HomeMy WebLinkAbout20130030 Ver 2_Application_201308083 - 0030 V 2,
C■ Kimley -Horn 3001 Weston Parkway
■ and Associates, Inc. Cary, North Carolina 27513
TEL 919 677 2000
FAX 919 677 2050
Transmittal
Date: August 7, 2013 Job Number: 012329037 '
Project Name: Bass Lake Outfall Greenway — Town of Holly Springs
To: Karen Higgins
NCDWR, WBSCP Unit
512 North Salisbury Street
Raleigh, NC 27604
919 - 807 -6360
We are sending these by
❑ U.S. Mail ® FedEx ❑ Hand Delivery
❑ Other
We are sending you
❑ Attached ❑ Under separate cover via the following items:
❑ Shop drawings ❑ Prints/Plans ❑ Samples ❑ Specifications ❑ Change Orders
❑ Other
Iiies Date No. / i frog
Revised Neuse Buffer Authorization RegM�stt
irk
These are transmitted as checked below.
® For your use ❑ Approved as submitted ❑ Resubmit ❑ Copies for approval
❑ As requested ❑ Approved as noted ❑ Submit ❑ Copies for distribution
❑ For review and comment ❑ Returned for corrections ❑ Return ❑ Connected prmts
Remarks:
Copy to: File
Signed:
Jennifer Yenawine, EIT
Kimley-Hom
and Associates, Inc.
August 7, 2013
Ms. Karen Higgins
NC DWR, WBSCP Unit
512 North Salisbury Street
Raleigh, NC 27604
Re: Revised Neuse Buffer Authorization
Bass Lake Outfall Greenway, Town of Holly Springs
Wake County, North Carolina
Dear Ms. Higgins:
13- 0ozo vim.
On behalf of The Town of Holly Springs, Kimley -Horn and Associates, Inc.
is submitting revisions to the Preconstruction Notification Application (PCN)
dated February 19, 2013 for authorization to construct the above reference
project under Nationwide Permit Number 18. The revisions requested are the
result of the addition of the Somerset Farms Connector to the original submittal.
There are no changes to wetland or stream impacts proposed A copy of this
submittal has also been submitted directly to Cherrie Smith with NCDENR. The
following revised information is included as part of this submittal:
• Revised Page 5 of the Preconstruction Notification Form
• Revised Impact Summary Table
• Revised Permit Drawings
• Revised Erosion Control Drawings
Very truly yours,
KIMLEY -HORN AND ASSOCIATES, INC.
Todd St. John, P.E.
Attachments
Cc: Len Bradley, Town of Holly Springs
Elizabeth Lynch, Kimley -Horn and Associates, Inc.
0
TEL 919 677 2000
FAX 919 677 2050
P.O. Box 33068
Raleigh, North Carolina
27636.3068
AUG -6 2013
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Tem ora
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ) I Updated Impact Totals 08/06/2013
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b.
Buffer Impact
number —
Permanent (P) or
Temporary
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet )
6g.
Zone 2
impact
(square
feet
B1 P
Fill
UT to Bass Lake
No
-2,744 -
4,168
B2 T
Sift fencing
UT to Bass Lake
No
- f-888-
6,586
B3 P
Fill
UT to Bass Lake
No
7 952
6,48s
B4 T
Sift fencing
UT to Bass Lake
No
5,175
8,253
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts:
--
-9.888-
6i. Comments:
10,754 13,127
Page 5 of 10
t &
0
Q
0
I
Bass /
\ Cake Rtl. /
/ S W
JE
WO B
P /
GRI B(AV
t BASS / s
LAKE t
I �
/ PROJECT
/ n
Ke Teal Dr I ` / a( V\
I I
I I /
I 1,
m 55
4-
Old �± Old Ada s Rd. /
OWNER:
TOWN OF HOLLY SPRINGS
128 S, MAIN STREET
HOLLY SPRINGS, NC 27540
Len Bradley
919.557.3934
len. bradley @h ollyspdngs.nc. us
ENGINEER
KIMLEY -HORN AND ASSOCIATES, INC.
3001 WESTON PARKWAY
CARY, NC 27513
Elizabeth Lynch, P.E.
