HomeMy WebLinkAbout20180199 Ver 1_Notice of Initial Credit Release_20210825Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Wednesday, August 25, 2021 5:12 PM
To: Crocker, Lindsay; Catherine Manner
Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haywood, Casey M CIV (USA); Davis, Erin B;
Wilson, Travis W.; Merritt, Katie; kathryn_matthews@fws.gov; Bowers, Todd; Harmon,
Beth; Matthews, Monte K CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY
CESAW (USA); Gibby, Jean B CIV USARMY CESAW (USA);
daniel@waterlandsolutions.com
Subject: [External] Notice of Initial Credit Release/ NCDMS Buffalo Creek Tributaries Mitigation
Site/ SAW-2018-00425/ Johnston Co.
Attachments: Buffalo Creek_100042_NS 01_STR_RW_Initial Release KB.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good day,
The 15-Day MYO/As-Built review for the Buffalo Creek Tributaries Mitigation Site (SAW-2018-00425) ended August 20,
2021. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All
comments received from the NCIRT are incorporated in the email below. Please address IRT concerns in the MY1 Report
and provide a response to comments. A site visit is not requested at this time. There were no objections to issuing the
initial 30% credit release of 1,226.550 warm SMUs and 1.037 riparian WMUs. Please find attached the current signed
ledger.
Was the drawing from the approved final mitigation plan used to show the red -lined changes? I noticed a few minor
differences, near the BMPs and crossings.
I also share the concern of potential future encroachment from the adjacent subdivision.
In future monitoring years please capture veg data (in a random plot) in areas where the old channel was filled
and wetland restoration is proposed.
DWR Comments, Erin Davis:
1. The CCPV figure and redline as -built drawing both show the FG-1 on R4 located outside of the channel. Please
confirm and accurately show this gauge location.
2. In the agency comments, the IRT asked for random veg plots along R5 and R6, which were not shown on the
CCPV. Please update accordingly.
3. Photos along R5 show a lot of large stone lining the channel. Was this stone size included in the approved design
plan? Based on the R5 reach drainage area is this armoring necessary?
4. Has the excess sediment shown in PS-2 Photo downstream of the MS-R2 culvert flushed through the project?
5. DWR appreciated the inclusion of the drone video. It was nice to see the effort made to minimize the
construction footprint and disturbance to surrounding mature trees.
USACE Comments, Casey Haywood:
1. Concur with DWR comments.
1
2. Appreciate the inclusion of the drone footage and photos of all monitoring devices.
3. The downstream photo of MS-R2 culvert appears to have significant amounts of sediment accumulation. Does
WLS have any concerns in this area or is the sediment being flushed out? Also, please note USACE expressed
sediment concerns on this reach in the MP comments and as a result WLS agreed to establish fixed photo points
along this reach to document stream channel characteristics. Please establish these fixed photo points in future
reports.
Please reach out with any questions.
Thanks,
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
2
Mitigation Project Name Buffalo Creek Tributaries Mitigation Project USACE Action ID 2018-00425
DMS ID 100042 DWR Permit 2018-0199
River Basin Neuse Date Project Instituted 1/11/2018
Cataloging Unit 03020201 Date Prepared 7/20/2021
County Johnston Stream/Wet. Service Area Neuse 03020201
KimberlyDanielle BrowningDigitally signed by Kimberly Danielle Browning
Date: 2021.08.25 11:11:34 -04'00'
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,226.550
1,226.550
0.000
1,226.550
2021
7/20/2021
3 - Year 1 Monitoring
10.00%
408.850
2022
4 - Year 2 Monitoring
10.00%
408.850
2023
5 - Year 3 Monitoring
10.00%
408.850
2024
6 - Year 4 Monitoring
5.00%
204.425
2025
7 - Year 5 Monitoring
10.00%
408.850
2026
8 - Year 6 Monitoring
5.00%
204.425
2027
9 - Year 7 Monitoring
10.00%
408.850
2028
Stream Bankfull Standard
10.00%
408.850
2025
Totals
1,226.550
Total Gross Credits
4,088.500
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,226.550
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,861.950
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1.037
1.037
0.000
1.037
2021
7/20/2021
3 - Year 1 Monitoring
10.00%
0.346
2022
4 - Year 2 Monitoring
10.00%
0.346
2023
5 - Year 3 Monitoring
15.00%
0.519
2024
6 - Year 4 Monitoring
5.00%
0.173
2025
7 - Year 5 Monitoring
15.00%
0.519
2026
8 - Year 6 Monitoring
5.00%
0.173
2027
9 - Year 7 Monitoring
10.00%
0.346
2028
Stream Bankfull Standard
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Totals
1.037
Total Gross Credits
3.458
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1.037
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Notes
Contingencies (if any)
Project Quantities
Buffalo Creek Tributaries Mitigation Project
100042
Neuse
03020201
Johnston
USACE Action ID 2018-00425
DWR Permit 2018-0199
Date Project Instituted 1/11/2018
Date Prepared 7/20/2021
Stream/Wet. Service Area Neuse 03020201
Total Percentage Released
29.99%
Remaining Unreleased Credits
2.421
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
3,168.000
Warm Stream
Enhancement I
1,296.000
Warm Stream
Preservation
565.000
Riparian
Restoration
3.420
Riparian
Enhancement
0.075
Debits
Warm Stream
Restoration
Credits
Warm Stream
Restoration
Equivalent
Credits
Riparian
Restoration
Credits
Riparian
Restoration
Equivalent
Credits
Beginning Balance (mitigation credits)
4,032.000
56.500
3.420
0.038
Released Credits
1,209.600
16.950
1.026
0.011
Unrealized Credits
0.000
0.000
0.000
0.000
Converted Credits
0.000
0.000
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
Permit #
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
1,209.600
16.950
1.026
0.011
Remaining Balance (Unreleased credits)
2,822.400
39.550
2.394
0.027
Total Remaining Balance (Released and Unreleased credits)
4,032.000
56.500
3.420
0.038