Loading...
HomeMy WebLinkAboutNCC191675_Annual Fee NOD Letter_20210917It ROY COOPER Governor EDZABETH S. BLSER S—f-y BRIAN WRENN �NrKMr 9/17/2021 Wynn Construction, Inc. Attn: Edward Averett 2550 Capitol Drive, Suite 105 Creedmoor, NC 27522 Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. NCC191675-2021 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 8/1/2021 and was due on 9/1/2021. The annual fee applies to the following construction site: Lot Clearing Plan for Lot 121 at Anderson Creek Crossing, Ph 8, Sec 2A 106 Wildlife Bridge Court, Spring Lake, NC Harnett County Certificate of Coverage No. NCC191675 NC Reference No. NCG01-2019-1675 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources Carolina Departmern of Urdronmenral Quallly I DIrlslonoFEnergy, Mlnnal and LandResouroes S12 North Sellsbury Street 1 1612 Mall 5ervlre center I Ralelgh, North carolEna 27699-1612 919.707.9200