919.677.2000
elza beth.lynch @Idmley-hom.00m
SURVEYOR
MAULDIN - WATKINS SURVEYING, PA
P.O. Box 444
FUQUAY VARINA, NC 27526
919.552.9326
Wayne Mauldin
Murvey @embargma4.com
VICINITY MAP
NITS
W OMBLE
PARK
1876 >7l
o �a
n
S.7
GRIGSBY AVE
SR 1395
THE TOWN OF HOLLY SPRINGS
BASS LAKE OUTFACE GREENWAY
FROM WOMBLE PARK TO BASS LAKE
WETLAND AND BUFFER IMPACTS
Summary of Wetland and Buffer Impacts
Site i
station
Temp-ay
FO in
Wedatds
Pemwirett I Tenpomy
F® in Stream
M*dards MVam
PertramA
Stngs Zorle 1
Teawaray
BuRerZorre 1
I
S fifer Te"waly &AerZxw
Zttne 2 BuRerZarte 2 3
TwMcra y
6rMer Zme 3
1
[M
[KI j [IFI
117 1 [SFI
[SFI
[SFI [SFI ISFJ
ISFI
1
22r20/23e50{-
O
O 1 O
O 0
0
0 29 3032
1311
2
39+9B -L-
0
O O
O 0
O
O 0 GM
3622
3
30+x/31+56 -L-
0.001
O O
0 0
0
O 0 11@
873
4
131 +SGl34+00 -L-
0
O O
0 0
0
0 26 496
1945
5
34- OW37+73 -L-
OL04
— 24
0 12186
im
31A ffi 4119
2111
6
37+$j39a9D{-
0
O 0
0 662
SIM
897 279 0
200
7
39tSW"+61 -L-
0
0 0
0 9
259
182D 4S7 7458
2816
8
44+67/4S+5D -L-
O
0 O
0 0
0
0 0 1219
376
9
45+5W47+30 -1L-
0
O 0
O O
0
0 0 2783
Sfi4
10
47+90/50+04 �-
0
O 0
0 0
0
0 0 7>�
11507
PROJECT REFERENCE NO. SHEET NO.
Updated Impacts!
to Site 5 for the
Somerset Farms
Connection
are highlighted in
yellow
CARL G. DEAN
TOWN MANAGER
C=" Kimley -Horn
and Associates, Inc.
CO 2012
Post Office Box 33068
Raleigh, North Carolina 27636
PE N0. F -D 102
�...HrCA,pp..�xx +�
,�� 2p: •,. S S.13
V 7� 5•
SEAL
037444
o``•
PRELIMINARY PLANS
00 N B POR CON6iRUCT10N
GRAPHIC SCALE
10 0 20
PLANS
10 0 20
PROFILE (HORIZONTAL)
2 0 4
PROFILE (VERTICAL)
PRELIMINARY PLANS
INCOMPLETE PLANS
M
a
z
NOTE:
IMPACTS TO ZONE 3 BUFFERS DO
NOT REQUIRE DWQ APPROVAL BUT
DO REQUIRE APPROVAL FROM THE
TOWN OF HOLLY SPRINGS
DICK SEARS
MAYOR
O
Original Plan Sheet with 401 Water Quality
Certification and Authorization Certificate
PERMANENT Approval on March 18, 2013.
BUFFER ZONE 3 pp
IMPACT = 4119 SF DWQ Project # 13 -0030
NOTE:
IMPACTS TO ZONE 3 BUFFERS
DO NOT REQUIRE DWQ APPROVAL
BUT DO REQUIRE APPROVAL FROM
THE TOWN OF HOLLY SPRINGS
PEP MANEN_;y- = ai►�
WET LAND ,
IMPACT = OQ7 - AC fir---
OF',
TEMPORARY C/� ' EEK
WETLAND
IMPACT = 0.004 AC
_ -NI m3
TEMPORARY -
BUFFER ZONE 2 'TEAS
IMPACT = 219 SF BUF,
PERMANENT - I
BUFFER ZONE I
20° o zo ao 60, IMPACT = 92 SF
TEMPORARY I _
BUFFER ZONE I
SCALE: I'= 20• IMPACT = 225 SF
F
m
TEMPORARY
2
9T = 149
BUFFER-ZONE 3
TEMPORARY —
BUFFER
IMPACT 1104 SF
IMPACT
= 235 SF
IMPACT
— 200 S
�7
\
BUFFER
TEMPORARY \ IMPACT
BUEEER ZONE \1
ZO E 2
= 116 SF
\
MANENT
`BUFFER
TPF TPF
ZONE 2
S
IMPACT = 2149 SF
ctQ
------ - -____
LEGEND
BZ
w
TEMPORARY SILT FENCE
(NCDOT STD 1605.01)
TEMPORARY
BUFFER ZONE 2 -
B2 IMPACT IMPACT = I3 F.
