From: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>
Sent: Thursday, August 5, 2021 10:51 AM
To: Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Wilson, Travis
W.; Bowers, Todd; kathryn_matthews@fws.gov; Twyla Cheatwood - NOAA Federal
(twyla.cheatwood@noaa.gov); Merritt, Katie
Cc: Crocker, Lindsay; Catherine Manner; Emily Dunnigan; Kayne Van Steil; Daniel Ingram;
Baumgartner, Tim; Harmon, Beth; Stanfill, Jim; Gibby, Jean B CIV USARMY CESAW
(USA); Hopper, Christopher D CIV (USA); Crumbley, Tyler A CIV USARMY CESAW
(USA); Haywood, Casey M CIV (USA)
Subject: [External] NCDMS As -Built Review / Buffalo Creek Tributaries / SAW-2018-00425 /
Johnston Co.
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good morning IRT,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may
not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: August 05, 2021
15-Day Comment Deadline: August 20, 2021
45-Day Credit Release Approval Deadline: September 19, 2021
Project information and location of the FINAL As -Built Baseline Monitoring Report (MY0):
Project Information:
Name: Buffalo Creek Tributaries
USACE Action ID: 2018-00425
NCDWR ID: 2018-0199 V2
DMS Project: 100042
RFP: 16-007401— Issued 12/7/2017
Institution: 1/11/2018 — Full Delivery
River Basin: Neuse 03020201
County: Johnston
Mitigation Plan Assets: 4,088.500 SMUs/3.458 WMUs
Provider: Water & Land Solutions (WLS) Catherine Manner, 571-643-3165
1
DMS PM: Lindsay Crocker, 919-593-3910
Please note:
Earthwork was completed April 22, 2021 and planting was completed April 26, 2021. The as -built stream length is —24
linear feet more than the centerline design length.
The final baseline (as -built) report, record drawings, and drone pictures were uploaded to the DMS/IRT SharePoint, and
DWR Laserfiche for IRT review.
https://ncconnect.sharepoi nt.com/sites/I RT-DMS/SitePages/Home.aspx
RIBITS:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:4337378224569::NO::P278 BANK ID:5765
Please reach out to the mitigation team if you have questions.
Thanks,
Casey
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
BUILDING STRONG ®
2