HomeMy WebLinkAbout20180199 Ver 1_As-Built Review_20210805Strickland, Bev From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil> Sent: Thursday, August 5, 2021 10:51 AM To: Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Wilson, Travis W.; Bowers, Todd; kathryn_matthews@fws.gov; Twyla Cheatwood - NOAA Federal (twyla.cheatwood@noaa.gov); Merritt, Katie Cc: Crocker, Lindsay; Catherine Manner; Emily Dunnigan; Kayne Van Steil; Daniel Ingram; Baumgartner, Tim; Harmon, Beth; Stanfill, Jim; Gibby, Jean B CIV USARMY CESAW (USA); Hopper, Christopher D CIV (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Haywood, Casey M CIV (USA) Subject: [External] NCDMS As -Built Review / Buffalo Creek Tributaries / SAW-2018-00425 / Johnston Co. Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: August 05, 2021 15-Day Comment Deadline: August 20, 2021 45-Day Credit Release Approval Deadline: September 19, 2021 Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0): Project Information: Name: Buffalo Creek Tributaries USACE Action ID: 2018-00425 NCDWR ID: 2018-0199 V2 DMS Project: 100042 RFP: 16-007401— Issued 12/7/2017 Institution: 1/11/2018 — Full Delivery River Basin: Neuse 03020201 County: Johnston Mitigation Plan Assets: 4,088.500 SMUs/3.458 WMUs Provider: Water & Land Solutions (WLS) Catherine Manner, 571-643-3165 1 DMS PM: Lindsay Crocker, 919-593-3910 Please note: Earthwork was completed April 22, 2021 and planting was completed April 26, 2021. The as -built stream length is —24 linear feet more than the centerline design length. The final baseline (as -built) report, record drawings, and drone pictures were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for IRT review. https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:4337378224569::NO::P278 BANK ID:5765 Please reach out to the mitigation team if you have questions. Thanks, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers BUILDING STRONG ® 2