(SEE EROSION CONTROL DETAIL)
_ _ SF
1
w
_
- TEMPORARY
�
BUFF R ZONE 3
IMPACT = 1067 SF
- 8 - - - - - _
SITE-
NOTE:
IMPACTS TO ZONE 3 BUFFERS
DO NOT REQUIRE DWQ APPROVAL
BUT DO REQUIRE APPROVAL FROM
THE TOWN OF HOLLY SPRINGS
PEP MANEN_;y- = ai►�
WET LAND ,
IMPACT = OQ7 - AC fir---
OF',
TEMPORARY C/� ' EEK
WETLAND
IMPACT = 0.004 AC
_ -NI m3
TEMPORARY -
BUFFER ZONE 2 'TEAS
IMPACT = 219 SF BUF,
PERMANENT - I
BUFFER ZONE I
20° o zo ao 60, IMPACT = 92 SF
TEMPORARY I _
BUFFER ZONE I
SCALE: I'= 20• IMPACT = 225 SF
F
m
- TEMPORARY
BUFFER ZONE 2
IMPACT = 67 SF
F PERMANENT
BUFFER ZONE I
IMPACT = 595 SF
RMANENT -�
BUFFER ZONE l
I .,PACT = 700 SF „
06' 51.0" E -r_
Z
PERMANENT
BUFFER ZONE 2
IMPACT = 897 SF
TEMPORARY
BUFFER ZONE 2
IMPACT = 145 SF
0
SITE - b
a�
z w
•ER; BONE
2
9T = 149
SF,,
TEMPORARY —
BUFFER
ZONE I
IMPACT
= 235 SF
- TEMPORARY
BUFFER ZONE 2
IMPACT = 67 SF
F PERMANENT
BUFFER ZONE I
IMPACT = 595 SF
RMANENT -�
BUFFER ZONE l
I .,PACT = 700 SF „
06' 51.0" E -r_
Z
PERMANENT
BUFFER ZONE 2
IMPACT = 897 SF
TEMPORARY
BUFFER ZONE 2
IMPACT = 145 SF
0
SITE - b
a�
z w
ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY
TEMPORARY BUFFER PERMANENT BUFFER
WETLAND € i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS
*_ _ * _ _a TEMPORARY P7� PERMANENT
U WETLAND IMPACTS WETLAND IMPACTS F
TEMPORARY BUFFER � PERMANENT BUFFER
BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS
STREAM —
BUFFER ZONE 3 — BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT
TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS
WETLAND AND BUFFER SCALE PROJECT:
IMPACT SHEET BASS LAKE OUTFALL GREENWAY
PRELIMINARY AS NOTED
m xm m raR rn�smucuon
.+uwacA. 01239037
PRM -4
T EM �ORARY
BUFF -R
ZONE
IMPACT
— 200 S
TEMPORAR '
\
BUFFER
TEMPORARY \ IMPACT
BUEEER ZONE \1
ZO E 2
= 116 SF
\
IMPACT _ 252
S
TEMPORARY
7,
LEGEND
STREAM
IMPACT = 24
-
LF
TEMPORARY SILT FENCE
(NCDOT STD 1605.01)
(SEE EROSION CONTROL DETAIL)
ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY
TEMPORARY BUFFER PERMANENT BUFFER
WETLAND € i BUFFER ZONE I — BZ 1 ZONE /IMPACTS ZONE /IMPACTS
