Loading...
HomeMy WebLinkAbout20130662 Ver 1_More Info Received_20130801 Homewood, Sue From: Idowu, Ade [Ade.ldowu@greensboro-nc.gov] Sent: Thursday, August 01, 2013 5:07 PM To: Homewood, Sue Cc: Williams, Andrew E SAW Subject: RE: Hill St. Manhole Attachments: Sheet2-Design_HillStreet07292013.pdf; Sheet3-Details_HillStreet07292013.pdf Answers to your questions: The plan is to minimize the amount of actual re-grading that has to be done to the stream bed and centerline. The major concern is removing the point bar that has built up over the years and pushed the stream south towards the water line surge vault and repairing the bank around the surge vault. I've utilized a A-vane to help raise the stream invert but not too much as it require a lot more disturbance to the stream bed. You show upstream and downstream coffer dams, are you going to pump around while the work is being done? - Coffer dams and a pump around will be utilized as necessary for construction. To construct, we will have to enter the site from the north to get to the south bank. There isn't that much flow in the channel and some of the water is backwater from N. Buffalo. Can you please provide me a detail for the cross/A vane. - Attached are a profile sheet and a detail sheet for your review. Can you provide me with a profile view of the stream and the cross vane. I need to see what the drop is going to be over the cross vane and that you are using it to raise the stream invert above the riprap around the pipe. The cross section of the riprap area is good and I just need to show the cross vane isn't going to be a 2 foot drop or anything. See attached drawings. I am also sending hardcopy to your office. Please let me know if you have any more questions. Ade Idowu Stormwater Operations Management Supervisor Department of Water Resources City of Greensboro Phone:(336) 373-2619, Fax(336)373-3119 PO Box 3136, Greensboro, NC 27402-3136 www.greensboro-nc.gov From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov] Sent: Monday, July 22, 2013 11:46 AM To: Idowu, Ade Cc: Williams, Andrew E SAW Subject: Hill St. Manhole Hi Ade, A couple questions/requests: i You show upstream and downstream coffer dams, are you going to pump around while the work is being done? Can you please provide me a detail for the cross/A vane. Can you provide me with a profile view of the stream and the cross vane. I need to see what the drop is going to be over the cross vane and that you are using it to raise the stream invert above the riprap around the pipe. The cross section of the riprap area is good and I just need to show the cross vane isn't going to be a 2 foot drop or anything. Thanks. Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-4964 FAX: (336) 771-4630 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. ------------------------------------------------------- Please note that email sent to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties . 2 0 LoQ II $ e iKZ' o pigz �Q 4 U la CD €s g M y a ow Uz LL f 0 Q co Q o ZO o I I Do o w w � z wLLI - � O m a Y o LLL nninNve O 14 r a N ffi e� i y isl W W o D z W § 3WiY4k W o Q HZ CC �pp Pi � g C o g W 8w \ W o S o 3U' � ggy z I o a 44 � pp U s�� (D €s y� oz�m R50 N` Wz \ _ Wo o \ 0 W Ww � o UZ �� HIHIM iiiiiiiiiiellillilliillillillillilI HIM HIM iiiiiiiiii Iiiiiiiii HIM T \m�aa 1 - z AK J w d d Tu z z z/ L1J W it N N �" W O W W w \ LL Z O� � UlQ(x F�p i O i \z_� i i i