Loading...
HomeMy WebLinkAboutNCC215207_ESC Approval Submitted_20210916ROY COOPER Governor ELIZABETH S. BISER J Secretary t, BRIAN WRENN Director August 18, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Vida 2, LLC Attention: Kent Gregory, Registered Agent 115 West Avenue Kannapolis, North Carolina 28081 RE: Project Name: At the Center (Vida 2) (Express Review) Acres Approved: 3.58 Project ID: CABAR-2017-074 County: Cabarrus, City: Kannapolis Address: 200 S. Main St. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Aaron Wagoner, PE, LandDlesign Date Received by LQS: August 9, 2021 Plan Type: Revised Dear Mr. Gregory: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality (Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 ,a® Letter of Approval with Modifications Vida 2, LLC August 18, 2021 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Since°rely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department ec: Aaron Wagoner, PE Letter of Approval with Modifications Vida 2, LLC August 18, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: At the Center (Vida 2) (Express Review) Project ID: CABAR-2017-074 County: Cabarrus 1. Plan revision was to add Vida 2 development area to permitted area. 2. Any land disturbance 1 acre or more requires compliance with NCGO10000 (e.g. EC Note #12 on Sheet C-1.01). 3. Partial inlet protection for storm drainage under construction shall be provided at the end of each working day as noted in EC Note #16 on Sheet C-1.O1A. The attached construction detail should be used. Uostream End Storm Drain Overflow 1 /3 Pipe Diameter 3 Exterior BuPllyw Bottom p ywood of lure : ood Illustration of Flyw,00d Inlet protection for Storm Drain Under Ste -el Fence Upstream End nT Storm Drain' Over low 113 pipe Diameter dware Cloth Washed Stone Filter Across Pipe Inlet Figure 2: Illustration of Stone Filter Inlet PrOLCC600 for Storm Drain Under Constrk,6105, go