*_ _ * _ _a TEMPORARY P7� PERMANENT
U WETLAND IMPACTS WETLAND IMPACTS F
TEMPORARY BUFFER � PERMANENT BUFFER
BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS
STREAM —
BUFFER ZONE 3 — BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT
TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS
WETLAND AND BUFFER SCALE PROJECT:
IMPACT SHEET BASS LAKE OUTFALL GREENWAY
PRELIMINARY AS NOTED
m xm m raR rn�smucuon
.+uwacA. 01239037
PRM -4
0
O
PERMANENT
BUFFER ZONE 3 TEMPORARY
IMPACT = 4119 SF BUFFER ZONE B
IMPACT = 993 SF Updated Impacts for Site PERMANENT
TEMPORARY 5 due to Somerset Farm
BUFFER AC=2662 SF
BUFFER ZONE 3 PERMANENT
.3 BUFFET = ON 3 BUFFER ZONE l
S/0 IMPACT = 55/ SF Connector BUFFER ZONE 21 �Z
TEMPORARY IMPACT = 897 SP
_ BUFFER ZONE 2
- IMPACT = 397 SF TEMPORARY
BUFFER ZONE
BUFFEt ONE 2 TEMPORARY PAC=SF
C M e? IMPACT = a53izS IMP
= 24 LF
TEMPORARY - - - - °
N B2 ? ; ; \ ~� \ \` ,�\, - - BUFFER =� 37 SF_ SITE b `n
LLJ r�
\
W -— _
= W — —— — — — —— ` \� \� N
_ _ �`� � 1 � � r �
"
GO
ZE
- WL
" TEMPORARY -y - - - - - " - y w
iM `, ,� BUFF R ZONE 3 FTRMA T s -r w
1067 SF WETLAND - - - - - - - - - -
''� T -YO. IMPACT MPORA
TEMPORARY
'17A —IMPACT
BZ
� 0.004 AC
TEMPORARY t - I F
_— -T- 1 ! T PORAR)P
yy�3 ,
IMPACT UFFER =Z F - - - �` BU -DER ZO 3
/ — TEMPORARY___ /F i /MPA' = 200 F
Tt - BUFFER Z. -- TEMPO RY
IMPACT = 48� 7�S'T`
r TEMPORAR�`4 e
BUFFER ONE
NOTE: / \ a, �c ^< BUFFER ZONE 2 IMPACT = l6 SF
IMPACTS TO ZONE 3 BUFFERS BZ 1
DO NOT REQUIRE DWQ APPROVAL -_' IMPACT _ 107 SF
BUT DO REQUIRE APPROVAL FROM ���� -r TEMPORARY $ j
THE TOWN OF HOLLY SPRINGS / ,;i i _ RMANENT BUFFER ZONE / Z
- - BUFFER ZONE l IMPACT = 929 SF
/ - BZT�MPORARY ` �TiG1PACT = 607 SF
BUFFER =Z� 8 SF / t -
45 'y' --
-- -
� PERMANENT
BUFFER ZONES
IMPACT - 130 'REF
TEMPORARY - T 4RY BZ 2—
BUFFER Z��. ' FFER - LEGEND
IMPACT ;4I , IMPACT = 54 SF
20' 0' 20' 40' 60' PERMANENT TEMPORARY SILT FENCE
MEN C l BUFFER Z O N E - 2 - - - - (NCDOT STD 1605.01)
L
SCALE: I•s Zp• ` IMPACT = 590 SF SILT FENCE J —HOOK
/ �'`, i 1 /
(SEE EROS /ON CONTROL DETAIL)
