HomeMy WebLinkAbout20110120 Ver 2_Modifications_20130812.�HSW
;e
Engineering, Inc.
Ms. Jennifer Burdette
North Carolina Department of
Environment and Natural Resources
NCDENR — WEBSCAPE unit
1650 Mail Service center
Raleigh, NC 27699 -1650
Re: P -032 Infantry Platoon Battle Course, Holly Ridge, Onslow County
DWQ Project # 20110120, USACE Action ID. No. 201100257
Holly Shelter Swamp Creek, (030623,18- 74 -33, C, SW)
401/404 Water Quality Certification Modification of Plans
Dear Ms. Burdette:
Ik -o1 2ro v2
August 8, 2013
During the course of construction of the referenced project at Marine Corps Camp Lejeune, it was
noted that the ditch adjacent to Objective F (Ditch -13, Ditch Type 2) as shown on Sheet CG -121
(attached), and as originally proposed in the environmental permit applications (401, 404, erosion
and sedimentation control, and stormwater) is needed to maintain surface water flow in this area.
This ditch was removed from the project during the NCDENR stormwater permitting process, but is
needed to maintain existing surface water flow in this area. Please see the attached letter to Ms.
Joanne Steenhuis of the NCDENR Wilmington office for additional details.
This ditch will be constructed in accordance with the issued 401 and 404 permits, but with the
discharge point to stream 3 at a slightly different location to minimize disturbance to wetlands. As
permitted, the wetland impact area for the entire project is 71.65 acres. As currently proposed on
the attached CG -121 plan sheet the new wetland impact area is reduced slightly to 71.62 acres.
HSW is currently coordinating with Mr. Brad Shaver ( USACE) and the NCDENR stormwater permitting
section (Ms. Christine Nelson) to ensure consistency in construction plans for all environmental
permits. Attached are five (5) copies for the referenced revised plan sheet.
Please advise if you have any questions or comments. Thank you in advance for your assistance.
LEH /SDA/pap
Attachments
cc: Mr. Neal Paul, MCB Camp Leleune, DPW
Ms. Joanne Steenhuis, NCDENR, Wilmington
NC.
R eQ
AUG i 2 2013
3820 Northdale Boulevard • Suite 21 0B • Tampa, Florida • 33624.813/968 -7722 • FAX: 813/962 -2406
_„ . w
N'VV .
Engineering, Inc.
August 7, 2013
Ms. Joanne Steenhuis
North Carolina Department of
Environment and Natural Resources
127 Cardinal Dr. Ext.
Wilmington, NC 28405
Re: 401/404 Water Quality Certification Modification of Plans
Infantry Platoon Battle Course (P -032), MCB Camp Lejeune, NC
Dear Ms. Steenhuis:
During the course of construction of the Infantry Platoon Battle Course (P -032) at Marine
Corps Camp Lejeune, it was noted that the ditch adjacent to Objective F (Ditch -13, Ditch
Type 2) as shown on Sheet CG-121 (attached), and as originally proposed in the
environmental permit applications (401, 404, erosion and sedimentation control, and
stormwater) is needed to maintain surface water flow in this area.
You may recall that during the stormwater permitting process for this project this ditch was
removed. HSW transmitted a letter regarding this minor change to the appropriate 401 and
404 regulatory agency offices.
This ditch will be constructed in accordance with the issued 401 and 404 permits, but with
the discharge point to stream 3 at a slightly different location to minimize disturbance to
wetlands. As permitted, the wetland impact area for the entire project is 71.65 acres. As
currently proposed the new wetland impact area is reduced slightly to 71.62 acres.
As this ditch was removed from the stormwater permit, HSW has communicated with Ms.
Christine Nelson (NCDENR- Stormwater) and is currently in the process of submitting a
Stormwater Management Permit Plan Revision Application to include the addition of this
ditch as shown on the attached revised plan sheet CG -121.
Please advise if you have any questions or comments. Thank you in advance for your
assistance.
Sincerely,
HSW ENGINEERING, INC.
C. Dennis Peek, P.E.
Vice President / Principal Engineer
LEH /CDP /pap
cc: Mr. Brad Shaver - USCOE, Wilmington
12@NU V R
AUG 1 2 2013
3820 Northdale Boulevard • Suite 21 0B • Tampa, Florida • 33624.813/968 -7722 • FAX: 813/962 -2406
N:3835100
C
N:3835000
N:3834900
0
0
w
3.03
SEE SHEET CG -120
GEOFABRIC L7 D DFCI
WITH NCDOT CLLA &B STONE
RIPRAP,,
TOB VARIES
MATCH EXISTING
GRADE
o° SEE SHEET CG -122
ui
TOe VARIES
MATCH EXISTING--\
GRADE
o!
a �
°o
o
U 0! i?
