 328.600 2028 Stream Bankfull Standard 10.00% 328.600 2025 Totals 985.800 Total Gross Credits 3,286.000 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 985.800 Total Percentage Released 30.00% Remaining Unreleased Credits 2,300.200 Credit Release Milestone Riparian Credits Project Credits Scheduled u Releases /o Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 2.180 2.180 0.000 2.180 2021 4/8/2021 3 - Year 1 Monitoring 10.00% 0.727 2022 4 - Year 2 Monitoring 10.00% 0.727 2023 5 - Year 3 Monitoring 15.00% 1.090 2024 6 - Year 4 Monitoring 5.00% 0.363 2025 7 - Year 5 Monitoring 15.00% 1.090 2026 8 - Year 6 Monitoring 5.00% 0.363 2027 9 - Year 7 Monitoring 10.00% 0.727 2028 Totals 2.180 Total Gross Credits 7.267 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 2.180 Total Percentage Released 30.00% Remaining Unreleased Credits 5.087 Page 1 of 2 Mitigation Project Name Sandy Branch USACE Action ID 2018-01167 DMS ID 100060 DWR Permit 2018-0786 River Basin Cape Fear Date Project Instituted 4/20/2018 Cataloging Unit 03030003 Date Prepared 4/8/2021 County Chatham Stream/Wet. Service Area Cape Fear 03030003 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,286.000 Riparian Restoration 8.540 Debits Warm Stream Restoration Credits Riparian Restoration Beginning Balance (mitigation credits) 3,286.000 7.267 Released Credits 985.800 2.180 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 985.800 2.180 Remaining Balance (Unreleased credits) 2,300.210 5.087 Total Remaining Balance (Released and Unreleased credits) 3,286.000 7.267 Page 2 of 2