ENVIRONMENTAL FEATURES KEY IMPACTS KEY SHEET & SUMMARY
- -�- - - - TEMPORARY BUFFER PERMANENT BUFFER
WETLAND * * * ; BUFFER ZONE I -- B i - - - -- ZONE 1 IMPACTS ZONE I IMPACTS
�_ _ *_ *_ _' _ _I TEMPORARY � PERMANENT
TEMPORARY BUFFER PERMANENT BUFFER WETLAND IMPACTS WETLAND IMPACTS
STREAM F
BUFFER ZONE 2 — BZ 2 ZONE 2 IMPACTS ZONE 2 IMPACTS
- - --
BUFFER ZONE 3 - BZ TEMPORARY BUFFER PERMANENT BUFFER TEMPORARY PERMANENT
TOP OF BANK ZONE 3 IMPACTS ZONE 3 IMPACTS STREAM IMPACTS STREAM IMPACTS
3 PREPARED IN THE OFFICE OF: SCALE. PROJECT.
s 2 WETLAND AND BUFFER
Kimley -Horn IMPACT SHEET
NO.: REN90N: DATE: DRArm BY: CHECKED BY PRELIMINARY BASS LAKE OUTFALL GREENWAY
This document, together with the c hiCh and designs presented herein, as on instrument of services, is intended only for
and Associates Inc. pDMDT 1F°"�"MT° AS NOTED
� the specific purpose and [lien[ for which it xas prepared. Reuse of and imDraDer rNiance of this document witho,l written
.0hori:otion and odapuon by Kimley -Ham old Associates. Inc.. shall be withoat liability to Kimley -Horn and As..GOtes, Inc. 3001 WESTON PARKWAY — CARY NC 27513 .ae ���aEP. —IT r+oK ,
Z caDyright Kim ey -Horn and Associates. 1—. 2012 PHONE: (919) 677 -2000 FAX: (919) 677 -2050 01239037 PRM -4
x
C
M
N
C
tit
Total Disturbed Area (shaded) = 5.78 acres
lm
0
— — — - PROJECT DENUDED AREAS
IMPERVIOUS AND PERVIOUS SURFACES IN
BASS LAKE OUTFALL GREENWAY PATH
DISTURBED AREAS
PROPOSED IMPERVIOUS SURFACE = 1.60 AC
PROPOSED PERVIOUS SURFACE = 4.18 AC
NARRATIVE —
Project Description
Tile Boss Lake Outfall Greenway is a part of a multl -use troll system for bicycle O <
and pedestrian use. ltIs being constructed by the Town of Holly Springs to connect
and access recreatlonal, cultural, and educotlonal destinotlons In Holly Springs. �\
Approximately 578 acres will be dlsturbed durinq the construction of this project. \\
Also.approxlmctely 4.18 acres wI /l be vegetatively stabilized with gross and permanent
plantings. \\
The Boss Lake OutfallGreenway Is located in Wake County, Holly Springs. NC. Tie
project site begins of Womble Pork on Grigsby Avenue and continues along fte proposed/
existing sanitary sewer & pedestrian greenwoy easement to Bass Lake. \\
Site Description
The site Is generally rollings and contolas some dralnoge ways ftiat are bordered by O �\
moderate slopes.Lond use along the proJecfls predominate /y undeveloped.
Majority of the drainage from the pro s�ect site st)eet flows over tl� pproposed greenway
Into the UT to Basal Creek or drains fo existing streams or ctannels being crossed with
cross pipes or bridges. TMs drainage flaws Into the UT to Basa! Creek thus no new
dralno9e patterns will be introduced. Pre - construction rurroff equals Post - construction
runoff for olI exTstlrg system outlets that are to be retalned.The fill slopes and
drainage dltcles around tie project appear to be stable and do not slow signs of \ ��
significant erosion soils. � \�
So /ls � \
The soll �s ttrate projectllmlts are mostly sandy looms
( C2,AoCeD,C 2gC2,WnAWoA).
DQ,
BASS LAKE
� C
SIl1
0
Z
PREPARED IN THE OFFICE OF,
Kimley -Horn
and Associates Inc.
'
P.O. BOX 33068 - RALEIGH NORTH CAROLINA 27636 -3068
PHONE: (9 19) 677 -2000 FAX: (9 19) 677 -2050 N.C. LISENCE 'F -O 102
DENUDED AREA MAP
,,,00.`HsC���q�,,'
..�:�oEESS,* ;.. .
q sue, ��:
- •'. 033167 _
.'•``NaINEE°'•,
'� M • •"' C,
•• ;,,,;;; .
so 0 300
PROJECT:
BASS LAKE OUTFALL GREENWAY
R
sEVe
pns
paeM
CHECIIEp BY:
This t
This ded only t. together with the concepts and designs presented herein. as an Instrument of serI ce. IS
se
Intended only for the specific purpose ano client for which it was prepared. Reuse of ana impropr
reliance on this document without written authorizOtlon and adoption by Kimley -Horn and Ass Inc.
shalibe without liability t0 Kimley -Horn Old Associates, Inc,
Copyright Kimley -Horn and Associates,lnc.,2012
ace .�
012329037 FC- 1A
• - w
n
N
BRIDGE AND CULVERT EROSION CONTROL PHASING:
1. CONTRACTOR TO INSTALL ALL EROSION CONTROL MEASURES BEFORE ANY
CLEARING AND GRUBBING IS PERFORMED.
