Loading...
HomeMy WebLinkAboutNCC191396_Annual Fee NOD Letter_20210917It ROY COOPER Governor EDZABETH S. BLSER S—f-y BRIAN WRENN �NrKMr 9/17/2021 Eastwood Homes of Raleigh, LLC Attn: Andy Crawford 6601 Six Forks Road Suite 100 Raleigh, NC 27615-6520 Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. NCC191396-2021 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 8/1/2021 and was due on 9/1/2021. The annual fee applies to the following construction site: Daniel Farm Lots 2-8, 142-151, 155-168, 177-188 NC-210/1-40, Pleasant Grove, NC Johnston County Certificate of Coverage No. NCC191396 NC Reference No. NCG01-2019-1396 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources Carolina Departmern of Urdronmenral Quallly I DIrlslonoFEnergy, Mlnnal and LandResouroes S12 North Sellsbury Street 1 1612 Mall 5ervlre center I Ralelgh, North carolEna 27699-1612 919.707.9200