W
a
$ w o
2 U
°n w
a ¢ °a
II'
"
i
1. SEE SHEET CG -501 FOR ROAD SECTIONS.
W
1 �
c— U)
co
�A
LU
LU
mop`
DETAIL.
—'
1
N
3. SEE SHEETS CS-601 THRU CS-603 FOR ROAD HORIZONTAL
ALIGNMENT INFORMATION
N:3834900
0
0
w
3.03
SEE SHEET CG -120
GEOFABRIC L7 D DFCI
WITH NCDOT CLLA &B STONE
RIPRAP,,
TOB VARIES
MATCH EXISTING
GRADE
o° SEE SHEET CG -122
ui
TOe VARIES
MATCH EXISTING--\
GRADE
o!
a �
°o
o
U 0! i?
W
a
$ w o
2 U
°n w
a ¢ °a
II'
"
1. SEE SHEET CG -501 FOR ROAD SECTIONS.
2. SEE SHEET EC -500 FOR CONSTRUCTION ENTRANCE
DETAIL.
N
3. SEE SHEETS CS-601 THRU CS-603 FOR ROAD HORIZONTAL
ALIGNMENT INFORMATION
U
4. SEE SHEETS CG -200 THRU CG -203 FOR ROAD VERTICAL
'-
ALIGNMENT INFORMATION.
I-
W
5. SEE SHEET ER -100 THRU P -032 FOR WETLAND IMPACT
/
W
INFORMATION.
2
6. SEE SHEET CG -301 THRU CG -302 FOR LOW WATER
/
U)
CROSSING (LWC) SECTIONS.
W
7. SEE SHEET CG-601 FOR STORM STRUCTURE & PIPE
- - U)
SCHEDULE.
hLOVRAC
-
8. SEE SHEET EC-503 FOR EROSION CONTROL NOTES.
9. SEE SHEETS CU -150 THRU CU -531 WATER DISTRIBUTION
-
-
INFORMATION.
/
10. SEE SHEET CG -300 FOR STORMWATER PIPE SECTIONS.
11. SEE SHEET EC -503 FOR SEED /SOD INFORMATION.
- -
12. ALL NEW GRADING IS MAXIMUM SLOPE OF 3:1.
..
-
11 CONTRACTOR TO CONSULT RDD BEFORE THE DETAILED
/
PLACEMENT OF THE MICRO TERRAIN. THIS IS TO OCCUR
AFTER EACH OF THE OBJECTIVES ARE ESTABLISHED. THE
NUMBERS AND SIZES OF THE FEATURES WILL REMAIN THE
SAME AS THOSE DEPICTED ON PLANS.
4�
14, ACCESS AND SERVICE ROADS ARE NOT DESIGNED FOR
-
-
CONSTRUCTION TRAFFIC, CONTRACTOR SHALL BE
i RESPONSIBLE FOR ENSURING THE ROAD GRADES ARE AS
-
-
/' SHOWN ON PLANS AT THE END OF CONSTRUCTION.
-
(,,)ALL ALL DITCHES SHOWN ON PLANS ARE EXISTING.
- -
NOTE:
CONSTRUCTION ACTIVITIES WITHIN THE SR10 SDZ HAVE RESTRICTIONS
/
DUE TO SR10 RANGE OPERATIONS. DURING THE MONTHS OF JUNE
THROUGH SEPTEMBER AND JANUARY THROUGH APRIL CONSTRUCTION
U
-
IS RESTRICTED TO THE FOLLOWING SCHEDULE. NO CONSTRUCTION
CAN OCCUR FROM TUESDAY THROUGH THURSDAY EACH WEEK. THE
-
Z
W
CONTRACTOR WILL HAVE THE AREAS WITHIN THE SR10 SDZ FOR
F
cf)
_
-
CONSTRUCTION ON FRIDAY THROUGH MONDAY. THERE WILL BE TIMES
WHEN THE AREA OF OBJECTIVE F WILL BE AVAILABLE FOR
-
CONSTRUCTION ACTIVITIES DIFFERENT THAT THE SCHEDULE TIMES
O
PREVIOUSLY MENTIONED. RANGE CONTROL WILL NOTIFY THE
(�
-" __....
CONTRACTING OFFICER. THE CONTRACTING OFFICER WILL THEN
LJ
NOTIFY THE CONTRACTOR OF THIS AVAILABILITY.
Z
J
r
�
�
C7
0
U
m
F-
LEGEND
Z
Z
W
UNDISTURBED WETLAND
af
0
_
(f)
w
O
W
U)
- ON-SITE
-
- BORROW AREA 2
WETLAND IMPACT (WIA)
®
W
d
BOTTOM EL: 11.00
W
11-Ola -o Y2.
°o
N
N
Z
713 ii L RQN6E DES /6N TEAM A�G E j1 CyyORb
SUITE 2'
TAMPA, FLORIDA 33624