2. CONTRACTOR TO ACCESS BRIDGE AND CULVERT LOCATIONS USING PROPOSED
GREENWAY PATH FOOTPRINT. USE MUD MATS (SEE EROSION CONTROL DETAILS)
IN WETLAND AREAS AND OTHER LOW AREAS TO LIMIT IMPACTS.
3. CONTRACTOR TO DEWAYM EXCAVATED AREAS AS NEEDED USING IMPERVIOUS
DIKES, SPECIAL STILLING BASINS, AND BYPASSING PUMPING.
A. AFTER BRIDGE AND CULVERTS ARE SET, CONTRACTOR IS TO STABILIZE ALL
DISTURBED AREAS AND STREAM BANK SLOPES USING EROSION CONTROL MATTING,
SEEDING, AND MULCH TO MAINTAIN A VIGOROUS, DENSE, VEGETATIVE COVER.
TOE PROTECTION
SEE DETAIL 3 !CD -21
EST 50 SY PSRM
MINIMUM HAND CLIA'NG INSTALL TREE PROTECTION
ONLY ALONG STREAM BANK FENCE
WITHIN BRIDGE FOOTPRINT N\F
REVEGETATE INSTALL TEMPORARY STREAM CROSSING BEN JOSEPH THOMAS
TEMPORARY USING 24 FOOT OF 24TEMPORARY PIPE &ALMA LUCILLE LEA 67- BUFFER IMPACTS OR WOOD BR /DGEMAT DB 2472 \PG 560
PER NOTES CROSSING WIDTH = APPROX 10'lNIN/N/ZE1 PIN' 0658 -36 -5904
ABOVE. CROSSING LENGTH = SEE DETAIL (MINIMIZE) {OO
O INSTALL PIPE COVER = %2 DIAMETER OF PIPE 40 /�- —TPF_
x EINFORCED
BACKFILL =EARTH MATER /AL
5/ NCE SURFACE STONE = COARSE AGGREGATE
nT� (TYP) BANK STABILIZATION = CLASS 'B'R/PRAP
SEE DETAIL IN PLANS
Q V
et
I
4 m ti
w� - -- — � /0
Lam. li
Q
CLASS I SPECIAL STILLING
RIP RAP 'F BASING - \
EST 6 SY CLASS /RIP RAP BI 2 \\ 11
B 1 EST 12 SY.v I
REVEGETATION OF TEMPORARY IMPACTS TO RIPARIAN BUFFERS:
PLANT AREA WITH AN EVEN MIX OF THE FOLLOWING NATIVE SPECIES:
AMERICAN SYCAMORE (PLATANUS OCCIDENTALIS)
RED MAPLE (ACER RUBRUM)
WATER OAK (QUERCUS NIGRA)
TREES SHALL BE PLANTED OUTSIDE OF EXISTING SANITARY SEWER EASEMENT
WHERE RIPARIAN BUFFERS HAVE BEEN TEMPORARILY IMPACTED BY
CONSTRUCTION. PLANT TREES AT A DENSITY OF 10 FEET ON CENTER. TREES
SHALL BE 1 GALLON CONTAINERS AND INSTALLED PER DETAIL A ON SHEET LA -4.
LASS _ CLA55 IRIP RAP lm
RIP R EST /5 SY l INST LL R SILT CHECK, TYPE A
EST 4
C ` r� AT A L OR A GE OUTLETS DURING
EAR G AND RUBBING. INSTALL
SIL CE A UND TOP OF CULVERTS
RIP RAP EMBANKMENT PROTECTION AFTER PIPE I INSTALLED.ATYPI _
S /RIP RAP. TONS
ez E EE DETAIL 8 (CD -2) �., TIE TO EXISTING SWALE
STANDARD 'V'DITCH — F
EST 12 PSRM OUTLET PROTECT /ON
( SEE DETAIL 7fCD -21 STANDARD -•,. CLASS B RIP RAP
i H5427
INSTALL ROCK SILT CHECK, TYPE A EST 6 SY ,1
AT ALL DRAINAGE OUTLETS DURING
I CLEARING AND GRUBBING. :l -L- STA 42 +32, IB"RT
/W = 36850'
INSTALL ROCK CHECK DAMS AS NEEDED
CUT V, DITCH DURING CLEARING /GRUBBING AND
//- EST 70 SY PSRM GRADING OPERATIONS. INSTALL
SEE DETAIL 6 !CD -21 WATTLES AS SHOWN ON PLANS AS
yam, rt.
FINAL EROSION CONTROL MEASURES
3..
SOMERSET FARM S/D
2000APG 179
1
SPRING PEAK COURT
(50' PUBLIC, R /W)
LIMITS OF DISTURBANCE
(TYP)
INSTALL SILT "E-
1
INSTALL REINFORCf1D
SILT FENCE (TYP) -_
45 +00
+2
Rr
°o
Q
1UP
N
Z �
U�
Cell
co
Z
N \F
MINNIE DIXON
INSTALL OPEN THROAT
DS 3409 \PG 671
CATCH BASIN
PIN° 0658- 46-1774
-L- STA 42 +32,12LT
NCDOT STD 840.04
THROAT EL= 3725'
INV OUT = 370.40'
RCP -CLASS N
2B LF W/ FES
28
LASS _ CLA55 IRIP RAP lm
RIP R EST /5 SY l INST LL R SILT CHECK, TYPE A
EST 4
C ` r� AT A L OR A GE OUTLETS DURING
EAR G AND RUBBING. INSTALL
SIL CE A UND TOP OF CULVERTS
RIP RAP EMBANKMENT PROTECTION AFTER PIPE I INSTALLED.ATYPI _
S /RIP RAP. TONS
ez E EE DETAIL 8 (CD -2) �., TIE TO EXISTING SWALE
STANDARD 'V'DITCH — F
EST 12 PSRM OUTLET PROTECT /ON
( SEE DETAIL 7fCD -21 STANDARD -•,. CLASS B RIP RAP
i H5427
INSTALL ROCK SILT CHECK, TYPE A EST 6 SY ,1
AT ALL DRAINAGE OUTLETS DURING
I CLEARING AND GRUBBING. :l -L- STA 42 +32, IB"RT
/W = 36850'
INSTALL ROCK CHECK DAMS AS NEEDED
CUT V, DITCH DURING CLEARING /GRUBBING AND
//- EST 70 SY PSRM GRADING OPERATIONS. INSTALL
SEE DETAIL 6 !CD -21 WATTLES AS SHOWN ON PLANS AS
yam, rt.
FINAL EROSION CONTROL MEASURES
3..
SOMERSET FARM S/D
2000APG 179
1
SPRING PEAK COURT
(50' PUBLIC, R /W)
LIMITS OF DISTURBANCE
(TYP)
INSTALL SILT "E-
1
INSTALL REINFORCf1D
SILT FENCE (TYP) -_
45 +00
+2
Rr
°o
Q
1UP
N
Z �
U�
Cell
co
Z
PREPARED IN THE OFFICE OF:
Kimley -Horn
C and Associates Inc.
,
3068
PHONE: (939) 0678 7 -2000 RALEIGH, NORTH 9 119)A6ROL1z050 76 N.C. LISENCE "F -0 102
EROSION CONTROL PLAN
CARG,11,,
FFS..... 9w4
o ro.
sFAL
033167 -
I NFE ,
........... E ,''
I,��'�.:.,� „�.:�,
20 0 410
PROJECT:
BASS LAKE OUTFACE GREENWAY
REV. NO:
1ument
GATE:
IWof Sri
pEttEp BY:
Thtb document, or together with the concepts and designs presented hereto, as an Instrument of service, is
intentled only for the specific purpose and client for which it was prepared. Reuse of and Improper
reliance on this document without written authorization and adoption by Klmley -Horn and Assoctotes, Inc.
shall yDght without
Cop KlmleyflHorinta 0 Assocattes.I 2012 ocrotes ,Inc.
l.L�
doe xuuBER: SxEET xuuxEP:
012329037 EC-4